NYSDOT contract D265517 bid tabulation

BRIDGE REPLACEMENT- NY Route 34 over Dry Run Creek. Let by New York State DOT on September 11, 2025, Tioga, Region 09. 5 bids received; low bid $4,028,400 by Ing Civil Inc.

Owner
New York State DOT
Letting
11 SEP 2025
Pay items
126
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ing Civil Inc$4,028,400Low
2Bothar Construction LLC$4,477,778+11%
3Economy Paving Co Inc$4,497,779+12%
4Slate Hill Constructors Inc$4,823,056+20%
5R De Vincentis Construction Inc$4,871,000+21%
NYSDOT contract D265517: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ing Civil Inc2. Bothar Construction LLC3. Economy Paving Co Inc4. Slate Hill Constructors Inc5. R De Vincentis Construction Inc
1Clearing and Grubbing (201.06)LS1$24,000$16,000$75,000$75,000$20,000
2Removal of Substructures (202.19)CY32$124.00$285.00$95.00$400.00$600.00
3Unclassified Excavation and Disposal (203.02)CY4,700$12.00$34.75$25.00$43.00$16.00
4Embankment In Place (203.03)CY8,500$23.00$37.60$35.00$33.00$29.00
5Select Granular Fill (203.07)CY55$88.00$51.50$35.00$130.00$90.00
6Select Structural Fill (203.21)CY135$71.00$60.50$65.00$90.00$78.00
7Structure Excavation (206.01)CY1,280$12.00$22.00$35.00$36.00$19.00
8Trench and Culvert Excavation (206.0201)CY383$24.00$37.40$1.00$40.00$45.00
9Geotextile Bedding (207.20)SY138$10.00$11.00$4.50$10.00$9.00
10Geotextile Drainage (207.22)SY738$1.90$2.85$1.50$7.00$5.00
11Prefabricated Composite Structural Drain (207.26)SY38$21.00$64.30$10.00$30.00$21.00
12Prefabricated Composite Integral Abutment Drain (207.27)SY88$14.00$61.00$11.50$22.00$26.00
13 (208.01000609)141$160.00$92.50$30.00$150.00$240.00
14Mulch – Temporary (209.100101)SY11,490$0.40$2.60$1.00$1.00$1.50
15Seed and Mulch – Temporary (209.1003)SY4,245$0.68$3.10$1.25$1.30$1.75
16Silt Fence - Temporary (209.13)LF250$6.00$2.90$5.00$14.00$7.50
17Rolled Erosion Control Product, Class I Type C, Short Term (209.1803)SY500$3.00$3.10$4.00$5.65$4.00
18Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY3,288$2.00$3.60$5.00$7.00$3.00
19 (209.23010009)971$6.00$5.15$5.50$12.00$7.50
20Subbase Course, Optional Type (304.15)CY1,671$60.00$50.00$65.00$75.00$77.00
21 (404.0189)TON100$236.00$134.00$135.00$170.00$193.00
22 (404.0982)TON750$154.00$135.00$165.00$160.00$187.00
23 (404.2589)TON1,201$149.00$120.00$145.00$150.00$165.00
24 (407.01040009)500$12.00$6.85$3.00$7.00$7.50
25Asphalt Pavement Joint Adhesive (418.7603)LF1,700$3.00$1.70$0.35$3.25$4.00
26Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY2,200$9.00$7.65$10.00$16.00$14.50
27Steel H-Piles (HP 12x84) (551.012084)LF2,160$2.00$114.00$15.15$3.00$2.25
28Splices for Steel H-Piles (551.12)EACH14$10.00$402.50$1.00$15.00$11.00
29Furnishing Equipment for Driving Piles (551.13)LS1$660,000$55,200$245,000$300,000$285,000
30Dynamic Pile Load Testing (551.14)EACH2$2,000.00$6,785.00$4,000.00$2,200.00$2,200.00
31 (553.020001)EACH1$1.00$4,200.00$1,000.00$1.00$28,000
32 (553.020002)EACH1$1.00$4,200.00$1,000.00$1.00$28,000
33 (553.030001)EACH1$1.00$7,570.00$1,000.00$1.00$14,000
34 (553.030002)EACH1$1.00$7,570.00$1,000.00$1.00$14,000
35Concrete for Structures, Performance (555.0021)CY152$1,000.00$1,360.00$1,000.00$1,800.00$1,700.00
36Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$9.00$9.00$9.00$9.00$9.00
