NYSDOT contract D265769 bid tabulation

Bridge Repair/Culvert Replacement SFY 27A. Let by New York State DOT on May 7, 2026, Essex, Rensselaer, Saratoga, Region 01. 5 bids received; low bid $13,697,706 by WM J Keller & Sons Construction Corp.

Owner
New York State DOT
Letting
07 MAY 2026
Pay items
105
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1WM J Keller & Sons Construction Corp$13,697,706Low
2Rifenburg Contracting Corporation$13,957,733+2.0%
3D A Collins Construction Co Inc$14,490,892+6.0%
4James H Maloy Inc$14,497,000+6.0%
5Harrison & Burrowes Bridge Constructors Inc$18,767,768+37%
NYSDOT contract D265769: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. WM J Keller & Sons Construction Corp2. Rifenburg Contracting Corporation3. D A Collins Construction Co Inc4. James H Maloy Inc5. Harrison & Burrowes Bridge Constructors Inc
1Clearing and Grubbing (201.07)ACRE2.85$50,000$27,500$36,200$25,000$30,000
2Unclassified Excavation and Disposal (203.02)CY2,700$60.00$54.50$27.50$40.00$75.00
3Embankment In Place (203.03)CY3,690$44.00$62.00$35.50$38.00$62.00
4Select Granular Fill (203.07)CY225$126.00$49.00$100.00$200.00$115.00
5Select Structural Fill (203.21)CY125$120.00$49.00$185.00$250.00$130.00
6 (203.24010017)62$230.00$256.00$245.00$130.00$250.00
7Structure Excavation (206.01)CY5,645$35.00$58.30$47.50$55.00$66.00
8Trench and Culvert Excavation (206.0201)CY410$95.00$85.60$52.50$200.00$80.00
9Test Pit Excavation (206.05)EACH1$1,800.00$2,500.00$1,550.00$1,000.00$3,500.00
10Geotextile Bedding (207.20)SY330$7.00$5.00$2.90$8.00$5.00
11Geotextile Separation (207.21)SY2,790$6.00$3.00$4.15$3.00$2.00
12Prefabricated Composite Structural Drain (207.26)SY225$22.00$21.50$31.50$42.00$13.00
13Mulch – Temporary (209.100101)SY4,115$2.75$1.25$1.40$2.25$1.25
14Seed and Mulch – Temporary (209.1003)SY4,115$4.00$1.50$1.65$2.50$1.50
15Sediment Filter Log - Temporary, 12”, Type B (209.1312)LF1,560$16.00$10.52$9.30$12.00$10.00
16Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY3,830$6.25$6.00$5.85$7.00$6.00
17Stabilized Construction Access (209.22)SY610$85.00$100.00$34.00$35.00$170.00
18Subbase Course, Type 1 (304.11)CY12$120.00$207.00$75.50$400.00$630.00
19Subbase Course, Type 2 (304.12)CY435$122.00$110.00$110.00$165.00$170.00
20 (404.0189)TON7$350.00$538.00$435.00$900.00$500.00
21 (404.0983)TON70$330.00$379.00$255.00$400.00$475.00
22 (404.1989)TON230$250.00$253.50$285.00$250.00$260.00
23 (404.3789)TON400$200.00$221.00$185.00$250.00$250.00
24Straight Tack Coat (407.0103)GAL58$50.00$17.00$4.65$75.00$120.00
25Asphalt Pavement Joint Adhesive (418.7603)LF700$10.00$1.35$2.95$7.00$7.00
26Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY155$79.00$31.50$24.00$80.00$36.00
27 (553.020001)EACH1$29,300$550,000$27,100$140,000$115,000
28 (553.020002)EACH1$29,300$250,000$26,500$261,000$115,000
29 (553.020003)EACH1$29,300$546,000$26,800$220,000$115,000
30 (554.3001)SF3,340$145.00$70.60$70.50$80.00$65.00
31Concrete for Structures, Performance (555.0021)CY121.50$1,687.00$3,000.00$1,900.00$2,900.00$3,100.00
32Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$15.00$15.00$15.00$15.00$15.00
33Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB7,830$6.07$9.50$4.25$8.00$5.50
34Drilling and Grouting Bolts or Reinforcing Bars (586.0201)EACH102$88.00$105.00$150.00$65.00$40.00
35 (595.50000018)845$13.00$9.00$5.60$12.00$7.50
36 (602.90500807)845$4,700.00$4,500.00$5,250.00$4,400.00$5,000.00
37 (602.90600107)630$6,600.00$4,500.00$5,214.28$6,900.00$9,250.00
38 (603.63150701)90$3,878.00$4,500.00$4,450.00$4,900.00$5,500.00
39 (603.9815)LF75$78.00$78.00$77.00$100.00$120.00
40Box Beam Guide Railing (606.10)LF2,604$50.00$60.80$58.50$55.00$62.00
41Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF66$57.75$70.20$67.50$65.00$70.00
42Box Beam Guide Railing End Assembly Type I (606.120102)EACH1$4,675.00$5,685.00$5,450.00$5,200.00$6,200.00
43Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH4$2,225.00$2,700.00$2,600.00$2,700.00$3,000.00
44Resetting Box Beam Guide Railing (606.53)LF78$44.50$55.00$52.00$50.00$55.00
45Removing and Disposing Cable Guide Railing (606.70)LF2,005$2.00$2.40$2.35$2.25$3.00
46Removing and Disposing Box Beam Guide Railing (606.73)LF663$5.00$6.00$5.85$6.00$6.00
47Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79)EACH2$500.00$608.00$585.00$600.00$750.00
48Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920)EACH4$185.00$225.00$215.00$200.00$250.00
