NYSDOT contract D265535 bid tabulation
BRIDGE AND CULVERT REPLACEMENT - NY Routes 3 and 12E. Let by New York State DOT on August 7, 2025, Jefferson, Region 07. 3 bids received; low bid $16,600,479 by Tioga Construction Company Inc.
- Owner
- New York State DOT
- Letting
- 07 AUG 2025
- Pay items
- 237
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Tioga Construction Company Inc | $16,600,479 | Low |
| 2 | Vector Construction Corp | $18,203,721 | +10% |
| 3 | Slate Hill Constructors Inc | $18,925,059 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Tioga Construction Company Inc | 2. Vector Construction Corp | 3. Slate Hill Constructors Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.07) | ACRE | 1.50 | $15,000 | $90,000 | $23,000 |
| 2 | (202.120001) | LS | 1 | $60,000 | $75,000 | $100,000 |
| 3 | (202.120002) | LS | 1 | $20,000 | $30,000 | $100,000 |
| 4 | (202.120003) | LS | 1 | $90,000 | $85,000 | $100,000 |
| 5 | (202.120004) | LS | 1 | $100,000 | $175,000 | $200,000 |
| 6 | (202.120005) | LS | 1 | $90,000 | $175,000 | $200,000 |
| 7 | (202.120006) | LS | 1 | $60,000 | $80,000 | $100,000 |
| 8 | (202.120007) | LS | 1 | $90,000 | $150,000 | $200,000 |
| 9 | Removal of Substructures (202.19) | CY | 1,165 | $120.00 | $130.00 | $250.00 |
| 10 | Unclassified Excavation and Disposal (203.02) | CY | 9,023 | $28.00 | $36.00 | $50.00 |
| 11 | Embankment In Place (203.03) | CY | 9,372 | $26.00 | $32.00 | $40.00 |
| 12 | Select Granular Fill (203.07) | CY | 164 | $70.00 | $75.00 | $105.00 |
| 13 | Select Structural Fill (203.21) | CY | 3,221 | $80.00 | $65.00 | $80.00 |
| 14 | (203.24010017) | 35 | $80.00 | $100.00 | $260.00 | |
| 15 | Structure Excavation (206.01) | CY | 10,150 | $35.00 | $35.00 | $55.00 |
| 16 | Trench and Culvert Excavation (206.0201) | CY | 1,584 | $70.00 | $32.00 | $50.00 |
| 17 | Test Pit Excavation (206.05) | EACH | 11 | $800.00 | $750.00 | $425.00 |
| 18 | Geotextile Bedding (207.20) | SY | 46 | $25.00 | $23.00 | $7.00 |
| 19 | Geotextile Drainage (207.22) | SY | 755 | $3.00 | $4.00 | $6.00 |
| 20 | Geotextile Stabilization (207.24) | SY | 2,600 | $3.00 | $3.00 | $4.50 |
| 21 | Prefabricated Composite Structural Drain (207.26) | SY | 131 | $15.00 | $19.00 | $16.00 |
| 22 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 1,063 | $15.00 | $19.00 | $16.00 |
| 23 | (208.01030022) | 244 | $90.00 | $90.00 | $120.00 | |
| 24 | (209.11010024) | 7 | $500.00 | $100.00 | $500.00 | |
| 25 | Check Dam, (Ditch Bottom Width >3′ to 6′), Stone – Permanent (209.110602) | EACH | 3 | $600.00 | $451.00 | $650.00 |
| 26 | Turbidity Curtain – Temporary (209.1501) | LF | 2,095 | $15.00 | $12.00 | $17.00 |
| 27 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 6,583 | $4.50 | $4.50 | $5.75 |
| 28 | Soil Stabilizers, Class IV Type A (209.2101) | SY | 6,901 | $1.90 | $2.00 | $1.50 |
| 29 | Sediment Filter Log, 12″ (209.2301) | LF | 12,135 | $10.00 | $6.75 | $8.25 |
| 30 | Subbase Course, Type 2 (304.12) | CY | 9,060 | $100.00 | $80.00 | $85.00 |
| 31 | (404.0001) | TON | 408 | $80.00 | $80.00 | $80.00 |
| 32 | (404.0189) | TON | 287 | $185.00 | $190.00 | $195.00 |
