NYSDOT contract D265570 bid tabulation
BRIDGE REPLACEMENT - Route 28 over Rock River. Let by New York State DOT on October 23, 2025, Hamilton, Region 02. 2 bids received; low bid $4,949,335 by Kubricky-Jointa Lime LLC.
- Owner
- New York State DOT
- Letting
- 23 OCT 2025
- Pay items
- 78
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kubricky-Jointa Lime LLC | $4,949,335 | Low |
| 2 | Ing Civil Inc | $5,304,400 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kubricky-Jointa Lime LLC | 2. Ing Civil Inc |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $59,000 | $20,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 167 | $37.50 | $20.00 |
| 3 | Embankment In Place (203.03) | CY | 1,250 | $45.50 | $20.00 |
| 4 | Select Granular Fill, Slope Protection - Type A (203.0801) | CY | 100 | $125.00 | $170.00 |
| 5 | Select Structural Fill (203.21) | CY | 325 | $115.00 | $150.00 |
| 6 | Sand Backfill (203.25) | CY | 34 | $190.00 | $260.00 |
| 7 | Structure Excavation (206.01) | CY | 9,500 | $13.00 | $21.00 |
| 8 | Geotextile Bedding (207.20) | SY | 17 | $67.50 | $28.00 |
| 9 | Prefabricated Composite Structural Drain (207.26) | SY | 118 | $21.00 | $24.00 |
| 10 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 110 | $23.50 | $25.00 |
| 11 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 2,124 | $4.85 | $3.00 |
| 12 | (209.23010009) | 1,800 | $8.00 | $5.00 | |
| 13 | (304.01940004) | 2 | $320.00 | $650.00 | |
| 14 | Subbase Course, Type 2 (304.12) | CY | 118 | $140.00 | $170.00 |
| 15 | (404.0982) | TON | 162 | $150.00 | $275.00 |
| 16 | (404.2589) | TON | 90 | $185.00 | $275.00 |
| 17 | Straight Tack Coat (407.0103) | GAL | 97 | $11.00 | $10.00 |
| 18 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 80 | $3.90 | $40.00 |
| 19 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 1,617 | $5.55 | $13.00 |
| 20 | (551.03950017) | 1,288 | $130.00 | $152.00 | |
| 21 | Cast-In-Place Concrete Piles (551.11) | LF | 1,610 | $23.50 | $165.00 |
| 22 | Furnishing Equipment for Driving Piles (551.13) | LS | 1 | $762,000 | $500,000 |
| 23 | Performance Concrete Quality Adjustment - Cast In Place Piles (551.9902) | QUALITY UNIT | 1 | $8.21 | $8.21 |
| 24 | (553.030001) | EACH | 1 | $36,500 | $1.00 |
| 25 | (553.030002) | EACH | 1 | $36,500 | $1.00 |
| 26 | Footing Concrete, Performance (555.0011) | CY | 79 | $1,250.00 | $2,700.00 |
| 27 | Concrete for Structures, Performance (555.0021) | CY | 195 | $1,750.00 | $1,100.00 |
| 28 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $7.00 | $7.00 |
| 29 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $10.00 | $10.00 |
| 30 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 6,512 | $0.01 | $1.70 |
| 31 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 70,181 | $0.01 | $1.70 |
| 32 | (557.1012) | SY | 257 | $545.00 | $700.00 |
| 33 | (557.1112) | SY | 477 | $875.00 | $600.00 |
| 34 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 677 | $0.01 | $0.01 |
| 35 | Sidewalks and Safety Walks (557.30) | SY | 60 | $350.00 | $275.00 |
| 36 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $13.08 | $13.08 |
| 37 | Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902) | QUALITY UNIT | 1 | $9.20 | $9.20 |
| 38 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 605 | $14.50 | $14.00 |
| 39 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 7,706 | $1.00 | $0.50 |
| 40 | Protective Sealing of New Structural Concrete (559.02) | SF | 2,300 | $1.55 | $0.60 |
| 41 | Prestressed Concrete New England Bulb Tee Units (563.05) | LF | 560 | $1,000.00 | $850.00 |
| 42 | (565.30130101) | 10 | $115.00 | $400.00 | |
| 43 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 323 | $230.00 | $200.00 |
| 44 | Transition Bridge Railing (568.70) | LF | 128 | $200.00 | $170.00 |
| 45 | Box Beam Guide Railing (606.10) | LF | 294 | $54.50 | $47.00 |
| 46 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 2 | $2,550.00 | $2,200.00 |
| 47 | Removing and Storing Box Beam Guide Railing (606.63) | LF | 836 | $9.95 | $5.00 |
| 48 | Stone Curb – Bridge (Type A) (609.0301) | LF | 30 | $61.00 | $3,000.00 |
| 49 | Stone Curb – Bridge (Type F1) (609.0302) | LF | 320 | $61.50 | $100.00 |
| 50 | (610.14080002) | 5,000 | $4.60 | $1.50 | |
| 51 | (610.16020224) | 3,800 | $1.50 | $16.00 | |
| 52 | (615.01010108) | 65 | $155.00 | $143.00 | |
| 53 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $181,000 | $50,000 |
| 54 | (619.0501) | LS | 1 | $962,000 | $1,400,000 |
| 55 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 450 | $8.80 | $8.00 |
| 56 | (619.0901) | LF | 3,800 | $1.15 | $1.00 |
| 57 | (619.110511) | EACH | 2 | $9,050.00 | $10,000 |
| 58 | (619.130101) | EACH | 1 | $27,700 | $55,000 |
| 59 | Mailboxes (619.27) | EACH | 1 | $470.00 | $1,100.00 |
| 60 | Stone Filling (Light) (620.03) | CY | 6 | $160.00 | $300.00 |
| 61 | Stone Filling (Heavy) (620.05) | CY | 360 | $140.00 | $171.00 |
| 62 | Bedding Material, Type 1 (620.0801) | CY | 78 | $165.00 | $160.00 |
| 63 | Survey Operations (625.01) | LS | 1 | $81,200 | $50,000 |
| 64 | (627.50140008) | 80 | $19.50 | $7.00 | |
| 65 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1,900.00 | $1.00 |
| 66 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 12 | $2,500.00 | $1,500.00 |
| 67 | (637.41000115) | 12 | $155.00 | $250.00 | |
| 68 | Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24) | EACH | 9 | $37.50 | $32.00 |
| 69 | Steel Post, 2.0 lb/ft (646.32) | EACH | 8 | $76.00 | $65.00 |
| 70 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 3 | $145.00 | $125.00 |
| 71 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 3 | $29.50 | $25.00 |
| 72 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 2,574 | $2.95 | $2.50 |
| 73 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 1,142 | $2.95 | $2.50 |
| 74 | Field Change Payment (FCP) (697.03) | DOL | 145,678.41 | $1.00 | $1.00 |
| 75 | Asphalt Price Adjustment (698.04) | DOL | 197.82 | $1.00 | $1.00 |
| 76 | Fuel Price Adjustment (698.05) | DOL | 884 | $1.00 | $1.00 |
| 77 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 78 | Mobilization (699.040001) | LS | 1 | $180,000 | $202,063 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of October 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.