NYSDOT contract D265597 bid tabulation
BRIDGE REPLACEMENTS (3), US ROUTE 11. Let by New York State DOT on December 4, 2025, Franklin, Region 07. 3 bids received; low bid $9,996,791 by Luck Brothers Inc.
- Owner
- New York State DOT
- Letting
- 04 DEC 2025
- Pay items
- 194
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Luck Brothers Inc | $9,996,791 | Low |
| 2 | Vector Construction Corp | $13,409,049 | +34% |
| 3 | Kubricky-Jointa Lime LLC | $13,797,159 | +38% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Luck Brothers Inc | 2. Vector Construction Corp | 3. Kubricky-Jointa Lime LLC |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $16,184 | $120,000 | $14,600 |
| 2 | (202.120001) | LS | 1 | $87,045 | $300,000 | $290,000 |
| 3 | (202.120002) | LS | 1 | $87,045 | $300,000 | $250,000 |
| 4 | (202.120003) | LS | 1 | $87,045 | $500,000 | $480,000 |
| 5 | Removal of Substructures (202.19) | CY | 330 | $225.17 | $160.00 | $335.00 |
| 6 | Unclassified Excavation and Disposal (203.02) | CY | 5,934 | $24.42 | $35.00 | $43.50 |
| 7 | Embankment In Place (203.03) | CY | 1,343 | $19.33 | $35.00 | $26.00 |
| 8 | Select Granular Fill (203.07) | CY | 853 | $83.52 | $80.00 | $47.50 |
| 9 | Select Granular Fill, Slope Protection - Type A (203.0801) | CY | 58 | $88.99 | $120.00 | $97.00 |
| 10 | Select Structural Fill (203.21) | CY | 270 | $76.13 | $120.00 | $110.00 |
| 11 | (205.0201) | LS | 1 | $21,321 | $3,000.00 | $6,050.00 |
| 12 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 40 | $165.21 | $200.00 | $125.00 |
| 13 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 4 | $2,923.39 | $500.00 | $325.00 |
| 14 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 1 | $2,923.39 | $1,250.00 | $1,000.00 |
| 15 | Laboratory Analysis for Ignitability (205.0403) | EACH | 1 | $877.02 | $500.00 | $35.50 |
| 16 | Laboratory Analysis for ph (205.0404) | EACH | 1 | $233.87 | $300.00 | $19.00 |
| 17 | Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406) | EACH | 4 | $584.68 | $500.00 | $88.50 |
| 18 | Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407) | EACH | 4 | $584.68 | $500.00 | $110.00 |
| 19 | (205.050201) | TON | 165 | $94.54 | $120.00 | $74.50 |
| 20 | Structure Excavation (206.01) | CY | 3,561 | $29.94 | $50.00 | $49.00 |
| 21 | Trench and Culvert Excavation (206.0201) | CY | 2,432 | $56.08 | $50.00 | $49.50 |
| 22 | Geotextile Bedding (207.20) | SY | 9 | $114.83 | $100.00 | $150.00 |
| 23 | Geotextile Drainage (207.22) | SY | 278 | $3.79 | $5.00 | $1.80 |
| 24 | Geotextile Stabilization (207.24) | SY | 3,091 | $1.42 | $5.00 | $3.00 |
| 25 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 286 | $32.24 | $22.00 | $15.00 |
| 26 | Seed and Mulch – Temporary (209.1003) | SY | 3,404 | $1.21 | $2.00 | $2.95 |
| 27 | Check Dam (Ditch Bottom Width 0.0 to 3′), Stone – Temporary (209.110101) | EACH | 3 | $789.44 | $500.00 | $1,700.00 |
| 28 | Check Dam (Ditch Bottom Width >3′ to 6′), Stone – Temporary (209.110102) | EACH | 1 | $1,441.11 | $600.00 | $2,450.00 |
| 29 | Turbidity Curtain – Temporary (209.1501) | LF | 848 | $31.69 | $16.00 | $37.00 |
| 30 | Rolled Erosion Control Product, Class II Type D, Intermediate (209.1904) | SY | 1,287 | $5.63 | $6.00 | $6.25 |