37Uncoated Bar Reinforcement for Concrete Structures (556.0201)LB12,288$1.80$2.10$2.60$2.90$2.00
38Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB8,877$2.10$2.35$2.70$3.00$2.26
39 (557.1019)SY153$350.00$498.00$500.00$500.00$450.00
40 (557.2219)SY249$280.00$532.00$550.00$500.00$525.00
41Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29)SY408$0.01$1.00$1.00$0.10$1.00
42Sidewalks and Safety Walks (557.30)SY25$325.00$1,630.00$650.00$900.00$650.00
43Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901)QUALITY UNIT1$9.77$9.77$9.77$9.77$9.77
44Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902)QUALITY UNIT1$9.00$9.00$9.00$9.00$9.00
45Longitudinal Sawcut Grooving of Structural Slab Surface (558.02)SY150$44.00$54.00$52.00$50.00$62.00
46Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01)SF1,350$0.50$2.35$1.40$4.00$3.00
47Protective Sealing of New Structural Concrete (559.02)SF220$1.70$4.50$2.10$6.00$3.00
48Prestressed Concrete Hollow Slab Units (563.03)SF2,052$125.00$143.00$150.00$150.00$155.00
49 (565.30130101)36$260.00$93.50$400.00$300.00$325.00
50Steel Bridge Railing (Three-Rail) (568.54)LF135$203.00$250.00$205.00$215.00$225.00
51Transition Bridge Railing (568.70)LF128$225.00$255.00$225.00$235.00$251.00
52 (584.21010001)379$225.00$459.00$400.00$400.00$696.00
53 (584.9901)1$54.05$54.05$54.05$54.05$54.05
54 (603.6001)LF40$73.00$74.30$100.00$80.00$175.00
55 (603.6101)LF106$51.00$76.30$100.00$70.00$135.00
56 (603.7301)EACH4$2,000.00$2,890.00$2,750.00$2,450.00$3,600.00
57Underdrain Filter, Type II (605.1001)CY53$54.00$104.00$35.00$110.00$185.00
58 (605.1602)LF303$9.00$14.75$25.00$13.00$20.00
59 (605.16020008)23$18.00$15.80$25.00$18.00$60.00
60 (605.21010018)1$400.00$863.00$200.00$225.00$750.00
61Box Beam Guide Railing (606.10)LF642$47.00$52.90$45.00$50.00$51.00
62Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF50$57.00$65.30$55.00$60.00$62.00
63Box Beam Guide Railing With Extra Long Posts (606.1001)LF111$52.00$58.40$55.00$55.00$57.00
64Box Beam Guide Railing with Extra Long Posts (Shop Bent or Shop Mitered) (606.100102)LF72$60.00$70.15$65.00$65.00$66.00
65Box Beam End Piece (606.120101)EACH4$610.00$776.25$610.00$650.00$700.00
66Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH5$2,000.00$2,507.00$2,000.00$2,150.00$2,200.00
67 (606.73000015)520$4.00$6.45$5.50$9.00$13.00
68Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920)EACH4$500.00$800.00$100.00$900.00$350.00
69 (607.41010010)815$3.20$4.00$5.00$8.00$8.00
70Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON55$330.00$265.00$225.00$350.00$330.00
71Stone Curb – Bridge (Type A) (609.0301)LF57$92.00$87.00$150.00$105.00$96.00
72Stone Curb – Bridge (Type F1) (609.0302)LF137$80.00$99.70$90.00$85.00$89.00
73Mycorrhizal Fungi (610.0701)LB1$100.00$115.00$100.00$105.00$110.00
74Compost (610.10)CY105$117.00$120.00$40.00$90.00$130.00
75Weed Removal (610.13)SY3,823$1.00$1.25$1.00$3.00$1.10
76 (610.15120208)1,249$0.01$4.60$3.50$4.00$8.00
77Turf Establishment -Lawns (610.1602)SY415$3.70$3.45$3.00$7.00$3.30
78Turf Establishment – Performance (610.1605)SY3,830$12.00$14.00$1.50$22.00$2.00
79Watering Vegetation (610.19)1,000 GALLONS59$20.00$23.00$20.00$120.00$23.00
80Mowing (610.21)SY5,804$0.01$0.60$0.50$2.00$0.60
81 (611.0442)EACH3$200.00$230.00$200.00$400.00$225.00
82 (611.19040024)3$10.00$11.50$10.00$205.00$11.00
83 (615.33010011)1$560.00$620.00$100.00$400.00$330.00
84 (616.08000024)1,167$12.00$13.80$12.00$17.00$15.00
85 (617.01010024)15,500$0.50$0.60$0.50$2.05$0.60
86 (617.10000024)850$10.00$35.15$1.00$52.00$175.00
87 (617.11000024)LS1$1.00$2,810.00$100.00$8,000.00$3,000.00
88Basic Work Zone Traffic Control (619.01)LS1$60,000$119,594$250,000$320,000$330,000
89 (619.0501)LS1$600,000$558,000$705,000$425,000$485,000
90 (619.080102)LF1,650$1.50$1.85$1.50$2.00$1.65
91 (619.100101)LF6,300$0.75$0.95$0.50$1.00$0.90
92 (619.130101)EACH1$140,000$179,400$200,000$145,000$165,000
93Temporary Rumble Strips (619.22)LF396$17.00$19.00$17.50$18.00$19.00
94Mailboxes (619.27)EACH6$340.00$263.00$550.00$100.00$200.00
95Stone Filling (Light) (620.03)CY54$102.00$133.00$135.00$200.00$115.00
96Stone Filling (Heavy) (620.05)CY1,630$155.00$180.00$155.00$160.00$167.00
97Bedding Material, Type 1 (620.0801)CY520$82.00$91.30$135.00$130.00$96.00
98 (620.29010009)200$47.00$28.76$15.00$60.00$36.00
99 (620.29110009)400$73.00$80.00$10.00$100.00$80.00
100Screened Gravel (In-Place Measure) (623.10)CY30$94.00$71.50$70.00$90.00$83.00
101Survey Operations (625.01)LS1$30,000$62,000$50,000$50,000$34,000
102 (627.50140008)2,700$3.40$5.00$1.00$6.00$6.00
103 (634.99010017)LS1$15,000$13,500$5,000.00$14,000$7,000.00
104 (634.99020017)LS1$6,000.00$49,300$5,000.00$5,000.00$10,000
105Concrete Cylinder Curing Equipment (637.04)EACH1$1.00$5,000.00$5,000.00$1,000.00$5,000.00
106Engineer’s Field Office – Type 1 (637.11)MONTH14$1.00$2,400.00$3,000.00$2,400.00$2,400.00
107Office Technology and Supplies (637.34)DOL10,500$1.00$1.00$1.00$1.00$1.00
108Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00$1.00
109Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00$1.00
110 (637.41000115)14$1.00$180.00$100.00$240.00$300.00
111White Paint Reflectorized Pavement Stripes – 20 mils (640.20)LF4,800$0.75$0.86$1.00$1.00$1.00
112Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21)LF4,700$0.75$0.86$1.00$1.00$1.00
113Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF89$44.00$43.40$45.00$50.00$48.00
114Type A Sign Posts (645.81)EACH14$215.00$230.00$215.00$230.00$230.00
115Reference Marker Panel (646.21)EACH3$48.00$46.00$50.00$50.00$54.00
116Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22)EACH32$16.00$19.30$15.00$17.00$18.00
117Steel Post, 2.0 lb/ft (646.32)EACH32$71.00$88.30$75.00$80.00$80.00
118Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH4$140.00$143.75$150.00$150.00$155.00
119Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH7$99.00$46.00$50.00$11.00$23.00
120 (647.83001002)12$77.00$10.35$20.00$11.00$34.00
121 (691.04000020)14,000$1.00$1.00$1.00$1.00$1.00
122Field Change Payment (FCP) (697.03)DOL163,000$1.00$1.00$1.00$1.00$1.00
123Asphalt Price Adjustment (698.04)DOL2,837.66$1.00$1.00$1.00$1.00$1.00
124Fuel Price Adjustment (698.05)DOL1,571$1.00$1.00$1.00$1.00$1.00
125Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00
126Mobilization (699.040001)LS1$152,006$124,001$170,004$160,000$186,792
NYSDOT contract D265517: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of September 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy