NYSDOT contract D265554 bid tabulation
REPLACEMENT OF ROUTE 51 CULVERT OVER STEELE CREEK. Let by New York State DOT on September 11, 2025, Herkimer, Region 02. 5 bids received; low bid $2,633,382 by Slate Hill Constructors Inc.
- Owner
- New York State DOT
- Letting
- 11 SEP 2025
- Pay items
- 84
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Slate Hill Constructors Inc | $2,633,382 | Low |
| 2 | Maple Ridge Organics LLC | $2,660,217 | +1.0% |
| 3 | BP Excavation LLC | $2,728,853 | +4.0% |
| 4 | Bothar Construction LLC | $2,824,242 | +7.0% |
| 5 | Cci Companies Inc | $3,219,281 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Slate Hill Constructors Inc | 2. Maple Ridge Organics LLC | 3. BP Excavation LLC | 4. Bothar Construction LLC | 5. Cci Companies Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $80,000 | $23,200 | $20,000 | $17,000 | $20,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 640 | $38.00 | $28.00 | $15.00 | $64.50 | $42.00 |
| 3 | Embankment In Place (203.03) | CY | 3,175 | $32.00 | $54.00 | $42.00 | $42.20 | $42.00 |
| 4 | Select Granular Fill (203.07) | CY | 160 | $95.00 | $54.00 | $59.00 | $83.25 | $100.00 |
| 5 | Select Structural Fill (203.21) | CY | 950 | $80.00 | $54.00 | $54.00 | $81.00 | $110.00 |
| 6 | Structure Excavation (206.01) | CY | 4,400 | $38.00 | $44.00 | $8.00 | $25.75 | $47.00 |
| 7 | Trench and Culvert Excavation (206.0201) | CY | 350 | $45.00 | $61.00 | $35.00 | $56.90 | $60.00 |
| 8 | Geotextile Separation (207.21) | SY | 300 | $8.00 | $4.00 | $13.00 | $3.30 | $2.00 |
| 9 | Prefabricated Composite Structural Drain (207.26) | SY | 250 | $16.00 | $14.00 | $7.00 | $37.90 | $15.00 |
| 10 | Seed and Mulch – Temporary (209.1003) | SY | 25 | $70.00 | $9.50 | $21.00 | $50.00 | $20.00 |
| 11 | Check Dam, Prefabricated – Temporary (209.1105) | LF | 100 | $50.00 | $19.00 | $187.00 | $96.00 | $16.00 |
| 12 | Rolled Erosion Control Product, Class II Type B, Intermediate (209.190201) | SY | 275 | $8.50 | $8.50 | $11.00 | $6.70 | $5.50 |
| 13 | (209.23010009) | 350 | $12.50 | $9.50 | $25.00 | $13.00 | $8.00 | |
| 14 | Subbase Course, Type 2 (304.12) | CY | 750 | $80.00 | $84.00 | $102.00 | $63.00 | $70.00 |
| 15 | (404.0001) | TON | 43 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 |
| 16 | (404.0982) | TON | 210 | $155.00 | $176.00 | $150.00 | $164.00 | $152.00 |
| 17 | (404.2589) | TON | 630 | $115.00 | $126.00 | $106.00 | $132.00 | $130.00 |
| 18 | Diluted Tack Coat (407.0102) | GAL | 260 | $2.50 | $8.50 | $2.50 | $6.30 | $2.50 |
| 19 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 750 | $3.50 | $2.50 | $3.50 | $2.00 | $3.50 |
| 20 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 400 | $30.00 | $16.00 | $26.00 | $18.55 | $25.00 |
| 21 | Shields and Shoring (552.17) | SF | 280 | $5.00 | $6.50 | $14.00 | $42.40 | $1.00 |
| 22 | (553.020001) | EACH | 1 | $1.00 | $21,600 | $25,000 | $75,000 | $176,000 |
| 23 | (553.020002) | EACH | 1 | $1.00 | $21,600 | $25,000 | $55,000 | $176,000 |
| 24 | Footing Concrete, Performance (555.0011) | CY | 255 | $1,300.00 | $743.00 | $1,600.00 | $945.00 | $1,050.00 |
| 25 | Concrete for Structures, Performance (555.0021) | CY | 80 | $2,200.00 | $1,440.00 | $2,800.00 | $1,685.00 | $1,750.00 |
| 26 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 27 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $11.00 | $11.00 | $11.00 | $11.00 | $11.00 |
| 28 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 23,400 | $2.15 | $2.50 | $2.00 | $2.35 | $2.00 |
| 29 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 3,100 | $3.20 | $3.50 | $2.00 | $2.60 | $2.25 |
| 30 | (560.13000001) | 25 | $500.00 | $150.00 | $600.00 | $120.00 | $675.00 | |
| 31 | (562.0101) | SY | 176 | $2,000.00 | $1,950.00 | $2,500.00 | $2,670.00 | $2,750.00 |
| 32 | Performance Concrete Quality Adjustment (562.99) | QUALITY UNIT | 1 | $17.00 | $17.00 | $17.00 | $17.00 | $17.00 |
| 33 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 95 | $260.00 | $303.00 | $250.00 | $287.50 | $270.00 |
| 34 | Transition Bridge Railing (568.70) | LF | 128 | $220.00 | $254.00 | $230.00 | $240.90 | $220.00 |
| 35 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 300 | $135.00 | $122.00 | $51.00 | $66.50 | $40.00 |
| 36 | (595.50000018) | 1,750 | $5.00 | $5.50 | $3.00 | $3.15 | $3.00 | |
| 37 | (603.171216) | EACH | 2 | $565.00 | $411.00 | $1,500.00 | $835.00 | $600.00 |
| 38 | (603.171912) | EACH | 1 | $2,400.00 | $2,200.00 | $3,000.00 | $2,420.00 | $2,500.00 |
| 39 | (603.9815) | LF | 20 | $35.00 | $41.00 | $100.00 | $44.00 | $90.00 |
| 40 | (603.9836) | LF | 50 | $80.00 | $112.00 | $200.00 | $118.00 | $130.00 |
| 41 | Underdrain Filter, Type II (605.1001) | CY | 30 | $110.00 | $92.00 | $75.00 | $104.00 | $175.00 |
| 42 | (605.1701) | LF | 250 | $5.00 | $5.50 | $17.00 | $4.20 | $17.00 |
| 43 | Box Beam Guide Railing (606.10) | LF | 542 | $55.00 | $58.00 | $55.00 | $54.60 | $50.00 |
| 44 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 419 | $60.00 | $63.00 | $56.00 | $59.00 | $55.00 |
| 45 | Box Beam Guide Railing With Extra Long Posts (606.1001) | LF | 207 | $58.00 | $61.00 | $55.00 | $57.20 | $52.00 |
| 46 | Box Beam Guide Railing with Extra Long Posts (Shop Bent or Shop Mitered) (606.100102) | LF | 45 | $65.00 | $69.00 | $63.00 | $65.25 | $60.00 |
| 47 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 8 | $2,200.00 | $2,540.00 | $2,150.00 | $2,415.00 | $2,200.00 |
| 48 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 360 | $7.00 | $5.50 | $6.00 | $6.60 | $4.25 |
| 49 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 820 | $7.00 | $6.00 | $6.00 | $7.70 | $5.25 |
| 50 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 3 | $550.00 | $319.00 | $1,500.00 | $824.00 | $125.00 |
| 51 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 1 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 |
| 52 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 8 | $385.00 | $339.00 | $450.00 | $304.00 | $300.00 |
| 53 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 110 | $145.00 | $109.00 | $175.00 | $125.00 | $130.00 |
| 54 | Turf Establishment – Performance (610.1605) | SY | 450 | $32.00 | $14.00 | $35.00 | $76.00 | $25.00 |
| 55 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $240,000 | $112,000 | $38,000 | $154,000 | $100,000 |
| 56 | Type III Construction Barricades (619.04) | EACH | 16 | $50.00 | $188.00 | $40.00 | $125.00 | $100.00 |
| 57 | (619.0501) | LS | 1 | $72,000 | $254,000 | $200,000 | $220,000 | $280,000 |
| 58 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 100 | $50.00 | $78.00 | $150.00 | $68.80 | $30.00 |
| 59 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 40 | $85.00 | $115.00 | $150.00 | $72.00 | $55.00 |
| 60 | Mailboxes (619.27) | EACH | 1 | $100.00 | $263.00 | $150.00 | $270.00 | $300.00 |
| 61 | Stone Filling (Light) (620.03) | CY | 125 | $135.00 | $102.00 | $164.00 | $184.00 | $130.00 |
| 62 | Stone Filling (Medium) (620.04) | CY | 15 | $150.00 | $180.00 | $133.00 | $124.00 | $150.00 |
| 63 | Bedding Material, Type 1 (620.0801) | CY | 175 | $110.00 | $82.00 | $93.00 | $114.00 | $130.00 |
| 64 | (620.14020009) | 750 | $220.00 | $315.00 | $246.00 | $242.00 | $275.00 | |
| 65 | Survey Operations (625.01) | LS | 1 | $31,000 | $60,200 | $72,000 | $40,220 | $75,000 |
| 66 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 5 | $500.00 | $715.00 | $3,000.00 | $1,120.00 | $700.00 |
| 67 | (627.50140008) | 60 | $10.00 | $3.00 | $5.00 | $26.40 | $10.00 | |
| 68 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1,000.00 | $7,480.00 | $3,500.00 | $5,000.00 | $500.00 |
| 69 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 5 | $2,650.00 | $3,590.00 | $2,000.00 | $2,500.00 | $4,000.00 |
| 70 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 71 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 14 | $45.00 | $51.00 | $60.00 | $47.45 | $45.00 |
| 72 | Type A Sign Posts (645.81) | EACH | 4 | $215.00 | $248.00 | $240.00 | $235.00 | $220.00 |
| 73 | Reference Marker Panel (646.21) | EACH | 1 | $55.00 | $61.00 | $50.00 | $57.50 | $55.00 |
| 74 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 8 | $25.00 | $28.00 | $20.00 | $25.90 | $25.00 |
| 75 | Steel Post, 2.0 lb/ft (646.32) | EACH | 6 | $100.00 | $108.00 | $100.00 | $102.00 | $95.00 |
| 76 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 4 | $170.00 | $182.00 | $175.00 | $172.50 | $155.00 |
| 77 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 7 | $11.00 | $61.00 | $100.00 | $57.50 | $155.00 |
| 78 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 1,750 | $3.50 | $3.50 | $3.50 | $3.45 | $3.10 |
| 79 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 1,150 | $3.50 | $3.50 | $3.50 | $3.45 | $3.10 |
| 80 | Field Change Payment (FCP) (697.03) | DOL | 100,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 81 | Asphalt Price Adjustment (698.04) | DOL | 576.19 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 82 | Fuel Price Adjustment (698.05) | DOL | 384 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 83 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 84 | Mobilization (699.040001) | LS | 1 | $80,000 | $102,000 | $100,000 | $104,778 | $123,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of September 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.