NYSDOT contract D265639 bid tabulation
CULVERT RESILIENCY PROJECT - Bridge Replacement. Let by New York State DOT on December 18, 2025, Franklin, Jefferson, St. Lawrence, Region 07. 2 bids received; low bid $8,180,400 by Ing Civil Inc.
- Owner
- New York State DOT
- Letting
- 18 DEC 2025
- Pay items
- 126
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ing Civil Inc | $8,180,400 | Low |
| 2 | Slate Hill Constructors Inc | $9,811,495 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ing Civil Inc | 2. Slate Hill Constructors Inc |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $148,000 | $185,000 |
| 2 | (202.110001) | LS | 1 | $300,000 | $290,000 |
| 3 | (202.120001) | LS | 1 | $140,000 | $140,000 |
| 4 | Removal of Substructures (202.19) | CY | 491 | $60.00 | $300.00 |
| 5 | Unclassified Excavation and Disposal (203.02) | CY | 3,159 | $19.00 | $45.00 |
| 6 | Embankment In Place (203.03) | CY | 2,936 | $52.00 | $60.00 |
| 7 | Select Granular Fill, Slope Protection - Type A (203.0801) | CY | 70 | $97.00 | $140.00 |
| 8 | Select Structural Fill (203.21) | CY | 878 | $99.00 | $85.00 |
| 9 | Structure Excavation (206.01) | CY | 10,227 | $20.00 | $45.00 |
| 10 | Trench and Culvert Excavation (206.0201) | CY | 203 | $41.00 | $45.00 |
| 11 | Geotextile Stabilization (207.24) | SY | 1,140 | $1.80 | $4.00 |
| 12 | Prefabricated Composite Structural Drain (207.26) | SY | 327 | $11.00 | $20.00 |
| 13 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 128 | $18.00 | $20.00 |
| 14 | Seed and Mulch – Temporary (209.1003) | SY | 4,367 | $1.00 | $1.50 |
| 15 | Check Dam (Ditch Bottom Width 0.0 to 3′), Gravel Bag – Temporary (209.110201) | EACH | 3 | $700.00 | $550.00 |
| 16 | Turbidity Curtain – Temporary (209.1501) | LF | 1,173 | $10.00 | $18.00 |
| 17 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 4,367 | $2.20 | $5.00 |
| 18 | Stabilized Construction Access (209.22) | SY | 600 | $22.00 | $30.00 |
| 19 | Sediment Filter Log, 12″ (209.2301) | LF | 3,204 | $7.00 | $8.00 |
| 20 | Subbase Course, Type 2 (304.12) | CY | 1,947 | $81.00 | $95.00 |
| 21 | (404.0001) | TON | 125 | $80.00 | $80.00 |
| 22 | (404.0189) | TON | 16 | $250.00 | $230.00 |
| 23 | (404.0983) | TON | 616 | $167.00 | $160.00 |
| 24 | (404.1989) | TON | 749 | $145.00 | $145.00 |
| 25 | (404.2589) | TON | 1,111 | $140.00 | $140.00 |
| 26 | Diluted Tack Coat (407.0102) | GAL | 811 | $3.70 | $6.00 |
| 27 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 2,254 | $1.20 | $3.00 |
| 28 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 2,031 | $11.00 | $20.00 |
| 29 | Steel H-Piles (HP 10x42) (551.010042) | LF | 2,610 | $2.00 | $2.25 |
| 30 | Cast-In-Place Concrete Piles (551.11) | LF | 720 | $28.00 | $55.00 |
| 31 | Splices for Steel H-Piles (551.12) | EACH | 20 | $10.00 | $11.00 |
| 32 | Furnishing Equipment for Driving Piles (551.13) | LS | 1 | $500,000 | $350,000 |
| 33 | Dynamic Pile Load Testing (551.14) | EACH | 4 | $1,000.00 | $1,100.00 |
| 34 | Splices for CIP Piles (551.15) | EACH | 8 | $10.00 | $11.00 |
| 35 | Performance Concrete Quality Adjustment - Cast In Place Piles (551.9902) | QUALITY UNIT | 1 | $13.26 | $13.26 |
| 36 | (553.020001) | EACH | 1 | $40,000 | $1.00 |
| 37 | (553.020002) | EACH | 1 | $40,000 | $1.00 |
