NYSDOT contract D265468 bid tabulation
Regional Large Culvert Rehabilitation/Replacement Project. Let by New York State DOT on August 7, 2025, Onondaga, Region 03. 2 bids received; low bid $6,543,210 by R De Vincentis Construction Inc.
- Owner
- New York State DOT
- Letting
- 07 AUG 2025
- Pay items
- 57
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R De Vincentis Construction Inc | $6,543,210 | Low |
| 2 | Vector Construction Corp | $8,504,399 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R De Vincentis Construction Inc | 2. Vector Construction Corp |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.07) | ACRE | 7 | $6,000.00 | $6,000.00 |
| 2 | Embankment In Place (203.03) | CY | 205 | $30.00 | $28.00 |
| 3 | Select Granular Fill (203.07) | CY | 524 | $78.00 | $58.00 |
| 4 | Trench and Culvert Excavation (206.0201) | CY | 3,000 | $13.00 | $35.00 |
| 5 | Mulch – Temporary (209.100101) | SY | 2,709 | $4.00 | $1.50 |
| 6 | Check Dam (Ditch Bottom Width >3′ to 6′), Stone – Temporary (209.110102) | EACH | 1 | $1,000.00 | $550.00 |
| 7 | Stabilized Construction Access (209.22) | SY | 3,300 | $30.00 | $22.00 |
| 8 | (209.23000009) | 1,675 | $12.00 | $13.00 | |
| 9 | (209.23010009) | 3,896 | $9.50 | $7.25 | |
| 10 | Shields and Shoring (552.17) | SF | 3,158 | $2.50 | $4.00 |
| 11 | (553.030001) | EACH | 1 | $10,000 | $35,000 |
| 12 | (553.030002) | EACH | 4 | $10,000 | $20,000 |
| 13 | (553.030003) | EACH | 2 | $10,000 | $20,000 |
| 14 | (553.030004) | EACH | 4 | $10,000 | $17,500 |
| 15 | (553.030005) | EACH | 4 | $10,000 | $17,500 |
| 16 | (553.030006) | EACH | 2 | $10,000 | $20,000 |
| 17 | (553.030007) | EACH | 2 | $10,000 | $30,000 |
| 18 | (553.030008) | EACH | 1 | $10,000 | $35,000 |
| 19 | (553.030009) | EACH | 2 | $10,000 | $17,500 |
| 20 | Concrete for Structures, Performance (555.0021) | CY | 75 | $2,250.00 | $2,500.00 |
| 21 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $7.50 | $7.50 |
| 22 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 6,630 | $2.60 | $3.50 |
| 23 | (602.2654) | LF | 137 | $774.00 | $1,200.00 |
| 24 | (602.2740) | LF | 938 | $567.00 | $925.00 |
| 25 | (602.2748) | LF | 390 | $535.00 | $770.00 |
| 26 | (602.2754) | LF | 430 | $577.00 | $650.00 |
| 27 | (602.2760) | LF | 321 | $827.00 | $1,190.00 |
| 28 | (602.2784) | LF | 1,213 | $861.00 | $1,380.00 |
| 29 | (602.3624) | LF | 14 | $1,650.00 | $1,700.00 |
| 30 | (602.3648) | LF | 398 | $655.00 | $600.00 |
| 31 | (602.432001) | SF | 3,659 | $126.00 | $154.00 |
| 32 | (602.435001) | SF | 10,713 | $91.00 | $106.00 |
| 33 | (603.9860) | LF | 350 | $225.00 | $165.00 |
| 34 | (604.500301) | LF | 7.80 | $7,915.00 | $7,150.00 |
| 35 | Topsoil - Roadside (610.1402) | CY | 770 | $118.00 | $40.00 |
| 36 | Turf Establishment - Roadside (610.1601) | SY | 4,600 | $7.00 | $3.00 |
| 37 | (613.04000001) | 1,012 | $51.00 | $28.00 | |
| 38 | (617.10000024) | 35 | $120.00 | $140.00 | |
| 39 | (617.11000024) | LS | 1 | $3,000.00 | $1,500.00 |
| 40 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $250,000 | $450,000 |
| 41 | (619.111111) | EACH | 3 | $8,000.00 | $5,000.00 |
| 42 | Stone Filling (Medium) (620.04) | CY | 740 | $170.00 | $143.00 |
| 43 | Stone Filling (Heavy) (620.05) | CY | 640 | $195.00 | $148.00 |
| 44 | Bedding Material, Type 1 (620.0801) | CY | 296 | $85.00 | $115.00 |
| 45 | Bedding Material, Type 2 (620.0802) | CY | 296 | $85.00 | $103.00 |
| 46 | Survey Operations (625.01) | LS | 1 | $16,000 | $65,000 |
| 47 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $5,000.00 | $5,000.00 |
| 48 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 16 | $2,100.00 | $3,200.00 |
| 49 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 |
| 50 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 |
| 51 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 |
| 52 | (691.04000020) | 60,000 | $1.00 | $1.00 | |
| 53 | Field Change Payment (FCP) (697.03) | DOL | 440,000 | $1.00 | $1.00 |
| 54 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 |
| 55 | Fuel Price Adjustment (698.05) | DOL | 1,320 | $1.00 | $1.00 |
| 56 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 57 | Mobilization (699.040001) | LS | 1 | $250,140 | $325,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of August 7, 2025. Compiled by Mirage Metrics.