NYSDOT contract D265595 bid tabulation
LARGE CULVERT AND BRIDGE REPLACEMENT - NY Route 12 (SH 505). Let by New York State DOT on December 18, 2025, Chenango, Region 09. 3 bids received; low bid $4,876,877 by Bothar Construction LLC.
- Owner
- New York State DOT
- Letting
- 18 DEC 2025
- Pay items
- 144
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bothar Construction LLC | $4,876,877 | Low |
| 2 | BP Excavation LLC | $5,198,819 | +7.0% |
| 3 | Slate Hill Constructors Inc | $5,879,186 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bothar Construction LLC | 2. BP Excavation LLC | 3. Slate Hill Constructors Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $50,000 | $30,000 | $130,000 |
| 2 | (202.120001) | LS | 1 | $10,945 | $138,500 | $255,000 |
| 3 | Removal of Substructures (202.19) | CY | 87 | $251.60 | $332.00 | $350.00 |
| 4 | (203.01990006) | 60 | $184.30 | $90.00 | $260.00 | |
| 5 | Unclassified Excavation and Disposal (203.02) | CY | 1,356 | $44.65 | $15.00 | $50.00 |
| 6 | Embankment In Place (203.03) | CY | 1,551 | $26.00 | $40.00 | $50.00 |
| 7 | Select Granular Fill (203.07) | CY | 135 | $68.60 | $57.00 | $66.00 |
| 8 | Select Structural Fill (203.21) | CY | 97 | $71.45 | $85.00 | $66.00 |
| 9 | (203.24010017) | 28 | $29.60 | $77.00 | $133.00 | |
| 10 | Structure Excavation (206.01) | CY | 2,140 | $27.00 | $16.00 | $56.00 |
| 11 | Trench and Culvert Excavation (206.0201) | CY | 287 | $44.00 | $35.00 | $60.00 |
| 12 | Geotextile Bedding (207.20) | SY | 182 | $16.40 | $8.00 | $8.00 |
| 13 | Geotextile Drainage (207.22) | SY | 94 | $13.40 | $9.00 | $7.00 |
| 14 | Prefabricated Composite Structural Drain (207.26) | SY | 54 | $40.35 | $29.00 | $20.00 |
| 15 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 134 | $38.70 | $28.00 | $20.00 |
| 16 | (208.01030022) | 56 | $138.60 | $159.00 | $160.00 | |
| 17 | Mulch – Temporary (209.100101) | SY | 2,384 | $1.10 | $2.00 | $1.00 |
| 18 | Seed and Mulch – Temporary (209.1003) | SY | 2,384 | $1.25 | $2.00 | $1.10 |
| 19 | Check Dam, (Ditch Bottom Width 0.0 to 3′), Stone – Permanent (209.110601) | EACH | 2 | $253.40 | $500.00 | $800.00 |
| 20 | Rolled Erosion Control Product, Class II Type A, Intermediate (209.1901) | SY | 80 | $3.70 | $16.00 | $3.25 |
| 21 | Stabilized Construction Access (209.22) | SY | 160 | $24.85 | $55.00 | $85.00 |
| 22 | (209.23010009) | 1,931 | $6.35 | $9.00 | $9.00 | |
| 23 | Subbase Course, Type 1 (304.11) | CY | 27 | $175.60 | $84.00 | $200.00 |
| 24 | Subbase Course, Optional Type (304.15) | CY | 1,467 | $53.50 | $66.00 | $95.00 |
| 25 | (404.0001) | TON | 100 | $90.00 | $90.00 | $90.00 |
| 26 | (404.0189) | TON | 578 | $173.80 | $160.00 | $145.00 |
| 27 | (404.0982) | TON | 501 | $165.60 | $170.00 | $150.00 |
| 28 | (404.2589) | TON | 944 | $141.00 | $150.00 | $140.00 |
| 29 | (407.01040009) | 699 | $8.15 | $4.00 | $7.00 | |
| 30 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 3,000 | $1.15 | $4.00 | $1.10 |
| 31 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 3,940 | $7.00 | $8.00 | $18.00 |
| 32 | Cast-In-Place Concrete Piles (551.11) | LF | 2,904 | $150.00 | $95.00 | $37.00 |
| 33 | Furnishing Equipment for Driving Piles (551.13) | LS | 1 | $81,066 | $100,000 | $275,000 |
| 34 | Dynamic Pile Load Testing (551.14) | EACH | 2 | $1,130.00 | $1,200.00 | $1,100.00 |
| 35 | Splices for CIP Piles (551.15) | EACH | 12 | $124.30 | $180.00 | $11.00 |
| 36 | Performance Concrete Quality Adjustment - Cast In Place Piles (551.9902) | QUALITY UNIT | 1 | $4.55 | $4.55 | $4.55 |
| 37 | (552.2001) | LF | 117 | $395.50 | $355.00 | $400.00 |
| 38 | (552.2201) | LF | 165 | $237.30 | $215.00 | $480.00 |
| 39 | (552.230201) | SF | 440 | $22.60 | $35.00 | $25.00 |
| 40 | (553.010001) | EACH | 1 | $10,500 | $32,700 | $1.00 |
| 41 | (553.010002) | EACH | 1 | $10,500 | $222,000 | $1.00 |
| 42 | (553.020001) | EACH | 1 | $7,500.00 | $19,590 | $1.00 |
| 43 | (553.020002) | EACH | 1 | $7,500.00 | $19,590 | $1.00 |
| 44 | (553.030001) | EACH | 1 | $11,000 | $32,650 | $1.00 |
| 45 | (553.030002) | EACH | 1 | $11,000 | $25,000 | $1.00 |
| 46 | (553.030003) | EACH | 2 | $4,300.00 | $30,000 | $1.00 |
| 47 | (553.030004) | EACH | 2 | $4,300.00 | $30,000 | $1.00 |
| 48 | (554.3001) | SF | 147 | $53.90 | $75.00 | $160.00 |
| 49 | Concrete for Structures, Performance (555.0021) | CY | 165 | $1,233.00 | $1,600.00 | $2,400.00 |
| 50 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $6.50 | $6.50 | $6.50 |
| 51 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 43,000 | $2.50 | $2.00 | $2.25 |
| 52 | (557.1019) | SY | 141 | $395.00 | $600.00 | $560.00 |
| 53 | (557.2219) | SY | 232 | $446.00 | $691.00 | $560.00 |
| 54 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 374 | $1.25 | $0.05 | $0.10 |
| 55 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $11.83 | $11.83 | $11.83 |
| 56 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 141 | $55.45 | $58.00 | $65.00 |
| 57 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 1,269 | $4.15 | $1.00 | $3.50 |
| 58 | Protective Sealing of New Structural Concrete (559.02) | SF | 733 | $4.35 | $1.00 | $6.00 |
| 59 | Prestressed Concrete Hollow Slab Units (563.03) | SF | 1,892 | $136.00 | $145.00 | $145.00 |
| 60 | (565.30130101) | 42 | $93.00 | $500.00 | $550.00 | |
| 61 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 42 | $282.30 | $280.00 | $350.00 |
| 62 | Transition Bridge Railing (568.70) | LF | 310 | $214.00 | $210.00 | $225.00 |
| 63 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 101 | $256.50 | $330.00 | $460.00 |
| 64 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $11.57 | $11.57 | $11.57 |
| 65 | (584.21010001) | 274 | $560.00 | $250.00 | $600.00 | |
| 66 | (584.9901) | 1 | $54.05 | $54.05 | $54.05 | |
| 67 | Bridge Railing Removal and Disposal (587.01) | LF | 92 | $3.00 | $11.00 | $45.00 |
| 68 | (595.50000018) | 1,708 | $3.00 | $3.00 | $6.00 | |
| 69 | (603.63180715) | 46 | $7,282.60 | $4,630.00 | $5,800.00 | |
| 70 | (603.67000001) | 61 | $3,523.35 | $2,150.00 | $1,600.00 | |
| 71 | Underdrain Filter, Type II (605.1001) | CY | 27 | $145.80 | $85.00 | $150.00 |
| 72 | (605.1601) | LF | 344 | $0.70 | $10.00 | $8.00 |
| 73 | Box Beam Guide Railing (606.10) | LF | 819 | $58.50 | $51.00 | $50.00 |
| 74 | Box Beam Guide Railing (Shop Mitered) (606.100003) | LF | 26 | $181.00 | $150.00 | $150.00 |
| 75 | Box Beam End Piece (606.120101) | EACH | 3 | $764.50 | $680.00 | $950.00 |
| 76 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 2 | $4,986.60 | $4,500.00 | $4,500.00 |
| 77 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 2 | $2,574.85 | $2,200.00 | $2,200.00 |
| 78 | Resetting Box Beam Guide Railing (606.53) | LF | 72 | $36.00 | $33.00 | $26.00 |
| 79 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 819 | $2.90 | $6.00 | $13.00 |
| 80 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 8 | $787.40 | $150.00 | $675.00 |
| 81 | (607.41010010) | 200 | $21.40 | $6.00 | $11.00 | |
| 82 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 236 | $220.50 | $200.00 | $220.00 |
| 83 | Stone Curb – Bridge (Type A) (609.0301) | LF | 68 | $172.00 | $250.00 | $190.00 |
| 84 | Weed Removal (610.13) | SY | 2,785 | $0.60 | $4.00 | $0.60 |
| 85 | Topsoil - Roadside (610.1402) | CY | 747 | $79.00 | $99.00 | $90.00 |
| 86 | Topsoil – On-Site Wetland Materials (610.1406) | CY | 183 | $22.50 | $105.00 | $80.00 |
| 87 | Turf Establishment - Roadside (610.1601) | SY | 480 | $3.60 | $6.00 | $3.50 |
| 88 | Turf Establishment -Lawns (610.1602) | SY | 1,757 | $2.30 | $3.00 | $2.20 |
| 89 | (610.16093224) | 547 | $3.45 | $7.00 | $3.25 | |
| 90 | Watering Vegetation (610.19) | 1,000 GALLONS | 522 | $23.00 | $55.00 | $22.00 |
| 91 | Mowing (610.21) | SY | 2,237 | $0.60 | $2.00 | $0.60 |
| 92 | (611.0132) | EACH | 2 | $575.00 | $1,400.00 | $525.00 |
| 93 | (611.0361) | EACH | 6 | $575.00 | $1,500.00 | $525.00 |
| 94 | (611.19010024) | 2 | $115.00 | $300.00 | $105.00 | |
| 95 | (611.19030024) | 6 | $57.50 | $325.00 | $53.00 | |
| 96 | (613.04000001) | 58 | $95.00 | $40.00 | $90.00 | |
| 97 | (614.060203) | EACH | 2 | $1,975.00 | $150.00 | $1,050.00 |
| 98 | (614.060303) | EACH | 1 | $1,975.00 | $200.00 | $1,300.00 |
| 99 | (614.060403) | EACH | 5 | $2,634.00 | $400.00 | $1,600.00 |
| 100 | (614.060603) | EACH | 1 | $3,951.00 | $750.00 | $2,650.00 |
| 101 | (616.08000024) | 175 | $17.25 | $30.00 | $16.00 | |
| 102 | (617.11000024) | LS | 1 | $2,674.00 | $2,000.00 | $850.00 |
| 103 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $130,294 | $65,000 | $400,000 |
| 104 | Type III Construction Barricades (619.04) | EACH | 41 | $120.00 | $60.00 | $55.00 |
| 105 | (619.0501) | LS | 1 | $385,000 | $250,000 | $650,000 |
| 106 | (619.080101) | LF | 173 | $5.75 | $6.00 | $5.50 |
| 107 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 2,240 | $7.00 | $7.00 | $6.50 |
| 108 | (619.100104) | LF | 8,160 | $6.60 | $7.00 | $6.00 |
| 109 | (619.111112) | EACH | 4 | $6,700.00 | $60,000 | $3,400.00 |
| 110 | (619.130101) | EACH | 1 | $77,292 | $100,000 | $80,000 |
| 111 | (619.130102) | EACH | 1 | $83,507 | $90,000 | $12,000 |
| 112 | Temporary Positive Barrier – Category 2 (Pinning Permitted) (619.1712) | LF | 870 | $56.00 | $90.00 | $90.00 |
| 113 | Temporary Positive Barrier – Category 7 (Pinning and Box-Beam-Stiffening Required) (619.1717) | LF | 410 | $67.00 | $95.00 | $100.00 |
| 114 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 100 | $59.00 | $85.00 | $60.00 |
| 115 | Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802) | EACH | 10 | $4,650.00 | $4,000.00 | $6,750.00 |
| 116 | Temporary Rumble Strips (619.22) | LF | 880 | $20.15 | $20.00 | $18.00 |
| 117 | Mailboxes (619.27) | EACH | 5 | $256.50 | $200.00 | $225.00 |
| 118 | Stone Filling (Light) (620.03) | CY | 12 | $135.70 | $170.00 | $120.00 |
| 119 | Stone Filling (Medium) (620.04) | CY | 316 | $136.70 | $134.00 | $135.00 |
| 120 | Stone Filling (Heavy) (620.05) | CY | 238 | $174.30 | $171.00 | $150.00 |
| 121 | Bedding Material, Type 1 (620.0801) | CY | 164 | $126.00 | $85.00 | $130.00 |
| 122 | (621.05020004) | 890 | $9.00 | $16.00 | $13.00 | |
| 123 | Crushed Stone (In-Place Measure) (623.12) | CY | 44 | $156.00 | $85.00 | $230.00 |
| 124 | Survey Operations (625.01) | LS | 1 | $60,000 | $62,685 | $28,000 |
| 125 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 1 | $1,681.00 | $9,000.00 | $1,000.00 |
| 126 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 6 | $698.10 | $1,400.00 | $550.00 |
| 127 | Permanent Survey Markers (625.06) | EACH | 2 | $3,925.00 | $2,000.00 | $3,000.00 |
| 128 | (627.50140008) | 610 | $9.10 | $6.00 | $4.00 | |
| 129 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $4,300.00 | $1,000.00 | $1,000.00 |
| 130 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 20 | $2,300.00 | $1,900.00 | $2,250.00 |
| 131 | Construction Testing supplies – Consumables (637.36) | DOL | 1,500 | $1.00 | $1.00 | $1.00 |
| 132 | (637.41000115) | 20 | $186.00 | $125.00 | $160.00 | |
| 133 | Reference Marker Panel (646.21) | EACH | 2 | $31.65 | $50.00 | $23.00 |
| 134 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 19 | $18.25 | $30.00 | $23.00 |
| 135 | Steel Post, 2.0 lb/ft (646.32) | EACH | 15 | $73.45 | $90.00 | $70.00 |
| 136 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 18 | $175.80 | $50.00 | $11.00 |
| 137 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 1,040 | $10.15 | $11.00 | $13.00 |
| 138 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 3,120 | $1.75 | $4.00 | $2.00 |
| 139 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 4,608 | $1.75 | $4.00 | $2.00 |
| 140 | Field Change Payment (FCP) (697.03) | DOL | 169,000 | $1.00 | $1.00 | $1.00 |
| 141 | Asphalt Price Adjustment (698.04) | DOL | 1,156 | $1.00 | $1.00 | $1.00 |
| 142 | Fuel Price Adjustment (698.05) | DOL | 1,900 | $1.00 | $1.00 | $1.00 |
| 143 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 144 | Mobilization (699.040001) | LS | 1 | $185,034 | $150,000 | $200,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of December 18, 2025. Compiled by Mirage Metrics.