NYSDOT contract D265369 bid tabulation

INTERSECTION RECONSTRUCTION - Routes 7 & 23. Let by New York State DOT on January 23, 2025, Otsego, Region 09. 6 bids received; low bid $4,057,705 by Bothar Construction LLC.

Owner
New York State DOT
Letting
23 JAN 2025
Pay items
179
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Bothar Construction LLC$4,057,705Low
2Rifenburg Construction Inc$4,274,115+5.0%
3Upstate Companies I, LLC$4,509,681+11%
4James H Maloy Inc$4,932,000+22%
5Cci Companies Inc$4,983,276+23%
6Lancaster Development and Tully Construction Co LLC$5,272,328+30%
NYSDOT contract D265369: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Bothar Construction LLC2. Rifenburg Construction Inc3. Upstate Companies I, LLC4. James H Maloy Inc5. Cci Companies Inc6. Lancaster Development and Tully Construction Co LLC
1Clearing and Grubbing (201.06)LS1$2,600.00$7,500.00$12,149$20,000$25,000$4,490.00
2Unclassified Excavation and Disposal (203.02)CY4,658$29.50$35.00$39.29$41.00$70.00$43.80
3Embankment In Place (203.03)CY1,394$25.00$8.50$74.31$27.00$15.00$21.40
4Select Granular Fill (203.07)CY529$80.00$38.00$89.04$140.00$105.00$185.00
5Controlled Low Strength Material (CLSM) (204.01)CY30$417.00$240.00$360.52$250.00$450.00$515.00
6Trench and Culvert Excavation (206.0201)CY1,884$42.00$36.25$64.54$97.00$85.00$74.60
7Conduit Excavation and Backfill including Surface Restoration (206.03)LF992$41.50$23.00$93.83$23.00$19.15$22.70
8SWTD - Maximum Treatment Flow Rate over 2.0 cfs up to 2.8 cfs (208.5301)EACH1$19,600$20,000$16,758$21,000$20,000$22,500
9 (209.11010024)29$291.50$375.00$257.05$215.00$400.00$383.00
10Silt Fence - Temporary (209.13)LF250$10.80$10.25$10.18$12.00$6.50$9.00
11Soil Stabilizers, Class IV Type A (209.2101)SY600$3.45$4.00$3.63$3.50$3.00$3.50
12Subbase Course, Optional Type (304.15)CY2,979$58.00$68.00$46.51$109.00$80.00$85.10
13 (404.0001)TON197$90.00$90.00$90.00$90.00$90.00$90.00
14 (404.0189)TON26$420.00$315.50$189.75$175.00$350.00$313.00
15 (404.0982)TON617$178.00$146.00$186.30$175.00$200.00$158.00
16 (404.1989)TON1,479$126.00$109.50$155.25$140.00$122.50$123.00
17 (404.2589)TON1,849$121.00$103.00$143.75$135.00$114.00$114.00
18 (407.01040009)986$5.50$3.75$17.83$16.00$3.00$3.00
19Asphalt Pavement Joint Adhesive (418.7603)LF3,770$0.97$0.75$1.90$1.75$1.50$1.50
20Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY741$17.65$15.00$22.32$14.00$35.00$26.90
21 (502.12110018)95$1,360.00$1,350.00$824.36$1,200.00$1,400.00$1,560.00
22 (502.9101)715$11.00$32.00$17.83$24.00$25.00$34.80
23 (502.9111)205$13.00$54.00$20.70$17.00$55.00$37.40
24Sealing Transverse Joints- Highway Joint Sealant (502.9210)LF715$16.00$20.00$17.25$6.00$26.00$13.60
25Sealing Longitudinal Joints-Highway Joint Sealant (502.9310)LF205$15.00$20.00$25.88$5.00$26.00$12.50
26Shields and Shoring (552.17)SF6,777$1.75$0.10$12.68$1.00$1.00$0.88
27Concrete for Structures, Performance (555.0021)CY29$1,566.00$1,700.00$977.50$1,700.00$2,100.00$750.00
28Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$12.00$12.00$12.00$12.00$12.00$12.00