| 33 | (404.0983) | TON | 1,932 | $170.00 | $190.00 | $180.00 |
| 34 | (404.1989) | TON | 2,817 | $130.00 | $140.00 | $140.00 |
| 35 | (404.2589) | TON | 3,049 | $130.00 | $140.00 | $140.00 |
| 36 | Diluted Tack Coat (407.0102) | GAL | 2,539 | $12.00 | $12.00 | $12.00 |
| 37 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 21,711 | $0.25 | $0.25 | $0.50 |
| 38 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 3,357 | $15.00 | $10.00 | $16.00 |
| 39 | Micropiles (Design Provided - 12.75 in. Diameter) (551.321275) | LF | 1,210 | $300.00 | $215.00 | $215.00 |
| 40 | (551.33) | 950 | $80.00 | $139.00 | $140.00 | |
| 41 | Furnishing Equipment for Installing Micropiles (551.34) | LS | 1 | $80,000 | $50,000 | $40,000 |
| 42 | Shields and Shoring (552.17) | SF | 7,541 | $1.00 | $0.50 | $1.00 |
| 43 | (553.010001) | EACH | 1 | $8,000.00 | $15,000 | $1.00 |
| 44 | (553.010002) | EACH | 1 | $8,000.00 | $15,000 | $1.00 |
| 45 | (553.010003) | EACH | 1 | $15,000 | $50,000 | $1.00 |
| 46 | (553.010004) | EACH | 1 | $12,000 | $50,000 | $1.00 |
| 47 | (553.010005) | EACH | 1 | $20,000 | $15,000 | $1.00 |
| 48 | (553.010006) | EACH | 1 | $20,000 | $15,000 | $1.00 |
| 49 | (553.010007) | EACH | 1 | $6,000.00 | $20,000 | $1.00 |
| 50 | (553.010008) | EACH | 1 | $6,000.00 | $20,000 | $1.00 |
| 51 | (553.010009) | EACH | 1 | $35,000 | $25,000 | $1.00 |
| 52 | (553.010010) | EACH | 1 | $35,000 | $25,000 | $1.00 |
| 53 | (553.020001) | EACH | 1 | $1,500.00 | $12,000 | $1.00 |
| 54 | (553.020002) | EACH | 1 | $1,500.00 | $12,000 | $1.00 |
| 55 | (553.020003) | EACH | 1 | $5,000.00 | $15,000 | $1.00 |
| 56 | (553.020004) | EACH | 1 | $5,000.00 | $15,000 | $1.00 |
| 57 | (553.030001) | EACH | 1 | $100.00 | $12,000 | $1.00 |
| 58 | Footing Concrete, Performance (555.0011) | CY | 769 | $1,300.00 | $1,200.00 | $1,350.00 |
| 59 | Concrete for Structures, Performance (555.0021) | CY | 991 | $1,600.00 | $1,800.00 | $1,950.00 |
| 60 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $6.50 | $6.50 | $6.50 |
| 61 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $9.50 | $9.50 | $9.50 |
| 62 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 110,262 | $1.80 | $1.80 | $1.75 |
| 63 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 74,085 | $1.90 | $1.98 | $2.00 |
| 64 | Stud Shear Connectors for Bridges (556.03) | EACH | 5,030 | $6.50 | $7.00 | $7.00 |
| 65 | (557.1013) | SY | 143 | $450.00 | $550.00 | $600.00 |
| 66 | (557.1019) | SY | 851 | $440.00 | $550.00 | $600.00 |
| 67 | (557.1113) | SY | 258 | $650.00 | $790.00 | $700.00 |
| 68 | (557.1119) | SY | 1,220 | $700.00 | $790.00 | $750.00 |
| 69 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 2,495 | $0.01 | $0.01 | $0.10 |
| 70 | Sidewalks and Safety Walks (557.30) | SY | 34 | $350.00 | $320.00 | $500.00 |
| 71 | (557.60010004) | 2,339 | $50.00 | $45.00 | $53.00 | |
| 72 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $10.03 | $10.03 | $10.03 |
| 73 | Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902) | QUALITY UNIT | 1 | $13.51 | $13.51 | $13.51 |
| 74 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 2,339 | $22.00 | $21.00 | $26.00 |
| 75 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 21,060 | $0.40 | $0.60 | $2.00 |
| 76 | Protective Sealing of New Structural Concrete (559.02) | SF | 7,280 | $0.50 | $0.80 | $4.50 |
| 77 | (562.0101) | SY | 117 | $1,800.00 | $1,650.00 | $1,550.00 |
| 78 | Performance Concrete Quality Adjustment (562.99) | QUALITY UNIT | 1 | $16.50 | $16.50 | $16.50 |
| 79 | (563.0102) | LF | 260 | $1,200.00 | $1,600.00 | $1,100.00 |
| 80 | (564.0501) | LS | 1 | $150,000 | $175,000 | $175,000 |
| 81 | (564.0502) | LS | 1 | $100,000 | $120,000 | $112,000 |
| 82 | (564.0503) | LS | 1 | $200,000 | $200,000 | $175,000 |
| 83 | (564.0504) | LS | 1 | $210,000 | $225,000 | $185,000 |
| 84 | (564.0505) | LS | 1 | $250,000 | $210,000 | $195,000 |
| 85 | (564.20010008) | 254,400 | $0.60 | $0.60 | $0.50 | |
| 86 | Type E.B. Expansion Bearing (56 to 111 k) (565.2032) | EACH | 10 | $2,500.00 | $4,000.00 | $2,300.00 |
| 87 | Type E.B. Expansion Bearing (112 to 168 k) (565.2033) | EACH | 40 | $2,200.00 | $4,000.00 | $2,400.00 |
| 88 | (565.30130101) | 12 | $500.00 | $150.00 | $240.00 | |
| 89 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 199 | $210.00 | $230.00 | $230.00 |
| 90 | Transition Bridge Railing (568.70) | LF | 1,080 | $180.00 | $200.00 | $210.00 |
| 91 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 585 | $500.00 | $415.00 | $600.00 |
| 92 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $11.90 | $11.90 | $11.90 |
| 93 | (572.00020101) | LS | 1 | $20,000 | $4,000.00 | $10.00 |
| 94 | (572.00020201) | LS | 1 | $20,000 | $4,000.00 | $10.00 |
| 95 | (572.00020301) | LS | 1 | $50,000 | $4,000.00 | $10.00 |
| 96 | (572.00020401) | LS | 1 | $50,000 | $4,000.00 | $10.00 |
| 97 | (572.00020501) | LS | 1 | $50,000 | $4,000.00 | $10.00 |
| 98 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 30 | $30.00 | $82.00 | $350.00 |
| 99 | Bridge Railing Removal and Storage (587.02) | LF | 681 | $8.00 | $15.00 | $28.00 |
| 100 | (595.50000018) | 2,392 | $4.00 | $3.50 | $4.00 | |
| 101 | (603.051014) | LF | 50 | $50.00 | $40.00 | $50.00 |
| 102 | (603.051114) | LF | 398 | $55.00 | $45.00 | $60.00 |
| 103 | (603.051214) | LF | 40 | $60.00 | $50.00 | $70.00 |
| 104 | (603.051912) | LF | 35 | $140.00 | $200.00 | $175.00 |
| 105 | (603.171016) | EACH | 2 | $400.00 | $150.00 | $290.00 |
| 106 | (603.171116) | EACH | 22 | $450.00 | $200.00 | $330.00 |
| 107 | (603.171216) | EACH | 2 | $510.00 | $200.00 | $520.00 |
| 108 | (603.171316) | EACH | 2 | $520.00 | $240.00 | $520.00 |
| 109 | (603.171614) | EACH | 2 | $800.00 | $1,700.00 | $850.00 |
| 110 | (603.171912) | EACH | 2 | $2,200.00 | $2,000.00 | $2,200.00 |
| 111 | (603.6001) | LF | 23 | $100.00 | $80.00 | $90.00 |
| 112 | (603.6002) | LF | 91 | $110.00 | $80.00 | $95.00 |
| 113 | (603.6005) | LF | 114 | $160.00 | $125.00 | $140.00 |
| 114 | (603.7301) | EACH | 2 | $2,500.00 | $2,500.00 | $1,800.00 |
| 115 | (603.7302) | EACH | 1 | $2,500.00 | $2,800.00 | $1,850.00 |
| 116 | (603.7305) | EACH | 4 | $2,200.00 | $4,500.00 | $4,900.00 |
| 117 | (603.98100404) | 28 | $55.00 | $120.00 | $75.00 | |
| 118 | (603.9815) | LF | 71 | $30.00 | $60.00 | $23.00 |
| 119 | (603.9818) | LF | 50 | $35.00 | $40.00 | $40.00 |
| 120 | (603.9824) | LF | 226 | $45.00 | $45.00 | $47.00 |
| 121 | (604.300211) | LF | 11 | $700.00 | $800.00 | $900.00 |
| 122 | (604.301911) | LF | 6 | $650.00 | $800.00 | $900.00 |
| 123 | (604.302122) | LF | 20 | $720.00 | $800.00 | $700.00 |
| 124 | Underdrain Filter, Type I (605.0901) | CY | 233 | $110.00 | $70.00 | $110.00 |
| 125 | (605.1602) | LF | 40 | $20.00 | $35.00 | $15.00 |
| 126 | (605.1701) | LF | 2,246 | $3.50 | $3.20 | $7.00 |
| 127 | Box Beam Guide Railing (606.10) | LF | 7,281 | $44.00 | $45.00 | $50.00 |
| 128 | Box Beam Guide Railing (Shop Mitered) (606.100003) | LF | 141 | $150.00 | $125.00 | $140.00 |
| 129 | Box Beam End Piece (606.120101) | EACH | 6 | $630.00 | $850.00 | $840.00 |
| 130 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 6 | $4,000.00 | $4,500.00 | $4,200.00 |
| 131 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 36 | $2,200.00 | $2,300.00 | $2,200.00 |
| 132 | Removing and Storing Box Beam Guide Railing (606.63) | LF | 2,617 | $4.00 | $7.00 | $7.00 |
| 133 | Removing and Storing Box Beam Guide Railing End Assembly (606.6920) | EACH | 28 | $120.00 | $300.00 | $130.00 |
| 134 | Removing and Disposing Cable Guide Railing (606.70) | LF | 1,140 | $3.00 | $4.00 | $6.00 |
| 135 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 73 | $5.00 | $12.00 | $11.00 |
| 136 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 222 | $5.00 | $8.00 | $7.00 |
| 137 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 4 | $150.00 | $200.00 | $550.00 |
| 138 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 4 | $150.00 | $200.00 | $220.00 |
| 139 | (607.3201) | LF | 60 | $200.00 | $80.00 | $125.00 |
| 140 | (607.3202) | LF | 30 | $200.00 | $100.00 | $185.00 |
| 141 | (607.59000007) | 45 | $50.00 | $60.00 | $67.00 | |
| 142 | (607.62000010) | 39 | $15.00 | $25.00 | $150.00 | |
| 143 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 17 | $80.00 | $80.00 | $80.00 |
| 144 | Concrete Sidewalks and Driveways (608.0101) | CY | 2 | $1,800.00 | $3,000.00 | $2,200.00 |
| 145 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 275 | $250.00 | $260.00 | $260.00 |
| 146 | Stone Curb – Bridge (Type A) (609.0301) | LF | 415 | $150.00 | $125.00 | $145.00 |
| 147 | Stone Curb – Bridge (Type F1) (609.0302) | LF | 144 | $70.00 | $80.00 | $95.00 |
| 148 | (609.0401) | LF | 78 | $80.00 | $90.00 | $100.00 |
| 149 | (609.99970011) | 8 | $200.00 | $145.00 | $770.00 | |
| 150 | Mycorrhizal Fungi (610.0701) | LB | 74 | $30.00 | $30.00 | $60.00 |
| 151 | Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101) | CY | 13 | $100.00 | $100.00 | $110.00 |
| 152 | Topsoil – Reuse On-Site Materials (610.1401) | CY | 1,143 | $50.00 | $48.00 | $55.00 |
| 153 | Topsoil - Roadside (610.1402) | CY | 400 | $90.00 | $75.00 | $90.00 |
| 154 | Turf Establishment - Roadside (610.1601) | SY | 14,125 | $1.30 | $1.40 | $1.75 |
| 155 | Turf Establishment – Nurse Crops (610.1606) | SY | 36 | $5.00 | $5.00 | $5.25 |
| 156 | Wildflower Seeding (610.17) | SY | 36 | $5.00 | $5.50 | $40.00 |
| 157 | Watering Vegetation (610.19) | 1,000 GALLONS | 89 | $20.00 | $21.00 | $80.00 |
