NYSDOT contract D265517 bid tabulation
BRIDGE REPLACEMENT- NY Route 34 over Dry Run Creek. Let by New York State DOT on September 11, 2025, Tioga, Region 09. 5 bids received; low bid $4,028,400 by Ing Civil Inc.
- Owner
- New York State DOT
- Letting
- 11 SEP 2025
- Pay items
- 126
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ing Civil Inc | $4,028,400 | Low |
| 2 | Bothar Construction LLC | $4,477,778 | +11% |
| 3 | Economy Paving Co Inc | $4,497,779 | +12% |
| 4 | Slate Hill Constructors Inc | $4,823,056 | +20% |
| 5 | R De Vincentis Construction Inc | $4,871,000 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ing Civil Inc | 2. Bothar Construction LLC | 3. Economy Paving Co Inc | 4. Slate Hill Constructors Inc | 5. R De Vincentis Construction Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $24,000 | $16,000 | $75,000 | $75,000 | $20,000 |
| 2 | Removal of Substructures (202.19) | CY | 32 | $124.00 | $285.00 | $95.00 | $400.00 | $600.00 |
| 3 | Unclassified Excavation and Disposal (203.02) | CY | 4,700 | $12.00 | $34.75 | $25.00 | $43.00 | $16.00 |
| 4 | Embankment In Place (203.03) | CY | 8,500 | $23.00 | $37.60 | $35.00 | $33.00 | $29.00 |
| 5 | Select Granular Fill (203.07) | CY | 55 | $88.00 | $51.50 | $35.00 | $130.00 | $90.00 |
| 6 | Select Structural Fill (203.21) | CY | 135 | $71.00 | $60.50 | $65.00 | $90.00 | $78.00 |
| 7 | Structure Excavation (206.01) | CY | 1,280 | $12.00 | $22.00 | $35.00 | $36.00 | $19.00 |
| 8 | Trench and Culvert Excavation (206.0201) | CY | 383 | $24.00 | $37.40 | $1.00 | $40.00 | $45.00 |
| 9 | Geotextile Bedding (207.20) | SY | 138 | $10.00 | $11.00 | $4.50 | $10.00 | $9.00 |
| 10 | Geotextile Drainage (207.22) | SY | 738 | $1.90 | $2.85 | $1.50 | $7.00 | $5.00 |
| 11 | Prefabricated Composite Structural Drain (207.26) | SY | 38 | $21.00 | $64.30 | $10.00 | $30.00 | $21.00 |
| 12 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 88 | $14.00 | $61.00 | $11.50 | $22.00 | $26.00 |
| 13 | (208.01000609) | 141 | $160.00 | $92.50 | $30.00 | $150.00 | $240.00 | |
| 14 | Mulch – Temporary (209.100101) | SY | 11,490 | $0.40 | $2.60 | $1.00 | $1.00 | $1.50 |
| 15 | Seed and Mulch – Temporary (209.1003) | SY | 4,245 | $0.68 | $3.10 | $1.25 | $1.30 | $1.75 |
| 16 | Silt Fence - Temporary (209.13) | LF | 250 | $6.00 | $2.90 | $5.00 | $14.00 | $7.50 |
| 17 | Rolled Erosion Control Product, Class I Type C, Short Term (209.1803) | SY | 500 | $3.00 | $3.10 | $4.00 | $5.65 | $4.00 |
| 18 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 3,288 | $2.00 | $3.60 | $5.00 | $7.00 | $3.00 |
| 19 | (209.23010009) | 971 | $6.00 | $5.15 | $5.50 | $12.00 | $7.50 | |
| 20 | Subbase Course, Optional Type (304.15) | CY | 1,671 | $60.00 | $50.00 | $65.00 | $75.00 | $77.00 |
| 21 | (404.0189) | TON | 100 | $236.00 | $134.00 | $135.00 | $170.00 | $193.00 |
| 22 | (404.0982) | TON | 750 | $154.00 | $135.00 | $165.00 | $160.00 | $187.00 |
| 23 | (404.2589) | TON | 1,201 | $149.00 | $120.00 | $145.00 | $150.00 | $165.00 |
| 24 | (407.01040009) | 500 | $12.00 | $6.85 | $3.00 | $7.00 | $7.50 | |
| 25 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,700 | $3.00 | $1.70 | $0.35 | $3.25 | $4.00 |
| 26 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 2,200 | $9.00 | $7.65 | $10.00 | $16.00 | $14.50 |
| 27 | Steel H-Piles (HP 12x84) (551.012084) | LF | 2,160 | $2.00 | $114.00 | $15.15 | $3.00 | $2.25 |
| 28 | Splices for Steel H-Piles (551.12) | EACH | 14 | $10.00 | $402.50 | $1.00 | $15.00 | $11.00 |
| 29 | Furnishing Equipment for Driving Piles (551.13) | LS | 1 | $660,000 | $55,200 | $245,000 | $300,000 | $285,000 |
| 30 | Dynamic Pile Load Testing (551.14) | EACH | 2 | $2,000.00 | $6,785.00 | $4,000.00 | $2,200.00 | $2,200.00 |
| 31 | (553.020001) | EACH | 1 | $1.00 | $4,200.00 | $1,000.00 | $1.00 | $28,000 |
| 32 | (553.020002) | EACH | 1 | $1.00 | $4,200.00 | $1,000.00 | $1.00 | $28,000 |
| 33 | (553.030001) | EACH | 1 | $1.00 | $7,570.00 | $1,000.00 | $1.00 | $14,000 |
| 34 | (553.030002) | EACH | 1 | $1.00 | $7,570.00 | $1,000.00 | $1.00 | $14,000 |
| 35 | Concrete for Structures, Performance (555.0021) | CY | 152 | $1,000.00 | $1,360.00 | $1,000.00 | $1,800.00 | $1,700.00 |
| 36 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| 37 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 12,288 | $1.80 | $2.10 | $2.60 | $2.90 | $2.00 |
| 38 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 8,877 | $2.10 | $2.35 | $2.70 | $3.00 | $2.26 |
| 39 | (557.1019) | SY | 153 | $350.00 | $498.00 | $500.00 | $500.00 | $450.00 |
| 40 | (557.2219) | SY | 249 | $280.00 | $532.00 | $550.00 | $500.00 | $525.00 |
| 41 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 408 | $0.01 | $1.00 | $1.00 | $0.10 | $1.00 |
| 42 | Sidewalks and Safety Walks (557.30) | SY | 25 | $325.00 | $1,630.00 | $650.00 | $900.00 | $650.00 |
| 43 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $9.77 | $9.77 | $9.77 | $9.77 | $9.77 |
| 44 | Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902) | QUALITY UNIT | 1 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| 45 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 150 | $44.00 | $54.00 | $52.00 | $50.00 | $62.00 |
| 46 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 1,350 | $0.50 | $2.35 | $1.40 | $4.00 | $3.00 |
| 47 | Protective Sealing of New Structural Concrete (559.02) | SF | 220 | $1.70 | $4.50 | $2.10 | $6.00 | $3.00 |
| 48 | Prestressed Concrete Hollow Slab Units (563.03) | SF | 2,052 | $125.00 | $143.00 | $150.00 | $150.00 | $155.00 |
| 49 | (565.30130101) | 36 | $260.00 | $93.50 | $400.00 | $300.00 | $325.00 | |
| 50 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 135 | $203.00 | $250.00 | $205.00 | $215.00 | $225.00 |
| 51 | Transition Bridge Railing (568.70) | LF | 128 | $225.00 | $255.00 | $225.00 | $235.00 | $251.00 |
| 52 | (584.21010001) | 379 | $225.00 | $459.00 | $400.00 | $400.00 | $696.00 | |
| 53 | (584.9901) | 1 | $54.05 | $54.05 | $54.05 | $54.05 | $54.05 | |
| 54 | (603.6001) | LF | 40 | $73.00 | $74.30 | $100.00 | $80.00 | $175.00 |
| 55 | (603.6101) | LF | 106 | $51.00 | $76.30 | $100.00 | $70.00 | $135.00 |
| 56 | (603.7301) | EACH | 4 | $2,000.00 | $2,890.00 | $2,750.00 | $2,450.00 | $3,600.00 |
| 57 | Underdrain Filter, Type II (605.1001) | CY | 53 | $54.00 | $104.00 | $35.00 | $110.00 | $185.00 |
| 58 | (605.1602) | LF | 303 | $9.00 | $14.75 | $25.00 | $13.00 | $20.00 |
| 59 | (605.16020008) | 23 | $18.00 | $15.80 | $25.00 | $18.00 | $60.00 | |
