NYSDOT contract D265592 bid tabulation
BRIDGE REPLACEMENT - NY Route 3, Town of Hounsfield. Let by New York State DOT on November 6, 2025, Jefferson, Region 07. 4 bids received; low bid $2,230,559 by Luck Brothers Inc.
- Owner
- New York State DOT
- Letting
- 06 NOV 2025
- Pay items
- 80
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Luck Brothers Inc | $2,230,559 | Low |
| 2 | Tuscarora Construction Co Inc | $2,457,789 | +10% |
| 3 | Vector Construction Corp | $2,565,423 | +15% |
| 4 | Slate Hill Constructors Inc | $2,610,799 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Luck Brothers Inc | 2. Tuscarora Construction Co Inc | 3. Vector Construction Corp | 4. Slate Hill Constructors Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $6,012.34 | $25,800 | $8,000.00 | $1,000.00 |
| 2 | (202.120001) | LS | 1 | $35,273 | $98,100 | $270,000 | $55,000 |
| 3 | Removal of Substructures (202.19) | CY | 105 | $404.82 | $410.00 | $180.00 | $240.00 |
| 4 | Unclassified Excavation and Disposal (203.02) | CY | 1,526 | $12.48 | $24.00 | $37.00 | $60.00 |
| 5 | Embankment In Place (203.03) | CY | 2,331 | $31.33 | $50.00 | $29.00 | $80.00 |
| 6 | Select Structural Fill (203.21) | CY | 412 | $43.95 | $77.00 | $75.00 | $100.00 |
| 7 | (203.24010017) | 3 | $262.47 | $500.00 | $380.77 | $200.00 | |
| 8 | Structure Excavation (206.01) | CY | 1,335 | $67.66 | $59.00 | $40.00 | $65.00 |
| 9 | Prefabricated Composite Structural Drain (207.26) | SY | 133 | $38.67 | $30.00 | $20.00 | $23.00 |
| 10 | Seed and Mulch – Temporary (209.1003) | SY | 2,199 | $1.97 | $1.30 | $2.40 | $1.25 |
| 11 | Turbidity Curtain – Temporary (209.1501) | LF | 312 | $43.83 | $29.00 | $14.00 | $20.00 |
| 12 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 2,008 | $6.27 | $6.00 | $3.20 | $5.00 |
| 13 | Stabilized Construction Access (209.22) | SY | 200 | $24.43 | $26.00 | $40.00 | $22.00 |
| 14 | Sediment Filter Log, 12″ (209.2301) | LF | 1,373 | $9.51 | $10.00 | $6.00 | $9.00 |
| 15 | Subbase Course, Type 2 (304.12) | CY | 1,165 | $49.06 | $90.00 | $75.00 | $90.00 |
| 16 | (404.0001) | TON | 79 | $80.00 | $80.00 | $80.00 | $80.00 |
| 17 | (404.0189) | TON | 97 | $162.97 | $190.00 | $240.00 | $200.00 |
| 18 | (404.0683) | TON | 35 | $286.32 | $500.00 | $415.00 | $425.00 |
| 19 | (404.0983) | TON | 310 | $135.47 | $170.00 | $175.00 | $175.00 |
| 20 | (404.1989) | TON | 471 | $115.91 | $138.00 | $145.00 | $140.00 |
| 21 | (404.2589) | TON | 758 | $81.23 | $118.00 | $130.00 | $125.00 |
| 22 | Diluted Tack Coat (407.0102) | GAL | 492 | $4.00 | $6.00 | $3.60 | $4.00 |
| 23 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,226 | $1.54 | $2.00 | $1.00 | $1.25 |
| 24 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 920 | $17.52 | $28.00 | $24.00 | $18.00 |
| 25 | (553.020001) | EACH | 1 | $24,008 | $80,500 | $30,000 | $1.00 |
| 26 | (553.020002) | EACH | 1 | $24,008 | $80,500 | $30,000 | $1.00 |
| 27 | Footing Concrete, Performance (555.0011) | CY | 90.80 | $776.38 | $1,700.00 | $1,900.00 | $1,500.00 |
| 28 | Concrete for Structures, Performance (555.0021) | CY | 43.70 | $2,039.77 | $2,800.00 | $2,600.00 | $3,600.00 |
| 29 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $5.60 | $5.60 | $5.60 | $5.60 |
| 30 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $14.12 | $14.12 | $14.12 | $14.12 |
| 31 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 3,879 | $3.42 | $2.00 | $2.00 | $2.00 |
| 32 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 6,825 | $3.02 | $2.20 | $2.50 | $2.25 |
| 33 | Protective Sealing of New Structural Concrete (559.02) | SF | 1,000 | $1.04 | $1.50 | $0.80 | $6.00 |
| 34 | (562.0101) | SY | 179.30 | $1,741.17 | $2,540.00 | $2,900.00 | $1,800.00 |
| 35 | Performance Concrete Quality Adjustment (562.99) | QUALITY UNIT | 1 | $17.00 | $17.00 | $17.00 | $17.00 |
| 36 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 87 | $486.11 | $470.00 | $600.00 | $480.00 |
| 37 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $9.92 | $9.92 | $9.92 | $9.92 |
| 38 | (595.50000018) | 2,355 | $4.85 | $5.00 | $4.00 | $3.00 | |
| 39 | Box Beam Guide Railing (606.10) | LF | 939 | $48.07 | $46.00 | $50.00 | $50.00 |
| 40 | Box Beam Guide Railing (Shop Mitered) (606.100003) | LF | 54 | $146.13 | $58.00 | $145.00 | $60.00 |
| 41 | Box Beam End Piece (606.120101) | EACH | 1 | $669.95 | $580.00 | $650.00 | $625.00 |
| 42 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 3 | $2,264.42 | $2,220.00 | $2,150.00 | $2,400.00 |
| 43 | Removing and Storing Box Beam Guide Railing (606.63) | LF | 1,237 | $7.00 | $5.00 | $8.00 | $12.50 |
| 44 | Removing and Storing Box Beam Guide Railing End Assembly (606.6920) | EACH | 4 | $154.84 | $60.00 | $700.00 | $800.00 |
| 45 | Transition Between Box Beam Guide Rail and Single Slope Half Section Concrete Barrier (One or Two Way Operation) (606.8803) | EACH | 4 | $6,663.41 | $7,600.00 | $7,500.00 | $16,000 |
| 46 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 1 | $80.00 | $80.00 | $80.00 | $80.00 |
| 47 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 24 | $323.59 | $235.00 | $300.00 | $280.00 |
| 48 | Stone Curb – Bridge (Type A) (609.0301) | LF | 42 | $156.22 | $200.00 | $240.00 | $180.00 |
| 49 | Turf Establishment – Performance (610.1605) | SY | 2,199 | $16.35 | $5.00 | $15.00 | $23.00 |
| 50 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $281,744 | $48,500 | $55,000 | $305,000 |
| 51 | Type III Construction Barricades (619.04) | EACH | 12 | $76.65 | $100.00 | $120.00 | $55.00 |
| 52 | (619.110512) | EACH | 2 | $75,721 | $4,500.00 | $25,000 | $3,000.00 |
| 53 | Temporary Positive Barrier – Category 3 (Pinning Prohibited) (619.1713) | LF | 80 | $24.53 | $70.00 | $40.00 | $100.00 |
| 54 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 6 | $47.79 | $100.00 | $60.00 | $40.00 |
| 55 | Stone Filling (Light) (620.03) | CY | 7 | $110.16 | $150.00 | $200.00 | $220.00 |
| 56 | Stone Filling (Medium) (620.04) | CY | 190 | $75.69 | $190.00 | $145.00 | $330.00 |
| 57 | Bedding Material, Type 1 (620.0801) | CY | 84 | $36.48 | $140.00 | $70.00 | $130.00 |
| 58 | (621.51050003) | 64 | $17.05 | $90.00 | $42.00 | $12.00 | |
| 59 | Survey Operations (625.01) | LS | 1 | $36,226 | $20,000 | $35,000 | $25,000 |
| 60 | (627.50140008) | 236 | $3.84 | $11.00 | $6.00 | $10.00 | |
| 61 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1,586.87 | $6,000.00 | $2,000.00 | $300.00 |
| 62 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 21 | $2,896.53 | $1,900.00 | $1,500.00 | $2,500.00 |
| 63 | Rain Gauge (637.26) | EACH | 1 | $173.11 | $180.00 | $180.00 | $100.00 |
| 64 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 65 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 66 | (637.41000115) | 21 | $200.59 | $100.00 | $150.00 | $150.00 | |
| 67 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 44.30 | $42.87 | $45.00 | $45.00 | $50.00 |
| 68 | Type A Sign Posts (645.81) | EACH | 12 | $214.36 | $185.00 | $210.00 | $200.00 |
| 69 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 16 | $11.25 | $15.00 | $11.00 | $15.00 |
| 70 | Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24) | EACH | 12 | $28.40 | $15.00 | $30.00 | $15.00 |
| 71 | Steel Post, 1.1 lb/ft (646.31) | EACH | 16 | $69.67 | $64.00 | $70.00 | $70.00 |
| 72 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 7 | $21.44 | $60.00 | $25.00 | $11.00 |
| 73 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 8 | $21.44 | $60.00 | $25.00 | $11.00 |
| 74 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 19,686 | $0.73 | $0.70 | $0.75 | $1.00 |
| 75 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 18,360 | $0.73 | $0.70 | $0.75 | $1.00 |
| 76 | Field Change Payment (FCP) (697.03) | DOL | 183,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 77 | Asphalt Price Adjustment (698.04) | DOL | 1,097 | $1.00 | $1.00 | $1.00 | $1.00 |
| 78 | Fuel Price Adjustment (698.05) | DOL | 930 | $1.00 | $1.00 | $1.00 | $1.00 |
| 79 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 80 | Mobilization (699.040001) | LS | 1 | $85,021 | $94,000 | $92,000 | $90,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of November 6, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.