| 31 | Stabilized Construction Access (209.22) | SY | 100 | $55.79 | $50.00 | $78.00 |
| 32 | Sediment Filter Log, 12″ (209.2301) | LF | 1,310 | $13.87 | $12.00 | $12.50 |
| 33 | Subbase Course, Type 2 (304.12) | CY | 3,291 | $92.04 | $120.00 | $93.00 |
| 34 | (404.0001) | TON | 206 | $80.00 | $80.00 | $80.00 |
| 35 | (404.0983) | TON | 777 | $176.41 | $170.00 | $175.00 |
| 36 | (404.1989) | TON | 1,198 | $156.41 | $150.00 | $155.00 |
| 37 | (404.3789) | TON | 2,129 | $138.80 | $150.00 | $155.00 |
| 38 | Diluted Tack Coat (407.0102) | GAL | 1,274 | $5.57 | $5.00 | $4.75 |
| 39 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 5,620 | $1.16 | $1.00 | $1.20 |
| 40 | (520.50000004) | 506 | $8.90 | $14.00 | $17.00 | |
| 41 | Cast-In-Place Concrete Piles (551.11) | LF | 1,080 | $166.93 | $100.00 | $105.00 |
| 42 | Furnishing Equipment for Driving Piles (551.13) | LS | 1 | $41,197 | $130,000 | $325,000 |
| 43 | Splices for CIP Piles (551.15) | EACH | 16 | $219.72 | $200.00 | $235.00 |
| 44 | Drilled Shafts (2.5 ft. Diameter) (551.50025) | LF | 369 | $766.44 | $500.00 | $590.00 |
| 45 | Furnishing Equipment for Installing Drilled Shafts (551.53) | LS | 2 | $71,408 | $150,000 | $138,000 |
| 46 | Performance Concrete Quality Adjustment - Drilled Shafts (551.9901) | QUALITY UNIT | 1 | $60.51 | $60.51 | $60.51 |
| 47 | Performance Concrete Quality Adjustment - Cast In Place Piles (551.9902) | QUALITY UNIT | 1 | $13.26 | $13.26 | $13.26 |
| 48 | Shields and Shoring (552.17) | SF | 15,618 | $3.30 | $1.00 | $0.41 |
| 49 | (552.2001) | LF | 175 | $104.36 | $110.00 | $110.00 |
| 50 | (552.2101) | LF | 45 | $910.36 | $800.00 | $820.00 |
| 51 | (552.2201) | LF | 235 | $161.49 | $180.00 | $240.00 |
| 52 | (552.230201) | SF | 386 | $31.20 | $43.00 | $55.50 |
| 53 | (553.020001) | EACH | 1 | $141,624 | $1.00 | $87,100 |
| 54 | (553.020002) | EACH | 1 | $141,624 | $1.00 | $87,100 |
| 55 | Concrete for Structures, Performance (555.0021) | CY | 317.30 | $1,754.78 | $2,200.00 | $2,050.00 |
| 56 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $11.50 | $11.50 | $11.50 |
| 57 | Galvanized Bar Reinforcement for Structures (556.0203) | LB | 73,493 | $3.02 | $2.50 | $3.06 |
| 58 | Stud Shear Connectors for Bridges (556.03) | EACH | 7,966 | $6.79 | $8.00 | $9.50 |
| 59 | (557.1013) | SY | 114 | $667.73 | $800.00 | $820.00 |
| 60 | (557.1019) | SY | 277.70 | $467.46 | $800.00 | $590.00 |
| 61 | (557.1113) | SY | 461 | $702.49 | $900.00 | $1,500.00 |
| 62 | (557.1119) | SY | 666.20 | $619.37 | $800.00 | $1,050.00 |
| 63 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 1,515.90 | $34.01 | $0.01 | $0.01 |
| 64 | Sidewalks and Safety Walks (557.30) | SY | 83 | $353.97 | $400.00 | $285.00 |
| 65 | (557.60010004) | 1,392 | $39.03 | $40.00 | $45.00 | |
| 66 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $12.81 | $12.81 | $12.81 |
| 67 | Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902) | QUALITY UNIT | 1 | $12.76 | $12.76 | $12.76 |
| 68 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 1,367 | $18.98 | $20.00 | $31.00 |
| 69 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 12,896 | $0.87 | $0.60 | $1.55 |
| 70 | Protective Sealing of New Structural Concrete (559.02) | SF | 5,169 | $0.83 | $1.00 | $2.40 |
| 71 | (564.0501) | LS | 1 | $293,769 | $575,000 | $350,000 |
