NYSDOT contract D265829 bid tabulation
NYS Rte 51 (BIN 1026410) over Dunderberg Creek. Let by New York State DOT on September 17, 2026, Otsego, Region 09. 5 bids received; low bid $1,167,158 by Bothar Construction LLC.
- Owner
- New York State DOT
- Letting
- 17 SEP 2026
- Pay items
- 81
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bothar Construction LLC | $1,167,158 | Low |
| 2 | James H Maloy Inc | $1,227,000 | +5.0% |
| 3 | Maple Ridge Civil LLC | $1,230,000 | +5.0% |
| 4 | Slate Hill Constructors Inc | $1,292,592 | +11% |
| 5 | Vector Construction Corp | $1,356,262 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bothar Construction LLC | 2. James H Maloy Inc | 3. Maple Ridge Civil LLC | 4. Slate Hill Constructors Inc | 5. Vector Construction Corp |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.07) | ACRE | 0.10 | $94,500 | $16,000 | $28,500 | $60,000 | $30,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 333 | $64.50 | $115.00 | $40.00 | $100.00 | $155.00 |
| 3 | Embankment In Place (203.03) | CY | 5 | $176.30 | $80.00 | $175.00 | $560.00 | $170.00 |
| 4 | Structure Excavation (206.01) | CY | 60 | $97.20 | $200.00 | $48.00 | $260.00 | $300.00 |
| 5 | Trench and Culvert Excavation (206.0201) | CY | 38 | $80.60 | $140.00 | $76.00 | $160.00 | $250.00 |
| 6 | Test Pit Excavation (206.05) | EACH | 4 | $1,426.00 | $750.00 | $1,050.00 | $975.00 | $1,000.00 |
| 7 | Geotextile Separation (207.21) | SY | 630 | $3.25 | $2.50 | $5.50 | $3.00 | $5.00 |
| 8 | Silt Fence - Temporary (209.13) | LF | 200 | $8.40 | $8.00 | $11.00 | $10.00 | $7.00 |
| 9 | Drainage Structure Inlet Protection, Concrete Block – Temporary (209.1704) | LF | 16 | $75.45 | $50.00 | $280.00 | $110.00 | $120.00 |
| 10 | Stabilized Construction Access (209.22) | SY | 67 | $27.05 | $70.00 | $83.00 | $50.00 | $100.00 |
| 11 | (209.23010009) | 405 | $7.30 | $12.00 | $9.00 | $10.00 | $16.00 | |
| 12 | Subbase Course, Type 1 (304.11) | CY | 9 | $205.90 | $85.00 | $185.00 | $180.00 | $220.00 |
| 13 | Subbase Course, Optional Type (304.15) | CY | 201 | $131.80 | $200.00 | $100.00 | $160.00 | $150.00 |
| 14 | (404.0982) | TON | 4 | $720.80 | $750.00 | $250.00 | $750.00 | $700.00 |
| 15 | (404.2589) | TON | 17 | $680.60 | $750.00 | $225.00 | $750.00 | $700.00 |
| 16 | (407.01040009) | 5 | $19.90 | $27.00 | $91.00 | $28.00 | $25.00 | |
| 17 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 335 | $1.20 | $6.00 | $12.00 | $6.00 | $5.00 |
| 18 | (553.020001) | EACH | 1 | $20,000 | $50,000 | $26,000 | $1.00 | $40,000 |
| 19 | (553.030001) | EACH | 1 | $75,000 | $65,000 | $53,000 | $1.00 | $150,000 |
| 20 | Concrete for Structures, Performance (555.0021) | CY | 12 | $2,716.00 | $2,500.00 | $3,550.00 | $4,000.00 | $2,250.00 |
| 21 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 22 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 1,678 | $10.90 | $4.00 | $4.00 | $5.00 | $4.00 |
| 23 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 18 | $81.65 | $25.00 | $30.00 | $0.10 | $0.01 |
| 24 | Sidewalks and Safety Walks (557.30) | SY | 21 | $960.30 | $800.00 | $605.00 | $1,200.00 | $1,200.00 |
| 25 | Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902) | QUALITY UNIT | 1 | $22.51 | $22.51 | $22.51 | $22.51 | $22.51 |
| 26 | Protective Sealing of New Structural Concrete (559.02) | SF | 748 | $6.95 | $5.00 | $2.50 | $4.00 | $0.60 |
| 27 | (560.04010008) | 426 | $440.80 | $380.00 | $316.90 | $150.00 | $290.00 | |
| 28 | (560.10040010) | 36 | $71.95 | $105.00 | $180.00 | $120.00 | $90.00 | |
| 29 | Invert Slab With Cut-Off Wall (562.02) | SY | 118 | $953.50 | $1,100.00 | $1,100.00 | $820.00 | $1,800.00 |
| 30 | Performance Concrete Quality Adjustment (562.99) | QUALITY UNIT | 1 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 31 | Transition Bridge Railing (568.70) | LF | 48 | $425.50 | $400.00 | $405.00 | $390.00 | $425.00 |
| 32 | Vertical Faced Concrete Parapet (569.03) | LF | 31 | $1,043.00 | $750.00 | $1,800.00 | $650.00 | $700.00 |
| 33 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $27.45 | $27.45 | $27.45 | $27.45 | $27.45 |
| 34 | (570.090001) | LS | 1 | $2,572.00 | $100.00 | $2,300.00 | $1,000.00 | $500.00 |
| 35 | (570.100001) | LS | 1 | $2,572.00 | $100.00 | $2,300.00 | $1,000.00 | $500.00 |
| 36 | Timber and Lumber (594.01) | CF | 210 | $53.30 | $300.00 | $110.00 | $120.00 | $100.00 |
| 37 | (595.50000018) | 124 | $16.30 | $12.00 | $25.00 | $13.00 | $7.00 | |
