NYSDOT contract D265369 bid tabulation
INTERSECTION RECONSTRUCTION - Routes 7 & 23. Let by New York State DOT on January 23, 2025, Otsego, Region 09. 6 bids received; low bid $4,057,705 by Bothar Construction LLC.
- Owner
- New York State DOT
- Letting
- 23 JAN 2025
- Pay items
- 179
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bothar Construction LLC | $4,057,705 | Low |
| 2 | Rifenburg Construction Inc | $4,274,115 | +5.0% |
| 3 | Upstate Companies I, LLC | $4,509,681 | +11% |
| 4 | James H Maloy Inc | $4,932,000 | +22% |
| 5 | Cci Companies Inc | $4,983,276 | +23% |
| 6 | Lancaster Development and Tully Construction Co LLC | $5,272,328 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bothar Construction LLC | 2. Rifenburg Construction Inc | 3. Upstate Companies I, LLC | 4. James H Maloy Inc | 5. Cci Companies Inc | 6. Lancaster Development and Tully Construction Co LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $2,600.00 | $7,500.00 | $12,149 | $20,000 | $25,000 | $4,490.00 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 4,658 | $29.50 | $35.00 | $39.29 | $41.00 | $70.00 | $43.80 |
| 3 | Embankment In Place (203.03) | CY | 1,394 | $25.00 | $8.50 | $74.31 | $27.00 | $15.00 | $21.40 |
| 4 | Select Granular Fill (203.07) | CY | 529 | $80.00 | $38.00 | $89.04 | $140.00 | $105.00 | $185.00 |
| 5 | Controlled Low Strength Material (CLSM) (204.01) | CY | 30 | $417.00 | $240.00 | $360.52 | $250.00 | $450.00 | $515.00 |
| 6 | Trench and Culvert Excavation (206.0201) | CY | 1,884 | $42.00 | $36.25 | $64.54 | $97.00 | $85.00 | $74.60 |
| 7 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 992 | $41.50 | $23.00 | $93.83 | $23.00 | $19.15 | $22.70 |
| 8 | SWTD - Maximum Treatment Flow Rate over 2.0 cfs up to 2.8 cfs (208.5301) | EACH | 1 | $19,600 | $20,000 | $16,758 | $21,000 | $20,000 | $22,500 |
| 9 | (209.11010024) | 29 | $291.50 | $375.00 | $257.05 | $215.00 | $400.00 | $383.00 | |
| 10 | Silt Fence - Temporary (209.13) | LF | 250 | $10.80 | $10.25 | $10.18 | $12.00 | $6.50 | $9.00 |
| 11 | Soil Stabilizers, Class IV Type A (209.2101) | SY | 600 | $3.45 | $4.00 | $3.63 | $3.50 | $3.00 | $3.50 |
| 12 | Subbase Course, Optional Type (304.15) | CY | 2,979 | $58.00 | $68.00 | $46.51 | $109.00 | $80.00 | $85.10 |
| 13 | (404.0001) | TON | 197 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 |
| 14 | (404.0189) | TON | 26 | $420.00 | $315.50 | $189.75 | $175.00 | $350.00 | $313.00 |
| 15 | (404.0982) | TON | 617 | $178.00 | $146.00 | $186.30 | $175.00 | $200.00 | $158.00 |
| 16 | (404.1989) | TON | 1,479 | $126.00 | $109.50 | $155.25 | $140.00 | $122.50 | $123.00 |
| 17 | (404.2589) | TON | 1,849 | $121.00 | $103.00 | $143.75 | $135.00 | $114.00 | $114.00 |
| 18 | (407.01040009) | 986 | $5.50 | $3.75 | $17.83 | $16.00 | $3.00 | $3.00 | |
| 19 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 3,770 | $0.97 | $0.75 | $1.90 | $1.75 | $1.50 | $1.50 |
| 20 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 741 | $17.65 | $15.00 | $22.32 | $14.00 | $35.00 | $26.90 |
| 21 | (502.12110018) | 95 | $1,360.00 | $1,350.00 | $824.36 | $1,200.00 | $1,400.00 | $1,560.00 | |
| 22 | (502.9101) | 715 | $11.00 | $32.00 | $17.83 | $24.00 | $25.00 | $34.80 | |
| 23 | (502.9111) | 205 | $13.00 | $54.00 | $20.70 | $17.00 | $55.00 | $37.40 | |
| 24 | Sealing Transverse Joints- Highway Joint Sealant (502.9210) | LF | 715 | $16.00 | $20.00 | $17.25 | $6.00 | $26.00 | $13.60 |
| 25 | Sealing Longitudinal Joints-Highway Joint Sealant (502.9310) | LF | 205 | $15.00 | $20.00 | $25.88 | $5.00 | $26.00 | $12.50 |
| 26 | Shields and Shoring (552.17) | SF | 6,777 | $1.75 | $0.10 | $12.68 | $1.00 | $1.00 | $0.88 |
| 27 | Concrete for Structures, Performance (555.0021) | CY | 29 | $1,566.00 | $1,700.00 | $977.50 | $1,700.00 | $2,100.00 | $750.00 |
| 28 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| 29 | Uncoated Steel Fabric Reinforcement for Structures (556.0101) | SY | 51 | $6.00 | $10.50 | $28.75 | $1.00 | $35.00 | $14.00 |
| 30 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 3 | $120.00 | $1.00 | $92.19 | $35.00 | $80.00 | $20.00 |
| 31 | (560.40000008) | 86 | $26.00 | $95.00 | $67.82 | $115.00 | $45.00 | $113.00 | |
| 32 | (560.70000008) | 49 | $202.00 | $320.00 | $65.38 | $100.00 | $300.00 | $247.00 | |
| 33 | (603.6002) | LF | 1,068 | $88.40 | $94.50 | $89.52 | $145.00 | $65.00 | $96.20 |
| 34 | (603.6003) | LF | 67 | $110.00 | $149.00 | $100.54 | $165.00 | $100.00 | $122.00 |
| 35 | Concrete Collars (603.77) | EACH | 1 | $3,370.00 | $1,800.00 | $862.50 | $2,000.00 | $3,000.00 | $3,010.00 |
| 36 | (603.9815) | LF | 42 | $26.40 | $78.50 | $61.92 | $50.00 | $60.00 | $92.20 |
| 37 | (603.9824) | LF | 48 | $58.45 | $94.00 | $83.89 | $70.00 | $75.00 | $125.00 |
| 38 | (604.070901) | EACH | 1 | $2,355.00 | $3,500.00 | $1,500.00 | $1,600.00 | $1,500.00 | $6,440.00 |
| 39 | (604.070902) | EACH | 1 | $2,355.00 | $3,500.00 | $1,500.00 | $1,600.00 | $1,000.00 | $6,440.00 |
| 40 | (604.070903) | EACH | 1 | $2,355.00 | $3,500.00 | $1,500.00 | $1,600.00 | $1,500.00 | $6,440.00 |
| 41 | (604.070904) | EACH | 1 | $2,355.00 | $3,500.00 | $1,500.00 | $1,600.00 | $1,500.00 | $6,440.00 |
| 42 | (604.070905) | EACH | 1 | $2,355.00 | $3,500.00 | $1,500.00 | $1,100.00 | $1,500.00 | $6,440.00 |
| 43 | (604.070906) | EACH | 1 | $2,355.00 | $3,500.00 | $1,500.00 | $1,100.00 | $1,500.00 | $6,440.00 |
| 44 | (604.070907) | EACH | 1 | $2,355.00 | $3,500.00 | $1,500.00 | $1,100.00 | $1,500.00 | $6,440.00 |
| 45 | (604.070908) | EACH | 1 | $2,355.00 | $3,500.00 | $1,500.00 | $1,100.00 | $1,500.00 | $6,440.00 |
| 46 | (604.070909) | EACH | 1 | $2,355.00 | $3,500.00 | $1,500.00 | $1,100.00 | $1,500.00 | $6,440.00 |
