NYSDOT contract D265726 bid tabulation
REGION 7 CROSS PIN 6 - BRIDGE RESILIENCY PROJECT. Let by New York State DOT on March 12, 2026, St. Lawrence, Region 07. 3 bids received; low bid $6,934,048 by Slate Hill Constructors Inc.
- Owner
- New York State DOT
- Letting
- 12 MAR 2026
- Pay items
- 136
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Slate Hill Constructors Inc | $6,934,048 | Low |
| 2 | Vector Construction Corp | $7,759,264 | +12% |
| 3 | Kubricky-Jointa Lime LLC | $8,197,940 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Slate Hill Constructors Inc | 2. Vector Construction Corp | 3. Kubricky-Jointa Lime LLC |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $30,000 | $65,000 | $22,300 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 2,025 | $40.00 | $38.00 | $44.00 |
| 3 | Embankment In Place (203.03) | CY | 4,772 | $50.00 | $38.00 | $16.50 |
| 4 | Select Granular Fill (203.07) | CY | 566 | $90.00 | $80.00 | $37.00 |
| 5 | Select Structural Fill (203.21) | CY | 1,793 | $80.00 | $80.00 | $76.50 |
| 6 | Controlled Low Strength Material (CLSM) (204.01) | CY | 23 | $250.00 | $619.00 | $385.00 |
| 7 | Structure Excavation (206.01) | CY | 10,175 | $40.00 | $28.00 | $34.50 |
| 8 | Trench and Culvert Excavation (206.0201) | CY | 934 | $40.00 | $34.00 | $54.50 |
| 9 | Geotextile Bedding (207.20) | SY | 334 | $10.00 | $9.00 | $7.30 |
| 10 | Geotextile Separation (207.21) | SY | 462 | $6.00 | $7.00 | $3.90 |
| 11 | Geotextile Stabilization (207.24) | SY | 690 | $7.00 | $7.00 | $3.50 |
| 12 | Prefabricated Composite Structural Drain (207.26) | SY | 571 | $13.00 | $22.00 | $14.00 |
| 13 | Seed and Mulch – Temporary (209.1003) | SY | 3,022 | $1.50 | $1.00 | $2.35 |
| 14 | Drainage Structure Inlet Protection, Gravel Bag – Temporary (209.1702) | CY | 10 | $220.00 | $40.00 | $580.00 |
| 15 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 1,483 | $5.50 | $4.00 | $3.90 |
| 16 | Stabilized Construction Access (209.22) | SY | 400 | $25.00 | $32.00 | $48.50 |
| 17 | Sediment Filter Log, 12″ (209.2301) | LF | 1,687 | $9.00 | $12.00 | $11.00 |
| 18 | (304.01940004) | 9 | $215.00 | $140.00 | $1,100.00 | |
| 19 | Subbase Course, Type 1 (304.11) | CY | 13 | $160.00 | $125.00 | $220.00 |
| 20 | Subbase Course, Type 2 (304.12) | CY | 1,412 | $100.00 | $95.00 | $85.00 |
| 21 | Subbase Course, Type 4 (304.14) | CY | 29 | $190.00 | $130.00 | $570.00 |
| 22 | (404.0983) | TON | 465 | $190.00 | $270.00 | $225.00 |
| 23 | (404.1989) | TON | 506 | $180.00 | $290.00 | $210.00 |
| 24 | (404.2589) | TON | 638 | $175.00 | $180.00 | $200.00 |
| 25 | Diluted Tack Coat (407.0102) | GAL | 587 | $10.00 | $6.00 | $9.75 |
| 26 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 4,244 | $0.25 | $1.10 | $0.13 |
| 27 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 1,899 | $10.00 | $18.00 | $19.00 |
| 28 | Shields and Shoring (552.17) | SF | 3,121 | $1.00 | $3.00 | $1.20 |
| 29 | (553.010001) | EACH | 1 | $1.00 | $50,000 | $48,000 |
| 30 | (553.010002) | EACH | 1 | $1.00 | $50,000 | $48,000 |
| 31 | (553.010003) | EACH | 1 | $1.00 | $500.00 | $30,000 |
| 32 | (553.010004) | EACH | 1 | $1.00 | $500.00 | $30,000 |
| 33 | (553.030001) | EACH | 1 | $1.00 | $145,000 | $195,000 |
| 34 | (553.030002) | EACH | 1 | $1.00 | $3,500.00 | $65,000 |
| 35 | (554.3002) | SF | 1,304 | $7.00 | $6.00 | $5.85 |
| 36 | Footing Concrete, Performance (555.0011) | CY | 298.60 | $1,250.00 | $1,400.00 | $830.00 |
| 37 | Concrete for Structures, Performance (555.0021) | CY | 153.20 | $2,600.00 | $2,100.00 | $1,680.00 |
| 38 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $5.50 | $5.50 | $5.50 |
| 39 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $12.70 | $12.70 | $12.70 |
| 40 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 19,030 | $2.25 | $3.00 | $2.30 |
| 41 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 14,541 | $2.50 | $3.50 | $2.50 |
| 42 | Protective Sealing of New Structural Concrete (559.02) | SF | 2,397 | $3.00 | $1.50 | $0.81 |
| 43 | (562.0101) | SY | 182 | $2,500.00 | $3,500.00 | $2,950.00 |
| 44 | Performance Concrete Quality Adjustment (562.99) | QUALITY UNIT | 1 | $17.00 | $17.00 | $17.00 |
| 45 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 189 | $280.00 | $250.00 | $275.00 |
| 46 | Transition Bridge Railing (568.70) | LF | 256 | $240.00 | $220.00 | $230.00 |
| 47 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 88 | $100.00 | $180.00 | $120.00 |
| 48 | (595.50000018) | 7,071 | $4.00 | $4.00 | $5.40 | |
| 49 | (603.171316) | EACH | 3 | $450.00 | $350.00 | $1,000.00 |
| 50 | (603.171614) | EACH | 5 | $600.00 | $850.00 | $1,900.00 |
| 51 | (603.66221115) | 92 | $6,500.00 | $8,000.00 | $7,550.00 | |
| 52 | (603.72) | 66 | $2,000.00 | $2,500.00 | $1,600.00 | |
| 53 | Concrete Collars (603.77) | EACH | 1 | $2,500.00 | $5,000.00 | $3,450.00 |
| 54 | (603.9818) | LF | 69 | $50.00 | $65.00 | $78.00 |
| 55 | (603.9824) | LF | 424 | $68.00 | $85.00 | $130.00 |
| 56 | (603.99050002) | 2 | $1,200.00 | $2,000.00 | $635.00 | |
| 57 | (604.300103) | LF | 5.80 | $1,000.00 | $1,500.00 | $1,000.00 |
| 58 | (604.300211) | LF | 6.90 | $1,000.00 | $1,500.00 | $1,150.00 |
| 59 | (604.300611) | LF | 11.70 | $1,200.00 | $1,500.00 | $1,150.00 |
| 60 | Box Beam Guide Railing (606.10) | LF | 1,212 | $60.00 | $65.00 | $63.00 |
| 61 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 18 | $165.00 | $170.00 | $195.00 |
| 62 | Box Beam End Piece (606.120101) | EACH | 1 | $1,000.00 | $75.00 | $855.00 |
| 63 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 9 | $2,600.00 | $2,800.00 | $2,900.00 |
| 64 | Removing and Disposing Cable Guide Railing (606.70) | LF | 1,721 | $6.00 | $6.00 | $7.40 |
| 65 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 12 | $650.00 | $250.00 | $730.00 |
| 66 | (607.06400016) | 67 | $215.00 | $250.00 | $250.00 | |
| 67 | (607.41010010) | 812 | $10.00 | $6.00 | $9.75 | |
| 68 | (607.59000007) | 996 | $22.00 | $25.00 | $43.00 | |
| 69 | (607.96000008) | 1,449 | $8.00 | $6.00 | $7.65 | |
| 70 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 3 | $90.00 | $90.00 | $90.00 |
| 71 | (608.01020005) | 8 | $2,500.00 | $2,500.00 | $3,850.00 | |
| 72 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 80 | $310.00 | $325.00 | $375.00 |
| 73 | Stone Curb – Bridge (Type A) (609.0301) | LF | 373 | $90.00 | $95.00 | $135.00 |
| 74 | Optional Curb (Precast Concrete Type PT4 or Cast-In-Place Concrete Type T4) (609.0903) | LF | 284 | $66.00 | $55.00 | $100.00 |
| 75 | Optional Curb (Precast Type Pm6 Or Cast-In-Place Type M6 ) (609.0904) | LF | 150 | $66.00 | $100.00 | $155.00 |
| 76 | Mycorrhizal Fungi (610.0701) | LB | 3 | $80.00 | $35.00 | $93.00 |
| 77 | Turf Establishment – Performance (610.1605) | SY | 2,127 | $4.00 | $8.00 | $15.00 |
| 78 | Watering Vegetation (610.19) | 1,000 GALLONS | 1 | $105.00 | $500.00 | $125.00 |
| 79 | (611.0261) | EACH | 3 | $700.00 | $650.00 | $855.00 |
| 80 | (611.0472) | EACH | 4 | $240.00 | $250.00 | $280.00 |
| 81 | Transplanting over 6 inches to 12 inches Diameter at Breast Height (611.14) | EACH | 3 | $450.00 | $4,000.00 | $4,950.00 |
| 82 | (611.19020024) | 3 | $230.00 | $100.00 | $260.00 | |
| 83 | (611.19040024) | 4 | $70.00 | $75.00 | $84.00 | |
| 84 | (613.04000001) | 28 | $140.00 | $185.00 | $440.00 | |
| 85 | (615.01010108) | 247 | $165.00 | $50.00 | $60.00 | |
| 86 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $920,000 | $197,000 | $511,000 |
| 87 | Type III Construction Barricades (619.04) | EACH | 24 | $50.00 | $212.00 | $215.00 |
| 88 | (619.0501) | LS | 1 | $450,000 | $1,360,000 | $1,550,000 |
| 89 | (619.0502) | LS | 1 | $120,000 | $72,000 | $350,000 |
| 90 | (619.080102) | LF | 968 | $4.00 | $3.75 | $4.30 |