| 38 | Box Beam Guide Railing (606.10) | LF | 149 | $69.00 | $65.00 | $69.00 | $64.00 | $75.00 |
| 39 | Box Beam End Piece (606.120101) | EACH | 2 | $1,127.00 | $1,050.00 | $990.00 | $1,050.00 | $1,250.00 |
| 40 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 176 | $45.10 | $10.00 | $19.00 | $14.00 | $10.00 |
| 41 | (607.41010010) | 70 | $24.85 | $5.00 | $21.00 | $12.00 | $14.00 | |
| 42 | Concrete Sidewalks and Driveways (608.0101) | CY | 8 | $3,562.00 | $4,000.00 | $1,800.00 | $6,000.00 | $2,500.00 |
| 43 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 9 | $336.10 | $750.00 | $425.00 | $745.00 | $750.00 |
| 44 | (608.21000003) | 2 | $631.10 | $500.00 | $575.00 | $525.00 | $550.00 | |
| 45 | (609.0401) | LF | 171 | $89.50 | $200.00 | $155.00 | $125.00 | $120.00 |
| 46 | Topsoil – Reuse On-Site Materials (610.1401) | CY | 85 | $113.50 | $95.00 | $105.00 | $80.00 | $80.00 |
| 47 | Turf Establishment – Performance (610.1605) | SY | 88 | $73.80 | $30.00 | $22.00 | $70.00 | $5.00 |
| 48 | Watering Vegetation (610.19) | 1,000 GALLONS | 69 | $37.30 | $15.00 | $24.00 | $55.00 | $1.00 |
| 49 | Mowing (610.21) | SY | 848 | $2.35 | $1.00 | $1.50 | $3.00 | $1.50 |
| 50 | (613.04000001) | 274 | $69.05 | $60.00 | $135.00 | $130.00 | $43.00 | |
| 51 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $80,000 | $56,000 | $188,161 | $400,000 | $125,000 |
| 52 | Type III Construction Barricades (619.04) | EACH | 4 | $128.60 | $325.00 | $400.00 | $55.00 | $250.00 |
| 53 | (619.0903) | LF | 223 | $14.40 | $8.00 | $16.00 | $8.00 | $12.50 |
| 54 | (619.110511) | EACH | 2 | $12,393 | $17,000 | $11,500 | $18,000 | $15,000 |
| 55 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 60 | $113.00 | $110.00 | $120.00 | $75.00 | $65.00 |
| 56 | Temporary Positive Barrier – Category 2 (Pinning Permitted) (619.1712) | LF | 20 | $113.00 | $115.00 | $130.00 | $95.00 | $65.00 |
| 57 | Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802) | EACH | 1 | $12,316 | $14,000 | $4,150.00 | $9,500.00 | $12,000 |
| 58 | Stone Filling (Light) (620.03) | CY | 5 | $311.10 | $200.00 | $235.00 | $200.00 | $250.00 |
| 59 | Stone Filling (Heavy) (620.05) | CY | 160 | $233.00 | $250.00 | $180.00 | $200.00 | $250.00 |
| 60 | Bedding Material, Type 1 (620.0801) | CY | 40 | $92.85 | $210.00 | $130.00 | $200.00 | $200.00 |
| 61 | Crushed Gravel (In-Place Measure) (623.11) | CY | 233 | $130.30 | $95.00 | $115.00 | $80.00 | $150.00 |
| 62 | Survey Operations (625.01) | LS | 1 | $39,067 | $29,604 | $38,000 | $12,500 | $30,000 |
| 63 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 22 | $512.50 | $425.00 | $790.00 | $700.00 | $300.00 |
| 64 | Permanent Survey Markers (625.06) | EACH | 2 | $5,469.00 | $2,200.00 | $2,400.00 | $6,000.00 | $5,500.00 |
| 65 | (627.50140008) | 157 | $13.20 | $12.00 | $2.50 | $8.00 | $7.50 | |
| 66 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,830.00 | $1,400.00 | $7,750.00 | $1,000.00 | $5,000.00 |
| 67 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 14 | $2,572.00 | $4,200.00 | $3,950.00 | $2,400.00 | $2,450.00 |
| 68 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 69 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 70 | White Paint Reflectorized Pavement Stripes – 15 mils (640.10) | LF | 617 | $4.60 | $3.00 | $3.00 | $2.75 | $4.00 |
| 71 | Yellow Paint Reflectorized Pavement Stripes - 15 mils (640.11) | LF | 243 | $4.60 | $3.00 | $3.00 | $2.75 | $4.00 |
| 72 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 44 | $41.40 | $40.00 | $56.00 | $40.00 | $42.00 |
| 73 | Type A Sign Posts (645.81) | EACH | 4 | $218.50 | $200.00 | $285.00 | $200.00 | $225.00 |
| 74 | (645.81090003) | 8 | $62.10 | $60.00 | $79.00 | $60.00 | $54.00 | |
| 75 | (655.05010010) | 1 | $1,844.00 | $2,800.00 | $1,600.00 | $3,150.00 | $2,500.00 | |
| 76 | Adjust Existing Valve Box Elevation (663.33) | EACH | 1 | $650.90 | $950.00 | $375.00 | $600.00 | $485.00 |
| 77 | Field Change Payment (FCP) (697.03) | DOL | 51,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 78 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 79 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 80 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 81 | Mobilization (699.040001) | LS | 1 | $44,001 | $47,000 | $40,939 | $45,000 | $52,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of September 17, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.