| 47 | (604.070910) | EACH | 1 | $2,355.00 | $3,500.00 | $1,500.00 | $1,100.00 | $1,500.00 | $6,440.00 |
| 48 | (604.13000011) | 8 | $940.00 | $1,700.00 | $503.13 | $650.00 | $1,750.00 | $1,810.00 | |
| 49 | (604.300671) | LF | 100 | $870.00 | $920.00 | $647.01 | $1,350.00 | $950.00 | $678.00 |
| 50 | (604.300691) | LF | 43 | $906.75 | $970.00 | $633.28 | $1,350.00 | $1,100.00 | $697.00 |
| 51 | (604.4048) | LF | 43 | $577.75 | $733.25 | $320.81 | $900.00 | $750.00 | $360.00 |
| 52 | Underdrain Filter, Type I (605.0901) | CY | 258 | $112.00 | $117.00 | $121.30 | $140.00 | $135.00 | $223.00 |
| 53 | (605.1701) | LF | 3,220 | $3.75 | $14.50 | $2.37 | $5.00 | $3.00 | $4.85 |
| 54 | Box Beam Guide Railing (606.10) | LF | 395 | $51.75 | $45.00 | $51.75 | $54.00 | $45.00 | $53.30 |
| 55 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 74 | $77.05 | $67.00 | $77.05 | $70.00 | $67.00 | $79.30 |
| 56 | Box Beam End Piece (606.120101) | EACH | 1 | $920.00 | $800.00 | $920.00 | $820.00 | $800.00 | $947.00 |
| 57 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 1 | $2,415.00 | $2,100.00 | $2,415.00 | $2,200.00 | $2,100.00 | $2,490.00 |
| 58 | Box Beam Median Barrier End Assembly, Type C (606.1403) | EACH | 1 | $7,176.00 | $6,240.00 | $7,176.00 | $6,500.00 | $6,240.00 | $7,390.00 |
| 59 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 528 | $2.50 | $7.50 | $15.44 | $5.00 | $11.00 | $12.50 |
| 60 | Removing and Disposing Box Beam Median Barrier (606.74) | LF | 30 | $2.50 | $13.50 | $45.64 | $6.00 | $45.00 | $21.90 |
| 61 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 2 | $802.00 | $400.00 | $219.05 | $155.00 | $1,400.00 | $658.00 |
| 62 | Removing and Disposing Box Beam Median Barrier End Assembly-Type C (606.7932) | EACH | 1 | $802.00 | $1,200.00 | $219.05 | $770.00 | $1,400.00 | $658.00 |
| 63 | (607.41010010) | 2,427 | $2.65 | $5.50 | $5.12 | $5.00 | $7.00 | $6.60 | |
| 64 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 1 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 |
| 65 | Concrete Sidewalks and Driveways (608.0101) | CY | 178 | $1,208.65 | $1,200.00 | $1,012.52 | $1,400.00 | $1,500.00 | $1,780.00 |
| 66 | (608.01020005) | 37 | $1,800.00 | $1,775.00 | $1,321.48 | $1,600.00 | $1,700.00 | $2,510.00 | |
| 67 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 110 | $188.00 | $205.00 | $260.00 | $400.00 | $250.00 | $227.00 |
| 68 | (608.21000003) | 38 | $550.00 | $441.00 | $465.75 | $450.00 | $300.00 | $480.00 | |
| 69 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 2,383 | $54.35 | $71.50 | $68.13 | $65.00 | $90.00 | $115.00 |
| 70 | Stone Curb – Mountable (MT) (609.0214) | LF | 1,326 | $91.00 | $106.00 | $95.79 | $85.00 | $105.00 | $139.00 |
| 71 | Stone Curb – Roundabout (RD) (609.0218) | LF | 261 | $206.00 | $202.25 | $214.80 | $180.00 | $210.00 | $263.00 |
| 72 | Mycorrhizal Fungi (610.0701) | LB | 28 | $34.50 | $30.00 | $57.50 | $32.00 | $30.00 | $35.50 |
| 73 | Compost (610.10) | CY | 243 | $71.00 | $90.00 | $126.14 | $105.00 | $90.00 | $90.00 |
| 74 | Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101) | CY | 16 | $69.00 | $100.00 | $143.75 | $105.00 | $60.00 | $71.10 |
| 75 | Weed Removal (610.13) | SY | 183 | $3.45 | $30.00 | $9.20 | $32.00 | $3.00 | $3.55 |
| 76 | Topsoil - Roadside (610.1402) | CY | 342 | $65.00 | $108.00 | $143.96 | $95.00 | $175.00 | $100.00 |
| 77 | Topsoil - Special Planting Mix (610.1404) | CY | 10 | $172.50 | $143.00 | $254.29 | $100.00 | $220.00 | $178.00 |
| 78 | (610.15120208) | 2,726 | $1.95 | $4.00 | $3.09 | $4.00 | $12.00 | $1.00 | |
| 79 | Sodding (610.18) | SY | 2,701 | $13.80 | $6.60 | $19.44 | $8.00 | $12.00 | $12.00 |
| 80 | Watering Vegetation – As Specified (610.1901) | 1,000 GALLONS | 5,071 | $1.15 | $6.50 | $5.75 | $1.00 | $1.00 | $1.00 |
| 81 | (611.0202) | EACH | 3 | $862.50 | $500.00 | $1,207.50 | $525.00 | $750.00 | $888.00 |
| 82 | (611.0351) | EACH | 1 | $575.00 | $500.00 | $977.50 | $525.00 | $500.00 | $592.00 |
| 83 | (611.0442) | EACH | 29 | $92.00 | $200.00 | $184.00 | $210.00 | $80.00 | $94.70 |
| 84 | (611.0721) | EACH | 245 | $46.00 | $15.00 | $36.80 | $16.00 | $40.00 | $47.40 |
| 85 | (611.0741) | EACH | 47 | $40.25 | $20.00 | $40.25 | $21.00 | $35.00 | $41.40 |
| 86 | (611.0751) | EACH | 3 | $69.00 | $50.00 | $51.75 | $52.00 | $60.00 | $71.10 |
| 87 | (611.19020024) | 3 | $11.50 | $20.00 | $345.00 | $21.00 | $10.00 | $11.80 | |
| 88 | (611.19030024) | 1 | $11.50 | $20.00 | $293.25 | $21.00 | $10.00 | $11.80 | |
| 89 | (611.19040024) | 29 | $5.75 | $5.00 | $55.20 | $5.50 | $5.00 | $5.90 | |
| 90 | (611.19050024) | 81 | $5.75 | $10.00 | $52.00 | $5.50 | $5.00 | $5.90 | |
| 91 | (611.19070024) | 295 | $2.30 | $5.00 | $11.50 | $5.50 | $2.00 | $2.35 | |
| 92 | (614.060204) | EACH | 1 | $1,220.50 | $2,000.00 | $1,627.91 | $5,000.00 | $2,250.00 | $1,800.00 |
| 93 | Pre-Existing Stump Removal up to 24” diameter at 6 inches above grade (614.0701) | EACH | 1 | $523.00 | $650.00 | $614.82 | $600.00 | $1,100.00 | $899.00 |
| 94 | Tree Root Pruning (614.09) | LF | 70 | $20.80 | $50.00 | $31.30 | $60.00 | $150.00 | $19.40 |
| 95 | (615.02050124) | 1 | $465.00 | $1,125.00 | $1,052.91 | $500.00 | $8,500.00 | $489.00 | |
| 96 | (617.01010024) | 150 | $5.75 | $20.00 | $14.38 | $21.00 | $5.00 | $5.00 | |
| 97 | (617.10000024) | 5 | $350.00 | $165.00 | $575.00 | $120.00 | $400.00 | $175.00 | |
| 98 | (617.11000024) | LS | 1 | $3,000.00 | $1,000.00 | $5,750.00 | $1,000.00 | $6,500.00 | $310.00 |
| 99 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $150,000 | $509,010 | $185,641 | $307,900 | $275,000 | $275,000 |
| 100 | Type III Construction Barricades (619.04) | EACH | 58 | $123.00 | $150.00 | $281.75 | $250.00 | $300.00 | $125.00 |
| 101 | (619.100101) | LF | 10,754 | $0.35 | $0.29 | $0.90 | $0.85 | $0.80 | $0.50 |
