NYSDOT contract D265810 bid tabulation
NY 201 Pavement Resurfacing, Flyover to Harry L. Drive. Let by New York State DOT on August 27, 2026, Broome, Region 09. 3 bids received; low bid $9,897,897 by Bothar Construction LLC.
- Owner
- New York State DOT
- Letting
- 27 AUG 2026
- Pay items
- 91
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bothar Construction LLC | $9,897,897 | Low |
| 2 | Barrett Paving Materials Inc | $10,117,768 | +2.0% |
| 3 | Lancaster Development and Tully Construction Co LLC | $13,434,308 | +36% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bothar Construction LLC | 2. Barrett Paving Materials Inc | 3. Lancaster Development and Tully Construction Co LLC |
|---|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 1,610 | $64.00 | $180.00 | $117.00 |
| 2 | (203.24010017) | 258 | $57.70 | $78.00 | $64.90 | |
| 3 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 48 | $70.15 | $61.00 | $85.40 |
| 4 | (209.11010024) | 27 | $539.20 | $222.00 | $753.00 | |
| 5 | (304.00010018) | 56,647 | $1.55 | $0.85 | $1.15 | |
| 6 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 1,682 | $100.00 | $100.00 | $100.00 |
| 7 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 1,682 | $100.00 | $100.00 | $100.00 |
| 8 | (404.0589) | TON | 1,331 | $173.90 | $232.00 | $295.00 |
| 9 | (404.1989) | TON | 1,063 | $193.70 | $229.00 | $283.00 |
| 10 | (404.2589) | TON | 1,771 | $159.70 | $183.00 | $229.00 |
| 11 | (407.01040009) | 7,152 | $4.85 | $4.35 | $2.90 | |
| 12 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 27,149 | $0.70 | $1.30 | $1.55 |
| 13 | (421.09520109) | 4,183 | $207.20 | $191.50 | $268.00 | |
| 14 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 4,132 | $9.30 | $23.00 | $18.80 |
| 15 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 234 | $24.05 | $14.00 | $9.85 |
| 16 | (557.05013011) | 2,236 | $244.00 | $260.00 | $399.00 | |
| 17 | Bridge Joint Seal (567.63) | LF | 99 | $200.40 | $95.00 | $187.00 |
| 18 | (568.75010001) | 5,872 | $88.90 | $77.32 | $112.00 | |
| 19 | Reinforcing Bar Exposure (579.02) | SF | 4,422 | $44.05 | $65.00 | $86.20 |
| 20 | Removal of Structural Concrete (580.01) | CY | 23 | $8,072.00 | $2,600.00 | $13,000 |
| 21 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 138 | $86.45 | $96.00 | $123.00 |
| 22 | (604.070901) | EACH | 27 | $1,792.00 | $2,600.00 | $5,790.00 |
| 23 | (604.070902) | EACH | 6 | $2,152.00 | $2,500.00 | $3,780.00 |
| 24 | Box Beam Guide Railing (606.10) | LF | 881 | $68.95 | $59.93 | $86.10 |
| 25 | Box Beam Guide Railing with Extra Long Posts (Shop Bent or Shop Mitered) (606.100102) | LF | 210 | $82.25 | $71.50 | $98.00 |
| 26 | Box Beam Median Barrier (606.11) | LF | 1,582 | $98.55 | $85.69 | $119.00 |
| 27 | Box Beam Median Barrier (Shop Bent or Shop Mitered) (606.110002) | LF | 115 | $113.65 | $98.83 | $136.00 |
| 28 | Box Beam End Piece (606.120101) | EACH | 3 | $910.25 | $791.51 | $1,150.00 |
| 29 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 1 | $6,142.80 | $5,341.56 | $8,080.00 |
| 30 | Box Beam Median Barrier End Assembly, Type B (606.1402) | EACH | 2 | $2,999.85 | $2,608.54 | $2,800.00 |
| 31 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 1,016 | $7.55 | $5.00 | $7.00 |
| 32 | Removing and Disposing Box Beam Median Barrier (606.74) | LF | 1,721 | $8.90 | $6.00 | $8.40 |
| 33 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 4 | $1,911.00 | $100.00 | $140.00 |
| 34 | Removing and Disposing Box Beam Median Barrier End Assembly-Type A (606.7930) | EACH | 2 | $1,911.00 | $775.00 | $1,080.00 |
| 35 | Transition from Box Beam Guide Rail to Full-Section Single-Slope Concrete Barrier (One- or Two-Way Operation) (606.8806) | EACH | 2 | $21,033 | $19,800 | $20,500 |
| 36 | (607.06410016) | 665 | $122.55 | $110.00 | $149.00 | |
| 37 | (607.96000008) | 665 | $18.00 | $15.40 | $21.70 | |
| 38 | (608.01030009) | 4 | $3,500.00 | $3,500.00 | $4,200.00 | |
| 39 | (608.01040009) | 80,000 | $1.00 | $1.00 | $1.00 | |
| 40 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 115 | $359.00 | $580.00 | $550.00 |
| 41 | Turf Establishment – Performance (610.1605) | SY | 860 | $30.90 | $28.00 | $55.80 |
| 42 | (617.01010024) | 100 | $92.00 | $83.00 | $4.25 | |
| 43 | (617.10000024) | 1 | $643.70 | $2,300.00 | $676.00 | |
| 44 | (617.11000024) | LS | 1 | $2,500.00 | $530.00 | $210.00 |
| 45 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $700,000 | $1,010,000 | $1,500,000 |
| 46 | (619.0901) | LF | 114,400 | $0.35 | $0.56 | $0.42 |
| 47 | (619.111112) | EACH | 12 | $12,245 | $9,400.00 | $20,400 |
| 48 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $802,603 | $300,000 | $402,000 |
| 49 | Survey Operations (625.01) | LS | 1 | $31,670 | $45,000 | $117,055 |
| 50 | (627.50140008) | 2,401 | $7.75 | $9.50 | $15.70 | |
| 51 | Cleaning Existing Pavement and/or Shoulder (633.11) | SY | 49,516 | $0.65 | $1.00 | $0.93 |
| 52 | Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15) | SY | 4,716 | $90.40 | $107.00 | $105.00 |
| 53 | Stress Relieving Pavement Repairs (633.16) | SY | 12,657 | $186.60 | $197.00 | $252.00 |
| 54 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 8 | $2,575.00 | $4,125.00 | $12,000 |
| 55 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 | $1.00 |
| 56 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 239 | $48.30 | $42.00 | $78.00 |
| 57 | Type A Sign Posts (645.81) | EACH | 30 | $281.75 | $411.00 | $490.00 |
| 58 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 2 | $1,897.50 | $1,650.00 | $2,240.00 |
| 59 | (645.81090003) | 4 | $97.75 | $85.00 | $112.00 | |
| 60 | Reference Marker Panel (646.21) | EACH | 20 | $46.00 | $40.00 | $70.00 |
| 61 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 28 | $20.70 | $18.00 | $42.00 |
| 62 | Steel Post, 2.0 lb/ft (646.32) | EACH | 21 | $86.25 | $75.00 | $161.00 |
| 63 | Brackets for Barrier and Multidirectional Mounting (646.50) | EACH | 14 | $120.75 | $105.00 | $175.00 |
| 64 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 16 | $28.75 | $25.00 | $70.00 |
| 65 | Remove and Dispose Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.52) | EACH | 2 | $34.50 | $30.00 | $84.00 |
| 66 | (647.83001002) | 32 | $23.00 | $20.00 | $14.00 | |
| 67 | Pavement Ride Quality Adjustment to Asphalt Level 2 (653.1020) | QUALITY UNIT | 160 | $125.00 | $125.00 | $125.00 |
| 68 | Telescoping Manhole Frame & Cover (655.1302) | EACH | 4 | $1,773.00 | $3,200.00 | $2,960.00 |
| 69 | (680.51010009) | 7 | $598.00 | $520.00 | $728.00 | |
| 70 | (680.51100010) | 7 | $525.55 | $457.00 | $640.00 | |
| 71 | (680.520203) | LF | 48 | $18.40 | $16.00 | $22.40 |
| 72 | Inductance Loop Installation (680.54) | LF | 1,158 | $23.30 | $20.25 | $28.30 |
| 73 | Shielded Lead-in Cable (680.71) | LF | 370 | $4.00 | $3.45 | $4.85 |
| 74 | Inductance Loop Wire (680.72) | LF | 3,058 | $1.15 | $1.00 | $1.40 |
| 75 | (680.79300010) | 19 | $169.05 | $147.00 | $206.00 | |
| 76 | Install Ball/Arrow LED Traffic Signal Module (680.810308) | EACH | 21 | $54.05 | $47.00 | $65.80 |
| 77 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 21 | $254.15 | $221.00 | $309.00 |
| 78 | Traffic Signal Bracket Assembly - 3 Way (680.8113) | EACH | 1 | $2,725.50 | $2,370.00 | $3,320.00 |
| 79 | Traffic Signal Bracket Assembly - 4 Way (680.8114) | EACH | 1 | $2,741.60 | $2,384.00 | $3,340.00 |
| 80 | (680.83010005) | 370 | $8.85 | $7.70 | $10.80 | |
| 81 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 38,000 | $0.70 | $0.59 | $0.83 |
| 82 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 19,200 | $0.70 | $0.59 | $0.83 |
| 83 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 8,890 | $4.15 | $3.50 | $5.00 |
| 84 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 56 | $86.25 | $75.00 | $105.00 |
| 85 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 28 | $258.75 | $275.00 | $315.00 |
| 86 | (691.04000020) | 37,000 | $1.00 | $1.00 | $1.00 | |
| 87 | Field Change Payment (FCP) (697.03) | DOL | 300,000 | $1.00 | $1.00 | $1.00 |
| 88 | Asphalt Price Adjustment (698.04) | DOL | 1,345 | $1.00 | $1.00 | $1.00 |
| 89 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 90 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 91 | Mobilization (699.040001) | LS | 1 | $380,000 | $350,692 | $515,462 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of August 27, 2026. Compiled by Mirage Metrics.