| 38 | (553.020003) | EACH | 1 | $80,000 | $1.00 |
| 39 | (553.020004) | EACH | 1 | $80,000 | $1.00 |
| 40 | (553.030001) | EACH | 1 | $175,000 | $1.00 |
| 41 | Footing Concrete, Performance (555.0011) | CY | 211.50 | $1,200.00 | $1,200.00 |
| 42 | Concrete for Structures, Performance (555.0021) | CY | 224.10 | $1,300.00 | $2,000.00 |
| 43 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $5.50 | $5.50 |
| 44 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $11.50 | $11.50 |
| 45 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 9,509 | $1.65 | $3.00 |
| 46 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 46,416 | $1.75 | $3.20 |
| 47 | Stud Shear Connectors for Bridges (556.03) | EACH | 1,980 | $4.00 | $6.00 |
| 48 | (557.1019) | SY | 177 | $350.00 | $550.00 |
| 49 | (557.1119) | SY | 413 | $450.00 | $650.00 |
| 50 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 589 | $0.01 | $0.10 |
| 51 | Sidewalks and Safety Walks (557.30) | SY | 32 | $415.00 | $750.00 |
| 52 | (557.60010004) | 549 | $36.00 | $45.00 | |
| 53 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $13.07 | $13.07 |
| 54 | Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902) | QUALITY UNIT | 1 | $10.35 | $10.35 |
| 55 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 549 | $15.00 | $22.00 |
| 56 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 5,788 | $0.60 | $1.50 |
| 57 | Protective Sealing of New Structural Concrete (559.02) | SF | 2,931 | $0.80 | $5.00 |
| 58 | (562.0101) | SY | 172 | $1,800.00 | $2,200.00 |
| 59 | (562.0102) | SY | 210 | $1,600.00 | $1,950.00 |
| 60 | Performance Concrete Quality Adjustment (562.99) | QUALITY UNIT | 1 | $17.00 | $17.00 |
| 61 | (564.0501) | LS | 1 | $500,000 | $350,000 |
| 62 | (565.30130101) | 12 | $400.00 | $550.00 | |
| 63 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 353 | $202.00 | $230.00 |
| 64 | Transition Bridge Railing (568.70) | LF | 384 | $174.00 | $190.00 |
| 65 | (572.00020101) | LS | 1 | $105,000 | $100,000 |
| 66 | (595.50000018) | 4,889 | $4.00 | $5.00 | |
| 67 | Box Beam Guide Railing (606.10) | LF | 2,076 | $45.00 | $50.00 |
| 68 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 24 | $127.00 | $70.00 |
| 69 | Box Beam End Piece (606.120101) | EACH | 1 | $626.00 | $600.00 |
| 70 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 8 | $4,010.00 | $4,600.00 |
| 71 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 3 | $2,113.00 | $2,400.00 |
| 72 | Removing and Storing Box Beam Guide Railing (606.63) | LF | 408 | $5.00 | $13.00 |
| 73 | Removing and Storing Box Beam Guide Railing End Assembly (606.6920) | EACH | 4 | $500.00 | $1,000.00 |
| 74 | Removing and Disposing Cable Guide Railing (606.70) | LF | 1,033 | $5.00 | $10.00 |
| 75 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 285 | $8.00 | $9.00 |
| 76 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 4 | $500.00 | $1,000.00 |
| 77 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 4 | $500.00 | $1,000.00 |
| 78 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 3 | $80.00 | $80.00 |
| 79 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 37 | $296.00 | $230.00 |
| 80 | Stone Curb – Bridge (Type A) (609.0301) | LF | 150 | $114.00 | $140.00 |
| 81 | Stone Curb – Bridge (Type F1) (609.0302) | LF | 171 | $102.00 | $160.00 |
| 82 | Turf Establishment – Performance (610.1605) | SY | 4,367 | $14.00 | $15.00 |
| 83 | (615.01010108) | 46 | $190.00 | $130.00 | |
| 84 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $160,000 | $1,200,000 |
| 85 | Type III Construction Barricades (619.04) | EACH | 32 | $200.00 | $50.00 |
| 86 | (619.0501) | LS | 1 | $1,000,000 | $920,000 |
| 87 | (619.080101) | LF | 11,030 | $1.00 | $1.75 |
| 88 | (619.080102) | LF | 10,532 | $1.00 | $1.75 |
| 89 | (619.100101) | LF | 11,030 | $1.00 | $1.25 |
| 90 | (619.111112) | EACH | 6 | $10,000 | $3,600.00 |
| 91 | (619.130201) | EACH | 1 | $50,000 | $30,000 |
| 92 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 240 | $26.00 | $55.00 |
| 93 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 1,290 | $26.00 | $95.00 |
| 94 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 12 | $200.00 | $65.00 |
| 95 | Temporary Rumble Strips (619.22) | LF | 1,296 | $16.00 | $12.00 |
| 96 | Stone Filling (Light) (620.03) | CY | 129 | $104.00 | $200.00 |
| 97 | Stone Filling (Medium) (620.04) | CY | 1,031 | $130.00 | $200.00 |
| 98 | Bedding Material, Type 1 (620.0801) | CY | 522 | $93.00 | $130.00 |
| 99 | (620.14020009) | 368 | $182.00 | $370.00 | |
| 100 | Cleaning Culverts with Span of 50 in. or Less (621.01) | LF | 30 | $50.00 | $90.00 |
| 101 | (621.05020004) | 767 | $7.00 | $15.00 | |
| 102 | Survey Operations (625.01) | LS | 1 | $80,000 | $45,000 |
| 103 | (625.110001) | EACH | 1 | $70,000 | $12,000 |
| 104 | (627.50140008) | 423 | $8.00 | $6.00 | |
| 105 | Field Laboratory (637.01) | EACH | 2 | $5,000.00 | $2,100.00 |
| 106 | Concrete Cylinder Curing Equipment (637.04) | EACH | 3 | $5,000.00 | $200.00 |
| 107 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 48 | $1,000.00 | $2,900.00 |
| 108 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 |
| 109 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 |
| 110 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 |
| 111 | (637.41000115) | 24 | $400.00 | $150.00 | |
| 112 | (637.41000215) | 24 | $400.00 | $150.00 | |
| 113 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 12 | $42.00 | $55.00 |
| 114 | Type A Sign Posts (645.81) | EACH | 2 | $205.00 | $250.00 |
| 115 | Reference Marker Panel (646.21) | EACH | 4 | $28.00 | $55.00 |
| 116 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 25 | $16.00 | $22.00 |
| 117 | Steel Post, 2.0 lb/ft (646.32) | EACH | 23 | $65.00 | $90.00 |
| 118 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 1 | $20.00 | $11.00 |
| 119 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 6,075 | $2.50 | $3.50 |
| 120 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 2,477 | $2.50 | $3.50 |
| 121 | (691.04000020) | 65,820 | $1.00 | $1.00 | |
| 122 | Field Change Payment (FCP) (697.03) | DOL | 529,000 | $1.00 | $1.00 |
| 123 | Asphalt Price Adjustment (698.04) | DOL | 3,299 | $1.00 | $1.00 |
| 124 | Fuel Price Adjustment (698.05) | DOL | 1,890 | $1.00 | $1.00 |
| 125 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 126 | Mobilization (699.040001) | LS | 1 | $314,368 | $300,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of December 18, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.