| 72 | (564.0502) | LS | 1 | $176,684 | $375,000 | $220,000 |
| 73 | (564.0503) | LS | 1 | $501,107 | $775,000 | $635,000 |
| 74 | (564.20010008) | 4,360 | $1.17 | $0.01 | $0.01 | |
| 75 | (565.30130101) | 34 | $321.96 | $200.00 | $545.00 | |
| 76 | Steel Bridge Railing (Four-Rail) (568.51) | LF | 138 | $260.56 | $265.00 | $280.00 |
| 77 | Transition Bridge Railing (568.70) | LF | 436 | $182.87 | $185.00 | $195.00 |
| 78 | Vertical Faced Concrete Parapet (569.03) | LF | 94 | $526.46 | $500.00 | $635.00 |
| 79 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 252 | $572.46 | $575.00 | $450.00 |
| 80 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $12.70 | $12.70 | $12.70 |
| 81 | Lead-Exposure Control Plan (570.01) | LS | 1 | $2,773.37 | $1.00 | $590.00 |
| 82 | Medical Testing (570.02) | DOL | 12,000 | $1.00 | $1.00 | $1.00 |
| 83 | Personal-Exposure-Monitoring Sample Analysis (570.03) | DOL | 7,000 | $1.00 | $1.00 | $1.00 |
| 84 | Decontamination Facilities (570.04) | CALENDAR WEEK | 44 | $138.66 | $1.00 | $1.00 |
| 85 | (570.100001) | LS | 1 | $1.11 | $1.00 | $1.00 |
| 86 | (570.100002) | LS | 1 | $1.11 | $1.00 | $1.00 |
| 87 | (570.100003) | LS | 1 | $1.11 | $1.00 | $1.00 |
| 88 | (572.00020101) | LS | 1 | $80,415 | $125,000 | $72,000 |
| 89 | (572.00020201) | LS | 1 | $50,491 | $80,000 | $49,000 |
| 90 | (572.00020301) | LS | 1 | $110,002 | $165,000 | $124,000 |
| 91 | (572.010001) | SF | 505 | $1.17 | $3.00 | $0.01 |
| 92 | Bridge Railing Removal and Storage (587.02) | LF | 255 | $8.13 | $30.00 | $100.00 |
| 93 | Culvert-End Safety Grate (603.0101) | SF | 60 | $48.28 | $40.00 | $52.50 |
| 94 | (603.17142401) | 1 | $2,224.05 | $3,000.00 | $2,650.00 | |
| 95 | (603.17143001) | 1 | $4,448.54 | $4,300.00 | $4,900.00 | |
| 96 | (603.6005) | LF | 228 | $124.05 | $180.00 | $165.00 |
| 97 | (603.7305) | EACH | 2 | $3,961.71 | $8,000.00 | $4,950.00 |
| 98 | (603.97000002) | 3 | $1,007.26 | $400.00 | $400.00 | |
| 99 | (603.9818) | LF | 189 | $60.47 | $120.00 | $100.00 |
| 100 | (603.9824) | LF | 541 | $80.06 | $100.00 | $115.00 |
| 101 | (603.9830) | LF | 135 | $100.27 | $120.00 | $125.00 |
| 102 | (603.99050002) | 1 | $3,004.66 | $3,200.00 | $1,300.00 | |
| 103 | (604.300611) | LF | 93.10 | $860.14 | $1,400.00 | $910.00 |
| 104 | (604.4048) | LF | 7.10 | $573.71 | $1,400.00 | $1,000.00 |
| 105 | (605.03010015) | 3,563 | $22.29 | $22.00 | $22.00 | |
| 106 | (605.03020015) | 210 | $36.67 | $40.00 | $52.00 | |
| 107 | Box Beam Guide Railing (606.10) | LF | 1,127 | $50.14 | $50.00 | $54.00 |
| 108 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 57 | $60.18 | $60.00 | $65.00 |
| 109 | Box Beam Guide Railing With Extra Long Posts (606.1001) | LF | 382 | $54.52 | $60.00 | $58.50 |
| 110 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 4 | $4,460.46 | $5,000.00 | $4,800.00 |
| 111 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 8 | $2,345.53 | $3,000.00 | $2,550.00 |
| 112 | Removing and Storing Box Beam Guide Railing (606.63) | LF | 1,100 | $6.53 | $12.00 | $5.90 |
| 113 | Removing and Storing Box Beam Guide Railing End Assembly (606.6920) | EACH | 8 | $192.26 | $400.00 | $100.00 |
| 114 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 4 | $688.72 | $400.00 | $685.00 |
| 115 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 202 | $80.00 | $80.00 | $80.00 |
| 116 | Concrete Sidewalks and Driveways (608.0101) | CY | 95 | $1,168.21 | $1,200.00 | $1,100.00 |
| 117 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 236.36 | $319.46 | $300.00 | $355.00 |
| 118 | (608.21000003) | 3 | $410.38 | $500.00 | $480.00 | |
| 119 | Stone Curb – Bridge (Type A) (609.0301) | LF | 79 | $128.16 | $220.00 | $120.00 |
| 120 | Stone Curb – Bridge (Type F1) (609.0302) | LF | 116 | $135.72 | $169.91 | $115.00 |
| 121 | (609.0401) | LF | 1,085 | $47.94 | $60.00 | $59.50 |
| 122 | Mycorrhizal Fungi (610.0701) | LB | 4 | $54.93 | $50.00 | $59.00 |
| 123 | Weed Removal (610.13) | SY | 707 | $1.10 | $1.00 | $1.20 |
| 124 | Turf Establishment – Performance (610.1605) | SY | 1,702 | $15.35 | $9.45 | $1.75 |
| 125 | Watering Vegetation (610.19) | 1,000 GALLONS | 98 | $5.55 | $10.00 | $12.00 |
| 126 | (611.0151) | EACH | 2 | $988.73 | $1,200.00 | $1,050.00 |
| 127 | (611.0281) | EACH | 2 | $769.01 | $900.00 | $830.00 |
| 128 | (611.0361) | EACH | 1 | $823.95 | $900.00 | $885.00 |
| 129 | (611.0432) | EACH | 6 | $109.86 | $120.00 | $120.00 |
| 130 | Portable Drip Irrigation System (611.17) | EACH | 5 | $65.91 | $80.00 | $71.00 |
| 131 | Removal of Portable Drip Irrigation System (611.18) | EACH | 5 | $21.97 | $25.00 | $23.50 |
| 132 | (611.19010024) | 2 | $21.97 | $20.00 | $23.50 | |
| 133 | (611.19020024) | 2 | $21.97 | $20.00 | $23.50 | |
| 134 | (611.19030024) | 1 | $21.97 | $20.00 | $23.50 | |
| 135 | Pre-Existing Stump Removal up to 24” diameter at 6 inches above grade (614.0701) | EACH | 10 | $1,772.89 | $400.00 | $775.00 |
| 136 | (615.08010005) | 2 | $3,291.10 | $3,000.00 | $1,850.00 | |
| 137 | (615.80010005) | 21 | $471.13 | $400.00 | $710.00 | |
| 138 | (617.01010024) | 7,575 | $0.55 | $0.50 | $0.59 | |
| 139 | (617.10000024) | 140 | $77.44 | $107.00 | $105.00 | |
| 140 | (617.11000024) | LS | 1 | $2,025.91 | $3,000.00 | $2,500.00 |
| 141 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $480,119 | $1,200,000 | $1,781,000 |
| 142 | Type III Construction Barricades (619.04) | EACH | 79 | $77.71 | $135.00 | $65.00 |
| 143 | (619.080101) | LF | 1,222 | $2.75 | $3.00 | $2.95 |
| 144 | (619.100101) | LF | 1,155 | $2.75 | $3.00 | $2.95 |
| 145 | (619.100103) | LF | 1,100 | $6.04 | $6.00 | $6.50 |
| 146 | (619.111112) | EACH | 7 | $40,822 | $16,000 | $11,900 |
| 147 | (619.130201) | EACH | 1 | $154,072 | $300,000 | $188,000 |
| 148 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 160 | $66.89 | $60.00 | $83.50 |
| 149 | Temporary Positive Barrier – Category 2 (Pinning Permitted) (619.1712) | LF | 300 | $58.69 | $60.00 | $83.50 |
| 150 | Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715) | LF | 160 | $43.19 | $60.00 | $83.50 |
| 151 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 260 | $36.50 | $60.00 | $83.50 |
| 152 | Temporary Impact Attenuator - Gating (Test Level 2) (619.1812) | EACH | 2 | $10,681 | $18,000 | $36,100 |
| 153 | Temporary Rumble Strips (619.22) | LF | 216 | $25.82 | $20.00 | $30.00 |
| 154 | Stone Filling (Light) (620.03) | CY | 24 | $332.60 | $180.00 | $185.00 |
| 155 | Stone Filling (Heavy) (620.05) | CY | 1,084 | $136.10 | $220.00 | $105.00 |
| 156 | Bedding Material, Type 1 (620.0801) | CY | 215 | $70.16 | $120.00 | $175.00 |
| 157 | Bedding Material, Type 2 (620.0802) | CY | 105 | $64.52 | $120.00 | $135.00 |
| 158 | Screened Gravel (In-Place Measure) (623.10) | CY | 95 | $108.58 | $120.00 | $165.00 |
| 159 | Survey Operations (625.01) | LS | 1 | $70,503 | $240,000 | $262,000 |
| 160 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 7 | $1,071.52 | $500.00 | $1,200.00 |
| 161 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 1 | $1,071.52 | $500.00 | $1,150.00 |
| 162 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 13 | $680.50 | $300.00 | $255.00 |
| 163 | (627.50140008) | 466 | $3.95 | $8.00 | $6.50 | |
| 164 | Field Laboratory (637.01) | EACH | 1 | $2,239.91 | $2,000.00 | $28,300 |
| 165 | Concrete Cylinder Curing Equipment (637.04) | EACH | 3 | $584.68 | $3,500.00 | $590.00 |
| 166 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 20 | $2,444.54 | $3,800.00 | $4,150.00 |
| 167 | Rain Gauge (637.26) | EACH | 1 | $175.41 | $200.00 | $190.00 |
| 168 | Office Technology and Supplies (637.34) | DOL | 1,200 | $1.00 | $1.00 | $1.00 |
| 169 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 170 | (637.41000115) | 20 | $207.56 | $110.00 | $140.00 | |
| 171 | (637.41000215) | 20 | $207.56 | $110.00 | $140.00 | |
| 172 | (637.41000315) | 20 | $207.56 | $110.00 | $140.00 | |
| 173 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 13.50 | $43.94 | $50.00 | $47.50 |
| 174 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 137.90 | $44.66 | $50.00 | $48.00 |
| 175 | Type A Sign Posts (645.81) | EACH | 43 | $225.21 | $226.00 | $245.00 |
| 176 | Reference Marker Panel (646.21) | EACH | 1 | $30.76 | $38.00 | $33.00 |
| 177 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 25 | $12.08 | $340.00 | $13.00 |
| 178 | Steel Post, 2.0 lb/ft (646.32) | EACH | 19 | $71.41 | $80.00 | $77.00 |
| 179 | Flexible Delineator, Single Unit, One Way (646.40) | EACH | 2 | $115.35 | $110.00 | $125.00 |
| 180 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 1 | $192.26 | $190.00 | $205.00 |
| 181 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 26 | $21.97 | $25.00 | $23.50 |
| 182 | (647.83001002) | 24 | $19.77 | $20.00 | $21.50 | |
| 183 | Welded Frame & Reticuline Grate 11 (655.1111) | EACH | 12 | $774.75 | $900.00 | $1,950.00 |
| 184 | Manhole Frame & Cover (655.1202) | EACH | 1 | $647.72 | $900.00 | $1,800.00 |
| 185 | (670.2307) | LF | 158 | $175.77 | $90.00 | $67.50 |
| 186 | (670.2602) | LF | 456 | $41.56 | $18.00 | $9.40 |
| 187 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 4,120 | $1.53 | $2.00 | $1.65 |
| 188 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 5,190 | $1.53 | $2.00 | $1.65 |
| 189 | (691.04000020) | 91,350 | $1.00 | $1.00 | $1.00 | |
| 190 | Field Change Payment (FCP) (697.03) | DOL | 706,000 | $1.00 | $1.00 | $1.00 |
| 191 | Asphalt Price Adjustment (698.04) | DOL | 5,200 | $1.00 | $1.00 | $1.00 |
| 192 | Fuel Price Adjustment (698.05) | DOL | 4,380 | $1.00 | $1.00 | $1.00 |
| 193 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 194 | Mobilization (699.040001) | LS | 1 | $377,103 | $504,000 | $525,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of December 4, 2025. Compiled by Mirage Metrics.