NYSDOT contract D265418 bid tabulation
CULVERT REPAIR & REPLACEMENT - Various Locations. Let by New York State DOT on February 27, 2025, Essex, Saratoga, Warren, Washington, Region 01. 3 bids received; low bid $7,425,115 by Rifenburg Construction Inc.
- Owner
- New York State DOT
- Letting
- 27 FEB 2025
- Pay items
- 144
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rifenburg Construction Inc | $7,425,115 | Low |
| 2 | Ing Civil Inc | $8,255,400 | +11% |
| 3 | Kubricky-Jointa Lime LLC | $9,806,384 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rifenburg Construction Inc | 2. Ing Civil Inc | 3. Kubricky-Jointa Lime LLC |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $75,000 | $324,000 | $62,800 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 4,756 | $15.00 | $28.00 | $20.00 |
| 3 | Embankment In Place (203.03) | CY | 4,077 | $27.00 | $66.00 | $20.00 |
| 4 | Select Granular Fill (203.07) | CY | 66 | $154.50 | $168.00 | $100.00 |
| 5 | Select Structural Fill (203.21) | CY | 318 | $136.00 | $134.00 | $105.00 |
| 6 | (203.24010017) | 77 | $42.00 | $73.00 | $250.00 | |
| 7 | Controlled Low Strength Material (CLSM) (204.01) | CY | 17 | $299.00 | $800.00 | $400.00 |
| 8 | Structure Excavation (206.01) | CY | 2,399 | $50.00 | $40.00 | $70.00 |
| 9 | Trench and Culvert Excavation (206.0201) | CY | 104 | $85.00 | $50.00 | $110.00 |
| 10 | Geotextile Separation (207.21) | SY | 778 | $1.00 | $2.30 | $3.85 |
| 11 | Geotextile Stabilization (207.24) | SY | 2,020 | $1.10 | $1.80 | $5.00 |
| 12 | Prefabricated Composite Structural Drain (207.26) | SY | 105 | $25.25 | $16.00 | $36.50 |
| 13 | Mulch – Temporary (209.100101) | SY | 4,411 | $1.50 | $0.50 | $3.30 |
| 14 | (209.11000001) | 2 | $750.00 | $2,200.00 | $115.00 | |
| 15 | Silt Fence - Temporary (209.13) | LF | 403 | $7.00 | $10.00 | $20.00 |
| 16 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 1,038 | $5.00 | $2.00 | $10.50 |
| 17 | Stabilized Construction Access (209.22) | SY | 322 | $20.50 | $25.00 | $52.50 |
| 18 | Sediment Filter Log, 12″ (209.2301) | LF | 2,518 | $8.50 | $4.50 | $12.00 |
| 19 | Subbase Course, Type 2 (304.12) | CY | 948 | $105.00 | $110.00 | $105.00 |
| 20 | (404.0001) | TON | 64 | $80.00 | $80.00 | $80.00 |
| 21 | (404.0189) | TON | 11 | $368.00 | $232.00 | $310.00 |
| 22 | (404.0589) | TON | 5 | $231.00 | $242.00 | $375.00 |
| 23 | (404.0983) | TON | 263 | $228.00 | $232.00 | $265.00 |
| 24 | (404.1989) | TON | 298 | $170.00 | $223.00 | $230.00 |
| 25 | (404.3789) | TON | 591 | $160.00 | $213.00 | $220.00 |
| 26 | (404.4289) | TON | 80 | $185.00 | $290.00 | $265.00 |
| 27 | (404.4489) | TON | 117 | $179.00 | $281.00 | $265.00 |
| 28 | Straight Tack Coat (407.0103) | GAL | 245 | $3.00 | $42.00 | $66.00 |
| 29 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,249 | $1.50 | $8.50 | $3.30 |
| 30 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 1,112 | $15.25 | $34.00 | $33.00 |
| 31 | (552.2001) | LF | 181 | $396.00 | $280.00 | $265.00 |
| 32 | (552.2101) | LF | 105 | $1,000.00 | $1,200.00 | $1,300.00 |
| 33 | (552.2201) | LF | 295 | $150.00 | $150.00 | $200.00 |
| 34 | (552.230201) | SF | 1,197 | $12.25 | $18.00 | $30.50 |
| 35 | (553.020001) | EACH | 1 | $55,000 | $80,000 | $42,000 |
| 36 | (553.020002) | EACH | 1 | $7,650.00 | $80,000 | $15,000 |
| 37 | (553.030002) | EACH | 1 | $20,000 | $80,000 | $34,000 |
| 38 | (553.030003) | EACH | 1 | $20,000 | $60,000 | $30,000 |
| 39 | (553.030004) | EACH | 2 | $45,000 | $40,000 | $27,000 |
| 40 | (553.030005) | EACH | 2 | $20,000 | $35,000 | $114,000 |
| 41 | (553.030006) | EACH | 1 | $64,000 | $50,000 | $20,000 |
| 42 | (553.030007) | EACH | 1 | $100.00 | $50,000 | $20,000 |
| 43 | (553.030008) | EACH | 1 | $100.00 | $50,000 | $20,000 |
| 44 | (553.030009) | EACH | 1 | $40,000 | $50,000 | $20,000 |
| 45 | (553.030010) | EACH | 1 | $51,000 | $40,000 | $50,000 |
| 46 | (553.030011) | EACH | 1 | $31,000 | $50,000 | $20,000 |
| 47 | (554.3001) | SF | 2,022 | $45.50 | $60.00 | $60.50 |
| 48 | Footing Concrete, Performance (555.0011) | CY | 214 | $2,000.00 | $1,500.00 | $1,570.00 |
| 49 | Concrete for Structures, Performance (555.0021) | CY | 57 | $2,900.00 | $2,800.00 | $3,400.00 |
| 50 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 5 | $1.80 | $1.80 | $1.80 |
| 51 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 3 | $4.42 | $4.42 | $4.42 |
| 52 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 4,583 | $3.50 | $1.75 | $3.50 |
| 53 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 13,639 | $5.00 | $1.95 | $5.00 |
| 54 | Stud Shear Connectors for Bridges (556.03) | EACH | 884 | $6.00 | $4.00 | $9.55 |
| 55 | Dimension Stone Masonry (560.01) | SF | 426 | $160.00 | $230.00 | $215.00 |
| 56 | Tuck Pointing (560.09) | SF | 432 | $35.25 | $95.00 | $66.00 |
| 57 | (562.0101) | SY | 151 | $1,535.00 | $2,200.00 | $2,150.00 |
| 58 | Performance Concrete Quality Adjustment (562.99) | QUALITY UNIT | 1 | $18.00 | $18.00 | $18.00 |
| 59 | Steel Bridge Railing (Four-Rail) (568.51) | LF | 93 | $366.50 | $367.00 | $485.00 |
| 60 | Transition Bridge Railing (568.70) | LF | 320 | $198.25 | $199.00 | $260.00 |
| 61 | Removal and Replacement of Structural Concrete (582.0051) | CY | 1 | $5,400.00 | $15,000 | $25,000 |
| 62 | (582.99) | 1 | $25.00 | $25.00 | $25.00 | |
| 63 | Removal of Structural Concrete - Replacement with Shotcrete, No Reinforcement Bar Encasement (583.02) | SF | 1,318 | $46.25 | $60.00 | $91.50 |
| 64 | Removal of Structural Concrete - Replacement with Shotcrete, with Reinforcement Bar Encasement (583.03) | SF | 792 | $47.50 | $72.00 | $170.00 |
| 65 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 58 | $50.00 | $65.00 | $140.00 |
| 66 | (595.50000018) | 1,176 | $8.50 | $10.00 | $19.50 | |
| 67 | Structural Paving of Inverts with Portland Cement Concrete (602.2002) | SF | 825 | $44.00 | $60.00 | $84.50 |
| 68 | (602.2663) | LF | 610 | $1,300.00 | $660.00 | $1,650.00 |
| 69 | (602.90200107) | 76 | $2,350.00 | $2,000.00 | $2,950.00 | |
| 70 | (602.90300107) | 116 | $1,975.00 | $2,000.00 | $2,950.00 | |
| 71 | (603.64150815) | 34 | $4,300.00 | $4,400.00 | $5,150.00 | |
| 72 | (603.67000001) | 79 | $2,225.00 | $3,200.00 | $3,800.00 | |
| 73 | (603.9818) | LF | 302 | $21.00 | $43.00 | $96.50 |
| 74 | Box Beam Guide Railing (606.10) | LF | 1,989 | $44.75 | $45.00 | $59.00 |
| 75 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 216 | $52.75 | $53.00 | $69.50 |
| 76 | Box Beam End Piece (606.120101) | EACH | 3 | $630.00 | $630.00 | $830.00 |
| 77 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 2 | $4,420.00 | $4,500.00 | $5,850.00 |
| 78 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 16 | $2,005.00 | $2,005.00 | $2,650.00 |
| 79 | Box Beam End Assembly Type III (606.1203) | EACH | 1 | $7,880.00 | $7,900.00 | $10,400 |
| 80 | Resetting Cable Guide Railing (606.50) | LF | 44 | $100.50 | $91.00 | $120.00 |
| 81 | Resetting Box Beam Guide Railing (606.53) | LF | 576 | $38.00 | $35.00 | $45.00 |
| 82 | Removing and Disposing Cable Guide Railing (606.70) | LF | 696 | $3.00 | $4.00 | $20.00 |
| 83 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 947 | $3.50 | $4.00 | $20.00 |
| 84 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 1,276 | $3.25 | $4.00 | $22.50 |
| 85 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 6 | $425.00 | $400.00 | $1,050.00 |
| 86 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 4 | $415.00 | $225.00 | $1,600.00 |
| 87 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 11 | $300.00 | $400.00 | $1,150.00 |
| 88 | Guide Rail Transition Box Beam to 3-Cable (One or Two-Way) (606.83) | EACH | 1 | $16,815 | $17,000 | $22,200 |
| 89 | (607.41010010) | 3,276 | $5.50 | $8.00 | $8.20 | |
| 90 | (607.96000008) | 117 | $2.25 | $8.00 | $35.00 | |
| 91 | (607.98010111) | 286 | $38.50 | $34.00 | $46.00 | |
| 92 | Fertilizer (610.0501) | LB | 225 | $5.00 | $5.00 | $6.60 |
| 93 | Mycorrhizal Fungi (610.0701) | LB | 12 | $50.00 | $50.00 | $66.00 |
| 94 | Topsoil - Roadside (610.1402) | CY | 1,283 | $50.00 | $70.00 | $130.00 |
| 95 | (610.16010524) | 1,550 | $2.00 | $2.00 | $2.65 | |
| 96 | (610.16010724) | 655 | $2.00 | $2.00 | $2.65 | |
| 97 | (610.16010824) | 51 | $10.00 | $10.00 | $13.00 | |
| 98 | Turf Establishment – Performance (610.1605) | SY | 4,229 | $16.25 | $16.00 | $22.00 |
| 99 | Watering Vegetation (610.19) | 1,000 GALLONS | 34 | $20.00 | $20.00 | $26.50 |
| 100 | Mowing (610.21) | SY | 3,346 | $0.40 | $0.01 | $0.55 |
| 101 | (613.04000001) | 150 | $93.25 | $155.00 | $170.00 | |
| 102 | (614.060104) | EACH | 3 | $632.00 | $2,000.00 | $2,850.00 |
| 103 | (617.10000024) | 250 | $35.00 | $36.00 | $77.00 | |
| 104 | (617.11000024) | LS | 1 | $350.00 | $1.00 | $8,650.00 |
| 105 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $1,317,755 | $1,290,000 | $1,675,000 |
| 106 | Type III Construction Barricades (619.04) | EACH | 18 | $150.00 | $100.00 | $78.50 |
| 107 | (619.07010001) | 47 | $250.00 | $100.00 | $21.50 | |
| 108 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 955 | $7.50 | $7.00 | $8.70 |
| 109 | (619.100103) | LF | 2,288 | $7.00 | $7.00 | $7.35 |
| 110 | (619.111213) | WEEK | 108 | $435.00 | $500.00 | $395.00 |
| 111 | (619.1301) | EACH | 4 | $9,000.00 | $15,000 | $16,500 |
| 112 | (619.1302) | EACH | 6 | $1,000.00 | $8,000.00 | $10,000 |
| 113 | Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715) | LF | 1,854 | $32.00 | $40.00 | $63.00 |
| 114 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 290 | $29.00 | $45.00 | $63.00 |
| 115 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 60 | $65.00 | $80.00 | $68.50 |
| 116 | Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803) | EACH | 5 | $3,500.00 | $5,000.00 | $10,500 |
| 117 | Mailboxes (619.27) | EACH | 1 | $500.00 | $500.00 | $350.00 |
| 118 | Stone Filling (Light) (620.03) | CY | 76 | $107.00 | $108.00 | $115.00 |
| 119 | Stone Filling (Medium) (620.04) | CY | 139 | $132.00 | $124.00 | $135.00 |
| 120 | Stone Filling (Heavy) (620.05) | CY | 421 | $148.00 | $130.00 | $155.00 |
| 121 | Bedding Material, Type 1 (620.0801) | CY | 147 | $127.00 | $137.00 | $125.00 |
| 122 | Crushed Stone (In-Place Measure) (623.12) | CY | 485 | $117.00 | $104.00 | $130.00 |
| 123 | Survey Operations (625.01) | LS | 1 | $75,000 | $204,000 | $195,000 |
| 124 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 24 | $675.00 | $400.00 | $1,550.00 |
| 125 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 3 | $325.00 | $500.00 | $395.00 |
| 126 | (627.50140008) | 468 | $5.50 | $7.00 | $4.35 | |
| 127 | Cleaning Existing Pavement and/or Shoulder (633.11) | SY | 5,679 | $0.40 | $0.50 | $1.65 |
| 128 | Field Laboratory (637.01) | EACH | 1 | $3,000.00 | $1.00 | $27,900 |
| 129 | Concrete Cylinder Curing Equipment (637.04) | EACH | 3 | $1,500.00 | $1.00 | $710.00 |
| 130 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 23 | $3,000.00 | $1,000.00 | $3,300.00 |
| 131 | Office Technology and Supplies (637.34) | DOL | 6,750 | $1.00 | $1.00 | $1.00 |
| 132 | Type A Sign Posts (645.81) | EACH | 4 | $225.00 | $225.00 | $295.00 |
| 133 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 16 | $25.00 | $25.00 | $33.00 |
| 134 | Steel Post, 2.0 lb/ft (646.32) | EACH | 16 | $81.00 | $81.00 | $105.00 |
| 135 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 1 | $130.00 | $130.00 | $170.00 |
| 136 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 4 | $40.00 | $40.00 | $52.50 |
| 137 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 1,964 | $9.19 | $7.20 | $9.45 |
| 138 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 1,956 | $9.19 | $7.20 | $9.45 |
| 139 | (691.04000020) | 68,000 | $1.00 | $1.00 | $1.00 | |
| 140 | Field Change Payment (FCP) (697.03) | DOL | 356,000 | $1.00 | $1.00 | $1.00 |
| 141 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 142 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 143 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 144 | Mobilization (699.040001) | LS | 1 | $285,000 | $316,642 | $350,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of February 27, 2025. Compiled by Mirage Metrics.