NYSDOT contract D265597 bid tabulation

BRIDGE REPLACEMENTS (3), US ROUTE 11. Let by New York State DOT on December 4, 2025, Franklin, Region 07. 3 bids received; low bid $9,996,791 by Luck Brothers Inc.

Owner
New York State DOT
Letting
04 DEC 2025
Pay items
194
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Luck Brothers Inc$9,996,791Low
2Vector Construction Corp$13,409,049+34%
3Kubricky-Jointa Lime LLC$13,797,159+38%
NYSDOT contract D265597: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Luck Brothers Inc2. Vector Construction Corp3. Kubricky-Jointa Lime LLC
1Clearing and Grubbing (201.06)LS1$16,184$120,000$14,600
2 (202.120001)LS1$87,045$300,000$290,000
3 (202.120002)LS1$87,045$300,000$250,000
4 (202.120003)LS1$87,045$500,000$480,000
5Removal of Substructures (202.19)CY330$225.17$160.00$335.00
6Unclassified Excavation and Disposal (203.02)CY5,934$24.42$35.00$43.50
7Embankment In Place (203.03)CY1,343$19.33$35.00$26.00
8Select Granular Fill (203.07)CY853$83.52$80.00$47.50
9Select Granular Fill, Slope Protection - Type A (203.0801)CY58$88.99$120.00$97.00
10Select Structural Fill (203.21)CY270$76.13$120.00$110.00
11 (205.0201)LS1$21,321$3,000.00$6,050.00
12Field Organic Vapor Monitoring of Contaminated Soil (205.03)HR40$165.21$200.00$125.00
13Petroleum Contamination Parameter Analysis (205.0401)EACH4$2,923.39$500.00$325.00
14Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402)EACH1$2,923.39$1,250.00$1,000.00
15Laboratory Analysis for Ignitability (205.0403)EACH1$877.02$500.00$35.50
16Laboratory Analysis for ph (205.0404)EACH1$233.87$300.00$19.00
17Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406)EACH4$584.68$500.00$88.50
18Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407)EACH4$584.68$500.00$110.00
19 (205.050201)TON165$94.54$120.00$74.50
20Structure Excavation (206.01)CY3,561$29.94$50.00$49.00
21Trench and Culvert Excavation (206.0201)CY2,432$56.08$50.00$49.50
22Geotextile Bedding (207.20)SY9$114.83$100.00$150.00
23Geotextile Drainage (207.22)SY278$3.79$5.00$1.80
24Geotextile Stabilization (207.24)SY3,091$1.42$5.00$3.00
25Prefabricated Composite Integral Abutment Drain (207.27)SY286$32.24$22.00$15.00
26Seed and Mulch – Temporary (209.1003)SY3,404$1.21$2.00$2.95
27Check Dam (Ditch Bottom Width 0.0 to 3′), Stone – Temporary (209.110101)EACH3$789.44$500.00$1,700.00
28Check Dam (Ditch Bottom Width >3′ to 6′), Stone – Temporary (209.110102)EACH1$1,441.11$600.00$2,450.00
29Turbidity Curtain – Temporary (209.1501)LF848$31.69$16.00$37.00
30Rolled Erosion Control Product, Class II Type D, Intermediate (209.1904)SY1,287$5.63$6.00$6.25
31Stabilized Construction Access (209.22)SY100$55.79$50.00$78.00
32Sediment Filter Log, 12″ (209.2301)LF1,310$13.87$12.00$12.50
33Subbase Course, Type 2 (304.12)CY3,291$92.04$120.00$93.00
34 (404.0001)TON206$80.00$80.00$80.00
35 (404.0983)TON777$176.41$170.00$175.00
36 (404.1989)TON1,198$156.41$150.00$155.00
37 (404.3789)TON2,129$138.80$150.00$155.00
38Diluted Tack Coat (407.0102)GAL1,274$5.57$5.00$4.75
39Asphalt Pavement Joint Adhesive (418.7603)LF5,620$1.16$1.00$1.20
40 (520.50000004)506$8.90$14.00$17.00
