NYSDOT contract D265796 bid tabulation

I-81 OVER RT 11 NEDROW BRIDGE REPLACEMENT. Let by New York State DOT on July 16, 2026, Onondaga, Region 03. 6 bids received; low bid $18,373,738 by Winn Construction Services Inc.

Owner
New York State DOT
Letting
16 JUL 2026
Pay items
152
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Winn Construction Services Inc$18,373,738Low
2Economy Paving Co Inc$18,545,642+1.0%
3Cold Spring Construction Company$19,706,636+7.0%
4Slate Hill Constructors Inc$19,706,872+7.0%
5Vector Construction Corp$20,122,212+10%
6Lancaster Development and Tully Construction Co LLC$22,508,224+23%
NYSDOT contract D265796: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Winn Construction Services Inc2. Economy Paving Co Inc3. Cold Spring Construction Company4. Slate Hill Constructors Inc5. Vector Construction Corp6. Lancaster Development and Tully Construction Co LLC
1Clearing and Grubbing (201.07)ACRE0.20$30,000$2,000.00$16,500$80,000$40,000$27,400
2 (202.120001)LS1$375,000$625,000$350,000$330,000$950,000$290,000
3 (202.120002)LS1$375,000$615,000$350,000$330,000$950,000$290,000
4Removal of Substructures (202.19)CY1,325$115.00$95.00$175.00$200.00$120.00$182.00
5Unclassified Excavation and Disposal (203.02)CY9,290$30.00$25.00$41.00$40.00$34.00$49.50
6Embankment In Place (203.03)CY26,650$34.00$15.00$29.00$60.00$34.00$42.60
7Select Granular Fill (203.07)CY270$63.00$35.00$54.00$85.00$65.00$107.00
8Select Granular Fill, Slope Protection - Type A (203.0801)CY200$92.00$105.00$112.00$175.00$135.00$147.00
9Select Structural Fill (203.21)CY5,260$65.00$85.00$78.00$85.00$65.00$94.70
10 (203.24010017)20$71.00$100.00$98.00$300.00$65.00$151.00
11Structure Excavation (206.01)CY12,500$23.00$25.00$32.00$37.00$32.00$30.60
12Trench and Culvert Excavation (206.0201)CY280$60.00$10.00$62.00$70.00$54.00$95.60
13Prefabricated Composite Structural Drain (207.26)SY2,130$10.00$9.45$22.00$20.00$16.00$34.60
14Mulch – Temporary (209.100101)SY32,490$1.00$1.00$0.90$1.05$0.90$1.30
15Seed and Mulch – Temporary (209.1003)SY10,830$1.00$2.00$1.00$1.35$1.00$1.85
16Silt Fence - Temporary (209.13)LF200$4.50$7.05$11.00$7.50$5.00$18.10
17Drainage Structure Inlet Protection, Catch Basin Inserts for Trash, Sediment and Debris Removal – Temporary (209.1706)EACH2$50.00$250.00$150.00$1,000.00$240.00$577.00
18Rolled Erosion Control Product, Class I Type A, Short Term (209.1801)SY10,830$2.50$3.00$3.50$3.25$4.00$4.15
19Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY21,272$2.75$4.00$4.50$4.25$5.00$5.40
20 (209.23010009)6,458$4.25$7.05$8.50$7.50$8.00$10.30
21Subbase Course, Optional Type (304.15)CY4,371$73.00$95.00$93.00$90.00$90.00$103.00
22 (404.2589)TON2,110$164.00$135.00$157.00$130.00$125.00$153.00
23 (404.4389)TON779$180.00$145.00$130.00$125.00$120.00$161.00
24 (404.4489)TON1,556$160.00$125.00$110.00$125.00$120.00$128.00
25 (406.0982)TON1,950$195.00$175.00$149.00$155.00$150.00$183.00
26 (406.1989)TON1,070$195.00$165.00$160.00$140.00$135.00$181.00
27Diluted Tack Coat (407.0102)GAL1,380$3.00$3.00$12.00$2.50$2.25$2.50
28Straight Tack Coat (407.0103)GAL1,210$3.50$3.30$13.00$2.75$2.50$5.00
29Asphalt Pavement Joint Adhesive (418.7603)LF13,450$2.00$0.35$0.90$0.50$0.25$0.30
30Production Cold-Mill Surface Planing of Bituminous Concrete (490.15)SY19,160$3.25$4.20$2.40$5.50$4.00$3.50
31Shields and Shoring (552.17)SF962$10.00$1.00$1.00$8.00$1.00$1.25
32Footing Concrete, Performance (555.0011)CY1,812$900.00$695.00$675.00$900.00$900.00$879.00
33Concrete for Structures, Performance (555.0021)CY2,240$1,100.00$1,185.00$1,050.00$1,200.00$1,250.00$1,840.00
34 (555.72940001)3,700$14.50$10.95$58.00$30.00$20.00$33.40
35Performance Concrete Quality Adjustment – Footing Concrete (555.9901)QUALITY UNIT1$5.50$5.50$5.50$5.50$5.50$5.50
36Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$9.50$9.50$9.50$9.50$9.50$9.50
37Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB319,000$2.00$1.80$2.35$2.00$2.30$2.65
38Stainless Steel Bar Reinforcement for Structures (556.0205)LB21,000$3.75$3.60$4.20$3.90$5.00$4.95
39Stud Shear Connectors for Bridges (556.03)EACH5,670$10.00$10.00$11.00$8.40$9.00$9.70
40 (557.1012)SY1,180$650.00$555.00$625.00$610.00$650.00$604.00
41 (557.1112)SY1,210$675.00$735.00$760.00$715.00$725.00$922.00
42Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29)SY2,380$1.00$1.00$0.01$0.10$0.01$22.90
43Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901)QUALITY UNIT1$12.08$12.08$12.08$12.08$12.08$12.08
44Longitudinal Sawcut Grooving of Structural Slab Surface (558.02)SY2,170$6.75$9.85$8.00$9.00$7.00$17.80
45Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01)SF19,500$0.80$0.50$0.90$2.00$0.50$1.45
46Protective Sealing of New Structural Concrete (559.02)SF32,300$0.80$0.60$1.55$2.50$0.60$2.30
47 (564.0501)LS1$750,000$945,000$1,400,000$645,000$685,000$682,000
48 (564.0502)LS1$750,000$945,000$1,400,000$645,000$685,000$685,000
49Type E.B. Fixed Bearing (Over 225 k) (565.2025)EACH10$4,000.00$2,885.00$6,200.00$3,150.00$3,500.00$3,420.00
50Type E.B. Expansion Bearing (Over 225 k) (565.2035)EACH10$4,000.00$2,485.00$6,200.00$2,800.00$3,500.00$3,000.00
51 (567.51000016)164$63.00$1.00$62.00$70.00$40.00$39.70
52Armorless Bridge Joint (567.60)LF164$230.00$450.00$245.00$485.00$335.00$482.00
53Transition Bridge Railing (568.70)LF320$226.00$200.00$200.00$210.00$210.00$245.00
54Single Slope (Half-Section) Concrete Bridge Barrier (569.04)LF1,048$275.00$255.00$305.00$290.00$270.00$431.00
55Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99)QUALITY UNIT1$10.75$10.75$10.75$10.75$10.75$10.75
56Lead-Exposure Control Plan (570.01)LS1$5,000.00$100.00$0.01$1,000.00$1.00$2,430.00
57Medical Testing (570.02)DOL10,000$1.00$1.00$1.00$1.00$1.00$1.00
58Personal-Exposure-Monitoring Sample Analysis (570.03)DOL10,000$1.00$1.00$1.00$1.00$1.00$1.00
59Decontamination Facilities (570.04)CALENDAR WEEK4$700.00$100.00$250.00$400.00$1.00$607.00
60 (570.090001)LS1$1,000.00$1,000.00$0.01$1,000.00$1.00$1.20
61 (570.090002)LS1$1,000.00$1,000.00$0.01$1,000.00$1.00$1.20
62 (572.00020101)LS1$267,500$125,000$250,000$182,000$220,000$200,000
63 (572.00020201)LS1$267,500$125,000$250,000$182,000$220,000$200,000
64 (589.520001)EACH2$3,000.00$1,000.00$3,000.00$1.00$2,000.00$793.00
65 (589.520002)EACH2$3,000.00$1,000.00$3,000.00$4,000.00$2,000.00$793.00
66Culvert-End Safety Grate (603.0101)SF60$58.00$20.00$40.00$41.00$40.00$100.00
67 (603.171416)EACH1$616.00$200.00$1,125.00$1,050.00$600.00$908.00
68 (603.6005)LF42$105.00$185.00$216.00$145.00$200.00$193.00
69 (603.7305)EACH2$5,409.00$6,855.00$4,750.00$3,800.00$5,000.00$5,310.00
70Concrete Collars (603.77)EACH2$3,180.00$3,000.00$2,100.00$4,400.00$6,000.00$4,830.00
71 (603.9818)LF360$67.00$65.00$100.00$45.00$45.00$62.40
72 (604.300103)LF11$736.00$1,015.00$750.00$900.00$1,000.00$798.00
73Box Beam Guide Railing (606.10)LF6,400$53.00$50.00$49.00$51.00$55.00$58.90
74Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF200$59.00$55.00$53.00$56.00$55.00$65.00
75Box Beam End Piece (606.120101)EACH9$767.00$700.00$690.00$750.00$700.00$838.00
76Box Beam Guide Railing End Assembly Type I (606.120102)EACH4$5,002.00$5,000.00$4,500.00$4,800.00$5,000.00$4,500.00
77Box Beam Guide Railing End Assembly Type I with 18 ft Extension (606.120103)EACH2$6,113.00$5,500.00$5,500.00$5,800.00$6,000.00$7,500.00
78Box Beam End Assembly Type III (606.1203)EACH2$8,337.00$7,500.00$7,500.00$8,000.00$8,000.00$9,110.00
79Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) (606.26)EACH2$5,196.00$5,000.00$4,675.00$5,000.00$5,000.00$5,680.00
80Removing and Disposing Corrugated Beam Guide Railing (606.71)LF6,540$4.30$6.05$7.00$5.50$6.00$4.25
81Removing and Disposing Box Beam Guide Railing (606.73)LF1,201$6.10$6.60$7.00$6.00$6.00$6.05
82Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910)EACH10$732.00$395.00$350.00$700.00$300.00$729.00
83Removing and Disposing Weak- and Heavy-Post Corrugated Beam Energy-Absorbing Terminals (606.7911)EACH1$823.00$1,985.00$235.00$1,400.00$300.00$820.00
84Removing and Disposing Box Beam Energy-Absorbing Terminal (606.7921)EACH1$823.00$1,985.00$325.00$1,400.00$300.00$820.00
85Guide Rail Transition Weak-Post Corrugated Beam to Box Beam Guide Rail (One or Two Way Operation) (606.8101)EACH1$9,450.00$8,500.00$8,500.00$9,000.00$12,000$10,300
86 (607.36100011)1$514.00$500.00$250.00$1,250.00$700.00$1,390.00
87 (607.41010010)200$4.50$5.00$9.00$13.00$7.00$10.00
88Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON261$158.00$195.00$215.00$160.00$170.00$242.00
89Stone Curb – Bridge (Type A) (609.0301)LF120$139.00$200.00$132.00$145.00$160.00$172.00
90Compost (610.10)CY51$44.00$150.00$42.00$160.00$63.00$182.00
91Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101)CY1$210.00$200.00$200.00$210.00$200.00$243.00
92Weed Removal (610.13)SY13,432$2.00$0.50$2.25$0.75$2.00$0.73
93Topsoil – Reuse On-Site Materials (610.1401)CY1,822$31.00$5.00$45.00$80.00$52.00$20.00
94Topsoil - Roadside (610.1402)CY1,455$66.00$55.00$0.01$85.00$1.00$90.00
95 (610.15120208)3,767$8.75$1.35$1.65$2.10$2.00$1.60
96Turf Establishment - Roadside (610.1601)SY10,830$1.25$1.50$1.25$1.75$1.30$2.40
97 (610.16030824)2,609$2.75$2.00$2.70$2.10$2.80$3.05
98Watering Vegetation (610.19)1,000 GALLONS228$52.00$20.00$39.00$21.00$50.00$24.30
99Mowing (610.21)SY26,864$0.50$0.25$0.45$0.70$0.55$0.73
100Mowing Limits Markers (610.22)EACH24$105.00$150.00$185.00$160.00$100.00$182.00
101 (611.0242)EACH8$368.00$1,000.00$350.00$840.00$350.00$971.00
102 (611.0721)EACH77$26.00$100.00$25.00$65.00$25.00$72.90
103 (611.19020024)8$65.00$20.00$60.00$21.00$63.00$24.30
104 (611.19070024)77$2.50$5.00$2.25$5.25$2.50$6.05
105 (617.01030024)80$61.00$10.00$160.00$30.00$63.00$12.10
106 (617.10000024)78$72.00$10.00$160.00$80.00$70.00$41.20
107 (617.11000024)LS1$17,000$1,000.00$200.00$3,000.00$1,500.00$779.00
108Basic Work Zone Traffic Control (619.01)LS1$570,000$1,490,000$800,000$850,000$925,000$663,000
109Type III Construction Barricades (619.04)EACH19$382.00$250.00$225.00$50.00$130.00$153.00
110Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF15,151$7.25$5.00$5.80$4.75$4.50$7.90
111 (619.100101)LF9,710$1.10$1.00$0.85$1.00$0.90$1.20
112 (619.100104)LF39,160$6.10$4.00$5.80$4.50$4.50$6.70
113 (619.110611)WEEK4$1,000.00$500.00$1,500.00$2,750.00$6,200.00$1,400.00
114Temporary Positive Barrier – Category 3 (Pinning Prohibited) (619.1713)LF9,520$40.00$35.00$28.00$50.00$40.00$70.50
115Temporary Positive Barrier – Category 4 (Pinning Permitted) (619.1714)LF30$75.00$35.00$43.00$230.00$50.00$225.00
116Box Beam to Flared Temporary Concrete Barrier Transition (619.1720)EACH2$3,100.00$8,500.00$12,000$8,500.00$1,700.00$13,100
117Temporary Concrete Barrier Face to Box Beam Transition (619.1722)EACH1$14,000$1,500.00$17,000$9,000.00$1,900.00$17,400
118Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803)EACH2$12,000$3,000.00$15,000$8,500.00$9,000.00$23,500
119Pavement Patching (Force Acount) (619.2601)DOL5,000$1.00$1.00$1.00$1.00$1.00$1.00
120Pavement Patching (Tonnage) (619.2602)TON20$1,375.00$355.00$1,150.00$700.00$400.00$714.00
121Stone Filling (Light) (620.03)CY16$85.00$150.00$155.00$240.00$200.00$260.00
122Bedding Material, Type 1 (620.0801)CY17$143.00$125.00$130.00$250.00$200.00$229.00
123 (621.05020004)6,550$9.50$0.10$6.25$6.50$5.00$2.20
124 (621.51000015)422$34.00$1.00$9.50$14.00$16.00$33.60
125Survey Operations (625.01)LS1$75,000$105,000$230,000$90,000$225,000$393,385
126 (627.50140008)4,590$5.75$1.00$6.00$5.00$5.00$8.00
127Concrete Cylinder Curing Equipment (637.04)EACH1$18,500$10,000$250.00$900.00$5,000.00$4,070.00
128Engineer’s Field Office – Type 1 (637.11)MONTH18$3,700.00$5,000.00$3,000.00$2,650.00$4,200.00$11,000
129Rain Gauge (637.26)EACH1$100.00$100.00$100.00$60.00$75.00$72.90
130Office Technology and Supplies (637.34)DOL300$1.00$1.00$1.00$1.00$1.00$1.00
131Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00$1.00$1.00
132Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
133 (637.41000115)18$150.00$100.00$235.00$200.00$78.00$157.00
134 (637.41000215)18$150.00$100.00$235.00$200.00$78.00$157.00
135 (645.48010001)4$27,500$28,000$26,500$38,000$35,000$33,900
136Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF86$42.00$50.00$38.50$42.00$40.00$46.80
137Type A Sign Posts (645.81)EACH14$239.00$250.00$220.00$240.00$225.00$267.00
138Reference Marker Panel (646.21)EACH3$47.00$50.00$44.00$46.00$45.00$53.40
139Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH63$29.00$30.00$27.00$29.00$28.00$32.80
140Steel Post, 2.0 lb/ft (646.32)EACH66$87.00$75.00$80.00$84.00$90.00$97.20
141Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH11$43.00$50.00$40.00$42.00$32.00$48.60
142Milled-In Audible Roadway Delineators (MIARDs) (649.01)LF8,709$2.10$2.35$1.55$2.20$2.00$2.55
143 (685.16010014)11,720$3.10$3.50$3.00$3.50$4.00$3.65
144 (685.17010014)7,330$3.10$3.50$3.00$3.50$4.00$3.65
145White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104)LF2,120$3.50$3.50$3.50$4.00$4.00$4.25
146 (690.01000105)LS1$189,500$115,000$85,000$180,000$170,000$208,000
147 (691.04000020)109,200$1.00$1.00$1.00$1.00$1.00$1.00
148Field Change Payment (FCP) (697.03)DOL764,000$1.00$1.00$1.00$1.00$1.00$1.00
149Asphalt Price Adjustment (698.04)DOL4,964$1.00$1.00$1.00$1.00$1.00$1.00
150Fuel Price Adjustment (698.05)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
151Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
152Mobilization (699.040001)LS1$698,298$700,000$757,000$700,000$760,000$863,620
NYSDOT contract D265796: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of July 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy