NYSDOT contract D265806 bid tabulation
RT 23 bridge replacement over Canasawacta Creek. Let by New York State DOT on September 17, 2026, Chenango, Region 09. 7 bids received; low bid $4,567,000 by Maple Ridge Civil LLC.
- Owner
- New York State DOT
- Letting
- 17 SEP 2026
- Pay items
- 154
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Maple Ridge Civil LLC | $4,567,000 | Low |
| 2 | Vector Construction Corp | $4,682,316 | +3.0% |
| 3 | Tioga Construction Company Inc | $4,738,596 | +4.0% |
| 4 | Ing Civil Inc | $4,752,400 | +4.0% |
| 5 | Economy Paving Co Inc | $5,186,158 | +14% |
| 6 | Slate Hill Constructors Inc | $5,389,077 | +18% |
| 7 | Winn Construction Services Inc | $5,879,801 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Maple Ridge Civil LLC | 2. Vector Construction Corp | 3. Tioga Construction Company Inc | 4. Ing Civil Inc | 5. Economy Paving Co Inc | 6. Slate Hill Constructors Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $49,900 | $15,000 | $10,000 | $60,000 | $75,000 | $15,000 |
| 2 | (202.010001) | LS | 1 | $1,860.00 | $1,000.00 | $8,000.00 | $31,000 | $1,000.00 | $2,000.00 |
| 3 | (202.120001) | LS | 1 | $87,250 | $150,000 | $160,000 | $250,000 | $175,000 | $100,000 |
| 4 | Removal of Substructures (202.19) | CY | 222 | $54.00 | $100.00 | $180.00 | $70.00 | $115.00 | $285.00 |
| 5 | Unclassified Excavation and Disposal (203.02) | CY | 2,854 | $21.00 | $20.00 | $40.00 | $13.00 | $30.00 | $46.00 |
| 6 | Embankment In Place (203.03) | CY | 2,971 | $51.00 | $30.00 | $60.00 | $19.00 | $25.00 | $73.00 |
| 7 | Select Granular Fill (203.07) | CY | 65 | $82.00 | $60.00 | $80.00 | $91.00 | $45.00 | $140.00 |
| 8 | Select Structural Fill (203.21) | CY | 575 | $78.00 | $50.00 | $70.00 | $78.00 | $75.00 | $100.00 |
| 9 | (203.24010017) | 65 | $140.00 | $50.00 | $70.00 | $111.00 | $20.00 | $70.00 | |
| 10 | Sand Backfill (203.25) | CY | 5 | $1,190.00 | $200.00 | $600.00 | $730.00 | $75.00 | $600.00 |
| 11 | Structure Excavation (206.01) | CY | 3,535 | $16.00 | $15.00 | $18.00 | $13.00 | $25.00 | $46.00 |
| 12 | Trench and Culvert Excavation (206.0201) | CY | 560 | $28.00 | $30.00 | $35.00 | $42.00 | $5.00 | $46.00 |
| 13 | Test Pit Excavation (206.05) | EACH | 2 | $445.00 | $500.00 | $700.00 | $1,400.00 | $1,000.00 | $1,100.00 |
| 14 | Geotextile Bedding (207.20) | SY | 89 | $6.50 | $10.00 | $7.00 | $20.00 | $1.00 | $9.00 |
| 15 | Geotextile Drainage (207.22) | SY | 278 | $6.00 | $5.00 | $5.00 | $5.00 | $1.00 | $6.00 |
| 16 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 250 | $18.00 | $20.00 | $22.00 | $19.00 | $12.00 | $16.00 |
| 17 | Mulch – Temporary (209.100101) | SY | 1,212 | $1.00 | $0.01 | $1.50 | $1.50 | $1.50 | $1.60 |
| 18 | Seed and Mulch – Temporary (209.1003) | SY | 2,500 | $1.00 | $0.01 | $1.80 | $1.75 | $2.00 | $2.00 |
| 19 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 260 | $8.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.50 |
| 20 | Soil Stabilizers, Class IV Type A (209.2101) | SY | 1,017 | $1.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.25 |
| 21 | Stabilized Construction Access (209.22) | SY | 134 | $65.00 | $10.00 | $25.00 | $40.00 | $10.00 | $19.00 |
| 22 | (209.23010009) | 1,793 | $6.00 | $8.00 | $8.00 | $7.00 | $6.00 | $13.00 | |
| 23 | Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3312) | SF | 64 | $96.00 | $220.00 | $140.00 | $130.00 | $130.00 | $150.00 |
| 24 | Subbase Course, Optional Type (304.15) | CY | 1,165 | $41.00 | $60.00 | $75.00 | $60.00 | $85.00 | $85.00 |
| 25 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 73 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 26 | (404.0189) | TON | 25 | $200.00 | $200.00 | $190.00 | $215.00 | $300.00 | $390.00 |
| 27 | (404.0982) | TON | 376 | $160.00 | $150.00 | $186.00 | $181.00 | $165.00 | $165.00 |
| 28 | (404.1989) | TON | 357 | $155.00 | $160.00 | $172.00 | $165.00 | $165.00 | $155.00 |
| 29 | (404.2589) | TON | 719 | $145.00 | $160.00 | $148.00 | $158.00 | $165.00 | $145.00 |
| 30 | (407.01040009) | 474 | $13.00 | $3.00 | $17.00 | $5.00 | $3.70 | $16.00 | |
| 31 | Stabilized Gravel Surface Course (411.01) | CY | 8 | $130.00 | $100.00 | $300.00 | $148.00 | $50.00 | $400.00 |
| 32 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 3,834 | $0.70 | $0.50 | $0.90 | $1.00 | $0.40 | $4.00 |
| 33 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 1,723 | $4.50 | $10.00 | $8.00 | $10.00 | $7.50 | $7.00 |
| 34 | (551.03950017) | 613 | $110.00 | $120.00 | $400.00 | $141.00 | $10.00 | $120.00 | |
| 35 | Cast-In-Place Concrete Piles (551.11) | LF | 1,050 | $170.00 | $400.00 | $200.00 | $210.00 | $125.00 | $205.00 |
| 36 | Splices for CIP Piles (551.15) | EACH | 23 | $125.00 | $125.00 | $1.00 | $125.00 | $1.00 | $135.00 |
| 37 | Performance Concrete Quality Adjustment - Cast In Place Piles (551.9902) | QUALITY UNIT | 1 | $4.42 | $4.42 | $4.42 | $4.42 | $4.42 | $4.42 |
| 38 | (553.020001) | EACH | 1 | $64,600 | $25,000 | $25,000 | $1.00 | $1,000.00 | $1.00 |
| 39 | (553.020002) | EACH | 1 | $63,400 | $25,000 | $25,000 | $1.00 | $1,000.00 | $1.00 |
| 40 | (553.030001) | EACH | 1 | $23,750 | $10,000 | $5,000.00 | $60,000 | $5,000.00 | $1.00 |
| 41 | (553.030002) | EACH | 1 | $22,200 | $10,000 | $5,000.00 | $60,000 | $5,000.00 | $1.00 |
| 42 | Footing Concrete, Performance (555.0011) | CY | 64 | $1,380.00 | $1,200.00 | $1,100.00 | $1,600.00 | $1,150.00 | $2,000.00 |
| 43 | Concrete for Structures, Performance (555.0021) | CY | 240 | $1,890.00 | $1,400.00 | $1,600.00 | $1,300.00 | $1,750.00 | $2,100.00 |
| 44 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $6.50 | $6.50 | $6.50 | $6.50 | $6.50 | $6.50 |
| 45 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $6.38 | $6.38 | $6.38 | $6.38 | $6.38 | $6.38 |
| 46 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 7,000 | $2.50 | $2.00 | $2.10 | $1.85 | $1.00 | $2.25 |
| 47 | Galvanized Bar Reinforcement for Structures (556.0203) | LB | 74,800 | $2.50 | $2.50 | $2.50 | $1.40 | $2.25 | $3.25 |
| 48 | Stud Shear Connectors for Bridges (556.03) | EACH | 1,608 | $23.13 | $10.00 | $8.00 | $8.00 | $5.00 | $1.00 |
| 49 | (557.1019) | SY | 221 | $460.00 | $500.00 | $480.00 | $450.00 | $465.00 | $575.00 |
| 50 | (557.1119) | SY | 304 | $420.00 | $600.00 | $650.00 | $560.00 | $995.00 | $700.00 |
| 51 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 525 | $2.50 | $1.00 | $0.01 | $220.00 | $1.00 | $0.10 |
| 52 | Sidewalks and Safety Walks (557.30) | SY | 24 | $310.00 | $400.00 | $240.00 | $353.00 | $635.00 | $700.00 |
| 53 | (557.60010004) | 510 | $37.00 | $60.00 | $30.00 | $30.00 | $35.00 | $38.00 | |
| 54 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $12.22 | $12.22 | $12.22 | $12.22 | $12.22 | $12.22 |
| 55 | Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902) | QUALITY UNIT | 1 | $9.75 | $9.75 | $9.75 | $9.75 | $9.75 | $9.75 |
| 56 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 510 | $14.00 | $15.00 | $15.00 | $13.00 | $15.00 | $16.00 |
| 57 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 4,506 | $1.00 | $1.00 | $0.50 | $0.70 | $0.55 | $1.25 |
| 58 | Protective Sealing of New Structural Concrete (559.02) | SF | 2,193 | $2.00 | $1.00 | $0.50 | $0.90 | $0.75 | $3.50 |
| 59 | (564.0501) | LS | 1 | $374,800 | $330,000 | $350,000 | $220,000 | $375,000 | $290,000 |
| 60 | (564.20010008) | 84,700 | $0.70 | $1.00 | $0.50 | $0.45 | $0.01 | $0.65 | |
| 61 | (565.30130101) | 12 | $155.00 | $200.00 | $800.00 | $320.00 | $250.00 | $400.00 | |
| 62 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 131 | $330.00 | $280.00 | $272.00 | $272.00 | $250.00 | $285.00 |
| 63 | Transition Bridge Railing (568.70) | LF | 128 | $240.00 | $250.00 | $243.00 | $243.00 | $250.00 | $255.00 |
| 64 | Lead-Exposure Control Plan (570.01) | LS | 1 | $565.00 | $500.00 | $100.00 | $1.00 | $100.00 | $1,000.00 |
| 65 | Medical Testing (570.02) | DOL | 384 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 66 | Personal-Exposure-Monitoring Sample Analysis (570.03) | DOL | 2,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 67 | Decontamination Facilities (570.04) | CALENDAR WEEK | 6 | $1,130.00 | $100.00 | $150.00 | $1.00 | $10.00 | $500.00 |
| 68 | (570.10) | LS | 1 | $2,500.00 | $1.00 | $200.00 | $1.00 | $100.00 | $1,000.00 |
| 69 | Disposal of Hazardous Paint Removal Waste Containing Lead (571.03) | LB | 55 | $1.00 | $10.00 | $10.00 | $1.00 | $1.00 | $5.00 |
| 70 | Bridge Railing Removal and Disposal (587.01) | LF | 106 | $9.50 | $10.00 | $12.00 | $15.00 | $1.00 | $56.00 |
| 71 | Culvert-End Safety Grate (603.0101) | SF | 54 | $72.00 | $60.00 | $30.00 | $72.00 | $100.00 | $70.00 |
| 72 | (603.171814) | EACH | 2 | $965.00 | $1,000.00 | $900.00 | $1,100.00 | $600.00 | $1,600.00 |
| 73 | (603.780230) | LF | 75 | $200.00 | $100.00 | $150.00 | $100.00 | $200.00 | $145.00 |
| 74 | (605.1602) | LF | 24 | $150.00 | $40.00 | $60.00 | $38.00 | $10.00 | $25.00 |
| 75 | Box Beam Guide Railing (606.10) | LF | 346 | $57.00 | $60.00 | $60.00 | $58.00 | $60.00 | $62.00 |
| 76 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 93 | $77.00 | $70.00 | $65.00 | $64.00 | $75.00 | $67.00 |
| 77 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 1 | $4,920.00 | $7,500.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,200.00 |
| 78 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 4 | $2,400.00 | $3,000.00 | $2,300.00 | $2,300.00 | $2,500.00 | $2,500.00 |
| 79 | Box Beam End Assembly Type III (606.1203) | EACH | 1 | $6,930.00 | $8,000.00 | $8,000.00 | $8,000.00 | $7,500.00 | $8,500.00 |
| 80 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 458 | $6.50 | $6.00 | $10.00 | $5.00 | $5.00 | $13.00 |
| 81 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 4 | $360.00 | $200.00 | $200.00 | $400.00 | $125.00 | $1,000.00 |
| 82 | (607.41010010) | 210 | $10.00 | $5.00 | $6.00 | $11.00 | $7.50 | $10.00 | |
| 83 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 67 | $395.00 | $160.00 | $325.00 | $240.00 | $320.00 | $315.00 |
| 84 | Stone Curb – Bridge (Type A) (609.0301) | LF | 57 | $65.00 | $80.00 | $65.00 | $105.00 | $160.00 | $60.00 |
| 85 | Stone Curb – Bridge (Type F1) (609.0302) | LF | 127 | $72.00 | $80.00 | $75.00 | $72.00 | $115.00 | $85.00 |
| 86 | (610.10020309) | 85 | $97.00 | $100.00 | $90.00 | $106.00 | $75.00 | $95.00 | |
| 87 | Weed Removal (610.13) | SY | 6,001 | $3.50 | $2.00 | $0.50 | $0.50 | $0.50 | $0.75 |
| 88 | Topsoil – Reuse On-Site Materials (610.1401) | CY | 263 | $58.00 | $60.00 | $35.00 | $38.00 | $45.00 | $56.00 |
| 89 | Topsoil - Lawns (610.1403) | CY | 152 | $115.00 | $120.00 | $100.00 | $110.00 | $90.00 | $105.00 |
| 90 | (610.15120208) | 1,881 | $14.00 | $8.00 | $2.00 | $1.00 | $2.50 | $0.25 | |
| 91 | (610.16093624) | 4,184 | $0.80 | $3.00 | $2.00 | $2.00 | $2.00 | $2.20 | |
| 92 | Sodding (610.18) | SY | 1,817 | $16.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.50 |
| 93 | Watering Vegetation – As Specified (610.1901) | 1,000 GALLONS | 490 | $21.00 | $20.00 | $5.00 | $5.00 | $5.00 | $6.00 |
| 94 | Mowing (610.21) | SY | 1,817 | $2.00 | $1.00 | $1.50 | $1.50 | $0.50 | $1.75 |
| 95 | (611.0181) | EACH | 1 | $3,570.00 | $1,200.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,600.00 |
| 96 | (611.0281) | EACH | 10 | $540.00 | $600.00 | $650.00 | $650.00 | $650.00 | $700.00 |
| 97 | (611.0361) | EACH | 7 | $1,100.00 | $500.00 | $600.00 | $600.00 | $750.00 | $650.00 |
| 98 | (611.0741) | EACH | 5 | $47.00 | $50.00 | $80.00 | $80.00 | $100.00 | $84.00 |
| 99 | (611.19010024) | 1 | $115.00 | $50.00 | $100.00 | $100.00 | $100.00 | $110.00 | |
| 100 | (611.19020024) | 10 | $84.00 | $50.00 | $20.00 | $20.00 | $25.00 | $22.00 | |
| 101 | (611.19030024) | 7 | $120.00 | $50.00 | $20.00 | $20.00 | $25.00 | $22.00 | |
| 102 | (611.19070024) | 5 | $120.00 | $10.00 | $2.00 | $2.00 | $2.50 | $3.00 | |
| 103 | Rodent Guard (611.21) | EACH | 11 | $66.00 | $10.00 | $20.00 | $20.00 | $25.00 | $22.00 |
| 104 | Improvement of Vegetated Areas (614.05) | SY | 200 | $6.00 | $20.00 | $6.00 | $6.00 | $10.00 | $22.00 |
| 105 | (614.060403) | EACH | 1 | $1,540.00 | $1,500.00 | $2,500.00 | $5,000.00 | $500.00 | $1,750.00 |
| 106 | (614.060803) | EACH | 1 | $4,960.00 | $1,500.00 | $6,000.00 | $8,000.00 | $1,000.00 | $4,300.00 |
| 107 | (616.08000024) | 477 | $15.00 | $15.00 | $12.00 | $12.00 | $10.00 | $14.00 | |
| 108 | (616.09020609) | 168 | $50.00 | $60.00 | $20.00 | $20.00 | $20.00 | $22.00 | |
| 109 | (617.01010024) | 4,000 | $1.50 | $5.00 | $0.50 | $0.50 | $0.50 | $0.55 | |
| 110 | (617.10000024) | 150 | $8.00 | $60.00 | $90.00 | $22.00 | $10.00 | $44.00 | |
| 111 | (617.11000024) | LS | 1 | $1,020.00 | $2,500.00 | $2,000.00 | $1.00 | $100.00 | $3,500.00 |
| 112 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $255,000 | $120,000 | $60,000 | $80,000 | $275,000 | $250,000 |
| 113 | Type III Construction Barricades (619.04) | EACH | 12 | $395.00 | $100.00 | $160.00 | $200.00 | $250.00 | $50.00 |
| 114 | (619.0501) | LS | 1 | $470,500 | $600,000 | $600,000 | $1,000,000 | $1,115,000 | $745,000 |
| 115 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 1,100 | $7.50 | $6.00 | $6.50 | $6.00 | $5.50 | $6.00 |
| 116 | (619.100101) | LF | 1,682 | $2.50 | $2.00 | $2.00 | $2.00 | $2.50 | $2.00 |
| 117 | (619.100104) | LF | 4,181 | $6.00 | $5.00 | $5.50 | $5.00 | $5.50 | $5.50 |
| 118 | (619.111112) | EACH | 2 | $5,810.00 | $10,000 | $7,000.00 | $5,000.00 | $10,000 | $15,000 |
| 119 | (619.130101) | EACH | 1 | $84,450 | $120,000 | $80,000 | $80,000 | $100,000 | $85,000 |
| 120 | Temporary Rumble Strips (619.22) | LF | 440 | $51.00 | $20.00 | $15.00 | $20.00 | $20.00 | $20.00 |
| 121 | Mailboxes (619.27) | EACH | 2 | $270.00 | $500.00 | $300.00 | $200.00 | $500.00 | $100.00 |
| 122 | Stone Filling (Light) (620.03) | CY | 51 | $175.00 | $100.00 | $80.00 | $95.00 | $105.00 | $190.00 |
| 123 | Stone Filling (Heavy) (620.05) | CY | 220 | $51.00 | $140.00 | $100.00 | $100.00 | $105.00 | $175.00 |
| 124 | Bedding Material, Type 1 (620.0801) | CY | 225 | $81.00 | $60.00 | $60.00 | $76.00 | $105.00 | $165.00 |
| 125 | (620.13000016) | 655 | $33.00 | $180.00 | $160.00 | $181.00 | $155.00 | $225.00 | |
| 126 | (621.05020004) | 362 | $9.50 | $5.00 | $6.00 | $7.00 | $1.00 | $15.50 | |
| 127 | Crushed Stone (In-Place Measure) (623.12) | CY | 89 | $150.00 | $80.00 | $70.00 | $83.00 | $60.00 | $150.00 |
| 128 | Survey Operations (625.01) | LS | 1 | $53,350 | $60,000 | $50,000 | $50,000 | $50,000 | $25,000 |
| 129 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 4 | $475.00 | $600.00 | $1,300.00 | $680.00 | $3,675.00 | $1,100.00 |
| 130 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 17 | $475.00 | $600.00 | $1,300.00 | $530.00 | $1,750.00 | $1,100.00 |
| 131 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 2 | $450.00 | $300.00 | $900.00 | $650.00 | $2,250.00 | $1,000.00 |
| 132 | Permanent Survey Markers (625.06) | EACH | 3 | $1,280.00 | $600.00 | $1,800.00 | $685.00 | $5,000.00 | $4,400.00 |
| 133 | (627.50140008) | 181 | $2.50 | $6.00 | $5.00 | $8.00 | $1.00 | $6.00 | |
| 134 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,020.00 | $5,000.00 | $2,000.00 | $500.00 | $10,000 | $1,000.00 |
| 135 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 14 | $1,420.00 | $2,400.00 | $3,000.00 | $1.00 | $3,000.00 | $2,550.00 |
| 136 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 137 | (637.41000115) | 14 | $505.00 | $50.00 | $250.00 | $215.00 | $100.00 | $220.00 | |
| 138 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 2,970 | $0.90 | $2.00 | $0.80 | $2.00 | $2.00 | $2.20 |
| 139 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 1,066 | $0.90 | $2.00 | $0.80 | $2.00 | $2.00 | $2.20 |
| 140 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 40 | $31.00 | $60.00 | $41.00 | $41.00 | $40.00 | $42.00 |
| 141 | Type A Sign Posts (645.81) | EACH | 7 | $93.00 | $200.00 | $200.00 | $200.00 | $200.00 | $210.00 |
| 142 | Reference Marker Panel (646.21) | EACH | 1 | $33.00 | $50.00 | $45.00 | $44.00 | $50.00 | $46.00 |
| 143 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 7 | $4.50 | $50.00 | $22.00 | $22.00 | $20.00 | $23.00 |
| 144 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 15 | $17.00 | $50.00 | $30.00 | $28.00 | $30.00 | $30.00 |
| 145 | Steel Post, 2.0 lb/ft (646.32) | EACH | 16 | $40.00 | $80.00 | $80.00 | $80.00 | $100.00 | $84.00 |
| 146 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 10 | $56.00 | $50.00 | $45.00 | $45.00 | $50.00 | $160.00 |
| 147 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 980 | $11.00 | $10.00 | $8.00 | $7.70 | $12.95 | $9.00 |
| 148 | White Epoxy Reflectorized Pavement Stripes - 15 mil (685.0101) | LF | 120 | $66.00 | $10.00 | $60.00 | $10.00 | $10.00 | $12.00 |
| 149 | (691.04000020) | 14,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 150 | Field Change Payment (FCP) (697.03) | DOL | 151,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 151 | Asphalt Price Adjustment (698.04) | DOL | 200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 152 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 153 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 154 | Mobilization (699.040001) | LS | 1 | $169,494 | $160,000 | $180,000 | $182,298 | $175,000 | $200,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of September 17, 2026. Compiled by Mirage Metrics.