41Cast-In-Place Concrete Piles (551.11)LF1,080$166.93$100.00$105.00
42Furnishing Equipment for Driving Piles (551.13)LS1$41,197$130,000$325,000
43Splices for CIP Piles (551.15)EACH16$219.72$200.00$235.00
44Drilled Shafts (2.5 ft. Diameter) (551.50025)LF369$766.44$500.00$590.00
45Furnishing Equipment for Installing Drilled Shafts (551.53)LS2$71,408$150,000$138,000
46Performance Concrete Quality Adjustment - Drilled Shafts (551.9901)QUALITY UNIT1$60.51$60.51$60.51
47Performance Concrete Quality Adjustment - Cast In Place Piles (551.9902)QUALITY UNIT1$13.26$13.26$13.26
48Shields and Shoring (552.17)SF15,618$3.30$1.00$0.41
49 (552.2001)LF175$104.36$110.00$110.00
50 (552.2101)LF45$910.36$800.00$820.00
51 (552.2201)LF235$161.49$180.00$240.00
52 (552.230201)SF386$31.20$43.00$55.50
53 (553.020001)EACH1$141,624$1.00$87,100
54 (553.020002)EACH1$141,624$1.00$87,100
55Concrete for Structures, Performance (555.0021)CY317.30$1,754.78$2,200.00$2,050.00
56Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$11.50$11.50$11.50
57Galvanized Bar Reinforcement for Structures (556.0203)LB73,493$3.02$2.50$3.06
58Stud Shear Connectors for Bridges (556.03)EACH7,966$6.79$8.00$9.50
59 (557.1013)SY114$667.73$800.00$820.00
60 (557.1019)SY277.70$467.46$800.00$590.00
61 (557.1113)SY461$702.49$900.00$1,500.00
62 (557.1119)SY666.20$619.37$800.00$1,050.00
63Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29)SY1,515.90$34.01$0.01$0.01
64Sidewalks and Safety Walks (557.30)SY83$353.97$400.00$285.00
65 (557.60010004)1,392$39.03$40.00$45.00
66Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901)QUALITY UNIT1$12.81$12.81$12.81
67Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902)QUALITY UNIT1$12.76$12.76$12.76
68Longitudinal Sawcut Grooving of Structural Slab Surface (558.02)SY1,367$18.98$20.00$31.00
69Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01)SF12,896$0.87$0.60$1.55
70Protective Sealing of New Structural Concrete (559.02)SF5,169$0.83$1.00$2.40
71 (564.0501)LS1$293,769$575,000$350,000
72 (564.0502)LS1$176,684$375,000$220,000
73 (564.0503)LS1$501,107$775,000$635,000
74 (564.20010008)4,360$1.17$0.01$0.01
75 (565.30130101)34$321.96$200.00$545.00
76Steel Bridge Railing (Four-Rail) (568.51)LF138$260.56$265.00$280.00
77Transition Bridge Railing (568.70)LF436$182.87$185.00$195.00
78Vertical Faced Concrete Parapet (569.03)LF94$526.46$500.00$635.00
79Single Slope (Half-Section) Concrete Bridge Barrier (569.04)LF252$572.46$575.00$450.00
80Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99)QUALITY UNIT1$12.70$12.70$12.70
81Lead-Exposure Control Plan (570.01)LS1$2,773.37$1.00$590.00
82Medical Testing (570.02)DOL12,000$1.00$1.00$1.00
83Personal-Exposure-Monitoring Sample Analysis (570.03)DOL7,000$1.00$1.00$1.00
84Decontamination Facilities (570.04)CALENDAR WEEK44$138.66$1.00$1.00
85 (570.100001)LS1$1.11$1.00$1.00
86 (570.100002)LS1$1.11$1.00$1.00
87 (570.100003)LS1$1.11$1.00$1.00
88 (572.00020101)LS1$80,415$125,000$72,000
89 (572.00020201)LS1$50,491$80,000$49,000
90 (572.00020301)LS1$110,002$165,000$124,000
91 (572.010001)SF505$1.17$3.00$0.01
92Bridge Railing Removal and Storage (587.02)LF255$8.13$30.00$100.00
93Culvert-End Safety Grate (603.0101)SF60$48.28$40.00$52.50
94 (603.17142401)1$2,224.05$3,000.00$2,650.00
95 (603.17143001)1$4,448.54$4,300.00$4,900.00
96 (603.6005)LF228$124.05$180.00$165.00
97 (603.7305)EACH2$3,961.71$8,000.00$4,950.00
98 (603.97000002)3$1,007.26$400.00$400.00
99 (603.9818)LF189$60.47$120.00$100.00
100 (603.9824)LF541$80.06$100.00$115.00
101 (603.9830)LF135$100.27$120.00$125.00
102 (603.99050002)1$3,004.66$3,200.00$1,300.00
103 (604.300611)LF93.10$860.14$1,400.00$910.00
104 (604.4048)LF7.10$573.71$1,400.00$1,000.00
105 (605.03010015)3,563$22.29$22.00$22.00
106 (605.03020015)210$36.67$40.00$52.00
107Box Beam Guide Railing (606.10)LF1,127$50.14$50.00$54.00
108Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF57$60.18$60.00$65.00
109Box Beam Guide Railing With Extra Long Posts (606.1001)LF382$54.52$60.00$58.50
110Box Beam Guide Railing End Assembly Type I (606.120102)EACH4$4,460.46$5,000.00$4,800.00
111Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH8$2,345.53$3,000.00$2,550.00
112Removing and Storing Box Beam Guide Railing (606.63)LF1,100$6.53$12.00$5.90
113Removing and Storing Box Beam Guide Railing End Assembly (606.6920)EACH8$192.26$400.00$100.00
114Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920)EACH4$688.72$400.00$685.00
115Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT202$80.00$80.00$80.00
116Concrete Sidewalks and Driveways (608.0101)CY95$1,168.21$1,200.00$1,100.00
117Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON236.36$319.46$300.00$355.00
118 (608.21000003)3$410.38$500.00$480.00
119Stone Curb – Bridge (Type A) (609.0301)LF79$128.16$220.00$120.00
120Stone Curb – Bridge (Type F1) (609.0302)LF116$135.72$169.91$115.00
121 (609.0401)LF1,085$47.94$60.00$59.50
122Mycorrhizal Fungi (610.0701)LB4$54.93$50.00$59.00
123Weed Removal (610.13)SY707$1.10$1.00$1.20
124Turf Establishment – Performance (610.1605)SY1,702$15.35$9.45$1.75
125Watering Vegetation (610.19)1,000 GALLONS98$5.55$10.00$12.00
126 (611.0151)EACH2$988.73$1,200.00$1,050.00
127 (611.0281)EACH2$769.01$900.00$830.00
128 (611.0361)EACH1$823.95$900.00$885.00
129 (611.0432)EACH6$109.86$120.00$120.00
130Portable Drip Irrigation System (611.17)EACH5$65.91$80.00$71.00
131Removal of Portable Drip Irrigation System (611.18)EACH5$21.97$25.00$23.50
132 (611.19010024)2$21.97$20.00$23.50
133 (611.19020024)2$21.97$20.00$23.50
134 (611.19030024)1$21.97$20.00$23.50
135Pre-Existing Stump Removal up to 24” diameter at 6 inches above grade (614.0701)EACH10$1,772.89$400.00$775.00
136 (615.08010005)2$3,291.10$3,000.00$1,850.00
137 (615.80010005)21$471.13$400.00$710.00
138 (617.01010024)7,575$0.55$0.50$0.59
139 (617.10000024)140$77.44$107.00$105.00
140 (617.11000024)LS1$2,025.91$3,000.00$2,500.00
141Basic Work Zone Traffic Control (619.01)LS1$480,119$1,200,000$1,781,000
142Type III Construction Barricades (619.04)EACH79$77.71$135.00$65.00
143 (619.080101)LF1,222$2.75$3.00$2.95
144 (619.100101)LF1,155$2.75$3.00$2.95
145 (619.100103)LF1,100$6.04$6.00$6.50
146 (619.111112)EACH7$40,822$16,000$11,900
147 (619.130201)EACH1$154,072$300,000$188,000
148Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711)LF160$66.89$60.00$83.50
149Temporary Positive Barrier – Category 2 (Pinning Permitted) (619.1712)LF300$58.69$60.00$83.50
150Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715)LF160$43.19$60.00$83.50
151Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716)LF260$36.50$60.00$83.50
152Temporary Impact Attenuator - Gating (Test Level 2) (619.1812)EACH2$10,681$18,000$36,100
153Temporary Rumble Strips (619.22)LF216$25.82$20.00$30.00
154Stone Filling (Light) (620.03)CY24$332.60$180.00$185.00
155Stone Filling (Heavy) (620.05)CY1,084$136.10$220.00$105.00
156Bedding Material, Type 1 (620.0801)CY215$70.16$120.00$175.00
157Bedding Material, Type 2 (620.0802)CY105$64.52$120.00$135.00
158Screened Gravel (In-Place Measure) (623.10)CY95$108.58$120.00$165.00
159Survey Operations (625.01)LS1$70,503$240,000$262,000
160Concrete Right of Way Markers Type H (High) (625.03)EACH7$1,071.52$500.00$1,200.00
161Concrete Right of Way Markers Type L (Low) (625.04)EACH1$1,071.52$500.00$1,150.00
162Steel Pin and Cap Right of Way Markers (625.05)EACH13$680.50$300.00$255.00
163 (627.50140008)466$3.95$8.00$6.50
164Field Laboratory (637.01)EACH1$2,239.91$2,000.00$28,300
165Concrete Cylinder Curing Equipment (637.04)EACH3$584.68$3,500.00$590.00
166Engineer’s Field Office – Type 2 (637.12)MONTH20$2,444.54$3,800.00$4,150.00
167Rain Gauge (637.26)EACH1$175.41$200.00$190.00
168Office Technology and Supplies (637.34)DOL1,200$1.00$1.00$1.00
169Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00
170 (637.41000115)20$207.56$110.00$140.00
171 (637.41000215)20$207.56$110.00$140.00
172 (637.41000315)20$207.56$110.00$140.00
173Ground-Mounted Sign Panels without Z-bars (645.5101)SF13.50$43.94$50.00$47.50
174Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF137.90$44.66$50.00$48.00
175Type A Sign Posts (645.81)EACH43$225.21$226.00$245.00
176Reference Marker Panel (646.21)EACH1$30.76$38.00$33.00
177Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22)EACH25$12.08$340.00$13.00
178Steel Post, 2.0 lb/ft (646.32)EACH19$71.41$80.00$77.00
179Flexible Delineator, Single Unit, One Way (646.40)EACH2$115.35$110.00$125.00
180Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH1$192.26$190.00$205.00
181Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH26$21.97$25.00$23.50
182 (647.83001002)24$19.77$20.00$21.50
183Welded Frame & Reticuline Grate 11 (655.1111)EACH12$774.75$900.00$1,950.00
184Manhole Frame & Cover (655.1202)EACH1$647.72$900.00$1,800.00
185 (670.2307)LF158$175.77$90.00$67.50
186 (670.2602)LF456$41.56$18.00$9.40
187White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF4,120$1.53$2.00$1.65
188Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF5,190$1.53$2.00$1.65
189 (691.04000020)91,350$1.00$1.00$1.00
190Field Change Payment (FCP) (697.03)DOL706,000$1.00$1.00$1.00
191Asphalt Price Adjustment (698.04)DOL5,200$1.00$1.00$1.00
192Fuel Price Adjustment (698.05)DOL4,380$1.00$1.00$1.00
193Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00
194Mobilization (699.040001)LS1$377,103$504,000$525,000
NYSDOT contract D265597: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of December 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.