NYSDOT contract D265806 bid tabulation

RT 23 bridge replacement over Canasawacta Creek. Let by New York State DOT on September 17, 2026, Chenango, Region 09. 7 bids received; low bid $4,567,000 by Maple Ridge Civil LLC.

Owner
New York State DOT
Letting
17 SEP 2026
Pay items
154
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Maple Ridge Civil LLC$4,567,000Low
2Vector Construction Corp$4,682,316+3.0%
3Tioga Construction Company Inc$4,738,596+4.0%
4Ing Civil Inc$4,752,400+4.0%
5Economy Paving Co Inc$5,186,158+14%
6Slate Hill Constructors Inc$5,389,077+18%
7Winn Construction Services Inc$5,879,801+29%
NYSDOT contract D265806: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Maple Ridge Civil LLC2. Vector Construction Corp3. Tioga Construction Company Inc4. Ing Civil Inc5. Economy Paving Co Inc6. Slate Hill Constructors Inc
1Clearing and Grubbing (201.06)LS1$49,900$15,000$10,000$60,000$75,000$15,000
2 (202.010001)LS1$1,860.00$1,000.00$8,000.00$31,000$1,000.00$2,000.00
3 (202.120001)LS1$87,250$150,000$160,000$250,000$175,000$100,000
4Removal of Substructures (202.19)CY222$54.00$100.00$180.00$70.00$115.00$285.00
5Unclassified Excavation and Disposal (203.02)CY2,854$21.00$20.00$40.00$13.00$30.00$46.00
6Embankment In Place (203.03)CY2,971$51.00$30.00$60.00$19.00$25.00$73.00
7Select Granular Fill (203.07)CY65$82.00$60.00$80.00$91.00$45.00$140.00
8Select Structural Fill (203.21)CY575$78.00$50.00$70.00$78.00$75.00$100.00
9 (203.24010017)65$140.00$50.00$70.00$111.00$20.00$70.00
10Sand Backfill (203.25)CY5$1,190.00$200.00$600.00$730.00$75.00$600.00
11Structure Excavation (206.01)CY3,535$16.00$15.00$18.00$13.00$25.00$46.00
12Trench and Culvert Excavation (206.0201)CY560$28.00$30.00$35.00$42.00$5.00$46.00
13Test Pit Excavation (206.05)EACH2$445.00$500.00$700.00$1,400.00$1,000.00$1,100.00
14Geotextile Bedding (207.20)SY89$6.50$10.00$7.00$20.00$1.00$9.00
15Geotextile Drainage (207.22)SY278$6.00$5.00$5.00$5.00$1.00$6.00
16Prefabricated Composite Integral Abutment Drain (207.27)SY250$18.00$20.00$22.00$19.00$12.00$16.00
17Mulch – Temporary (209.100101)SY1,212$1.00$0.01$1.50$1.50$1.50$1.60
18Seed and Mulch – Temporary (209.1003)SY2,500$1.00$0.01$1.80$1.75$2.00$2.00
19Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY260$8.00$5.00$5.00$5.00$5.00$5.50
20Soil Stabilizers, Class IV Type A (209.2101)SY1,017$1.00$2.00$2.00$2.00$2.00$2.25
21Stabilized Construction Access (209.22)SY134$65.00$10.00$25.00$40.00$10.00$19.00
22 (209.23010009)1,793$6.00$8.00$8.00$7.00$6.00$13.00
23Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3312)SF64$96.00$220.00$140.00$130.00$130.00$150.00
24Subbase Course, Optional Type (304.15)CY1,165$41.00$60.00$75.00$60.00$85.00$85.00
25Pavement Density Quality Adjustment to Asphalt Items (404.0002)QUALITY UNIT73$100.00$100.00$100.00$100.00$100.00$100.00
26 (404.0189)TON25$200.00$200.00$190.00$215.00$300.00$390.00
27 (404.0982)TON376$160.00$150.00$186.00$181.00$165.00$165.00
28 (404.1989)TON357$155.00$160.00$172.00$165.00$165.00$155.00
29 (404.2589)TON719$145.00$160.00$148.00$158.00$165.00$145.00
30 (407.01040009)474$13.00$3.00$17.00$5.00$3.70$16.00
31Stabilized Gravel Surface Course (411.01)CY8$130.00$100.00$300.00$148.00$50.00$400.00
32Asphalt Pavement Joint Adhesive (418.7603)LF3,834$0.70$0.50$0.90$1.00$0.40$4.00
33Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY1,723$4.50$10.00$8.00$10.00$7.50$7.00
34 (551.03950017)613$110.00$120.00$400.00$141.00$10.00$120.00
35Cast-In-Place Concrete Piles (551.11)LF1,050$170.00$400.00$200.00$210.00$125.00$205.00
36Splices for CIP Piles (551.15)EACH23$125.00$125.00$1.00$125.00$1.00$135.00
37Performance Concrete Quality Adjustment - Cast In Place Piles (551.9902)QUALITY UNIT1$4.42$4.42$4.42$4.42$4.42$4.42
38 (553.020001)EACH1$64,600$25,000$25,000$1.00$1,000.00$1.00
39 (553.020002)EACH1$63,400$25,000$25,000$1.00$1,000.00$1.00
40 (553.030001)EACH1$23,750$10,000$5,000.00$60,000$5,000.00$1.00
41 (553.030002)EACH1$22,200$10,000$5,000.00$60,000$5,000.00$1.00
42Footing Concrete, Performance (555.0011)CY64$1,380.00$1,200.00$1,100.00$1,600.00$1,150.00$2,000.00
43Concrete for Structures, Performance (555.0021)CY240$1,890.00$1,400.00$1,600.00$1,300.00$1,750.00$2,100.00
44Performance Concrete Quality Adjustment – Footing Concrete (555.9901)QUALITY UNIT1$6.50$6.50$6.50$6.50$6.50$6.50
45Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$6.38$6.38$6.38$6.38$6.38$6.38
46Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB7,000$2.50$2.00$2.10$1.85$1.00$2.25
47Galvanized Bar Reinforcement for Structures (556.0203)LB74,800$2.50$2.50$2.50$1.40$2.25$3.25
48Stud Shear Connectors for Bridges (556.03)EACH1,608$23.13$10.00$8.00$8.00$5.00$1.00
49 (557.1019)SY221$460.00$500.00$480.00$450.00$465.00$575.00
50 (557.1119)SY304$420.00$600.00$650.00$560.00$995.00$700.00
51Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29)SY525$2.50$1.00$0.01$220.00$1.00$0.10
52Sidewalks and Safety Walks (557.30)SY24$310.00$400.00$240.00$353.00$635.00$700.00
53 (557.60010004)510$37.00$60.00$30.00$30.00$35.00$38.00
54Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901)QUALITY UNIT1$12.22$12.22$12.22$12.22$12.22$12.22
55Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902)QUALITY UNIT1$9.75$9.75$9.75$9.75$9.75$9.75
56Longitudinal Sawcut Grooving of Structural Slab Surface (558.02)SY510$14.00$15.00$15.00$13.00$15.00$16.00
57Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01)SF4,506$1.00$1.00$0.50$0.70$0.55$1.25
58Protective Sealing of New Structural Concrete (559.02)SF2,193$2.00$1.00$0.50$0.90$0.75$3.50
59 (564.0501)LS1$374,800$330,000$350,000$220,000$375,000$290,000
60 (564.20010008)84,700$0.70$1.00$0.50$0.45$0.01$0.65
61 (565.30130101)12$155.00$200.00$800.00$320.00$250.00$400.00
62Steel Bridge Railing (Three-Rail) (568.54)LF131$330.00$280.00$272.00$272.00$250.00$285.00
63Transition Bridge Railing (568.70)LF128$240.00$250.00$243.00$243.00$250.00$255.00
64Lead-Exposure Control Plan (570.01)LS1$565.00$500.00$100.00$1.00$100.00$1,000.00
65Medical Testing (570.02)DOL384$1.00$1.00$1.00$1.00$1.00$1.00
66Personal-Exposure-Monitoring Sample Analysis (570.03)DOL2,000$1.00$1.00$1.00$1.00$1.00$1.00
67Decontamination Facilities (570.04)CALENDAR WEEK6$1,130.00$100.00$150.00$1.00$10.00$500.00
68 (570.10)LS1$2,500.00$1.00$200.00$1.00$100.00$1,000.00
69Disposal of Hazardous Paint Removal Waste Containing Lead (571.03)LB55$1.00$10.00$10.00$1.00$1.00$5.00
70Bridge Railing Removal and Disposal (587.01)LF106$9.50$10.00$12.00$15.00$1.00$56.00
71Culvert-End Safety Grate (603.0101)SF54$72.00$60.00$30.00$72.00$100.00$70.00
72 (603.171814)EACH2$965.00$1,000.00$900.00$1,100.00$600.00$1,600.00
73 (603.780230)LF75$200.00$100.00$150.00$100.00$200.00$145.00
74 (605.1602)LF24$150.00$40.00$60.00$38.00$10.00$25.00
75Box Beam Guide Railing (606.10)LF346$57.00$60.00$60.00$58.00$60.00$62.00
76Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF93$77.00$70.00$65.00$64.00$75.00$67.00
77Box Beam Guide Railing End Assembly Type I (606.120102)EACH1$4,920.00$7,500.00$5,000.00$5,000.00$5,000.00$5,200.00
78Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH4$2,400.00$3,000.00$2,300.00$2,300.00$2,500.00$2,500.00
79Box Beam End Assembly Type III (606.1203)EACH1$6,930.00$8,000.00$8,000.00$8,000.00$7,500.00$8,500.00
80Removing and Disposing Box Beam Guide Railing (606.73)LF458$6.50$6.00$10.00$5.00$5.00$13.00
81Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920)EACH4$360.00$200.00$200.00$400.00$125.00$1,000.00
82 (607.41010010)210$10.00$5.00$6.00$11.00$7.50$10.00
83Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON67$395.00$160.00$325.00$240.00$320.00$315.00
84Stone Curb – Bridge (Type A) (609.0301)LF57$65.00$80.00$65.00$105.00$160.00$60.00
85Stone Curb – Bridge (Type F1) (609.0302)LF127$72.00$80.00$75.00$72.00$115.00$85.00
86 (610.10020309)85$97.00$100.00$90.00$106.00$75.00$95.00
87Weed Removal (610.13)SY6,001$3.50$2.00$0.50$0.50$0.50$0.75
88Topsoil – Reuse On-Site Materials (610.1401)CY263$58.00$60.00$35.00$38.00$45.00$56.00
89Topsoil - Lawns (610.1403)CY152$115.00$120.00$100.00$110.00$90.00$105.00
90 (610.15120208)1,881$14.00$8.00$2.00$1.00$2.50$0.25
91 (610.16093624)4,184$0.80$3.00$2.00$2.00$2.00$2.20
92Sodding (610.18)SY1,817$16.00$15.00$15.00$15.00$15.00$15.50
93Watering Vegetation – As Specified (610.1901)1,000 GALLONS490$21.00$20.00$5.00$5.00$5.00$6.00
94Mowing (610.21)SY1,817$2.00$1.00$1.50$1.50$0.50$1.75
95 (611.0181)EACH1$3,570.00$1,200.00$1,500.00$1,500.00$1,500.00$1,600.00
96 (611.0281)EACH10$540.00$600.00$650.00$650.00$650.00$700.00
97 (611.0361)EACH7$1,100.00$500.00$600.00$600.00$750.00$650.00
98 (611.0741)EACH5$47.00$50.00$80.00$80.00$100.00$84.00
99 (611.19010024)1$115.00$50.00$100.00$100.00$100.00$110.00
100 (611.19020024)10$84.00$50.00$20.00$20.00$25.00$22.00
101 (611.19030024)7$120.00$50.00$20.00$20.00$25.00$22.00
102 (611.19070024)5$120.00$10.00$2.00$2.00$2.50$3.00
103Rodent Guard (611.21)EACH11$66.00$10.00$20.00$20.00$25.00$22.00
104Improvement of Vegetated Areas (614.05)SY200$6.00$20.00$6.00$6.00$10.00$22.00
105 (614.060403)EACH1$1,540.00$1,500.00$2,500.00$5,000.00$500.00$1,750.00
106 (614.060803)EACH1$4,960.00$1,500.00$6,000.00$8,000.00$1,000.00$4,300.00
107 (616.08000024)477$15.00$15.00$12.00$12.00$10.00$14.00
108 (616.09020609)168$50.00$60.00$20.00$20.00$20.00$22.00
109 (617.01010024)4,000$1.50$5.00$0.50$0.50$0.50$0.55
110 (617.10000024)150$8.00$60.00$90.00$22.00$10.00$44.00
111 (617.11000024)LS1$1,020.00$2,500.00$2,000.00$1.00$100.00$3,500.00
112Basic Work Zone Traffic Control (619.01)LS1$255,000$120,000$60,000$80,000$275,000$250,000
113Type III Construction Barricades (619.04)EACH12$395.00$100.00$160.00$200.00$250.00$50.00
114 (619.0501)LS1$470,500$600,000$600,000$1,000,000$1,115,000$745,000
115Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF1,100$7.50$6.00$6.50$6.00$5.50$6.00
116 (619.100101)LF1,682$2.50$2.00$2.00$2.00$2.50$2.00