| 158 | Mowing (610.21) | SY | 31,044 | $0.40 | $0.35 | $0.55 |
| 159 | (611.0111) | EACH | 2 | $850.00 | $900.00 | $1,000.00 |
| 160 | (611.0211) | EACH | 5 | $600.00 | $650.00 | $800.00 |
| 161 | (611.0351) | EACH | 7 | $500.00 | $550.00 | $820.00 |
| 162 | (611.0412) | EACH | 230 | $60.00 | $65.00 | $100.00 |
| 163 | (611.19010024) | 2 | $20.00 | $20.00 | $300.00 | |
| 164 | (611.19020024) | 5 | $20.00 | $20.00 | $230.00 | |
| 165 | (611.19030024) | 7 | $20.00 | $20.00 | $250.00 | |
| 166 | (611.19040024) | 230 | $3.00 | $3.00 | $30.00 | |
| 167 | (613.07010008) | 24,960.96 | $1.00 | $1.00 | $1.00 | |
| 168 | (614.060304) | EACH | 1 | $800.00 | $1,500.00 | $1,300.00 |
| 169 | Pre-Existing Stump Removal up to 24” diameter at 6 inches above grade (614.0701) | EACH | 3 | $200.00 | $700.00 | $1,200.00 |
| 170 | (615.10010108) | 1 | $5,000.00 | $150,000 | $8,000.00 | |
| 171 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $400,000 | $675,000 | $1,100,000 |
| 172 | Type III Construction Barricades (619.04) | EACH | 74 | $100.00 | $150.00 | $50.00 |
| 173 | Temporary Business Signs (619.0701) | SF | 800 | $20.00 | $18.00 | $20.00 |
| 174 | (619.111112) | EACH | 29 | $1,500.00 | $6,500.00 | $6,000.00 |
| 175 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 640 | $22.00 | $40.00 | $55.00 |
| 176 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 56 | $40.00 | $40.00 | $33.00 |
| 177 | Mailboxes (619.27) | EACH | 12 | $250.00 | $260.00 | $100.00 |
| 178 | Stone Filling (Light) (620.03) | CY | 447 | $110.00 | $100.00 | $110.00 |
| 179 | Stone Filling (Medium) (620.04) | CY | 1,207 | $90.00 | $140.00 | $120.00 |
| 180 | Stone Filling (Heavy) (620.05) | CY | 340 | $90.00 | $140.00 | $140.00 |
| 181 | Bedding Material, Type 1 (620.0801) | CY | 517 | $65.00 | $90.00 | $100.00 |
| 182 | Bedding Material, Type 2 (620.0802) | CY | 42 | $85.00 | $90.00 | $120.00 |
| 183 | (620.14020009) | 215 | $140.00 | $170.00 | $200.00 | |
| 184 | (620.29110009) | 303 | $90.00 | $95.00 | $130.00 | |
| 185 | (621.05020004) | 710 | $3.00 | $8.00 | $23.00 | |
| 186 | Survey Operations (625.01) | LS | 1 | $200,000 | $425,000 | $220,000 |
| 187 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 28 | $1,600.00 | $600.00 | $1,000.00 |
| 188 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 3 | $1,600.00 | $600.00 | $1,000.00 |
| 189 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 25 | $500.00 | $150.00 | $500.00 |
| 190 | (627.50140008) | 3,842 | $4.00 | $4.00 | $4.00 | |
| 191 | Concrete Cylinder Curing Equipment (637.04) | EACH | 7 | $200.00 | $2,000.00 | $200.00 |
| 192 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 36 | $2,600.00 | $2,000.00 | $3,000.00 |
| 193 | Rain Gauge (637.26) | EACH | 1 | $50.00 | $120.00 | $100.00 |
| 194 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 |
| 195 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 |
| 196 | Construction Testing supplies – Consumables (637.36) | DOL | 700 | $1.00 | $1.00 | $1.00 |
| 197 | (637.41000115) | 36 | $50.00 | $100.00 | $105.00 | |
| 198 | (637.41000215) | 36 | $50.00 | $100.00 | $105.00 | |
| 199 | (637.41000315) | 36 | $50.00 | $100.00 | $105.00 | |
| 200 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 120 | $15.00 | $12.00 | $2.20 |
| 201 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 277 | $40.00 | $40.00 | $40.00 |
| 202 | Type A Sign Posts (645.81) | EACH | 16 | $200.00 | $180.00 | $180.00 |
| 203 | Type A Sign Posts with Extra Embedment (645.8104) | EACH | 30 | $220.00 | $220.00 | $230.00 |
| 204 | Reference Marker Panel (646.21) | EACH | 12 | $25.00 | $35.00 | $34.00 |
| 205 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 104 | $12.00 | $12.00 | $11.00 |
| 206 | Steel Post, 2.0 lb/ft (646.32) | EACH | 87 | $65.00 | $70.00 | $70.00 |
| 207 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 2 | $55.00 | $100.00 | $11.00 |
| 208 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 67 | $50.00 | $60.00 | $11.00 |
| 209 | Welded Frame & Rectangular Grate 11 (655.1011) | EACH | 3 | $900.00 | $1,200.00 | $1,300.00 |
| 210 | Welded Frame & Rectangular Grate 22 (655.1022) | EACH | 3 | $1,200.00 | $1,200.00 | $1,600.00 |
| 211 | (657.020001) | LS | 1 | $15,000 | $12,000 | $11,000 |
| 212 | (657.020002) | LS | 1 | $11,000 | $10,000 | $10,000 |
| 213 | (657.020003) | LS | 1 | $15,000 | $12,000 | $11,000 |
| 214 | (657.020004) | LS | 1 | $15,000 | $12,000 | $11,000 |
| 215 | (657.020005) | LS | 1 | $25,000 | $21,000 | $22,000 |
| 216 | (660.21120008) | 10 | $500.00 | $415.00 | $210.00 | |
| 217 | (663.0108) | LF | 4 | $620.00 | $400.00 | $460.00 |
| 218 | (663.1008) | EACH | 2 | $3,000.00 | $3,200.00 | $4,100.00 |
| 219 | (663.1301) | EACH | 1 | $6,000.00 | $6,000.00 | $9,100.00 |
| 220 | (663.160806) | EACH | 1 | $12,000 | $10,000 | $5,200.00 |
| 221 | Iron Water Main Fittings (3 - 8 inch diameter) (663.2001) | LB | 26 | $26.00 | $20.00 | $22.00 |
| 222 | (663.2106) | EACH | 2 | $350.00 | $200.00 | $130.00 |
| 223 | (663.2108) | EACH | 3 | $480.00 | $300.00 | $200.00 |
| 224 | (663.2308) | LF | 4 | $200.00 | $150.00 | $12.00 |
| 225 | (663.4108) | LF | 37 | $12.00 | $15.00 | $95.00 |
| 226 | Remove and Store Existing Water Valve & Valve Box (663.45) | EACH | 2 | $140.00 | $1,000.00 | $1,000.00 |
| 227 | Remove and Store Existing Hydrant (663.46) | EACH | 1 | $700.00 | $1,000.00 | $2,000.00 |
| 228 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 11,920 | $2.65 | $2.75 | $3.00 |
| 229 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 9,434 | $2.65 | $2.75 | $3.00 |
| 230 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 246 | $3.00 | $3.50 | $3.50 |
| 231 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 12 | $115.00 | $120.00 | $125.00 |
| 232 | (691.04000020) | 152,250 | $1.00 | $1.00 | $1.00 | |
| 233 | Field Change Payment (FCP) (697.03) | DOL | 1,308,000 | $1.00 | $1.00 | $1.00 |
| 234 | Asphalt Price Adjustment (698.04) | DOL | 22,476 | $1.00 | $1.00 | $1.00 |
| 235 | Fuel Price Adjustment (698.05) | DOL | 21,560 | $1.00 | $1.00 | $1.00 |
| 236 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 237 | Mobilization (699.040001) | LS | 1 | $630,000 | $690,000 | $500,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of August 7, 2025. Compiled by Mirage Metrics.