| 102 | (619.110513) | EACH | 7 | $8,160.20 | $4,850.00 | $11,270 | $9,000.00 | $6,500.00 | $9,690.00 |
| 103 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 658 | $78.15 | $18.00 | $89.82 | $72.00 | $60.00 | $127.00 |
| 104 | Temporary Positive Barrier – Category 2 (Pinning Permitted) (619.1712) | LF | 2,037 | $78.15 | $17.00 | $97.90 | $72.00 | $75.00 | $129.00 |
| 105 | Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802) | EACH | 2 | $4,305.75 | $7,625.00 | $6,440.00 | $11,000 | $5,000.00 | $23,700 |
| 106 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $50,000 | $75,000 | $57,500 | $35,049 | $95,000 | $37,900 |
| 107 | (619.99230101) | LS | 1 | $1,000.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 108 | (619.99230201) | 10 | $150.00 | $100.00 | $138.00 | $25.00 | $500.00 | $474.00 | |
| 109 | Stone Filling (Light) (620.03) | CY | 7 | $162.00 | $96.00 | $387.91 | $300.00 | $175.00 | $200.00 |
| 110 | (623.12000010) | 118 | $70.25 | $160.00 | $133.93 | $200.00 | $250.00 | $191.00 | |
| 111 | Survey Operations (625.01) | LS | 1 | $60,000 | $50,000 | $23,500 | $90,000 | $100,000 | $158,237 |
| 112 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 2 | $1,600.00 | $405.00 | $1,000.00 | $500.00 | $700.00 | $1,210.00 |
| 113 | Permanent Survey Markers (625.06) | EACH | 4 | $3,100.00 | $1,865.00 | $1,489.42 | $2,000.00 | $2,500.00 | $3,610.00 |
| 114 | (625.09010015) | LS | 1 | $5,000.00 | $10,000 | $6,000.00 | $4,000.00 | $40,000 | $45,600 |
| 115 | (625.110001) | EACH | 1 | $32,000 | $36,750 | $24,725 | $40,000 | $35,000 | $38,400 |
| 116 | (627.50140008) | 701 | $8.00 | $5.50 | $5.09 | $10.00 | $5.00 | $10.70 | |
| 117 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $6,200.00 | $1,000.00 | $2,875.00 | $2,200.00 | $4,000.00 | $3,960.00 |
| 118 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 14 | $2,300.00 | $2,500.00 | $2,875.00 | $5,000.00 | $4,250.00 | $6,670.00 |
| 119 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 120 | (637.41000115) | 14 | $1,200.00 | $400.00 | $180.72 | $400.00 | $300.00 | $158.00 | |
| 121 | (637.41000215) | 14 | $1,200.00 | $400.00 | $266.97 | $400.00 | $300.00 | $158.00 | |
| 122 | (642.31510024) | 2,887 | $1.15 | $3.00 | $10.35 | $2.25 | $1.00 | $1.20 | |
| 123 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 619 | $41.40 | $36.00 | $41.40 | $38.00 | $36.00 | $42.60 |
| 124 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 62 | $37.95 | $33.00 | $37.95 | $35.00 | $33.00 | $39.10 |
| 125 | Type A Sign Posts (645.81) | EACH | 72 | $247.25 | $215.00 | $247.25 | $225.00 | $215.00 | $255.00 |
| 126 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 8 | $1,184.50 | $1,030.00 | $1,256.38 | $1,100.00 | $1,030.00 | $1,220.00 |
| 127 | (645.81090003) | 14 | $57.50 | $50.00 | $57.50 | $54.00 | $50.00 | $59.20 | |
| 128 | (645.830201) | EACH | 2 | $4,715.00 | $4,100.00 | $4,715.00 | $4,300.00 | $4,100.00 | $4,850.00 |
| 129 | Reference Marker Panel (646.21) | EACH | 4 | $35.65 | $31.00 | $35.65 | $33.00 | $31.00 | $36.70 |
| 130 | Steel Post, 2.0 lb/ft (646.32) | EACH | 4 | $72.45 | $63.00 | $72.45 | $65.00 | $63.00 | $74.60 |
| 131 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 2 | $212.75 | $185.00 | $212.75 | $200.00 | $185.00 | $219.00 |
| 132 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 3 | $86.25 | $210.00 | $146.03 | $80.00 | $85.00 | $88.80 |
| 133 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 15 | $69.00 | $113.25 | $97.42 | $65.00 | $70.00 | $71.10 |
| 134 | Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65) | EACH | 2 | $345.00 | $700.00 | $1,454.98 | $320.00 | $350.00 | $355.00 |
| 135 | Cast Frame F1, UnMountable Curb Box CU1 & Reticuline Grate G1 (655.0704) | EACH | 17 | $2,010.50 | $1,800.00 | $1,497.36 | $2,500.00 | $2,500.00 | $2,590.00 |
| 136 | Parallel Bar Frame 11 PCB & Parallel Bar Grate 11 PCB (655.0902) | EACH | 8 | $2,091.00 | $1,850.00 | $1,402.41 | $2,700.00 | $2,500.00 | $2,490.00 |
| 137 | Manhole Frame & Grate (655.1201) | EACH | 6 | $1,441.00 | $1,200.00 | $821.08 | $1,700.00 | $1,250.00 | $1,890.00 |
| 138 | (660.75000010) | 18 | $625.00 | $500.00 | $632.50 | $300.00 | $700.00 | $959.00 | |
| 139 | (661.70010010) | 374 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 140 | (663.0106) | LF | 23 | $266.65 | $134.00 | $104.81 | $550.00 | $160.00 | $220.00 |
| 141 | (663.0110) | LF | 22 | $227.40 | $221.00 | $199.22 | $640.00 | $270.00 | $304.00 |
| 142 | (663.14010009) | 2 | $5,800.00 | $5,200.00 | $3,082.66 | $7,000.00 | $15,000 | $2,650.00 | |
| 143 | Iron Water Main Fittings (10 - 16 inch diameter) (663.2002) | LB | 520 | $5.60 | $7.00 | $6.02 | $20.00 | $6.50 | $6.80 |
| 144 | Relocate Existing Hydrant (663.31) | EACH | 1 | $6,600.00 | $5,300.00 | $3,887.66 | $9,000.00 | $15,000 | $1,850.00 |
| 145 | Adjust Existing Valve Box Elevation (663.33) | EACH | 3 | $500.00 | $175.00 | $261.03 | $1,500.00 | $150.00 | $354.00 |
| 146 | (663.4110) | LF | 22 | $40.00 | $71.00 | $44.73 | $100.00 | $200.00 | $44.50 |
| 147 | (670.0105) | EACH | 4 | $3,576.50 | $1,640.00 | $2,038.87 | $1,950.00 | $1,640.00 | $1,940.00 |
| 148 | (670.0106) | EACH | 9 | $4,312.50 | $1,830.00 | $1,790.61 | $2,200.00 | $1,830.00 | $2,170.00 |
| 149 | (670.10010005) | 4 | $7,682.00 | $4,800.00 | $8,993.00 | $5,400.00 | $4,800.00 | $5,680.00 | |
| 150 | (670.1536) | EACH | 9 | $3,737.50 | $2,510.00 | $3,315.45 | $2,900.00 | $2,510.00 | $2,970.00 |
| 151 | (670.1706) | EACH | 9 | $1,748.00 | $1,425.00 | $1,891.75 | $1,500.00 | $1,425.00 | $1,690.00 |
| 152 | Breakaway Transformer Base (Aluminum) (670.19) | EACH | 9 | $1,092.50 | $800.00 | $1,713.50 | $900.00 | $800.00 | $947.00 |
| 153 | (670.2602) | LF | 30 | $24.75 | $9.10 | $16.10 | $10.00 | $9.10 | $10.80 |
| 154 | (670.2603) | LF | 22 | $31.65 | $16.00 | $22.77 | $17.00 | $16.00 | $19.00 |
| 155 | Pullboxes less than 5 cubic feet, inside volume (Lighting) (670.3001) | EACH | 5 | $1,518.00 | $1,390.00 | $1,170.97 | $1,500.00 | $1,390.00 | $1,650.00 |
| 156 | (670.7004) | LF | 7,530 | $2.88 | $2.75 | $3.91 | $3.00 | $2.75 | $3.25 |
| 157 | (670.7006) | LF | 1,030 | $4.80 | $1.70 | $1.73 | $1.80 | $1.70 | $2.00 |
| 158 | (670.70300025) | 140 | $6.65 | $10.00 | $1.73 | $11.00 | $10.00 | $11.80 | |
| 159 | Remove and Dispose of Lamppost Assembly (670.81) | EACH | 1 | $339.25 | $1,750.00 | $1,178.75 | $1,900.00 | $1,750.00 | $2,070.00 |
| 160 | (670.91010011) | 1 | $166.75 | $1,750.00 | $793.50 | $1,900.00 | $1,750.00 | $2,070.00 | |
| 161 | Performance Concrete Quality Adjustment (670.99) | QUALITY UNIT | 1 | $14.05 | $14.05 | $14.05 | $14.05 | $14.05 | $14.05 |
| 162 | (680.510501) | EACH | 3 | $2,282.75 | $1,410.00 | $925.01 | $1,500.00 | $1,410.00 | $1,670.00 |
| 163 | (680.520505) | LF | 950 | $10.95 | $8.25 | $15.53 | $9.00 | $8.25 | $9.75 |
| 164 | Riser Assembly, 2-inch Diameter (680.700606) | EACH | 1 | $1,719.25 | $525.00 | $1,035.00 | $550.00 | $525.00 | $622.00 |
| 165 | (680.78100108) | LS | 1 | $7,647.50 | $6,100.00 | $12,765 | $6,500.00 | $6,100.00 | $7,220.00 |
| 166 | (680.82250608) | 7 | $264.50 | $350.00 | $241.50 | $375.00 | $350.00 | $414.00 | |
| 167 | (680.82250801) | 8 | $494.50 | $600.00 | $540.50 | $325.00 | $450.00 | $592.00 | |
| 168 | (680.82252310) | 6 | $7,417.50 | $10,700 | $12,581 | $12,000 | $10,700 | $12,700 | |
| 169 | (680.82254310) | 4 | $11,698 | $11,700 | $12,015 | $13,000 | $11,700 | $13,900 | |
| 170 | (680.95110001) | 1 | $17,538 | $9,050.00 | $11,908 | $10,000 | $9,050.00 | $10,700 | |
| 171 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 8,894 | $2.15 | $1.87 | $4.13 | $3.75 | $4.00 | $0.72 |
| 172 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 3,195 | $2.15 | $1.87 | $3.21 | $3.00 | $3.00 | $0.72 |
| 173 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 42 | $82.80 | $72.00 | $86.25 | $80.00 | $75.00 | $124.00 |
| 174 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 53 | $172.50 | $150.00 | $247.25 | $230.00 | $215.00 | $257.00 |
| 175 | Field Change Payment (FCP) (697.03) | DOL | 186,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 176 | Asphalt Price Adjustment (698.04) | DOL | 6,171 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 177 | Fuel Price Adjustment (698.05) | DOL | 1,582 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 178 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 179 | Mobilization (699.040001) | LS | 1 | $156,000 | $164,350 | $150,000 | $189,000 | $190,000 | $202,294 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of January 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.