49Guide Rail Transition 3-Cable to Box Beam (One-Way Only) (606.84)EACH1$10,150$12,340$11,800$11,000$12,500
50 (607.41010010)1,665$6.00$7.00$9.30$5.00$10.00
51Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON13$616.00$608.00$915.00$1,200.00$460.00
52Fertilizer (610.0501)LB8$70.00$121.50$81.50$80.00$110.00
53Mycorrhizal Fungi (610.0701)LB18$45.00$60.80$52.50$50.00$75.00
54Topsoil – On-Site Wetland Materials (610.1406)CY101$100.00$152.00$94.00$200.00$180.00
55Turf Establishment – Performance (610.1605)SY12,225$7.00$14.70$17.50$15.00$14.00
56Watering Vegetation (610.19)1,000 GALLONS690$6.00$6.10$7.00$7.00$5.00
57 (611.0131)EACH23$450.00$730.00$525.00$500.00$680.00
58 (611.0341)EACH3$300.00$485.00$350.00$350.00$450.00
59 (611.0442)EACH42$100.00$122.00$115.00$125.00$120.00
60 (611.19010024)23$50.00$25.00$58.50$55.00$20.00
61 (611.19030024)3$150.00$12.00$175.00$175.00$10.00
62 (611.19040024)42$20.00$2.50$23.50$22.00$2.00
63 (613.04000001)529$160.00$77.00$94.50$250.00$215.00
64 (615.01010108)155$600.00$98.50$95.00$145.00$200.00
65 (617.01010024)1,500$4.00$2.50$4.65$5.00$2.00
66Basic Work Zone Traffic Control (619.01)LS1$640,000$1,000,000$2,354,961$400,000$2,657,784
67Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF2,520$9.50$5.00$4.85$11.00$4.75
68 (619.100103)LF3,370$8.50$6.30$6.05$10.00$6.00
69 (619.111213)WEEK75$1,400.00$750.00$175.00$1,000.00$750.00
70 (619.130201)EACH1$82,310$150,000$42,200$95,000$175,000
71Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711)LF720$63.00$67.00$34.00$100.00$40.00
72Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716)LF640$77.50$25.00$72.00$103.00$80.00
73Warning Lights on Temporary Positive Barriers (619.1719)EACH16$45.00$105.00$14.00$110.00$30.00
74Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803)EACH6$13,440$7,500.00$5,800.00$20,000$7,500.00
75Nighttime Operations (Entire Project) (619.24)LS1$103,500$150,000$1.00$50,000$200,000
76Pavement Patching (Force Acount) (619.2601)DOL1,500$1.00$1.00$1.00$1.00$1.00
77Pavement Patching (Tonnage) (619.2602)TON1$1,680.00$1,000.00$855.00$2,500.00$3,000.00
78Mailboxes (619.27)EACH3$224.00$500.00$630.00$400.00$500.00
79Stone Filling (Medium) (620.04)CY195$117.00$157.50$235.00$300.00$200.00
80Stone Filling (Heavy) (620.05)CY1,225$124.00$184.50$120.00$255.00$210.00
81Bedding Material, Type 1 (620.0801)CY300$124.00$144.00$160.00$300.00$115.00
82Clean, Grade and Shape Existing Roadside Section (621.05)LF110$44.00$34.50$35.00$30.00$25.00
83Crushed Stone (In-Place Measure) (623.12)CY78$108.00$120.00$245.00$450.00$220.00
84Asphalt Gutter (624.020101)TON5$900.00$1,000.00$2,700.00$1,200.00$1,150.00
85Survey Operations (625.01)LS1$60,000$50,000$102,000$110,036$100,000
86Concrete Right of Way Markers Type H (High) (625.03)EACH6$500.00$970.00$2,000.00$1,200.00$1,500.00
87 (627.50140008)260$6.00$7.75$7.00$8.00$12.00
88Cleaning Existing Pavement and/or Shoulder (633.11)SY86$20.00$2.25$3.40$8.00$15.00
89Field Laboratory (637.01)EACH1$30,000$7,500.00$14,300$3,000.00$1,500.00
90Concrete Cylinder Curing Equipment (637.04)EACH1$1,000.00$2,500.00$1,900.00$1,500.00$2,500.00
91Engineer’s Field Office – Type 2 (637.12)MONTH16$3,000.00$4,000.00$4,950.00$4,000.00$3,500.00
92Office Technology and Supplies (637.34)DOL6,625$1.00$1.00$1.00$1.00$1.00
93Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF35$40.00$49.00$46.50$50.00$45.00
94Type A Sign Posts (645.81)EACH8$200.00$244.00$235.00$250.00$240.00
95Reference Marker Panel (646.21)EACH1$44.75$55.00$52.00$52.00$50.00
96Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH12$22.25$31.00$29.50$30.00$30.00
97Steel Post, 2.0 lb/ft (646.32)EACH12$87.00$106.00$100.00$95.00$100.00
98Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH4$60.00$73.00$70.00$75.00$75.00
99White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF410$15.00$6.00$5.85$17.00$55.00
100Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF410$15.00$6.00$5.85$17.00$5.50
101Field Change Payment (FCP) (697.03)DOL640,000$1.00$1.00$1.00$1.00$1.00
102Asphalt Price Adjustment (698.04)DOL305$1.00$1.00$1.00$1.00$1.00
103Fuel Price Adjustment (698.05)DOL200$1.00$1.00$1.00$1.00$1.00
104Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00
105Mobilization (699.040001)LS1$520,000$531,000$550,000$557,000$715,000
NYSDOT contract D265769: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of May 7, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy