NYSDOT contract D265784 bid tabulation
PIN 7143.40 - U.S. ROUTE 11 OVER CSX RAILROAD (ELLISBURG). Let by New York State DOT on June 25, 2026, Jefferson, Region 07. 4 bids received; low bid $3,197,549 by Winn Construction Services Inc.
- Owner
- New York State DOT
- Letting
- 25 JUN 2026
- Pay items
- 72
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Winn Construction Services Inc | $3,197,549 | Low |
| 2 | Tuscarora Construction Co Inc | $3,648,668 | +14% |
| 3 | Vector Construction Corp | $4,121,061 | +29% |
| 4 | Slate Hill Constructors Inc | $4,222,337 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Winn Construction Services Inc | 2. Tuscarora Construction Co Inc | 3. Vector Construction Corp | 4. Slate Hill Constructors Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $20,000 | $12,000 | $30,000 | $25,000 |
| 2 | (202.120001) | LS | 1 | $361,000 | $496,000 | $525,000 | $450,000 |
| 3 | Unclassified Excavation and Disposal (203.02) | CY | 1,032 | $34.00 | $65.00 | $40.00 | $60.00 |
| 4 | Embankment In Place (203.03) | CY | 625 | $48.00 | $80.00 | $37.00 | $100.00 |
| 5 | Select Structural Fill (203.21) | CY | 36 | $78.00 | $80.00 | $70.00 | $100.00 |
| 6 | Structure Excavation (206.01) | CY | 1,065 | $33.00 | $50.00 | $40.00 | $44.00 |
| 7 | Geotextile Stabilization (207.24) | SY | 1,501 | $1.00 | $2.00 | $3.20 | $6.50 |
| 8 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 155 | $11.00 | $28.00 | $20.00 | $23.00 |
| 9 | Sediment Filter Log – Temporary, 12″, Type A (209.1311) | LF | 923 | $5.00 | $15.00 | $10.00 | $9.00 |
| 10 | Rolled Erosion Control Product, Class II Type D, Intermediate (209.1904) | SY | 472 | $5.00 | $8.00 | $6.00 | $6.00 |
| 11 | Subbase Course, Type 2 (304.12) | CY | 890 | $73.00 | $80.00 | $72.00 | $115.00 |
| 12 | (404.0983) | TON | 168 | $221.00 | $195.00 | $200.00 | $205.00 |
| 13 | (404.1989) | TON | 285 | $210.00 | $185.00 | $190.00 | $195.00 |
| 14 | (404.2589) | TON | 293 | $204.00 | $180.00 | $185.00 | $190.00 |
| 15 | Diluted Tack Coat (407.0102) | GAL | 220 | $34.00 | $30.00 | $30.00 | $33.00 |
| 16 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,199 | $0.10 | $0.10 | $0.10 | $0.25 |
| 17 | (554.3001) | SF | 1,263 | $50.00 | $87.00 | $60.00 | $70.00 |
| 18 | Concrete for Structures, Performance (555.0021) | CY | 198 | $1,750.00 | $1,700.00 | $2,600.00 | $2,600.00 |
| 19 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $13.00 | $13.00 | $13.00 | $13.00 |
| 20 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 18,078 | $2.25 | $2.50 | $2.20 | $2.20 |
| 21 | (557.1019) | SY | 212 | $540.00 | $550.00 | $480.00 | $600.00 |
| 22 | (557.1219) | SY | 339 | $600.00 | $750.00 | $580.00 | $600.00 |
| 23 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 550 | $1.00 | $1.00 | $0.01 | $0.10 |
| 24 | (557.60010004) | 522 | $70.00 | $40.00 | $44.00 | $43.00 | |
| 25 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $11.21 | $11.21 | $11.21 | $11.21 |
| 26 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 522 | $16.00 | $15.00 | $15.00 | $22.00 |
| 27 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 4,698 | $0.75 | $1.00 | $0.62 | $2.00 |
| 28 | Protective Sealing of New Structural Concrete (559.02) | SF | 3,434 | $0.75 | $1.50 | $0.62 | $6.00 |
| 29 | Prestressed Concrete Hollow Slab Units (563.03) | SF | 2,672 | $132.00 | $200.00 | $225.00 | $130.00 |
| 30 | Type E.L. Bearing (56 to 111 k) (565.1922) | EACH | 22 | $850.00 | $700.00 | $900.00 | $840.00 |
| 31 | Transition Bridge Railing (568.70) | LF | 160 | $224.00 | $205.00 | $200.00 | $210.00 |
| 32 | (569.40010408) | 138 | $547.00 | $600.00 | $500.00 | $900.00 | |
| 33 | Removal of Structural Concrete (580.01) | CY | 127 | $1,500.00 | $1,130.00 | $2,400.00 | $3,500.00 |
| 34 | Removal and Replacement of Structural Concrete (582.0052) | SF | 111 | $278.00 | $230.00 | $260.00 | $450.00 |
| 35 | Removal of Structural Concrete- Replacement with Vertical and Overhead Patching Material (582.0061) | SF | 50 | $397.00 | $350.00 | $240.00 | $350.00 |
| 36 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 132 | $62.00 | $80.00 | $52.00 | $95.00 |
| 37 | Drilling and Grouting Bolts, Overhead or Sustained Tension, with Pullout Test (586.0401) | EACH | 126 | $87.00 | $80.00 | $55.00 | $150.00 |
| 38 | (605.03010015) | 755 | $17.00 | $24.00 | $18.00 | $30.00 | |
| 39 | (605.03020015) | 127 | $39.00 | $35.00 | $23.00 | $160.00 | |
| 40 | Box Beam Guide Railing (606.10) | LF | 708 | $59.00 | $50.00 | $60.00 | $55.00 |
| 41 | Removing and Storing Box Beam Guide Railing (606.63) | LF | 851 | $5.50 | $14.00 | $6.00 | $19.00 |
| 42 | (607.06400016) | 129 | $189.00 | $300.00 | $190.00 | $200.00 | |
| 43 | (607.41010010) | 373 | $3.75 | $8.00 | $10.00 | $6.00 | |
| 44 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 4 | $397.00 | $350.00 | $360.00 | $380.00 |
| 45 | Stone Curb – Bridge (Type A) (609.0301) | LF | 96 | $106.00 | $160.00 | $122.00 | $125.00 |
| 46 | Turf Establishment – Performance (610.1605) | SY | 472 | $14.00 | $10.00 | $17.00 | $34.00 |
| 47 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $70,000 | $81,000 | $340,000 | $273,000 |
| 48 | Type III Construction Barricades (619.04) | EACH | 32 | $376.00 | $200.00 | $130.00 | $55.00 |
| 49 | (619.111112) | EACH | 2 | $25,000 | $12,000 | $15,000 | $18,000 |
| 50 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 80 | $68.00 | $100.00 | $40.00 | $95.00 |
| 51 | Temporary Rumble Strips (619.22) | LF | 132 | $26.00 | $24.00 | $18.00 | $19.00 |
| 52 | Stone Filling (Light) (620.03) | CY | 431 | $89.00 | $160.00 | $100.00 | $130.00 |
| 53 | Bedding Material, Type 1 (620.0801) | CY | 69 | $115.00 | $160.00 | $100.00 | $160.00 |
| 54 | Crushed Stone (In-Place Measure) (623.12) | CY | 149 | $76.00 | $120.00 | $100.00 | $170.00 |
| 55 | Survey Operations (625.01) | LS | 1 | $25,000 | $25,000 | $45,000 | $24,000 |
| 56 | (625.130001) | EACH | 1 | $91,000 | $50,000 | $60,000 | $66,000 |
| 57 | (627.50140008) | 68 | $5.00 | $35.00 | $12.00 | $9.00 | |
| 58 | Field Laboratory (637.01) | EACH | 1 | $8,500.00 | $8,000.00 | $3,000.00 | $2,000.00 |
| 59 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $6,500.00 | $2,500.00 | $4,500.00 | $1,000.00 |
| 60 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 16 | $2,200.00 | $2,500.00 | $2,200.00 | $2,800.00 |
| 61 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 62 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 63 | (637.41000115) | 16 | $180.00 | $800.00 | $75.00 | $200.00 | |
| 64 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 6 | $50.00 | $40.00 | $30.00 | $110.00 |
| 65 | (670.2307) | LF | 138 | $109.00 | $148.00 | $80.00 | $160.00 |
| 66 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 1,800 | $2.50 | $2.00 | $3.50 | $4.00 |
| 67 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 1,800 | $2.50 | $2.00 | $3.50 | $4.00 |
| 68 | Field Change Payment (FCP) (697.03) | DOL | 284,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 69 | Asphalt Price Adjustment (698.04) | DOL | 726 | $1.00 | $1.00 | $1.00 | $1.00 |
| 70 | Fuel Price Adjustment (698.05) | DOL | 150 | $1.00 | $1.00 | $1.00 | $1.00 |
| 71 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 72 | Mobilization (699.040001) | LS | 1 | $120,400 | $140,000 | $156,000 | $150,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of June 25, 2026. Compiled by Mirage Metrics.