| 60 | (605.21010018) | 1 | $400.00 | $863.00 | $200.00 | $225.00 | $750.00 | |
| 61 | Box Beam Guide Railing (606.10) | LF | 642 | $47.00 | $52.90 | $45.00 | $50.00 | $51.00 |
| 62 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 50 | $57.00 | $65.30 | $55.00 | $60.00 | $62.00 |
| 63 | Box Beam Guide Railing With Extra Long Posts (606.1001) | LF | 111 | $52.00 | $58.40 | $55.00 | $55.00 | $57.00 |
| 64 | Box Beam Guide Railing with Extra Long Posts (Shop Bent or Shop Mitered) (606.100102) | LF | 72 | $60.00 | $70.15 | $65.00 | $65.00 | $66.00 |
| 65 | Box Beam End Piece (606.120101) | EACH | 4 | $610.00 | $776.25 | $610.00 | $650.00 | $700.00 |
| 66 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 5 | $2,000.00 | $2,507.00 | $2,000.00 | $2,150.00 | $2,200.00 |
| 67 | (606.73000015) | 520 | $4.00 | $6.45 | $5.50 | $9.00 | $13.00 | |
| 68 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 4 | $500.00 | $800.00 | $100.00 | $900.00 | $350.00 |
| 69 | (607.41010010) | 815 | $3.20 | $4.00 | $5.00 | $8.00 | $8.00 | |
| 70 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 55 | $330.00 | $265.00 | $225.00 | $350.00 | $330.00 |
| 71 | Stone Curb – Bridge (Type A) (609.0301) | LF | 57 | $92.00 | $87.00 | $150.00 | $105.00 | $96.00 |
| 72 | Stone Curb – Bridge (Type F1) (609.0302) | LF | 137 | $80.00 | $99.70 | $90.00 | $85.00 | $89.00 |
| 73 | Mycorrhizal Fungi (610.0701) | LB | 1 | $100.00 | $115.00 | $100.00 | $105.00 | $110.00 |
| 74 | Compost (610.10) | CY | 105 | $117.00 | $120.00 | $40.00 | $90.00 | $130.00 |
| 75 | Weed Removal (610.13) | SY | 3,823 | $1.00 | $1.25 | $1.00 | $3.00 | $1.10 |
| 76 | (610.15120208) | 1,249 | $0.01 | $4.60 | $3.50 | $4.00 | $8.00 | |
| 77 | Turf Establishment -Lawns (610.1602) | SY | 415 | $3.70 | $3.45 | $3.00 | $7.00 | $3.30 |
| 78 | Turf Establishment – Performance (610.1605) | SY | 3,830 | $12.00 | $14.00 | $1.50 | $22.00 | $2.00 |
| 79 | Watering Vegetation (610.19) | 1,000 GALLONS | 59 | $20.00 | $23.00 | $20.00 | $120.00 | $23.00 |
| 80 | Mowing (610.21) | SY | 5,804 | $0.01 | $0.60 | $0.50 | $2.00 | $0.60 |
| 81 | (611.0442) | EACH | 3 | $200.00 | $230.00 | $200.00 | $400.00 | $225.00 |
| 82 | (611.19040024) | 3 | $10.00 | $11.50 | $10.00 | $205.00 | $11.00 | |
| 83 | (615.33010011) | 1 | $560.00 | $620.00 | $100.00 | $400.00 | $330.00 | |
| 84 | (616.08000024) | 1,167 | $12.00 | $13.80 | $12.00 | $17.00 | $15.00 | |
| 85 | (617.01010024) | 15,500 | $0.50 | $0.60 | $0.50 | $2.05 | $0.60 | |
| 86 | (617.10000024) | 850 | $10.00 | $35.15 | $1.00 | $52.00 | $175.00 | |
| 87 | (617.11000024) | LS | 1 | $1.00 | $2,810.00 | $100.00 | $8,000.00 | $3,000.00 |
| 88 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $60,000 | $119,594 | $250,000 | $320,000 | $330,000 |
| 89 | (619.0501) | LS | 1 | $600,000 | $558,000 | $705,000 | $425,000 | $485,000 |
| 90 | (619.080102) | LF | 1,650 | $1.50 | $1.85 | $1.50 | $2.00 | $1.65 |
| 91 | (619.100101) | LF | 6,300 | $0.75 | $0.95 | $0.50 | $1.00 | $0.90 |
| 92 | (619.130101) | EACH | 1 | $140,000 | $179,400 | $200,000 | $145,000 | $165,000 |
| 93 | Temporary Rumble Strips (619.22) | LF | 396 | $17.00 | $19.00 | $17.50 | $18.00 | $19.00 |
| 94 | Mailboxes (619.27) | EACH | 6 | $340.00 | $263.00 | $550.00 | $100.00 | $200.00 |
| 95 | Stone Filling (Light) (620.03) | CY | 54 | $102.00 | $133.00 | $135.00 | $200.00 | $115.00 |
| 96 | Stone Filling (Heavy) (620.05) | CY | 1,630 | $155.00 | $180.00 | $155.00 | $160.00 | $167.00 |
| 97 | Bedding Material, Type 1 (620.0801) | CY | 520 | $82.00 | $91.30 | $135.00 | $130.00 | $96.00 |
| 98 | (620.29010009) | 200 | $47.00 | $28.76 | $15.00 | $60.00 | $36.00 | |
| 99 | (620.29110009) | 400 | $73.00 | $80.00 | $10.00 | $100.00 | $80.00 | |
| 100 | Screened Gravel (In-Place Measure) (623.10) | CY | 30 | $94.00 | $71.50 | $70.00 | $90.00 | $83.00 |
| 101 | Survey Operations (625.01) | LS | 1 | $30,000 | $62,000 | $50,000 | $50,000 | $34,000 |
| 102 | (627.50140008) | 2,700 | $3.40 | $5.00 | $1.00 | $6.00 | $6.00 | |
| 103 | (634.99010017) | LS | 1 | $15,000 | $13,500 | $5,000.00 | $14,000 | $7,000.00 |
| 104 | (634.99020017) | LS | 1 | $6,000.00 | $49,300 | $5,000.00 | $5,000.00 | $10,000 |
| 105 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1.00 | $5,000.00 | $5,000.00 | $1,000.00 | $5,000.00 |
| 106 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 14 | $1.00 | $2,400.00 | $3,000.00 | $2,400.00 | $2,400.00 |
| 107 | Office Technology and Supplies (637.34) | DOL | 10,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 108 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 109 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 110 | (637.41000115) | 14 | $1.00 | $180.00 | $100.00 | $240.00 | $300.00 | |
| 111 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 4,800 | $0.75 | $0.86 | $1.00 | $1.00 | $1.00 |
| 112 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 4,700 | $0.75 | $0.86 | $1.00 | $1.00 | $1.00 |
| 113 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 89 | $44.00 | $43.40 | $45.00 | $50.00 | $48.00 |
| 114 | Type A Sign Posts (645.81) | EACH | 14 | $215.00 | $230.00 | $215.00 | $230.00 | $230.00 |
| 115 | Reference Marker Panel (646.21) | EACH | 3 | $48.00 | $46.00 | $50.00 | $50.00 | $54.00 |
| 116 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 32 | $16.00 | $19.30 | $15.00 | $17.00 | $18.00 |
| 117 | Steel Post, 2.0 lb/ft (646.32) | EACH | 32 | $71.00 | $88.30 | $75.00 | $80.00 | $80.00 |
| 118 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 4 | $140.00 | $143.75 | $150.00 | $150.00 | $155.00 |
| 119 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 7 | $99.00 | $46.00 | $50.00 | $11.00 | $23.00 |
| 120 | (647.83001002) | 12 | $77.00 | $10.35 | $20.00 | $11.00 | $34.00 | |
| 121 | (691.04000020) | 14,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 122 | Field Change Payment (FCP) (697.03) | DOL | 163,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 123 | Asphalt Price Adjustment (698.04) | DOL | 2,837.66 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 124 | Fuel Price Adjustment (698.05) | DOL | 1,571 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 125 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 126 | Mobilization (699.040001) | LS | 1 | $152,006 | $124,001 | $170,004 | $160,000 | $186,792 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of September 11, 2025. Compiled by Mirage Metrics.