| 91 | (619.111112) | EACH | 4 | $8,000.00 | $25,000 | $4,750.00 |
| 92 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 200 | $50.00 | $40.00 | $120.00 |
| 93 | Temporary Positive Barrier – Category 4 (Pinning Permitted) (619.1714) | LF | 546 | $80.00 | $60.00 | $120.00 |
| 94 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 11 | $30.00 | $60.00 | $34.50 |
| 95 | Temporary Impact Attenuator - Gating (Test Level 2) (619.1812) | EACH | 2 | $12,000 | $16,000 | $7,000.00 |
| 96 | Temporary Rumble Strips (619.22) | LF | 432 | $20.00 | $18.00 | $14.50 |
| 97 | (619.27000007) | 4 | $100.00 | $140.00 | $350.00 | |
| 98 | Stone Filling (Light) (620.03) | CY | 37 | $150.00 | $130.00 | $155.00 |
| 99 | Stone Filling (Medium) (620.04) | CY | 492 | $150.00 | $150.00 | $130.00 |
| 100 | Stone Filling (Heavy) (620.05) | CY | 746 | $160.00 | $175.00 | $220.00 |
| 101 | Bedding Material, Type 1 (620.0801) | CY | 306 | $140.00 | $120.00 | $135.00 |
| 102 | Bedding Material, Type 2 (620.0802) | CY | 76 | $140.00 | $120.00 | $115.00 |
| 103 | Cleaning Closed Drainage Systems (621.03) | LF | 598 | $8.00 | $35.00 | $8.05 |
| 104 | Cleaning Drainage Structures (621.04) | EACH | 3 | $2,000.00 | $275.00 | $1,600.00 |
| 105 | (621.05020004) | 52 | $40.00 | $13.00 | $21.00 | |
| 106 | Crushed Stone (In-Place Measure) (623.12) | CY | 199 | $110.00 | $110.00 | $110.00 |
| 107 | Survey Operations (625.01) | LS | 1 | $32,500 | $75,000 | $62,500 |
| 108 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 10 | $1,100.00 | $600.00 | $2,050.00 |
| 109 | (625.130001) | EACH | 1 | $52,500 | $75,000 | $20,520 |
| 110 | (627.50140008) | 582 | $6.00 | $5.00 | $4.85 | |
| 111 | Field Laboratory (637.01) | EACH | 2 | $2,000.00 | $2,000.00 | $6,650.00 |
| 112 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $150.00 | $4,500.00 | $610.00 |
| 113 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 66 | $2,400.00 | $800.00 | $1,200.00 |
| 114 | Rain Gauge (637.26) | EACH | 1 | $100.00 | $75.00 | $200.00 |
| 115 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 |
| 116 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 |
| 117 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 118 | (637.41000115) | 17 | $200.00 | $100.00 | $53.00 | |
| 119 | (637.41000215) | 16 | $200.00 | $100.00 | $54.00 | |
| 120 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 49.20 | $70.00 | $45.00 | $51.50 |
| 121 | Type A Sign Posts (645.81) | EACH | 7 | $800.00 | $225.00 | $265.00 |
| 122 | Reference Marker Panel (646.21) | EACH | 3 | $38.00 | $30.00 | $34.00 |
| 123 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 17 | $22.00 | $15.00 | $17.00 |
| 124 | Steel Post, 2.0 lb/ft (646.32) | EACH | 15 | $75.00 | $70.00 | $79.50 |
| 125 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 5 | $12.00 | $22.00 | $24.50 |
| 126 | Furnishing and Applying Calcium Chloride (652.01) | TON | 9 | $120.00 | $900.00 | $1,140.00 |
| 127 | Welded Frame & Reticuline Grate 3 (655.1103) | EACH | 1 | $1,800.00 | $13,500 | $2,050.00 |
| 128 | Welded Frame & Reticuline Grate 11 (655.1111) | EACH | 3 | $1,800.00 | $1,200.00 | $2,150.00 |
| 129 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 3,330 | $2.75 | $1.50 | $1.70 |
| 130 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 2,522 | $2.75 | $1.50 | $1.70 |
| 131 | (691.04000020) | 67,200 | $1.00 | $1.00 | $1.00 | |
| 132 | Field Change Payment (FCP) (697.03) | DOL | 286,000 | $1.00 | $1.00 | $1.00 |
| 133 | Asphalt Price Adjustment (698.04) | DOL | 2,347 | $1.00 | $1.00 | $1.00 |
| 134 | Fuel Price Adjustment (698.05) | DOL | 2,775 | $1.00 | $1.00 | $1.00 |
| 135 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 136 | Mobilization (699.040001) | LS | 1 | $225,000 | $296,000 | $300,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 12, 2026. Compiled by Mirage Metrics.