29Uncoated Steel Fabric Reinforcement for Structures (556.0101)SY51$6.00$10.50$28.75$1.00$35.00$14.00
30Uncoated Bar Reinforcement for Concrete Structures (556.0201)LB3$120.00$1.00$92.19$35.00$80.00$20.00
31 (560.40000008)86$26.00$95.00$67.82$115.00$45.00$113.00
32 (560.70000008)49$202.00$320.00$65.38$100.00$300.00$247.00
33 (603.6002)LF1,068$88.40$94.50$89.52$145.00$65.00$96.20
34 (603.6003)LF67$110.00$149.00$100.54$165.00$100.00$122.00
35Concrete Collars (603.77)EACH1$3,370.00$1,800.00$862.50$2,000.00$3,000.00$3,010.00
36 (603.9815)LF42$26.40$78.50$61.92$50.00$60.00$92.20
37 (603.9824)LF48$58.45$94.00$83.89$70.00$75.00$125.00
38 (604.070901)EACH1$2,355.00$3,500.00$1,500.00$1,600.00$1,500.00$6,440.00
39 (604.070902)EACH1$2,355.00$3,500.00$1,500.00$1,600.00$1,000.00$6,440.00
40 (604.070903)EACH1$2,355.00$3,500.00$1,500.00$1,600.00$1,500.00$6,440.00
41 (604.070904)EACH1$2,355.00$3,500.00$1,500.00$1,600.00$1,500.00$6,440.00
42 (604.070905)EACH1$2,355.00$3,500.00$1,500.00$1,100.00$1,500.00$6,440.00
43 (604.070906)EACH1$2,355.00$3,500.00$1,500.00$1,100.00$1,500.00$6,440.00
44 (604.070907)EACH1$2,355.00$3,500.00$1,500.00$1,100.00$1,500.00$6,440.00
45 (604.070908)EACH1$2,355.00$3,500.00$1,500.00$1,100.00$1,500.00$6,440.00
46 (604.070909)EACH1$2,355.00$3,500.00$1,500.00$1,100.00$1,500.00$6,440.00
47 (604.070910)EACH1$2,355.00$3,500.00$1,500.00$1,100.00$1,500.00$6,440.00
48 (604.13000011)8$940.00$1,700.00$503.13$650.00$1,750.00$1,810.00
49 (604.300671)LF100$870.00$920.00$647.01$1,350.00$950.00$678.00
50 (604.300691)LF43$906.75$970.00$633.28$1,350.00$1,100.00$697.00
51 (604.4048)LF43$577.75$733.25$320.81$900.00$750.00$360.00
52Underdrain Filter, Type I (605.0901)CY258$112.00$117.00$121.30$140.00$135.00$223.00
53 (605.1701)LF3,220$3.75$14.50$2.37$5.00$3.00$4.85
54Box Beam Guide Railing (606.10)LF395$51.75$45.00$51.75$54.00$45.00$53.30
55Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF74$77.05$67.00$77.05$70.00$67.00$79.30
56Box Beam End Piece (606.120101)EACH1$920.00$800.00$920.00$820.00$800.00$947.00
57Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH1$2,415.00$2,100.00$2,415.00$2,200.00$2,100.00$2,490.00
58Box Beam Median Barrier End Assembly, Type C (606.1403)EACH1$7,176.00$6,240.00$7,176.00$6,500.00$6,240.00$7,390.00
59Removing and Disposing Box Beam Guide Railing (606.73)LF528$2.50$7.50$15.44$5.00$11.00$12.50
60Removing and Disposing Box Beam Median Barrier (606.74)LF30$2.50$13.50$45.64$6.00$45.00$21.90
61Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920)EACH2$802.00$400.00$219.05$155.00$1,400.00$658.00
62Removing and Disposing Box Beam Median Barrier End Assembly-Type C (606.7932)EACH1$802.00$1,200.00$219.05$770.00$1,400.00$658.00
63 (607.41010010)2,427$2.65$5.50$5.12$5.00$7.00$6.60
64Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT1$90.00$90.00$90.00$90.00$90.00$90.00
65Concrete Sidewalks and Driveways (608.0101)CY178$1,208.65$1,200.00$1,012.52$1,400.00$1,500.00$1,780.00
66 (608.01020005)37$1,800.00$1,775.00$1,321.48$1,600.00$1,700.00$2,510.00
67Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON110$188.00$205.00$260.00$400.00$250.00$227.00
68 (608.21000003)38$550.00$441.00$465.75$450.00$300.00$480.00
69Stone Curb – Near Vertical Face (NVF) (609.0212)LF2,383$54.35$71.50$68.13$65.00$90.00$115.00
70Stone Curb – Mountable (MT) (609.0214)LF1,326$91.00$106.00$95.79$85.00$105.00$139.00
71Stone Curb – Roundabout (RD) (609.0218)LF261$206.00$202.25$214.80$180.00$210.00$263.00
72Mycorrhizal Fungi (610.0701)LB28$34.50$30.00$57.50$32.00$30.00$35.50
73Compost (610.10)CY243$71.00$90.00$126.14$105.00$90.00$90.00
74Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101)CY16$69.00$100.00$143.75$105.00$60.00$71.10
75Weed Removal (610.13)SY183$3.45$30.00$9.20$32.00$3.00$3.55
76Topsoil - Roadside (610.1402)CY342$65.00$108.00$143.96$95.00$175.00$100.00
77Topsoil - Special Planting Mix (610.1404)CY10$172.50$143.00$254.29$100.00$220.00$178.00
78 (610.15120208)2,726$1.95$4.00$3.09$4.00$12.00$1.00
79Sodding (610.18)SY2,701$13.80$6.60$19.44$8.00$12.00$12.00
80Watering Vegetation – As Specified (610.1901)1,000 GALLONS5,071$1.15$6.50$5.75$1.00$1.00$1.00
81 (611.0202)EACH3$862.50$500.00$1,207.50$525.00$750.00$888.00
82 (611.0351)EACH1$575.00$500.00$977.50$525.00$500.00$592.00
83 (611.0442)EACH29$92.00$200.00$184.00$210.00$80.00$94.70
84 (611.0721)EACH245$46.00$15.00$36.80$16.00$40.00$47.40
85 (611.0741)EACH47$40.25$20.00$40.25$21.00$35.00$41.40
86 (611.0751)EACH3$69.00$50.00$51.75$52.00$60.00$71.10
87 (611.19020024)3$11.50$20.00$345.00$21.00$10.00$11.80
88 (611.19030024)1$11.50$20.00$293.25$21.00$10.00$11.80
89 (611.19040024)29$5.75$5.00$55.20$5.50$5.00$5.90
90 (611.19050024)81$5.75$10.00$52.00$5.50$5.00$5.90
91 (611.19070024)295$2.30$5.00$11.50$5.50$2.00$2.35
92 (614.060204)EACH1$1,220.50$2,000.00$1,627.91$5,000.00$2,250.00$1,800.00
93Pre-Existing Stump Removal up to 24” diameter at 6 inches above grade (614.0701)EACH1$523.00$650.00$614.82$600.00$1,100.00$899.00
94Tree Root Pruning (614.09)LF70$20.80$50.00$31.30$60.00$150.00$19.40
95 (615.02050124)1$465.00$1,125.00$1,052.91$500.00$8,500.00$489.00
96 (617.01010024)150$5.75$20.00$14.38$21.00$5.00$5.00
97 (617.10000024)5$350.00$165.00$575.00$120.00$400.00$175.00
98 (617.11000024)LS1$3,000.00$1,000.00$5,750.00$1,000.00$6,500.00$310.00
99Basic Work Zone Traffic Control (619.01)LS1$150,000$509,010$185,641$307,900$275,000$275,000
100Type III Construction Barricades (619.04)EACH58$123.00$150.00$281.75$250.00$300.00$125.00
101 (619.100101)LF10,754$0.35$0.29$0.90$0.85$0.80$0.50
102 (619.110513)EACH7$8,160.20$4,850.00$11,270$9,000.00$6,500.00$9,690.00
103Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711)LF658$78.15$18.00$89.82$72.00$60.00$127.00
104Temporary Positive Barrier – Category 2 (Pinning Permitted) (619.1712)LF2,037$78.15$17.00$97.90$72.00$75.00$129.00
105Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802)EACH2$4,305.75$7,625.00$6,440.00$11,000$5,000.00$23,700
106Nighttime Operations (Entire Project) (619.24)LS1$50,000$75,000$57,500$35,049$95,000$37,900
107 (619.99230101)LS1$1,000.00$2,500.00$2,500.00$2,500.00$2,500.00$2,500.00
108 (619.99230201)10$150.00$100.00$138.00$25.00$500.00$474.00
109Stone Filling (Light) (620.03)CY7$162.00$96.00$387.91$300.00$175.00$200.00
110 (623.12000010)118$70.25$160.00$133.93$200.00$250.00$191.00
111Survey Operations (625.01)LS1$60,000$50,000$23,500$90,000$100,000$158,237
112Steel Pin and Cap Right of Way Markers (625.05)EACH2$1,600.00$405.00$1,000.00$500.00$700.00$1,210.00
113Permanent Survey Markers (625.06)EACH4$3,100.00$1,865.00$1,489.42$2,000.00$2,500.00$3,610.00
114 (625.09010015)LS1$5,000.00$10,000$6,000.00$4,000.00$40,000$45,600
115 (625.110001)EACH1$32,000$36,750$24,725$40,000$35,000$38,400
116 (627.50140008)701$8.00$5.50$5.09$10.00$5.00$10.70
117Concrete Cylinder Curing Equipment (637.04)EACH1$6,200.00$1,000.00$2,875.00$2,200.00$4,000.00$3,960.00
118Engineer’s Field Office – Type 2 (637.12)MONTH14$2,300.00$2,500.00$2,875.00$5,000.00$4,250.00$6,670.00
119Office Technology and Supplies (637.34)DOL2,000$1.00$1.00$1.00$1.00$1.00$1.00
120 (637.41000115)14$1,200.00$400.00$180.72$400.00$300.00$158.00
121 (637.41000215)14$1,200.00$400.00$266.97$400.00$300.00$158.00
122 (642.31510024)2,887$1.15$3.00$10.35$2.25$1.00$1.20
123Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF619$41.40$36.00$41.40$38.00$36.00$42.60
124Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103)SF62$37.95$33.00$37.95$35.00$33.00$39.10
125Type A Sign Posts (645.81)EACH72$247.25$215.00$247.25$225.00$215.00$255.00
126High-Capacity Type A Sign Posts with Soil Plates Only (645.8106)EACH8$1,184.50$1,030.00$1,256.38$1,100.00$1,030.00$1,220.00
127 (645.81090003)14$57.50$50.00$57.50$54.00$50.00$59.20
128 (645.830201)EACH2$4,715.00$4,100.00$4,715.00$4,300.00$4,100.00$4,850.00
129Reference Marker Panel (646.21)EACH4$35.65$31.00$35.65$33.00$31.00$36.70
130Steel Post, 2.0 lb/ft (646.32)EACH4$72.45$63.00$72.45$65.00$63.00$74.60
131Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH2$212.75$185.00$212.75$200.00$185.00$219.00
132Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51)EACH3$86.25$210.00$146.03$80.00$85.00$88.80
133Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH15$69.00$113.25$97.42$65.00$70.00$71.10
134Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65)EACH2$345.00$700.00$1,454.98$320.00$350.00$355.00
135Cast Frame F1, UnMountable Curb Box CU1 & Reticuline Grate G1 (655.0704)EACH17$2,010.50$1,800.00$1,497.36$2,500.00$2,500.00$2,590.00
136Parallel Bar Frame 11 PCB & Parallel Bar Grate 11 PCB (655.0902)EACH8$2,091.00$1,850.00$1,402.41$2,700.00$2,500.00$2,490.00
137Manhole Frame & Grate (655.1201)EACH6$1,441.00$1,200.00$821.08$1,700.00$1,250.00$1,890.00
138 (660.75000010)18$625.00$500.00$632.50$300.00$700.00$959.00
139 (661.70010010)374$1.00$1.00$1.00$1.00$1.00$1.00
140 (663.0106)LF23$266.65$134.00$104.81$550.00$160.00$220.00
141 (663.0110)LF22$227.40$221.00$199.22$640.00$270.00$304.00
142 (663.14010009)2$5,800.00$5,200.00$3,082.66$7,000.00$15,000$2,650.00
143Iron Water Main Fittings (10 - 16 inch diameter) (663.2002)LB520$5.60$7.00$6.02$20.00$6.50$6.80
144Relocate Existing Hydrant (663.31)EACH1$6,600.00$5,300.00$3,887.66$9,000.00$15,000$1,850.00
145Adjust Existing Valve Box Elevation (663.33)EACH3$500.00$175.00$261.03$1,500.00$150.00$354.00
146 (663.4110)LF22$40.00$71.00$44.73$100.00$200.00$44.50
147 (670.0105)EACH4$3,576.50$1,640.00$2,038.87$1,950.00$1,640.00$1,940.00
148 (670.0106)EACH9$4,312.50$1,830.00$1,790.61$2,200.00$1,830.00$2,170.00
149 (670.10010005)4$7,682.00$4,800.00$8,993.00$5,400.00$4,800.00$5,680.00
150 (670.1536)EACH9$3,737.50$2,510.00$3,315.45$2,900.00$2,510.00$2,970.00
151 (670.1706)EACH9$1,748.00$1,425.00$1,891.75$1,500.00$1,425.00$1,690.00
152Breakaway Transformer Base (Aluminum) (670.19)EACH9$1,092.50$800.00$1,713.50$900.00$800.00$947.00
153 (670.2602)LF30$24.75$9.10$16.10$10.00$9.10$10.80
154 (670.2603)LF22$31.65$16.00$22.77$17.00$16.00$19.00
155Pullboxes less than 5 cubic feet, inside volume (Lighting) (670.3001)EACH5$1,518.00$1,390.00$1,170.97$1,500.00$1,390.00$1,650.00
156 (670.7004)LF7,530$2.88$2.75$3.91$3.00$2.75$3.25
157 (670.7006)LF1,030$4.80$1.70$1.73$1.80$1.70$2.00
158 (670.70300025)140$6.65$10.00$1.73$11.00$10.00$11.80
159Remove and Dispose of Lamppost Assembly (670.81)EACH1$339.25$1,750.00$1,178.75$1,900.00$1,750.00$2,070.00
160 (670.91010011)1$166.75$1,750.00$793.50$1,900.00$1,750.00$2,070.00
161Performance Concrete Quality Adjustment (670.99)QUALITY UNIT1$14.05$14.05$14.05$14.05$14.05$14.05
162 (680.510501)EACH3$2,282.75$1,410.00$925.01$1,500.00$1,410.00$1,670.00
163 (680.520505)LF950$10.95$8.25$15.53$9.00$8.25$9.75
164Riser Assembly, 2-inch Diameter (680.700606)EACH1$1,719.25$525.00$1,035.00$550.00$525.00$622.00
165 (680.78100108)LS1$7,647.50$6,100.00$12,765$6,500.00$6,100.00$7,220.00
166 (680.82250608)7$264.50$350.00$241.50$375.00$350.00$414.00
167 (680.82250801)8$494.50$600.00$540.50$325.00$450.00$592.00
168 (680.82252310)6$7,417.50$10,700$12,581$12,000$10,700$12,700
169 (680.82254310)4$11,698$11,700$12,015$13,000$11,700$13,900
170 (680.95110001)1$17,538$9,050.00$11,908$10,000$9,050.00$10,700
171White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF8,894$2.15$1.87$4.13$3.75$4.00$0.72
172Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF3,195$2.15$1.87$3.21$3.00$3.00$0.72
173White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304)EACH42$82.80$72.00$86.25$80.00$75.00$124.00
174White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404)EACH53$172.50$150.00$247.25$230.00$215.00$257.00
175Field Change Payment (FCP) (697.03)DOL186,000$1.00$1.00$1.00$1.00$1.00$1.00
176Asphalt Price Adjustment (698.04)DOL6,171$1.00$1.00$1.00$1.00$1.00$1.00
177Fuel Price Adjustment (698.05)DOL1,582$1.00$1.00$1.00$1.00$1.00$1.00
178Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
179Mobilization (699.040001)LS1$156,000$164,350$150,000$189,000$190,000$202,294
NYSDOT contract D265369: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of January 23, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy