NYSDOT contract D265418 bid tabulation

CULVERT REPAIR & REPLACEMENT - Various Locations. Let by New York State DOT on February 27, 2025, Essex, Saratoga, Warren, Washington, Region 01. 3 bids received; low bid $7,425,115 by Rifenburg Construction Inc.

Owner
New York State DOT
Letting
27 FEB 2025
Pay items
144
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rifenburg Construction Inc$7,425,115Low
2Ing Civil Inc$8,255,400+11%
3Kubricky-Jointa Lime LLC$9,806,384+32%
NYSDOT contract D265418: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rifenburg Construction Inc2. Ing Civil Inc3. Kubricky-Jointa Lime LLC
1Clearing and Grubbing (201.06)LS1$75,000$324,000$62,800
2Unclassified Excavation and Disposal (203.02)CY4,756$15.00$28.00$20.00
3Embankment In Place (203.03)CY4,077$27.00$66.00$20.00
4Select Granular Fill (203.07)CY66$154.50$168.00$100.00
5Select Structural Fill (203.21)CY318$136.00$134.00$105.00
6 (203.24010017)77$42.00$73.00$250.00
7Controlled Low Strength Material (CLSM) (204.01)CY17$299.00$800.00$400.00
8Structure Excavation (206.01)CY2,399$50.00$40.00$70.00
9Trench and Culvert Excavation (206.0201)CY104$85.00$50.00$110.00
10Geotextile Separation (207.21)SY778$1.00$2.30$3.85
11Geotextile Stabilization (207.24)SY2,020$1.10$1.80$5.00
12Prefabricated Composite Structural Drain (207.26)SY105$25.25$16.00$36.50
13Mulch – Temporary (209.100101)SY4,411$1.50$0.50$3.30
14 (209.11000001)2$750.00$2,200.00$115.00
15Silt Fence - Temporary (209.13)LF403$7.00$10.00$20.00
16Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY1,038$5.00$2.00$10.50
17Stabilized Construction Access (209.22)SY322$20.50$25.00$52.50
18Sediment Filter Log, 12″ (209.2301)LF2,518$8.50$4.50$12.00
19Subbase Course, Type 2 (304.12)CY948$105.00$110.00$105.00
20 (404.0001)TON64$80.00$80.00$80.00
21 (404.0189)TON11$368.00$232.00$310.00
22 (404.0589)TON5$231.00$242.00$375.00
23 (404.0983)TON263$228.00$232.00$265.00
24 (404.1989)TON298$170.00$223.00$230.00
25 (404.3789)TON591$160.00$213.00$220.00
26 (404.4289)TON80$185.00$290.00$265.00
27 (404.4489)TON117$179.00$281.00$265.00
28Straight Tack Coat (407.0103)GAL245$3.00$42.00$66.00
29Asphalt Pavement Joint Adhesive (418.7603)LF1,249$1.50$8.50$3.30
30Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY1,112$15.25$34.00$33.00
31 (552.2001)LF181$396.00$280.00$265.00
32 (552.2101)LF105$1,000.00$1,200.00$1,300.00
33 (552.2201)LF295$150.00$150.00$200.00
34 (552.230201)SF1,197$12.25$18.00$30.50
35 (553.020001)EACH1$55,000$80,000$42,000
36 (553.020002)EACH1$7,650.00$80,000$15,000
37 (553.030002)EACH1$20,000$80,000$34,000
38 (553.030003)EACH1$20,000$60,000$30,000
39 (553.030004)EACH2$45,000$40,000$27,000
40 (553.030005)EACH2$20,000$35,000$114,000
41 (553.030006)EACH1$64,000$50,000$20,000
42 (553.030007)EACH1$100.00$50,000$20,000
43 (553.030008)EACH1$100.00$50,000$20,000
44 (553.030009)EACH1$40,000$50,000$20,000
45 (553.030010)EACH1$51,000$40,000$50,000
46 (553.030011)EACH1$31,000$50,000$20,000
47 (554.3001)SF2,022$45.50$60.00$60.50
48Footing Concrete, Performance (555.0011)CY214$2,000.00$1,500.00$1,570.00
49Concrete for Structures, Performance (555.0021)CY57$2,900.00$2,800.00$3,400.00
50Performance Concrete Quality Adjustment – Footing Concrete (555.9901)QUALITY UNIT5$1.80$1.80$1.80
51Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT3$4.42$4.42$4.42
52Uncoated Bar Reinforcement for Concrete Structures (556.0201)LB4,583$3.50$1.75$3.50
53Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB13,639$5.00$1.95$5.00
54Stud Shear Connectors for Bridges (556.03)EACH884$6.00$4.00$9.55
55Dimension Stone Masonry (560.01)SF426$160.00$230.00$215.00
56Tuck Pointing (560.09)SF432$35.25$95.00$66.00
57 (562.0101)SY151$1,535.00$2,200.00$2,150.00
58Performance Concrete Quality Adjustment (562.99)QUALITY UNIT1$18.00$18.00$18.00
59Steel Bridge Railing (Four-Rail) (568.51)LF93$366.50$367.00$485.00
60Transition Bridge Railing (568.70)LF320$198.25$199.00$260.00
61Removal and Replacement of Structural Concrete (582.0051)CY1$5,400.00$15,000$25,000
62 (582.99)1$25.00$25.00$25.00
63Removal of Structural Concrete - Replacement with Shotcrete, No Reinforcement Bar Encasement (583.02)SF1,318$46.25$60.00$91.50
64Removal of Structural Concrete - Replacement with Shotcrete, with Reinforcement Bar Encasement (583.03)SF792$47.50$72.00$170.00
65Drilling and Grouting Bolts or Reinforcing Bars (586.0201)EACH58$50.00$65.00$140.00
66 (595.50000018)1,176$8.50$10.00$19.50
67Structural Paving of Inverts with Portland Cement Concrete (602.2002)SF825$44.00$60.00$84.50
68 (602.2663)LF610$1,300.00$660.00$1,650.00
69 (602.90200107)76$2,350.00$2,000.00$2,950.00
70 (602.90300107)116$1,975.00$2,000.00$2,950.00
71 (603.64150815)34$4,300.00$4,400.00$5,150.00
72 (603.67000001)79$2,225.00$3,200.00$3,800.00
73 (603.9818)LF302$21.00$43.00$96.50
74Box Beam Guide Railing (606.10)LF1,989$44.75$45.00$59.00
75Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF216$52.75$53.00$69.50
76Box Beam End Piece (606.120101)EACH3$630.00$630.00$830.00
77Box Beam Guide Railing End Assembly Type I (606.120102)EACH2$4,420.00$4,500.00$5,850.00
78Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH16$2,005.00$2,005.00$2,650.00
79Box Beam End Assembly Type III (606.1203)EACH1$7,880.00$7,900.00$10,400
80Resetting Cable Guide Railing (606.50)LF44$100.50$91.00$120.00
81Resetting Box Beam Guide Railing (606.53)LF576$38.00$35.00$45.00
82Removing and Disposing Cable Guide Railing (606.70)LF696$3.00$4.00$20.00
83Removing and Disposing Corrugated Beam Guide Railing (606.71)LF947$3.50$4.00$20.00
84Removing and Disposing Box Beam Guide Railing (606.73)LF1,276$3.25$4.00$22.50
85Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79)EACH6$425.00$400.00$1,050.00
86Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910)EACH4$415.00$225.00$1,600.00
87Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920)EACH11$300.00$400.00$1,150.00
88Guide Rail Transition Box Beam to 3-Cable (One or Two-Way) (606.83)EACH1$16,815$17,000$22,200
89 (607.41010010)3,276$5.50$8.00$8.20
90 (607.96000008)117$2.25$8.00$35.00
91 (607.98010111)286$38.50$34.00$46.00
92Fertilizer (610.0501)LB225$5.00$5.00$6.60
93Mycorrhizal Fungi (610.0701)LB12$50.00$50.00$66.00
94Topsoil - Roadside (610.1402)CY1,283$50.00$70.00$130.00
95 (610.16010524)1,550$2.00$2.00$2.65
96 (610.16010724)655$2.00$2.00$2.65
97 (610.16010824)51$10.00$10.00$13.00
98Turf Establishment – Performance (610.1605)SY4,229$16.25$16.00$22.00
99Watering Vegetation (610.19)1,000 GALLONS34$20.00$20.00$26.50
100Mowing (610.21)SY3,346$0.40$0.01$0.55
101 (613.04000001)150$93.25$155.00$170.00
102 (614.060104)EACH3$632.00$2,000.00$2,850.00
103 (617.10000024)250$35.00$36.00$77.00
104 (617.11000024)LS1$350.00$1.00$8,650.00
105Basic Work Zone Traffic Control (619.01)LS1$1,317,755$1,290,000$1,675,000
106Type III Construction Barricades (619.04)EACH18$150.00$100.00$78.50
107 (619.07010001)47$250.00$100.00$21.50
108Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF955$7.50$7.00$8.70
109 (619.100103)LF2,288$7.00$7.00$7.35
110 (619.111213)WEEK108$435.00$500.00$395.00
111 (619.1301)EACH4$9,000.00$15,000$16,500
112 (619.1302)EACH6$1,000.00$8,000.00$10,000
113Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715)LF1,854$32.00$40.00$63.00
114Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716)LF290$29.00$45.00$63.00
115Warning Lights on Temporary Positive Barriers (619.1719)EACH60$65.00$80.00$68.50
116Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803)EACH5$3,500.00$5,000.00$10,500
117Mailboxes (619.27)EACH1$500.00$500.00$350.00
118Stone Filling (Light) (620.03)CY76$107.00$108.00$115.00
119Stone Filling (Medium) (620.04)CY139$132.00$124.00$135.00
120Stone Filling (Heavy) (620.05)CY421$148.00$130.00$155.00
121Bedding Material, Type 1 (620.0801)CY147$127.00$137.00$125.00
122Crushed Stone (In-Place Measure) (623.12)CY485$117.00$104.00$130.00
123Survey Operations (625.01)LS1$75,000$204,000$195,000
124Concrete Right of Way Markers Type H (High) (625.03)EACH24$675.00$400.00$1,550.00
125Steel Pin and Cap Right of Way Markers (625.05)EACH3$325.00$500.00$395.00
126 (627.50140008)468$5.50$7.00$4.35
127Cleaning Existing Pavement and/or Shoulder (633.11)SY5,679$0.40$0.50$1.65
128Field Laboratory (637.01)EACH1$3,000.00$1.00$27,900
129Concrete Cylinder Curing Equipment (637.04)EACH3$1,500.00$1.00$710.00
130Engineer’s Field Office – Type 2 (637.12)MONTH23$3,000.00$1,000.00$3,300.00
131Office Technology and Supplies (637.34)DOL6,750$1.00$1.00$1.00
132Type A Sign Posts (645.81)EACH4$225.00$225.00$295.00
133Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH16$25.00$25.00$33.00
134Steel Post, 2.0 lb/ft (646.32)EACH16$81.00$81.00$105.00
135Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH1$130.00$130.00$170.00
136Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH4$40.00$40.00$52.50
137White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF1,964$9.19$7.20$9.45
138Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF1,956$9.19$7.20$9.45
139 (691.04000020)68,000$1.00$1.00$1.00
140Field Change Payment (FCP) (697.03)DOL356,000$1.00$1.00$1.00
141Asphalt Price Adjustment (698.04)DOL100$1.00$1.00$1.00
142Fuel Price Adjustment (698.05)DOL100$1.00$1.00$1.00
143Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00
144Mobilization (699.040001)LS1$285,000$316,642$350,000
NYSDOT contract D265418: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of February 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy