NYSDOT contract D265612 bid tabulation
NY Route 410 over the Black River Bridge Replacement. Let by New York State DOT on December 18, 2025, Lewis, Region 07. 2 bids received; low bid $24,193,378 by Tioga Construction Company Inc.
- Owner
- New York State DOT
- Letting
- 18 DEC 2025
- Pay items
- 176
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Tioga Construction Company Inc | $24,193,378 | Low |
| 2 | Vector Construction Corp | $35,611,877 | +47% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Tioga Construction Company Inc | 2. Vector Construction Corp |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $250,000 | $220,000 |
| 2 | (202.120001) | LS | 1 | $900,000 | $3,000,000 |
| 3 | Removal of Substructures (202.19) | CY | 318 | $150.00 | $200.00 |
| 4 | Unclassified Excavation and Disposal (203.02) | CY | 55,638 | $25.00 | $25.00 |
| 5 | Embankment In Place (203.03) | CY | 37,460 | $36.00 | $36.00 |
| 6 | Select Granular Fill (203.07) | CY | 211 | $100.00 | $80.00 |
| 7 | Surface Settlement Gauges (203.10) | EACH | 7 | $1,000.00 | $1,400.00 |
| 8 | (203.12030017) | 216,610 | $1.38 | $1.60 | |
| 9 | (203.12230017) | LS | 1 | $250,000 | $280,000 |
| 10 | (203.12430017) | 70,195 | $0.05 | $0.75 | |
| 11 | Select Structural Fill (203.21) | CY | 366 | $80.00 | $80.00 |
| 12 | Structure Excavation (206.01) | CY | 4,590 | $23.00 | $50.00 |
| 13 | Trench and Culvert Excavation (206.0201) | CY | 833 | $50.00 | $40.00 |
| 14 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 580 | $65.00 | $15.00 |
| 15 | Geotextile Bedding (207.20) | SY | 7 | $120.00 | $200.00 |
| 16 | Geotextile Separation (207.21) | SY | 16,334 | $1.50 | $3.00 |
| 17 | Geotextile Drainage (207.22) | SY | 539 | $2.60 | $4.00 |
| 18 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 202 | $18.00 | $22.00 |
| 19 | (208.01030022) | 117 | $80.00 | $90.00 | |
| 20 | (208.01040022) | 3 | $500.00 | $800.00 | |
| 21 | Seed and Mulch – Temporary (209.1003) | SY | 16,082 | $1.00 | $0.78 |
| 22 | Check Dam (Ditch Bottom Width >10′), Gravel Bag – Temporary (209.110204) | EACH | 3 | $900.00 | $800.00 |
| 23 | Check Dam, (Ditch Bottom Width >3′ to 6′), Stone – Permanent (209.110602) | EACH | 11 | $1,600.00 | $800.00 |
| 24 | Rolled Erosion Control Product, Class II Type A, Intermediate (209.1901) | SY | 285 | $5.00 | $7.00 |
| 25 | Rolled Erosion Control Product, Class II Type D, Intermediate (209.1904) | SY | 7,738 | $4.00 | $5.00 |
| 26 | Soil Stabilizers, Class IV Type A (209.2101) | SY | 8,423 | $2.00 | $1.00 |
| 27 | Sediment Filter Log, 12″ (209.2301) | LF | 5,633 | $8.00 | $8.00 |
| 28 | Subbase Course, Type 2 (304.12) | CY | 7,185 | $90.00 | $82.00 |
| 29 | (404.0001) | TON | 258 | $80.00 | $80.00 |
| 30 | (404.0983) | TON | 1,264 | $130.00 | $140.00 |
| 31 | (404.1989) | TON | 1,782 | $114.00 | $125.00 |
| 32 | (404.2589) | TON | 2,115 | $109.00 | $123.00 |
| 33 | (404.4289) | TON | 154 | $186.00 | $186.00 |
| 34 | Diluted Tack Coat (407.0102) | GAL | 1,564 | $9.00 | $11.00 |
| 35 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 9,202 | $0.45 | $0.50 |
| 36 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 1,717 | $10.00 | $12.00 |
| 37 | Steel H-Piles (HP 12x74) (551.012074) | LF | 10,178 | $65.00 | $30.00 |
| 38 | Steel H-Piles (HP 16x162) (551.016162) | LF | 6,840 | $140.00 | $65.00 |
| 39 | Splices for Steel H-Piles (551.12) | EACH | 73 | $50.00 | $1.00 |
| 40 | Furnishing Equipment for Driving Piles (551.13) | LS | 1 | $600,000 | $4,000,000 |
| 41 | Permanent Steel Sheeting (552.11) | SF | 13,436 | $120.00 | $80.00 |
| 42 | Interim Steel Sheeting (552.15) | SF | 1,843 | $50.00 | $80.00 |
| 43 | (553.010001) | EACH | 1 | $190,000 | $220,000 |
| 44 | (553.010002) | EACH | 1 | $300,000 | $850,000 |
| 45 | (553.010003) | EACH | 1 | $300,000 | $850,000 |
| 46 | (553.030001) | EACH | 1 | $10,000 | $500.00 |
| 47 | (553.030002) | EACH | 1 | $10,000 | $500.00 |
| 48 | (553.030003) | EACH | 1 | $10,000 | $500.00 |
| 49 | (554.3001) | SF | 1,350 | $60.00 | $76.00 |
| 50 | Footing Concrete, Performance (555.0011) | CY | 404 | $1,200.00 | $2,200.00 |
| 51 | Concrete for Structures, Performance (555.0021) | CY | 441 | $1,600.00 | $2,800.00 |
| 52 | Concrete for Structures, Performance (Deposited Under Water) (555.0031) | CY | 351 | $750.00 | $1,400.00 |
| 53 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $4.50 | $4.50 |
| 54 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $8.75 | $8.75 |
| 55 | Performance Concrete Quality Adjustment - Concrete Deposited Under Water (555.9903) | QUALITY UNIT | 1 | $9.25 | $9.25 |
| 56 | Galvanized Bar Reinforcement for Structures (556.0203) | LB | 98,643 | $2.50 | $3.00 |
| 57 | Stud Shear Connectors for Bridges (556.03) | EACH | 13,370 | $4.50 | $6.00 |
| 58 | (557.1019) | SY | 236 | $625.00 | $800.00 |
| 59 | (557.1119) | SY | 2,758 | $625.00 | $800.00 |
| 60 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 2,958 | $0.10 | $0.01 |
| 61 | Sidewalks and Safety Walks (557.30) | SY | 242 | $200.00 | $500.00 |
| 62 | (557.60010004) | 2,657 | $18.00 | $22.00 | |
| 63 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $8.45 | $8.45 |
| 64 | Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902) | QUALITY UNIT | 1 | $8.10 | $8.10 |
| 65 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 2,657 | $6.50 | $6.00 |
| 66 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 2,898 | $0.50 | $2.00 |
| 67 | Protective Sealing of New Structural Concrete (559.02) | SF | 10,056 | $0.50 | $2.00 |
| 68 | (564.0501) | LS | 1 | $4,000,000 | $6,320,000 |
| 69 | (565.20310003) | 25 | $6,000.00 | $9,000.00 | |
| 70 | Modular Expansion Joint System - Two Cell (566.02) | LF | 70 | $2,200.00 | $2,500.00 |
| 71 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 1,305 | $181.00 | $220.00 |
| 72 | Transition Bridge Railing (568.70) | LF | 128 | $168.00 | $200.00 |
| 73 | Lead-Exposure Control Plan (570.01) | LS | 1 | $100.00 | $1.00 |
| 74 | Medical Testing (570.02) | DOL | 5,000 | $1.00 | $1.00 |
| 75 | Personal-Exposure-Monitoring Sample Analysis (570.03) | DOL | 2,500 | $1.00 | $1.00 |
| 76 | Decontamination Facilities (570.04) | CALENDAR WEEK | 20 | $100.00 | $1.00 |
| 77 | (570.09) | LS | 1 | $500.00 | $1.00 |
| 78 | (570.10) | LS | 1 | $800.00 | $1.00 |
| 79 | (572.010001) | SF | 2,481 | $60.00 | $60.00 |
| 80 | Scuppers (Type B) (576.02) | EACH | 18 | $4,000.00 | $3,400.00 |
| 81 | (589.01) | 203,187 | $0.80 | $1.60 | |
| 82 | (603.171216) | EACH | 9 | $400.00 | $250.00 |
| 83 | (603.171614) | EACH | 4 | $800.00 | $600.00 |
| 84 | (603.9815) | LF | 416 | $25.00 | $38.00 |
| 85 | (603.9824) | LF | 123 | $50.00 | $65.00 |
| 86 | (604.302122) | LF | 7.30 | $1,200.00 | $1,200.00 |
| 87 | Underdrain Filter, Type II (605.1001) | CY | 36 | $110.00 | $110.00 |
| 88 | (605.1701) | LF | 2,458 | $3.00 | $4.50 |
| 89 | Box Beam Guide Railing (606.10) | LF | 5,626 | $43.00 | $45.00 |
| 90 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 298 | $52.00 | $55.00 |
| 91 | Box Beam Guide Railing (Shop Mitered) (606.100003) | LF | 66 | $65.00 | $145.00 |
| 92 | Box Beam End Piece (606.120101) | EACH | 3 | $545.00 | $650.00 |
| 93 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 1 | $4,000.00 | $4,500.00 |
| 94 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 10 | $2,100.00 | $2,200.00 |
| 95 | Resetting Box Beam Guide Railing (New Posts) (606.5348) | LF | 70 | $55.00 | $32.00 |
| 96 | Removing and Storing Box Beam Guide Railing End Assembly (606.6920) | EACH | 1 | $300.00 | $700.00 |
| 97 | Removing and Disposing Cable Guide Railing (606.70) | LF | 5,312 | $3.00 | $4.00 |
| 98 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 512 | $5.00 | $6.00 |
| 99 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 12 | $60.00 | $240.00 |
| 100 | (607.41010010) | 4,873 | $3.50 | $6.00 | |
| 101 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 18 | $80.00 | $80.00 |
| 102 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 361 | $145.00 | $150.00 |
| 103 | Stone Curb – Bridge (Type A) (609.0301) | LF | 60 | $55.00 | $90.00 |
| 104 | Stone Curb – Bridge (Type F1) (609.0302) | LF | 1,304 | $53.00 | $70.00 |
| 105 | Mycorrhizal Fungi (610.0701) | LB | 120 | $30.00 | $60.00 |
| 106 | Topsoil – Reuse On-Site Materials (610.1401) | CY | 617 | $50.00 | $65.00 |
| 107 | Topsoil - Roadside (610.1402) | CY | 860 | $100.00 | $98.00 |
| 108 | Topsoil - Lawns (610.1403) | CY | 34 | $120.00 | $110.00 |
| 109 | Topsoil – Wetland Materials (610.1407) | CY | 2,303 | $110.00 | $85.00 |
| 110 | Turf Establishment - Roadside (610.1601) | SY | 7,738 | $1.25 | $1.00 |
| 111 | Turf Establishment -Lawns (610.1602) | SY | 303 | $3.00 | $5.00 |
| 112 | Wildflower Seeding (610.17) | SY | 10,361 | $1.50 | $2.00 |
| 113 | Watering Vegetation – As Specified (610.1901) | 1,000 GALLONS | 2,990 | $2.00 | $20.00 |
| 114 | Mowing (610.21) | SY | 606 | $2.00 | $2.00 |
| 115 | (611.0142) | EACH | 18 | $675.00 | $670.00 |
| 116 | (611.0232) | EACH | 6 | $200.00 | $440.00 |
| 117 | (611.0442) | EACH | 348 | $60.00 | $90.00 |
| 118 | (611.0722) | EACH | 1,658 | $25.00 | $30.00 |
| 119 | Transplanting Herbaceous Plants (611.16) | EACH | 10 | $50.00 | $300.00 |
| 120 | (611.19010024) | 4 | $30.00 | $275.00 | |
| 121 | (611.19020024) | 2 | $20.00 | $130.00 | |
| 122 | (611.19040024) | 70 | $2.00 | $27.00 | |
| 123 | (613.04000001) | 43 | $50.00 | $220.00 | |
| 124 | (615.02050124) | 50 | $20.00 | $165.00 | |
| 125 | (615.02060124) | 7 | $80.00 | $640.00 | |
| 126 | (616.07000024) | 1,543 | $10.00 | $18.00 | |
| 127 | (616.15000024) | 3,608 | $20.00 | $35.00 | |
| 128 | (617.01020024) | 4,635 | $1.00 | $5.00 | |
| 129 | (617.01030024) | 859 | $15.00 | $27.00 | |
| 130 | (617.10000024) | 859 | $10.00 | $50.00 | |
| 131 | (617.11000024) | LS | 1 | $500.00 | $5,000.00 |
| 132 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $150,000 | $775,000 |
| 133 | (619.111112) | EACH | 4 | $7,000.00 | $25,000 |
| 134 | Mailboxes (619.27) | EACH | 4 | $300.00 | $310.00 |
| 135 | Stone Filling (Light) (620.03) | CY | 2 | $400.00 | $310.00 |
| 136 | Stone Filling (Heavy) (620.05) | CY | 1,046 | $130.00 | $125.00 |
| 137 | Bedding Material, Type 1 (620.0801) | CY | 176 | $90.00 | $100.00 |
| 138 | Crushed Stone (In-Place Measure) (623.12) | CY | 2,643 | $110.00 | $120.00 |
| 139 | Survey Operations (625.01) | LS | 1 | $250,000 | $340,000 |
| 140 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 2 | $2,000.00 | $1,000.00 |
| 141 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 3 | $900.00 | $500.00 |
| 142 | Permanent Survey Markers (625.06) | EACH | 4 | $2,500.00 | $1,000.00 |
| 143 | (627.50140008) | 68 | $5.00 | $10.00 | |
| 144 | Field Laboratory (637.01) | EACH | 1 | $2,500.00 | $4,000.00 |
| 145 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $5,000.00 | $7,500.00 |
| 146 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 30 | $2,500.00 | $2,500.00 |
| 147 | Rain Gauge (637.26) | EACH | 1 | $50.00 | $100.00 |
| 148 | Office Technology and Supplies (637.34) | DOL | 2,500 | $1.00 | $1.00 |
| 149 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 |
| 150 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 |
| 151 | (637.41000115) | 30 | $150.00 | $100.00 | |
| 152 | (637.41000215) | 30 | $150.00 | $100.00 | |
| 153 | (637.41000315) | 30 | $150.00 | $100.00 | |
| 154 | (645.34010104) | 1 | $500.00 | $2,500.00 | |
| 155 | (645.34010204) | 1 | $500.00 | $2,500.00 | |
| 156 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 91.30 | $55.00 | $44.00 |
| 157 | Type A Sign Posts (645.81) | EACH | 19 | $240.00 | $210.00 |
| 158 | Reference Marker Panel (646.21) | EACH | 8 | $45.00 | $30.00 |
| 159 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 26 | $18.00 | $13.00 |
| 160 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 2 | $24.00 | $17.00 |
| 161 | Steel Post, 1.1 lb/ft (646.31) | EACH | 12 | $90.00 | $135.00 |
| 162 | Steel Post, 2.0 lb/ft (646.32) | EACH | 24 | $110.00 | $70.00 |
| 163 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 5 | $160.00 | $250.00 |
| 164 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 3 | $7.00 | $50.00 |
| 165 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 25 | $7.00 | $25.00 |
| 166 | (647.83001002) | 13 | $6.00 | $20.00 | |
| 167 | Welded Frame & Reticuline Grate 22 (655.1122) | EACH | 1 | $2,000.00 | $1,700.00 |
| 168 | (662.60840201) | LS | 1 | $10,000 | $42,000 |
| 169 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 12,846 | $0.85 | $1.00 |
| 170 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 5,486 | $0.85 | $1.00 |
| 171 | (691.04000020) | 109,200 | $1.00 | $1.00 | |
| 172 | Field Change Payment (FCP) (697.03) | DOL | 1,206,000 | $1.00 | $1.00 |
| 173 | Asphalt Price Adjustment (698.04) | DOL | 11,245 | $1.00 | $1.00 |
| 174 | Fuel Price Adjustment (698.05) | DOL | 26,330 | $1.00 | $1.00 |
| 175 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 176 | Mobilization (699.040001) | LS | 1 | $930,000 | $1,280,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of December 18, 2025. Compiled by Mirage Metrics.