NYSDOT contract D265769 bid tabulation
Bridge Repair/Culvert Replacement SFY 27A. Let by New York State DOT on May 7, 2026, Essex, Rensselaer, Saratoga, Region 01. 5 bids received; low bid $13,697,706 by WM J Keller & Sons Construction Corp.
- Owner
- New York State DOT
- Letting
- 07 MAY 2026
- Pay items
- 105
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | WM J Keller & Sons Construction Corp | $13,697,706 | Low |
| 2 | Rifenburg Contracting Corporation | $13,957,733 | +2.0% |
| 3 | D A Collins Construction Co Inc | $14,490,892 | +6.0% |
| 4 | James H Maloy Inc | $14,497,000 | +6.0% |
| 5 | Harrison & Burrowes Bridge Constructors Inc | $18,767,768 | +37% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. WM J Keller & Sons Construction Corp | 2. Rifenburg Contracting Corporation | 3. D A Collins Construction Co Inc | 4. James H Maloy Inc | 5. Harrison & Burrowes Bridge Constructors Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.07) | ACRE | 2.85 | $50,000 | $27,500 | $36,200 | $25,000 | $30,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 2,700 | $60.00 | $54.50 | $27.50 | $40.00 | $75.00 |
| 3 | Embankment In Place (203.03) | CY | 3,690 | $44.00 | $62.00 | $35.50 | $38.00 | $62.00 |
| 4 | Select Granular Fill (203.07) | CY | 225 | $126.00 | $49.00 | $100.00 | $200.00 | $115.00 |
| 5 | Select Structural Fill (203.21) | CY | 125 | $120.00 | $49.00 | $185.00 | $250.00 | $130.00 |
| 6 | (203.24010017) | 62 | $230.00 | $256.00 | $245.00 | $130.00 | $250.00 | |
| 7 | Structure Excavation (206.01) | CY | 5,645 | $35.00 | $58.30 | $47.50 | $55.00 | $66.00 |
| 8 | Trench and Culvert Excavation (206.0201) | CY | 410 | $95.00 | $85.60 | $52.50 | $200.00 | $80.00 |
| 9 | Test Pit Excavation (206.05) | EACH | 1 | $1,800.00 | $2,500.00 | $1,550.00 | $1,000.00 | $3,500.00 |
| 10 | Geotextile Bedding (207.20) | SY | 330 | $7.00 | $5.00 | $2.90 | $8.00 | $5.00 |
| 11 | Geotextile Separation (207.21) | SY | 2,790 | $6.00 | $3.00 | $4.15 | $3.00 | $2.00 |
| 12 | Prefabricated Composite Structural Drain (207.26) | SY | 225 | $22.00 | $21.50 | $31.50 | $42.00 | $13.00 |
| 13 | Mulch – Temporary (209.100101) | SY | 4,115 | $2.75 | $1.25 | $1.40 | $2.25 | $1.25 |
| 14 | Seed and Mulch – Temporary (209.1003) | SY | 4,115 | $4.00 | $1.50 | $1.65 | $2.50 | $1.50 |
| 15 | Sediment Filter Log - Temporary, 12”, Type B (209.1312) | LF | 1,560 | $16.00 | $10.52 | $9.30 | $12.00 | $10.00 |
| 16 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 3,830 | $6.25 | $6.00 | $5.85 | $7.00 | $6.00 |
| 17 | Stabilized Construction Access (209.22) | SY | 610 | $85.00 | $100.00 | $34.00 | $35.00 | $170.00 |
| 18 | Subbase Course, Type 1 (304.11) | CY | 12 | $120.00 | $207.00 | $75.50 | $400.00 | $630.00 |
| 19 | Subbase Course, Type 2 (304.12) | CY | 435 | $122.00 | $110.00 | $110.00 | $165.00 | $170.00 |
| 20 | (404.0189) | TON | 7 | $350.00 | $538.00 | $435.00 | $900.00 | $500.00 |
| 21 | (404.0983) | TON | 70 | $330.00 | $379.00 | $255.00 | $400.00 | $475.00 |
| 22 | (404.1989) | TON | 230 | $250.00 | $253.50 | $285.00 | $250.00 | $260.00 |
| 23 | (404.3789) | TON | 400 | $200.00 | $221.00 | $185.00 | $250.00 | $250.00 |
| 24 | Straight Tack Coat (407.0103) | GAL | 58 | $50.00 | $17.00 | $4.65 | $75.00 | $120.00 |
| 25 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 700 | $10.00 | $1.35 | $2.95 | $7.00 | $7.00 |
| 26 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 155 | $79.00 | $31.50 | $24.00 | $80.00 | $36.00 |
| 27 | (553.020001) | EACH | 1 | $29,300 | $550,000 | $27,100 | $140,000 | $115,000 |
| 28 | (553.020002) | EACH | 1 | $29,300 | $250,000 | $26,500 | $261,000 | $115,000 |
| 29 | (553.020003) | EACH | 1 | $29,300 | $546,000 | $26,800 | $220,000 | $115,000 |
| 30 | (554.3001) | SF | 3,340 | $145.00 | $70.60 | $70.50 | $80.00 | $65.00 |
| 31 | Concrete for Structures, Performance (555.0021) | CY | 121.50 | $1,687.00 | $3,000.00 | $1,900.00 | $2,900.00 | $3,100.00 |
| 32 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 33 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 7,830 | $6.07 | $9.50 | $4.25 | $8.00 | $5.50 |
| 34 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 102 | $88.00 | $105.00 | $150.00 | $65.00 | $40.00 |
| 35 | (595.50000018) | 845 | $13.00 | $9.00 | $5.60 | $12.00 | $7.50 | |
| 36 | (602.90500807) | 845 | $4,700.00 | $4,500.00 | $5,250.00 | $4,400.00 | $5,000.00 | |
| 37 | (602.90600107) | 630 | $6,600.00 | $4,500.00 | $5,214.28 | $6,900.00 | $9,250.00 | |
| 38 | (603.63150701) | 90 | $3,878.00 | $4,500.00 | $4,450.00 | $4,900.00 | $5,500.00 | |
| 39 | (603.9815) | LF | 75 | $78.00 | $78.00 | $77.00 | $100.00 | $120.00 |
| 40 | Box Beam Guide Railing (606.10) | LF | 2,604 | $50.00 | $60.80 | $58.50 | $55.00 | $62.00 |
| 41 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 66 | $57.75 | $70.20 | $67.50 | $65.00 | $70.00 |
| 42 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 1 | $4,675.00 | $5,685.00 | $5,450.00 | $5,200.00 | $6,200.00 |
| 43 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 4 | $2,225.00 | $2,700.00 | $2,600.00 | $2,700.00 | $3,000.00 |
| 44 | Resetting Box Beam Guide Railing (606.53) | LF | 78 | $44.50 | $55.00 | $52.00 | $50.00 | $55.00 |
| 45 | Removing and Disposing Cable Guide Railing (606.70) | LF | 2,005 | $2.00 | $2.40 | $2.35 | $2.25 | $3.00 |
| 46 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 663 | $5.00 | $6.00 | $5.85 | $6.00 | $6.00 |
| 47 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 2 | $500.00 | $608.00 | $585.00 | $600.00 | $750.00 |
| 48 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 4 | $185.00 | $225.00 | $215.00 | $200.00 | $250.00 |
| 49 | Guide Rail Transition 3-Cable to Box Beam (One-Way Only) (606.84) | EACH | 1 | $10,150 | $12,340 | $11,800 | $11,000 | $12,500 |
| 50 | (607.41010010) | 1,665 | $6.00 | $7.00 | $9.30 | $5.00 | $10.00 | |
| 51 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 13 | $616.00 | $608.00 | $915.00 | $1,200.00 | $460.00 |
| 52 | Fertilizer (610.0501) | LB | 8 | $70.00 | $121.50 | $81.50 | $80.00 | $110.00 |
| 53 | Mycorrhizal Fungi (610.0701) | LB | 18 | $45.00 | $60.80 | $52.50 | $50.00 | $75.00 |
| 54 | Topsoil – On-Site Wetland Materials (610.1406) | CY | 101 | $100.00 | $152.00 | $94.00 | $200.00 | $180.00 |
| 55 | Turf Establishment – Performance (610.1605) | SY | 12,225 | $7.00 | $14.70 | $17.50 | $15.00 | $14.00 |
| 56 | Watering Vegetation (610.19) | 1,000 GALLONS | 690 | $6.00 | $6.10 | $7.00 | $7.00 | $5.00 |
| 57 | (611.0131) | EACH | 23 | $450.00 | $730.00 | $525.00 | $500.00 | $680.00 |
| 58 | (611.0341) | EACH | 3 | $300.00 | $485.00 | $350.00 | $350.00 | $450.00 |
| 59 | (611.0442) | EACH | 42 | $100.00 | $122.00 | $115.00 | $125.00 | $120.00 |
| 60 | (611.19010024) | 23 | $50.00 | $25.00 | $58.50 | $55.00 | $20.00 | |
| 61 | (611.19030024) | 3 | $150.00 | $12.00 | $175.00 | $175.00 | $10.00 | |
| 62 | (611.19040024) | 42 | $20.00 | $2.50 | $23.50 | $22.00 | $2.00 | |
| 63 | (613.04000001) | 529 | $160.00 | $77.00 | $94.50 | $250.00 | $215.00 | |
| 64 | (615.01010108) | 155 | $600.00 | $98.50 | $95.00 | $145.00 | $200.00 | |
| 65 | (617.01010024) | 1,500 | $4.00 | $2.50 | $4.65 | $5.00 | $2.00 | |
| 66 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $640,000 | $1,000,000 | $2,354,961 | $400,000 | $2,657,784 |
| 67 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 2,520 | $9.50 | $5.00 | $4.85 | $11.00 | $4.75 |
| 68 | (619.100103) | LF | 3,370 | $8.50 | $6.30 | $6.05 | $10.00 | $6.00 |
| 69 | (619.111213) | WEEK | 75 | $1,400.00 | $750.00 | $175.00 | $1,000.00 | $750.00 |
| 70 | (619.130201) | EACH | 1 | $82,310 | $150,000 | $42,200 | $95,000 | $175,000 |
| 71 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 720 | $63.00 | $67.00 | $34.00 | $100.00 | $40.00 |
| 72 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 640 | $77.50 | $25.00 | $72.00 | $103.00 | $80.00 |
| 73 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 16 | $45.00 | $105.00 | $14.00 | $110.00 | $30.00 |
| 74 | Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803) | EACH | 6 | $13,440 | $7,500.00 | $5,800.00 | $20,000 | $7,500.00 |
| 75 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $103,500 | $150,000 | $1.00 | $50,000 | $200,000 |
| 76 | Pavement Patching (Force Acount) (619.2601) | DOL | 1,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 77 | Pavement Patching (Tonnage) (619.2602) | TON | 1 | $1,680.00 | $1,000.00 | $855.00 | $2,500.00 | $3,000.00 |
| 78 | Mailboxes (619.27) | EACH | 3 | $224.00 | $500.00 | $630.00 | $400.00 | $500.00 |
| 79 | Stone Filling (Medium) (620.04) | CY | 195 | $117.00 | $157.50 | $235.00 | $300.00 | $200.00 |
| 80 | Stone Filling (Heavy) (620.05) | CY | 1,225 | $124.00 | $184.50 | $120.00 | $255.00 | $210.00 |
| 81 | Bedding Material, Type 1 (620.0801) | CY | 300 | $124.00 | $144.00 | $160.00 | $300.00 | $115.00 |
| 82 | Clean, Grade and Shape Existing Roadside Section (621.05) | LF | 110 | $44.00 | $34.50 | $35.00 | $30.00 | $25.00 |
| 83 | Crushed Stone (In-Place Measure) (623.12) | CY | 78 | $108.00 | $120.00 | $245.00 | $450.00 | $220.00 |
| 84 | Asphalt Gutter (624.020101) | TON | 5 | $900.00 | $1,000.00 | $2,700.00 | $1,200.00 | $1,150.00 |
| 85 | Survey Operations (625.01) | LS | 1 | $60,000 | $50,000 | $102,000 | $110,036 | $100,000 |
| 86 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 6 | $500.00 | $970.00 | $2,000.00 | $1,200.00 | $1,500.00 |
| 87 | (627.50140008) | 260 | $6.00 | $7.75 | $7.00 | $8.00 | $12.00 | |
| 88 | Cleaning Existing Pavement and/or Shoulder (633.11) | SY | 86 | $20.00 | $2.25 | $3.40 | $8.00 | $15.00 |
| 89 | Field Laboratory (637.01) | EACH | 1 | $30,000 | $7,500.00 | $14,300 | $3,000.00 | $1,500.00 |
| 90 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1,000.00 | $2,500.00 | $1,900.00 | $1,500.00 | $2,500.00 |
| 91 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 16 | $3,000.00 | $4,000.00 | $4,950.00 | $4,000.00 | $3,500.00 |
| 92 | Office Technology and Supplies (637.34) | DOL | 6,625 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 93 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 35 | $40.00 | $49.00 | $46.50 | $50.00 | $45.00 |
| 94 | Type A Sign Posts (645.81) | EACH | 8 | $200.00 | $244.00 | $235.00 | $250.00 | $240.00 |
| 95 | Reference Marker Panel (646.21) | EACH | 1 | $44.75 | $55.00 | $52.00 | $52.00 | $50.00 |
| 96 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 12 | $22.25 | $31.00 | $29.50 | $30.00 | $30.00 |
| 97 | Steel Post, 2.0 lb/ft (646.32) | EACH | 12 | $87.00 | $106.00 | $100.00 | $95.00 | $100.00 |
| 98 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 4 | $60.00 | $73.00 | $70.00 | $75.00 | $75.00 |
| 99 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 410 | $15.00 | $6.00 | $5.85 | $17.00 | $55.00 |
| 100 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 410 | $15.00 | $6.00 | $5.85 | $17.00 | $5.50 |
| 101 | Field Change Payment (FCP) (697.03) | DOL | 640,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 102 | Asphalt Price Adjustment (698.04) | DOL | 305 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 103 | Fuel Price Adjustment (698.05) | DOL | 200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 104 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 105 | Mobilization (699.040001) | LS | 1 | $520,000 | $531,000 | $550,000 | $557,000 | $715,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of May 7, 2026. Compiled by Mirage Metrics.