NYSDOT contract D265829 bid tabulation

NYS Rte 51 (BIN 1026410) over Dunderberg Creek. Let by New York State DOT on September 17, 2026, Otsego, Region 09. 5 bids received; low bid $1,167,158 by Bothar Construction LLC.

Owner
New York State DOT
Letting
17 SEP 2026
Pay items
81
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Bothar Construction LLC$1,167,158Low
2James H Maloy Inc$1,227,000+5.0%
3Maple Ridge Civil LLC$1,230,000+5.0%
4Slate Hill Constructors Inc$1,292,592+11%
5Vector Construction Corp$1,356,262+16%
NYSDOT contract D265829: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Bothar Construction LLC2. James H Maloy Inc3. Maple Ridge Civil LLC4. Slate Hill Constructors Inc5. Vector Construction Corp
1Clearing and Grubbing (201.07)ACRE0.10$94,500$16,000$28,500$60,000$30,000
2Unclassified Excavation and Disposal (203.02)CY333$64.50$115.00$40.00$100.00$155.00
3Embankment In Place (203.03)CY5$176.30$80.00$175.00$560.00$170.00
4Structure Excavation (206.01)CY60$97.20$200.00$48.00$260.00$300.00
5Trench and Culvert Excavation (206.0201)CY38$80.60$140.00$76.00$160.00$250.00
6Test Pit Excavation (206.05)EACH4$1,426.00$750.00$1,050.00$975.00$1,000.00
7Geotextile Separation (207.21)SY630$3.25$2.50$5.50$3.00$5.00
8Silt Fence - Temporary (209.13)LF200$8.40$8.00$11.00$10.00$7.00
9Drainage Structure Inlet Protection, Concrete Block – Temporary (209.1704)LF16$75.45$50.00$280.00$110.00$120.00
10Stabilized Construction Access (209.22)SY67$27.05$70.00$83.00$50.00$100.00
11 (209.23010009)405$7.30$12.00$9.00$10.00$16.00
12Subbase Course, Type 1 (304.11)CY9$205.90$85.00$185.00$180.00$220.00
13Subbase Course, Optional Type (304.15)CY201$131.80$200.00$100.00$160.00$150.00
14 (404.0982)TON4$720.80$750.00$250.00$750.00$700.00
15 (404.2589)TON17$680.60$750.00$225.00$750.00$700.00
16 (407.01040009)5$19.90$27.00$91.00$28.00$25.00
17Asphalt Pavement Joint Adhesive (418.7603)LF335$1.20$6.00$12.00$6.00$5.00
18 (553.020001)EACH1$20,000$50,000$26,000$1.00$40,000
19 (553.030001)EACH1$75,000$65,000$53,000$1.00$150,000
20Concrete for Structures, Performance (555.0021)CY12$2,716.00$2,500.00$3,550.00$4,000.00$2,250.00
21Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$25.00$25.00$25.00$25.00$25.00
22Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB1,678$10.90$4.00$4.00$5.00$4.00
23Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29)SY18$81.65$25.00$30.00$0.10$0.01
24Sidewalks and Safety Walks (557.30)SY21$960.30$800.00$605.00$1,200.00$1,200.00
25Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902)QUALITY UNIT1$22.51$22.51$22.51$22.51$22.51
26Protective Sealing of New Structural Concrete (559.02)SF748$6.95$5.00$2.50$4.00$0.60
27 (560.04010008)426$440.80$380.00$316.90$150.00$290.00
28 (560.10040010)36$71.95$105.00$180.00$120.00$90.00
29Invert Slab With Cut-Off Wall (562.02)SY118$953.50$1,100.00$1,100.00$820.00$1,800.00
30Performance Concrete Quality Adjustment (562.99)QUALITY UNIT1$15.00$15.00$15.00$15.00$15.00
31Transition Bridge Railing (568.70)LF48$425.50$400.00$405.00$390.00$425.00
32Vertical Faced Concrete Parapet (569.03)LF31$1,043.00$750.00$1,800.00$650.00$700.00
33Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99)QUALITY UNIT1$27.45$27.45$27.45$27.45$27.45
34 (570.090001)LS1$2,572.00$100.00$2,300.00$1,000.00$500.00
35 (570.100001)LS1$2,572.00$100.00$2,300.00$1,000.00$500.00
36Timber and Lumber (594.01)CF210$53.30$300.00$110.00$120.00$100.00
37 (595.50000018)124$16.30$12.00$25.00$13.00$7.00
38Box Beam Guide Railing (606.10)LF149$69.00$65.00$69.00$64.00$75.00
39Box Beam End Piece (606.120101)EACH2$1,127.00$1,050.00$990.00$1,050.00$1,250.00
40Removing and Disposing Corrugated Beam Guide Railing (606.71)LF176$45.10$10.00$19.00$14.00$10.00
41 (607.41010010)70$24.85$5.00$21.00$12.00$14.00
42Concrete Sidewalks and Driveways (608.0101)CY8$3,562.00$4,000.00$1,800.00$6,000.00$2,500.00
43Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON9$336.10$750.00$425.00$745.00$750.00
44 (608.21000003)2$631.10$500.00$575.00$525.00$550.00
45 (609.0401)LF171$89.50$200.00$155.00$125.00$120.00
46Topsoil – Reuse On-Site Materials (610.1401)CY85$113.50$95.00$105.00$80.00$80.00
47Turf Establishment – Performance (610.1605)SY88$73.80$30.00$22.00$70.00$5.00
48Watering Vegetation (610.19)1,000 GALLONS69$37.30$15.00$24.00$55.00$1.00
49Mowing (610.21)SY848$2.35$1.00$1.50$3.00$1.50
50 (613.04000001)274$69.05$60.00$135.00$130.00$43.00
51Basic Work Zone Traffic Control (619.01)LS1$80,000$56,000$188,161$400,000$125,000
52Type III Construction Barricades (619.04)EACH4$128.60$325.00$400.00$55.00$250.00
53 (619.0903)LF223$14.40$8.00$16.00$8.00$12.50
54 (619.110511)EACH2$12,393$17,000$11,500$18,000$15,000
55Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711)LF60$113.00$110.00$120.00$75.00$65.00
56Temporary Positive Barrier – Category 2 (Pinning Permitted) (619.1712)LF20$113.00$115.00$130.00$95.00$65.00
57Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802)EACH1$12,316$14,000$4,150.00$9,500.00$12,000
58Stone Filling (Light) (620.03)CY5$311.10$200.00$235.00$200.00$250.00
59Stone Filling (Heavy) (620.05)CY160$233.00$250.00$180.00$200.00$250.00
60Bedding Material, Type 1 (620.0801)CY40$92.85$210.00$130.00$200.00$200.00
61Crushed Gravel (In-Place Measure) (623.11)CY233$130.30$95.00$115.00$80.00$150.00
62Survey Operations (625.01)LS1$39,067$29,604$38,000$12,500$30,000
63Steel Pin and Cap Right of Way Markers (625.05)EACH22$512.50$425.00$790.00$700.00$300.00
64Permanent Survey Markers (625.06)EACH2$5,469.00$2,200.00$2,400.00$6,000.00$5,500.00
65 (627.50140008)157$13.20$12.00$2.50$8.00$7.50
66Concrete Cylinder Curing Equipment (637.04)EACH1$2,830.00$1,400.00$7,750.00$1,000.00$5,000.00
67Engineer’s Field Office – Type 1 (637.11)MONTH14$2,572.00$4,200.00$3,950.00$2,400.00$2,450.00
68Office Technology and Supplies (637.34)DOL1,000$1.00$1.00$1.00$1.00$1.00
69Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00$1.00
70White Paint Reflectorized Pavement Stripes – 15 mils (640.10)LF617$4.60$3.00$3.00$2.75$4.00
71Yellow Paint Reflectorized Pavement Stripes - 15 mils (640.11)LF243$4.60$3.00$3.00$2.75$4.00
72Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF44$41.40$40.00$56.00$40.00$42.00
73Type A Sign Posts (645.81)EACH4$218.50$200.00$285.00$200.00$225.00
74 (645.81090003)8$62.10$60.00$79.00$60.00$54.00
75 (655.05010010)1$1,844.00$2,800.00$1,600.00$3,150.00$2,500.00
76Adjust Existing Valve Box Elevation (663.33)EACH1$650.90$950.00$375.00$600.00$485.00
77Field Change Payment (FCP) (697.03)DOL51,000$1.00$1.00$1.00$1.00$1.00
78Asphalt Price Adjustment (698.04)DOL100$1.00$1.00$1.00$1.00$1.00
79Fuel Price Adjustment (698.05)DOL100$1.00$1.00$1.00$1.00$1.00
80Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00
81Mobilization (699.040001)LS1$44,001$47,000$40,939$45,000$52,000
NYSDOT contract D265829: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of September 17, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy