Ing Civil Inc: NYSDOT bid record
Ing Civil Inc submitted 34 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 17 SEP 2026, and was the low bidder on 13 of them (38%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $58,476,366
- Latest bid
- 17 SEP 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 7 | 6 | 86% |
| 2023 | 4 | 1 | 25% |
| 2024 | 16 | 3 | 19% |
| 2025 | 6 | 3 | 50% |
| 2026 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 01 | 11 | 4 | 36% |
| Region 09 | 9 | 6 | 67% |
| Region 02 | 8 | 2 | 25% |
| Region 07 | 4 | 1 | 25% |
| Region 08 | 1 | 0 | 0% |
| Region 03 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 32 | 32 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 31 | 31 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 31 | 31 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 31 | 31 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 28 | 28 (100%) | $1.00 | $1.00 |
| Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs | 557.29 | SY | 24 | 23 (96%) | $0.01 | $0.10 |
| Unclassified Excavation and Disposal | 203.02 | CY | 32 | 21 (66%) | $18.00 | $71.00 |
| Structure Excavation | 206.01 | CY | 30 | 20 (67%) | $20.00 | $38.00 |
| Epoxy-Coated Bar Reinforcement for Structures | 556.0202 | LB | 24 | 18 (75%) | $1.88 | $3.25 |
| Box Beam Guide Railing End Assembly Type IIA | 606.120201 | EACH | 22 | 18 (82%) | $2,119.00 | $2,345.00 |
| Box Beam Guide Railing | 606.10 | LF | 28 | 17 (61%) | $48.50 | $55.00 |
| Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays | 559.01 | SF | 22 | 17 (77%) | $0.50 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Slate Hill Constructors Inc | 16 | 6 of 16 |
| Vector Construction Corp | 15 | 9 of 15 |
| Winn Construction Services Inc | 13 | 3 of 13 |
| Tioga Construction Company Inc | 10 | 7 of 10 |
| Bette & Cring LLC | 8 | 4 of 8 |
| James H Maloy Inc | 6 | 2 of 6 |
| R De Vincentis Construction Inc | 5 | 0 of 5 |
| Economy Paving Co Inc | 5 | 0 of 5 |
| Harrison & Burrowes Bridge Constructors Inc | 5 | 2 of 5 |
| Luck Brothers Inc | 5 | 3 of 5 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 17 SEP 2026 | D265806 | Region 09 | RT 23 bridge replacement over Canasawacta Creek | 4 of 7 | $4,752,400 | +4.0% |
| 18 DEC 2025 | D265639 | Region 07 | CULVERT RESILIENCY PROJECT - Bridge Replacement | 1 of 2 | $8,180,400 | Low, 20% under the second |
| 23 OCT 2025 | D265570 | Region 02 | BRIDGE REPLACEMENT - Route 28 over Rock River | 2 of 2 | $5,304,400 | +7.0% |
| 11 SEP 2025 | D265517 | Region 09 | BRIDGE REPLACEMENT- NY Route 34 over Dry Run Creek | 1 of 5 | $4,028,400 | Low, 11% under the second |
| 21 AUG 2025 | D265545 | Region 01 | BRIDGE DECK REPLACEMENT PROJECT | 3 of 4 | $11,634,400 | +23% |
| 27 MAR 2025 | D265319 | Region 01 | BRIDGE REPLACEMENT - US Route 9W over CSX Railroad | 1 of 3 | $16,425,400 | Low, 3.0% under the second |
| 27 FEB 2025 | D265418 | Region 01 | CULVERT REPAIR & REPLACEMENT - Various Locations. | 2 of 3 | $8,255,400 | +11% |
| 19 DEC 2024 | D265339 | Region 09 | Bridge Replacement-Route 10 over Elk Creek | 1 of 6 | $2,912,840 | Low, 5.0% under the second |
| 19 DEC 2024 | D265359 | Region 09 | BRIDGE REHAB/ENVIRO IMPROVEMENT-Various Locations | 5 of 9 | $1,454,144 | +32% |
| 19 DEC 2024 | D265368 | Region 01 | I87 NB Exit 32 Ramp/Bridge Replacement over Spruce Mill | 2 of 5 | $4,780,404 | +1.0% |
| 19 DEC 2024 | D265384 | Region 07 | PIN 7042.46 - N.Y. ROUTE 26 BRIDGE REHABILITATION | 3 of 6 | $2,541,464 | +2.0% |
| 19 DEC 2024 | D265385 | Region 01 | BRIDGE REPLACEMENT - NY Rt 146 over Normans Kill | 3 of 3 | $10,234,640 | +16% |
| 21 NOV 2024 | D265328 | Region 01 | Culvert Repair / Replacement SFY 25 | 2 of 4 | $4,122,540 | +8.0% |
| 07 NOV 2024 | D265326 | Region 03 | Bridge Replacement - Rt 49 over Big Bay Creek | 3 of 5 | $2,114,124 | +7.0% |
| 26 SEP 2024 | D265305 | Region 01 | Route 9N over Styles Brook | 1 of 6 | $2,228,844 | Low, 2.0% under the second |
| 22 AUG 2024 | D265286 | Region 02 | BRIDGE REPLACEMENT - Route 29 over Caroga Creek | 4 of 7 | $2,131,400 | +5.0% |
| 08 AUG 2024 | D265248 | Region 09 | RTE 42/52 over Neversink River Superstructure Replacement | 1 of 4 | $9,314,400 | Low, 1.0% under the second |
| 25 JUL 2024 | D265277 | Region 01 | Replacement of Route 22 over White Creek | 2 of 3 | $3,484,400 | 0.0% |
| 09 MAY 2024 | D265246 | Region 02 | SMALL CULVERT PREVENTATIVE MAINTENANCE PROJECT 22 | 4 of 4 | $3,102,544 | +10% |
| 25 APR 2024 | D265226 | Region 08 | Replace/rehabilitate the selected culverts | 2 of 3 | $11,244,510 | +29% |
| 28 MAR 2024 | D265181 | Region 02 | CULVERT REPAIR/REPLACEMENT PROJECT 23 | 4 of 4 | $3,271,700 | +50% |
| 08 FEB 2024 | D265208 | Region 07 | CARDIN RD OVER BEAVER CREEK CULVERT REPLACEMENT | 3 of 3 | $1,588,280 | +74% |
| 25 JAN 2024 | D265161 | Region 01 | PIN 1811.31 Bridge Deck Replacement Project SFY 23 | 3 of 4 | $7,812,844 | +16% |
| 14 DEC 2023 | D265133 | Region 02 | RTE 162 OVER CANYON ROAD AND FLAT CREEK DECK REPLACEMENT | 5 of 7 | $3,994,400 | +41% |
| 14 DEC 2023 | D265143 | Region 02 | RTE 46 OVER ONEIDA CREEK BRIDGE REPLACEMENT | 4 of 5 | $4,734,040 | +8.0% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.