117 (619.100104)LF4,181$6.00$5.00$5.50$5.00$5.50$5.50
118 (619.111112)EACH2$5,810.00$10,000$7,000.00$5,000.00$10,000$15,000
119 (619.130101)EACH1$84,450$120,000$80,000$80,000$100,000$85,000
120Temporary Rumble Strips (619.22)LF440$51.00$20.00$15.00$20.00$20.00$20.00
121Mailboxes (619.27)EACH2$270.00$500.00$300.00$200.00$500.00$100.00
122Stone Filling (Light) (620.03)CY51$175.00$100.00$80.00$95.00$105.00$190.00
123Stone Filling (Heavy) (620.05)CY220$51.00$140.00$100.00$100.00$105.00$175.00
124Bedding Material, Type 1 (620.0801)CY225$81.00$60.00$60.00$76.00$105.00$165.00
125 (620.13000016)655$33.00$180.00$160.00$181.00$155.00$225.00
126 (621.05020004)362$9.50$5.00$6.00$7.00$1.00$15.50
127Crushed Stone (In-Place Measure) (623.12)CY89$150.00$80.00$70.00$83.00$60.00$150.00
128Survey Operations (625.01)LS1$53,350$60,000$50,000$50,000$50,000$25,000
129Concrete Right of Way Markers Type H (High) (625.03)EACH4$475.00$600.00$1,300.00$680.00$3,675.00$1,100.00
130Concrete Right of Way Markers Type L (Low) (625.04)EACH17$475.00$600.00$1,300.00$530.00$1,750.00$1,100.00
131Steel Pin and Cap Right of Way Markers (625.05)EACH2$450.00$300.00$900.00$650.00$2,250.00$1,000.00
132Permanent Survey Markers (625.06)EACH3$1,280.00$600.00$1,800.00$685.00$5,000.00$4,400.00
133 (627.50140008)181$2.50$6.00$5.00$8.00$1.00$6.00
134Concrete Cylinder Curing Equipment (637.04)EACH1$2,020.00$5,000.00$2,000.00$500.00$10,000$1,000.00
135Engineer’s Field Office – Type 2 (637.12)MONTH14$1,420.00$2,400.00$3,000.00$1.00$3,000.00$2,550.00
136Office Technology and Supplies (637.34)DOL500$1.00$1.00$1.00$1.00$1.00$1.00
137 (637.41000115)14$505.00$50.00$250.00$215.00$100.00$220.00
138White Paint Reflectorized Pavement Stripes – 20 mils (640.20)LF2,970$0.90$2.00$0.80$2.00$2.00$2.20
139Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21)LF1,066$0.90$2.00$0.80$2.00$2.00$2.20
140Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF40$31.00$60.00$41.00$41.00$40.00$42.00
141Type A Sign Posts (645.81)EACH7$93.00$200.00$200.00$200.00$200.00$210.00
142Reference Marker Panel (646.21)EACH1$33.00$50.00$45.00$44.00$50.00$46.00
143Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22)EACH7$4.50$50.00$22.00$22.00$20.00$23.00
144Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH15$17.00$50.00$30.00$28.00$30.00$30.00
145Steel Post, 2.0 lb/ft (646.32)EACH16$40.00$80.00$80.00$80.00$100.00$84.00
146Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH10$56.00$50.00$45.00$45.00$50.00$160.00
147Centerline Audible Roadway Delineators (CARDs) (649.11)LF980$11.00$10.00$8.00$7.70$12.95$9.00
148White Epoxy Reflectorized Pavement Stripes - 15 mil (685.0101)LF120$66.00$10.00$60.00$10.00$10.00$12.00
149 (691.04000020)14,000$1.00$1.00$1.00$1.00$1.00$1.00
150Field Change Payment (FCP) (697.03)DOL151,000$1.00$1.00$1.00$1.00$1.00$1.00
151Asphalt Price Adjustment (698.04)DOL200$1.00$1.00$1.00$1.00$1.00$1.00
152Fuel Price Adjustment (698.05)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
153Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
154Mobilization (699.040001)LS1$169,494$160,000$180,000$182,298$175,000$200,000
NYSDOT contract D265806: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of September 17, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy