NYSDOT contract D265402 bid tabulation
REHAB/IMPROVEMENTS & CULVERT REPLACEMENTS- NYS Rts 94 & 17A. Let by New York State DOT on February 20, 2025, Orange, Region 08. 5 bids received; low bid $30,322,380 by Argenio Brothers Inc.
- Owner
- New York State DOT
- Letting
- 20 FEB 2025
- Pay items
- 349
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Argenio Brothers Inc | $30,322,380 | Low |
| 2 | D A Collins Construction Co Inc | $32,580,233 | +7.0% |
| 3 | Lancaster Development and Tully Construction Co LLC | $34,399,347 | +13% |
| 4 | C.A.C. Industries Inc | $35,854,056 | +18% |
| 5 | Ecco III Enterprises Inc | $39,336,000 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Argenio Brothers Inc | 2. D A Collins Construction Co Inc | 3. Lancaster Development and Tully Construction Co LLC | 4. C.A.C. Industries Inc | 5. Ecco III Enterprises Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $70,300 | $120,000 | $145,000 | $22,500 | $300,000 |
| 2 | (202.120001) | LS | 1 | $10,500 | $12,400 | $37,700 | $12,510 | $315,000 |
| 3 | (202.120002) | LS | 1 | $12,500 | $12,800 | $25,400 | $6,300.00 | $50,000 |
| 4 | Removal of Substructures (202.19) | CY | 148 | $255.00 | $185.00 | $321.00 | $486.00 | $450.00 |
| 5 | Unclassified Excavation and Disposal (203.02) | CY | 6,882 | $93.50 | $64.00 | $92.40 | $162.00 | $175.00 |
| 6 | Embankment In Place (203.03) | CY | 8,211 | $98.25 | $31.50 | $50.90 | $90.00 | $65.00 |
| 7 | Select Granular Fill (203.07) | CY | 4,499 | $127.50 | $64.00 | $147.00 | $63.00 | $52.00 |
| 8 | Select Structural Fill (203.21) | CY | 506 | $123.50 | $105.00 | $109.00 | $117.00 | $120.00 |
| 9 | (203.24010017) | 1,915 | $60.50 | $76.00 | $70.70 | $234.00 | $80.00 | |
| 10 | Sand Backfill (203.25) | CY | 64 | $50.00 | $2,550.00 | $84.80 | $72.00 | $115.00 |
| 11 | Controlled Low Strength Material (CLSM) (204.01) | CY | 52 | $375.00 | $920.00 | $1,220.00 | $432.00 | $500.00 |
| 12 | (205.0201) | LS | 1 | $5,000.00 | $4,200.00 | $7,700.00 | $16,200 | $7,500.00 |
| 13 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 12 | $350.00 | $160.00 | $190.00 | $189.00 | $110.00 |
| 14 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 6 | $580.00 | $430.00 | $1,900.00 | $577.00 | $500.00 |
| 15 | (205.050201) | TON | 47 | $235.00 | $315.00 | $189.00 | $108.00 | $130.00 |
| 16 | Structure Excavation (206.01) | CY | 4,156 | $68.00 | $38.00 | $97.10 | $135.00 | $100.00 |
| 17 | Trench and Culvert Excavation (206.0201) | CY | 7,608 | $206.00 | $87.00 | $120.00 | $45.00 | $25.00 |
| 18 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 2,330 | $69.50 | $89.00 | $124.00 | $36.00 | $70.00 |
| 19 | Test Pit Excavation (206.05) | EACH | 25 | $2,250.00 | $1,350.00 | $1,720.00 | $1,270.00 | $4,000.00 |
| 20 | Geotextile Bedding (207.20) | SY | 977 | $7.25 | $4.85 | $6.20 | $9.00 | $7.00 |
| 21 | Geotextile Separation (207.21) | SY | 5,119 | $3.75 | $2.85 | $2.60 | $3.60 | $3.00 |
| 22 | Prefabricated Composite Structural Drain (207.26) | SY | 119 | $44.75 | $20.00 | $39.60 | $36.00 | $30.00 |
| 23 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 183 | $33.25 | $29.50 | $40.50 | $36.00 | $20.00 |
| 24 | Mulch – Temporary (209.100101) | SY | 18,529 | $1.15 | $1.70 | $2.60 | $1.80 | $1.00 |
| 25 | Seed and Mulch – Temporary (209.1003) | SY | 18,529 | $1.40 | $1.75 | $3.40 | $3.60 | $1.20 |
| 26 | Silt Fence - Temporary (209.13) | LF | 8,052 | $4.55 | $6.25 | $9.00 | $4.50 | $12.00 |
| 27 | Drainage Structure Inlet Protection, Prefabricated – Temporary (209.1703) | LF | 43 | $55.00 | $18.00 | $74.10 | $63.00 | $83.00 |
| 28 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 440 | $5.15 | $8.30 | $11.00 | $9.00 | $6.00 |
| 29 | (209.20080009) | 50 | $32.75 | $32.00 | $39.00 | $18.00 | $30.11 | |
| 30 | (209.20160010) | 420 | $45.60 | $44.00 | $56.00 | $30.60 | $22.09 | |
| 31 | Soil Stabilizers, Class IV Type C (209.2103) | SY | 18,576 | $1.75 | $2.90 | $4.15 | $3.60 | $1.50 |
| 32 | Stabilized Construction Access (209.22) | SY | 129 | $39.08 | $77.00 | $85.20 | $63.00 | $100.00 |
| 33 | Sediment Filter Log, 12″ (209.2301) | LF | 965 | $12.25 | $9.70 | $12.90 | $9.00 | $18.56 |
| 34 | (304.11000008) | 6,305 | $90.00 | $75.00 | $132.00 | $63.00 | $180.00 | |
| 35 | (404.0001) | TON | 1,079 | $120.00 | $120.00 | $120.00 | $120.00 | $120.00 |
| 36 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 2 | $120.00 | $120.00 | $120.00 | $120.00 | $120.00 |
| 37 | (404.0189) | TON | 7,955 | $96.10 | $180.00 | $155.00 | $225.00 | $142.00 |
| 38 | (404.0961) | TON | 19,168 | $147.15 | $185.00 | $151.00 | $225.00 | $150.00 |
| 39 | (404.1979) | TON | 2,239 | $192.75 | $220.00 | $200.00 | $252.00 | $210.00 |
| 40 | (404.3779) | TON | 4,744 | $195.15 | $205.00 | $169.00 | $225.00 | $200.00 |
| 41 | Straight Tack Coat (407.0103) | GAL | 22,378 | $6.85 | $3.70 | $8.50 | $5.40 | $15.00 |
| 42 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 176,836 | $0.75 | $1.00 | $1.30 | $1.44 | $2.00 |
| 43 | Production Cold-Mill Surface Planing of Bituminous Concrete (490.15) | SY | 208,917 | $4.40 | $4.40 | $5.15 | $8.10 | $6.00 |
| 44 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 4,180 | $23.10 | $34.50 | $26.70 | $18.00 | $29.00 |
| 45 | (502.12110018) | 133 | $1,310.00 | $1,200.00 | $1,480.00 | $524.00 | $1,500.00 | |
| 46 | (502.12120018) | 15 | $1,934.92 | $1,700.00 | $2,670.00 | $810.00 | $1,800.00 | |
| 47 | (502.9100) | 507 | $25.00 | $17.50 | $41.00 | $162.00 | $35.97 | |
| 48 | Longitudinal Joints (502.9110) | LF | 214 | $25.50 | $32.00 | $30.60 | $153.00 | $15.13 |
| 49 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 80 | $675.00 | $660.00 | $1,040.00 | $748.00 | $620.00 |
| 50 | Micropiles (Contractor Designed) (551.30) | EACH | 30 | $4,100.00 | $10,100 | $13,300 | $19,260 | $17,000 |
| 51 | (551.33) | 1,036 | $362.50 | $265.00 | $302.00 | $216.00 | $275.00 | |
| 52 | Furnishing Equipment for Installing Micropiles (551.34) | LS | 1 | $11,600 | $89,800 | $56,900 | $51,030 | $150,000 |
| 53 | Static Pile Compressive Load Test (551.35) | EACH | 1 | $57,900 | $77,200 | $87,900 | $95,400 | $75,000 |
| 54 | Shields and Shoring (552.17) | SF | 20,861 | $2.00 | $1.55 | $2.10 | $36.00 | $5.00 |
| 55 | (553.010001) | EACH | 1 | $19,500 | $19,500 | $35,200 | $289,800 | $120,000 |
| 56 | (553.010002) | EACH | 1 | $19,500 | $19,500 | $35,200 | $275,400 | $120,000 |
| 57 | (553.020001) | EACH | 2 | $1,000.00 | $4,300.00 | $4,000.00 | $93,060 | $20,000 |
| 58 | (553.030001) | EACH | 3 | $500.00 | $4,300.00 | $2,500.00 | $20,250 | $12,500 |
| 59 | (553.030002) | EACH | 1 | $20,500 | $1.00 | $8,640.00 | $60,300 | $15,000 |
| 60 | (553.030003) | EACH | 1 | $2,000.00 | $8,150.00 | $8,640.00 | $47,520 | $25,000 |
| 61 | (553.030004) | EACH | 1 | $2,000.00 | $1.00 | $8,640.00 | $80,100 | $15,000 |
| 62 | (553.030005) | EACH | 1 | $98,000 | $45,500 | $44,500 | $162,000 | $150,000 |
| 63 | (553.030006) | EACH | 1 | $43,600 | $16,300 | $8,640.00 | $162,000 | $15,000 |
| 64 | (553.030007) | EACH | 1 | $83,500 | $37,900 | $12,600 | $135,000 | $200,000 |
| 65 | (553.030008) | EACH | 1 | $20,500 | $6,250.00 | $5,810.00 | $36,000 | $10,000 |
| 66 | (553.030009) | EACH | 1 | $20,500 | $6,250.00 | $5,810.00 | $36,000 | $10,000 |
| 67 | (553.030010) | EACH | 1 | $44,608 | $22,300 | $38,000 | $171,000 | $50,000 |
| 68 | (553.030011) | EACH | 1 | $44,608 | $20,800 | $38,000 | $54,000 | $50,000 |
| 69 | (553.030012) | EACH | 1 | $50,897 | $26,400 | $4,620.00 | $36,000 | $200,000 |
| 70 | Fill Type Retaining Wall (Greater than 6 ft. – 12 ft.) (554.41) | SF | 1,046 | $221.00 | $200.00 | $127.00 | $135.00 | $200.00 |
| 71 | Footing Concrete, Performance (555.0011) | CY | 42 | $2,000.00 | $1,450.00 | $1,890.00 | $1,143.00 | $2,600.00 |
| 72 | Concrete for Structures, Performance (555.0021) | CY | 183 | $1,830.00 | $1,600.00 | $2,220.00 | $1,440.00 | $2,750.00 |
| 73 | Concrete for Structures, Performance - Internal Cure (555.0022) | CY | 5 | $4,400.00 | $2,250.00 | $4,100.00 | $5,670.00 | $3,000.00 |
| 74 | (555.05000001) | 6 | $789.78 | $980.00 | $3,150.00 | $5,400.00 | $3,500.00 | |
| 75 | (555.10000006) | 52 | $995.00 | $920.00 | $1,140.00 | $414.00 | $420.00 | |
| 76 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 77 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $6.28 | $6.28 | $6.28 | $6.28 | $6.28 |
| 78 | Epoxy-Coated Steel Fabric Reinforcement (556.0102) | SY | 5 | $100.00 | $555.00 | $118.00 | $180.00 | $30.00 |
| 79 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 504 | $2.30 | $3.35 | $3.75 | $2.52 | $2.50 |
| 80 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 35,239 | $3.35 | $3.45 | $2.90 | $2.52 | $3.00 |
| 81 | Stud Shear Connectors for Bridges (556.03) | EACH | 1,212 | $8.10 | $10.50 | $5.05 | $11.70 | $5.00 |
| 82 | (557.1011) | SY | 164 | $1,657.00 | $550.00 | $620.00 | $594.00 | $750.00 |
| 83 | (557.1111) | SY | 150 | $3,060.00 | $1,850.00 | $1,220.00 | $936.00 | $1,350.00 |
| 84 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 313 | $6.00 | $1.00 | $37.50 | $5.40 | $1.00 |
| 85 | Sidewalks and Safety Walks (557.30) | SY | 32 | $98.00 | $455.00 | $790.00 | $261.00 | $450.00 |
| 86 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $15.16 | $15.16 | $15.16 | $15.16 | $15.16 |
| 87 | Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902) | QUALITY UNIT | 1 | $10.50 | $10.50 | $10.50 | $10.50 | $10.50 |
| 88 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 290 | $62.95 | $30.00 | $75.20 | $27.00 | $35.00 |
| 89 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 2,609 | $1.60 | $2.70 | $1.45 | $5.20 | $2.00 |
| 90 | Protective Sealing of New Structural Concrete (559.02) | SF | 2,092 | $3.20 | $3.30 | $1.65 | $6.30 | $2.00 |
| 91 | Rubble Stone Masonry (560.05) | CF | 410 | $250.00 | $240.00 | $188.00 | $72.00 | $160.00 |
| 92 | (560.13200007) | 10 | $395.00 | $1,050.00 | $244.00 | $1,642.78 | $300.00 | |
| 93 | (564.04030112) | LS | 1 | $5,000.00 | $63,200 | $89,700 | $41,400 | $50,000 |
| 94 | (564.0501) | LS | 1 | $168,550 | $196,000 | $180,000 | $121,320 | $400,000 |
| 95 | (564.20010008) | 27,500 | $1.15 | $0.33 | $0.38 | $0.81 | $0.30 | |
| 96 | (565.30130101) | 12 | $550.00 | $400.00 | $279.00 | $540.00 | $400.00 | |
| 97 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 96 | $382.00 | $365.00 | $467.00 | $513.00 | $370.00 |
| 98 | Transition Bridge Railing (568.70) | LF | 269 | $382.00 | $365.00 | $417.00 | $441.00 | $330.00 |
| 99 | Texas Aesthetic Concrete Bridge Barrier (569.08) | LF | 44 | $2,680.00 | $1,300.00 | $1,140.00 | $261.00 | $800.00 |
| 100 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $16.44 | $16.44 | $16.44 | $16.44 | $16.44 |
| 101 | (595.50000018) | 2,661 | $8.00 | $6.75 | $13.40 | $27.00 | $12.00 | |
| 102 | (602.3618) | LF | 21 | $1,460.00 | $1,550.00 | $1,890.00 | $954.00 | $825.00 |
| 103 | (603.171416) | EACH | 2 | $580.00 | $915.00 | $1,150.00 | $577.00 | $1,400.00 |
| 104 | (603.6001) | LF | 593 | $79.00 | $125.00 | $111.00 | $207.00 | $220.00 |
| 105 | (603.6002) | LF | 1,885 | $73.75 | $115.00 | $112.00 | $198.00 | $250.00 |
| 106 | (603.6003) | LF | 2,275 | $94.00 | $125.00 | $142.00 | $225.00 | $450.00 |
| 107 | (603.6004) | LF | 197 | $94.50 | $105.00 | $151.00 | $243.00 | $310.00 |
| 108 | (603.6005) | LF | 711 | $102.00 | $155.00 | $180.00 | $207.00 | $450.00 |
| 109 | (603.6006) | LF | 19 | $161.75 | $245.00 | $259.00 | $216.00 | $340.00 |
| 110 | (603.6010) | LF | 73 | $274.23 | $310.00 | $376.00 | $252.00 | $1,400.00 |
| 111 | (603.63040215) | 57 | $1,010.00 | $910.00 | $1,690.00 | $1,215.00 | $1,750.00 | |
| 112 | (603.63201015) | 63 | $5,820.00 | $5,700.00 | $7,530.00 | $3,600.00 | $7,500.00 | |
| 113 | (603.7303) | EACH | 5 | $2,410.00 | $3,700.00 | $3,130.00 | $2,061.00 | $3,500.00 |
| 114 | (603.7305) | EACH | 4 | $3,495.00 | $3,850.00 | $4,470.00 | $2,061.00 | $4,000.00 |
| 115 | (603.7307) | EACH | 1 | $4,280.00 | $4,200.00 | $5,810.00 | $2,061.00 | $5,000.00 |
| 116 | (603.7310) | EACH | 2 | $7,256.30 | $5,450.00 | $8,480.00 | $2,700.00 | $7,500.00 |
| 117 | (603.77210015) | 1 | $2,520.00 | $3,300.00 | $3,500.00 | $126.00 | $1,500.00 | |
| 118 | (603.77220015) | 2 | $1,500.00 | $3,250.00 | $3,880.00 | $1,800.00 | $1,500.00 | |
| 119 | (603.9824) | LF | 47 | $80.00 | $185.00 | $108.00 | $153.00 | $310.00 |
| 120 | (604.070801) | EACH | 26 | $1,730.00 | $3,650.00 | $6,880.00 | $522.00 | $2,000.00 |
| 121 | (604.300603) | LF | 12 | $3,695.00 | $1,100.00 | $679.00 | $1,980.00 | $1,600.00 |
| 122 | (604.300611) | LF | 9 | $630.00 | $1,100.00 | $758.00 | $1,810.00 | $1,600.00 |
| 123 | (604.301122) | LF | 9 | $890.00 | $1,250.00 | $954.00 | $1,810.00 | $1,700.00 |
| 124 | (604.301873) | LF | 74 | $680.00 | $1,100.00 | $678.00 | $1,062.00 | $1,700.00 |
| 125 | (604.302122) | LF | 198 | $655.00 | $1,050.00 | $596.00 | $1,908.00 | $1,200.00 |
| 126 | (604.4048) | LF | 43 | $590.00 | $1,050.00 | $474.00 | $1,620.00 | $1,400.00 |
| 127 | (604.4060) | LF | 20 | $665.00 | $920.00 | $607.00 | $1,800.00 | $1,500.00 |
| 128 | (604.500101) | LF | 80 | $1,210.00 | $1,400.00 | $600.00 | $676.00 | $1,300.00 |
| 129 | (604.50180010) | 9 | $5,690.00 | $2,250.00 | $600.00 | $738.00 | $3,500.00 | |
| 130 | Underdrain Filter, Type I (605.0901) | CY | 111 | $99.00 | $87.50 | $228.00 | $63.00 | $60.00 |
| 131 | Underdrain Filter, Type II (605.1001) | CY | 320 | $203.00 | $90.00 | $207.00 | $63.00 | $55.00 |
| 132 | (605.1701) | LF | 3,992 | $14.30 | $17.50 | $8.35 | $81.00 | $40.00 |
| 133 | Box Beam Guide Railing (606.10) | LF | 448 | $63.70 | $61.00 | $69.60 | $153.00 | $55.00 |
| 134 | Box Beam Guide Railing With Extra Long Posts (606.1001) | LF | 9 | $98.45 | $94.50 | $107.00 | $1,404.00 | $85.00 |
| 135 | Box Beam End Piece (606.120101) | EACH | 3 | $1,000.00 | $1,000.00 | $1,140.00 | $1,404.00 | $900.00 |
| 136 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 7 | $2,775.00 | $2,650.00 | $3,030.00 | $6,643.00 | $2,400.00 |
| 137 | HPBO (Mod.) Corrugated Beam Guide Railing (606.2701) | LF | 1,236 | $36.00 | $34.50 | $39.20 | $45.00 | $31.00 |
| 138 | HPBO (Mod.) Corrugated Beam Guide Railing with Extra Long Posts (606.2702) | LF | 666 | $39.50 | $38.00 | $43.00 | $54.00 | $34.00 |
| 139 | Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703) | EACH | 4 | $3,200.00 | $3,100.00 | $3,540.00 | $3,835.00 | $3,211.10 |
| 140 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 1,912 | $8.75 | $9.10 | $17.30 | $10.80 | $10.00 |
| 141 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 200 | $14.75 | $8.70 | $17.50 | $20.70 | $10.00 |
| 142 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 6 | $2,300.00 | $475.00 | $1,450.00 | $639.00 | $500.00 |
| 143 | Transition Between Box Beam Guide Rail and Single Slope Half Section Concrete Barrier (One or Two Way Operation) (606.8803) | EACH | 1 | $10,000 | $15,500 | $18,500 | $16,200 | $8,750.00 |
| 144 | Transition: HPBO (Mod.) Corrugated Guide Railing to Beam Box Beam Guide Railing (606.8901) | EACH | 1 | $8,600.00 | $8,300.00 | $9,420.00 | $13,500 | $7,450.00 |
| 145 | (607.41010010) | 1,000 | $4.00 | $7.05 | $12.80 | $4.50 | $10.00 | |
| 146 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 18 | $120.00 | $120.00 | $120.00 | $120.00 | $120.00 |
| 147 | Concrete Sidewalks and Driveways (608.0101) | CY | 621 | $1,827.65 | $1,900.00 | $2,000.00 | $661.50 | $1,400.00 |
| 148 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 329 | $296.15 | $620.00 | $150.00 | $252.00 | $350.00 |
| 149 | (608.21000003) | 129 | $469.00 | $450.00 | $512.00 | $252.00 | $405.00 | |
| 150 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 150 | $116.00 | $110.00 | $209.00 | $135.00 | $104.00 |
| 151 | Stone Curb – Mountable (MT) (609.0214) | LF | 224 | $155.00 | $145.00 | $218.00 | $135.00 | $131.00 |
| 152 | Stone Curb – Traversable (TR) (609.0217) | LF | 208 | $289.00 | $270.00 | $369.00 | $144.00 | $246.00 |
| 153 | Stone Curb – Roundabout (RD) (609.0218) | LF | 295 | $215.00 | $215.00 | $322.00 | $144.00 | $202.00 |
| 154 | Stone Curb – Bridge (Type A) (609.0301) | LF | 55 | $138.00 | $83.00 | $289.00 | $171.00 | $85.00 |
| 155 | Stone Curb – Bridge (Type F1) (609.0302) | LF | 96 | $139.16 | $140.00 | $159.00 | $126.00 | $110.00 |
| 156 | (609.0401) | LF | 5,518 | $91.51 | $92.50 | $108.00 | $81.00 | $75.00 |
| 157 | (609.0403) | LF | 73 | $110.54 | $100.00 | $122.00 | $108.00 | $80.00 |
| 158 | (609.0801) | LF | 1,062 | $1.00 | $37.00 | $125.00 | $144.00 | $106.00 |
| 159 | Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101) | CY | 18 | $81.08 | $260.00 | $295.00 | $72.00 | $70.00 |
| 160 | Topsoil - Roadside (610.1402) | CY | 2,107 | $201.59 | $190.00 | $165.00 | $117.00 | $150.00 |
| 161 | Topsoil - Special Planting Mix (610.1404) | CY | 133 | $115.83 | $95.50 | $108.00 | $117.00 | $100.00 |
| 162 | Turf Establishment - Roadside (610.1601) | SY | 13,875 | $1.74 | $2.95 | $4.40 | $1.80 | $1.50 |
| 163 | Turf Establishment -Lawns (610.1602) | SY | 205 | $3.47 | $4.85 | $9.80 | $6.30 | $3.00 |
| 164 | Wildflower Seeding (610.17) | SY | 409 | $3.47 | $6.50 | $7.40 | $7.20 | $3.00 |
| 165 | Watering Vegetation (610.19) | 1,000 GALLONS | 931 | $5.79 | $205.00 | $234.00 | $126.00 | $5.00 |
| 166 | (611.0161) | EACH | 13 | $1,042.44 | $865.00 | $987.00 | $891.00 | $900.00 |
| 167 | (611.0232) | EACH | 6 | $579.13 | $565.00 | $642.00 | $513.00 | $500.00 |
| 168 | (611.0452) | EACH | 48 | $115.83 | $97.50 | $111.00 | $162.00 | $100.00 |
| 169 | (611.0562) | EACH | 32 | $115.83 | $120.00 | $139.00 | $162.00 | $100.00 |
| 170 | (611.0741) | EACH | 128 | $57.91 | $44.50 | $50.90 | $27.00 | $50.00 |
| 171 | Portable Drip Irrigation System (611.17) | EACH | 20 | $69.50 | $22.50 | $25.80 | $63.00 | $60.00 |
| 172 | Removal of Portable Drip Irrigation System (611.18) | EACH | 20 | $23.17 | $21.50 | $24.20 | $36.00 | $20.00 |
| 173 | (611.19010024) | 13 | $23.17 | $690.00 | $788.00 | $162.00 | $20.00 | |
| 174 | (611.19020024) | 6 | $23.17 | $585.00 | $665.00 | $162.00 | $20.00 | |
| 175 | (611.19040024) | 48 | $5.79 | $87.50 | $99.90 | $162.00 | $5.00 | |
| 176 | (611.19050024) | 32 | $5.79 | $125.00 | $141.00 | $162.00 | $5.00 | |
| 177 | (611.19070024) | 128 | $2.32 | $40.50 | $45.90 | $162.00 | $2.00 | |
| 178 | (613.04000001) | 72 | $83.88 | $100.00 | $310.00 | $396.00 | $150.00 | |
| 179 | (613.06000101) | LS | 1 | $45,000 | $45,000 | $45,000 | $45,000 | $45,000 |
| 180 | (613.06000201) | LS | 1 | $45,000 | $45,000 | $45,000 | $45,000 | $45,000 |
| 181 | (614.060201) | EACH | 4 | $1,737.40 | $1,650.00 | $784.00 | $657.00 | $2,000.00 |
| 182 | (614.060204) | EACH | 15 | $1,737.40 | $1,650.00 | $765.00 | $855.00 | $2,000.00 |
| 183 | (614.060304) | EACH | 3 | $4,053.92 | $3,900.00 | $1,110.00 | $1,170.00 | $4,000.00 |
| 184 | (614.060404) | EACH | 1 | $5,212.19 | $5,000.00 | $1,280.00 | $1,530.00 | $5,500.00 |
| 185 | (614.060501) | EACH | 1 | $8,686.98 | $8,350.00 | $2,000.00 | $1,800.00 | $9,000.00 |
| 186 | (614.060504) | EACH | 1 | $8,686.98 | $8,350.00 | $2,180.00 | $2,070.00 | $9,000.00 |
| 187 | (614.060601) | EACH | 1 | $11,004 | $10,600 | $2,660.00 | $2,970.00 | $12,000 |
| 188 | (615.01010108) | 180 | $153.42 | $6.50 | $50.00 | $90.00 | $163.00 | |
| 189 | (615.02060124) | 2 | $3,673.62 | $1,300.00 | $2,410.00 | $3,600.00 | $8,500.00 | |
| 190 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $3,245,072 | $4,530,000 | $3,078,000 | $444,700 | $5,707,933 |
| 191 | Type III Construction Barricades (619.04) | EACH | 133 | $139.14 | $35.00 | $138.00 | $171.00 | $300.00 |
| 192 | Temporary Business Signs (619.0701) | SF | 10 | $30.25 | $70.50 | $102.00 | $351.00 | $500.00 |
| 193 | (619.080102) | LF | 3,114 | $2.43 | $1.65 | $2.35 | $1.80 | $3.07 |
| 194 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 949 | $5.73 | $11.00 | $7.95 | $1.80 | $10.73 |
| 195 | Cover Existing Pavement Marking Letters or Symbols (Removable Tape) (619.0804) | EACH | 9 | $289.57 | $390.00 | $663.00 | $99.00 | $379.35 |
| 196 | (619.0901) | LF | 585 | $1.68 | $0.83 | $2.65 | $1.80 | $1.00 |
| 197 | (619.100101) | LF | 13,656 | $0.83 | $0.83 | $0.66 | $1.80 | $4.00 |
| 198 | (619.110513) | EACH | 8 | $27,031 | $33,200 | $16,400 | $48,600 | $20,000 |
| 199 | (619.1301) | EACH | 1 | $39,907 | $23,000 | $77,500 | $173,070 | $125,000 |
| 200 | (619.1302) | EACH | 1 | $23,923 | $10,500 | $77,500 | $173,070 | $100,000 |
| 201 | (619.1303) | EACH | 1 | $57,913 | $16,300 | $77,500 | $173,070 | $120,000 |
| 202 | (619.1304) | EACH | 1 | $34,317 | $14,600 | $77,500 | $173,070 | $125,000 |
| 203 | (619.1305) | EACH | 1 | $55,373 | $26,300 | $77,500 | $173,070 | $100,000 |
| 204 | (619.1306) | EACH | 2 | $19,873 | $9,900.00 | $77,500 | $173,070 | $100,000 |
| 205 | Maintain Traffic Signal Equipment (Requirement B) Intersection (619.1612) | MONTH | 11 | $405.39 | $390.00 | $1,900.00 | $630.00 | $350.00 |
| 206 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 2,434 | $22.72 | $40.50 | $87.40 | $63.00 | $90.00 |
| 207 | (619.2401) | LS | 1 | $8,972.28 | $24,800 | $18,100 | $157,500 | $150,000 |
| 208 | Traffic Control Supervisor (619.25) | MONTH | 1 | $23,955 | $39,000 | $41,500 | $10,260 | $2,100.00 |
| 209 | Mailboxes (619.27) | EACH | 6 | $352.89 | $1,100.00 | $957.00 | $2,430.00 | $750.00 |
| 210 | Stone Filling (Fine) (620.02) | CY | 518 | $185.51 | $155.00 | $50.00 | $72.00 | $100.00 |
| 211 | Stone Filling (Light) (620.03) | CY | 147 | $232.72 | $170.00 | $199.00 | $72.00 | $155.00 |
| 212 | Stone Filling (Medium) (620.04) | CY | 408 | $264.76 | $195.00 | $221.00 | $63.00 | $135.00 |
| 213 | Stone Filling (Heavy) (620.05) | CY | 599 | $349.38 | $190.00 | $70.00 | $63.00 | $120.00 |
| 214 | Bedding Material, Type 1 (620.0801) | CY | 368 | $201.92 | $170.00 | $220.00 | $81.00 | $140.00 |
| 215 | (621.51000015) | 33,269 | $7.57 | $13.00 | $3.00 | $2.70 | $5.00 | |
| 216 | Crushed Stone (In-Place Measure) (623.12) | CY | 50 | $206.38 | $280.00 | $320.00 | $81.00 | $120.00 |
| 217 | Asphalt Gutter (624.020101) | TON | 5 | $586.17 | $1,650.00 | $641.00 | $1,260.00 | $400.00 |
| 218 | Survey Operations (625.01) | LS | 1 | $140,712 | $243,000 | $850,000 | $386,100 | $1,500,000 |
| 219 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 42 | $477.72 | $1,850.00 | $970.00 | $810.00 | $500.00 |
| 220 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 4 | $1,512.40 | $620.00 | $588.00 | $180.00 | $300.00 |
| 221 | (625.09010015) | LS | 1 | $7,561.98 | $36,600 | $100,273 | $19,800 | $10,000 |
| 222 | (627.50140008) | 9,732 | $3.47 | $4.55 | $4.50 | $9.00 | $12.00 | |
| 223 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 11,060 | $37.73 | $125.00 | $162.00 | $126.00 | $70.00 |
| 224 | Cleaning and Preparation of Pavement Surfaces-Lines (635.0103) | LF | 285 | $3.07 | $6.65 | $6.65 | $2.70 | $6.50 |
| 225 | Cleaning and Preparation of Pavement Surfaces-Letters (635.0203) | EACH | 3 | $86.87 | $140.00 | $133.00 | $54.00 | $135.48 |
| 226 | Cleaning and Preparation of Pavement Surfaces-Symbols (635.0303) | EACH | 4 | $144.78 | $445.00 | $265.00 | $45.00 | $433.54 |
| 227 | Concrete Cylinder Curing Equipment (637.04) | EACH | 2 | $1,260.33 | $600.00 | $4,080.00 | $1,350.00 | $7,300.00 |
| 228 | Engineer’s Field Office – Type 4 (637.14) | MONTH | 30 | $7,057.84 | $6,900.00 | $6,970.00 | $19,800 | $10,000 |
| 229 | Rain Gauge (637.26) | EACH | 1 | $252.07 | $180.00 | $75.90 | $1,800.00 | $500.00 |
| 230 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 231 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 232 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 233 | (637.41000115) | 30 | $67.22 | $145.00 | $139.00 | $360.00 | $100.00 | |
| 234 | (637.41000215) | 30 | $67.22 | $145.00 | $139.00 | $360.00 | $100.00 | |
| 235 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 112 | $104.24 | $100.00 | $114.00 | $126.00 | $90.00 |
| 236 | Type A Sign Posts (645.81) | EACH | 60 | $442.46 | $425.00 | $483.00 | $333.00 | $382.00 |
| 237 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 23 | $20.85 | $20.00 | $22.80 | $126.00 | $18.00 |
| 238 | Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24) | EACH | 2 | $57.92 | $55.50 | $63.20 | $90.00 | $50.00 |
| 239 | Steel Post, 2.0 lb/ft (646.32) | EACH | 21 | $86.87 | $83.50 | $94.80 | $108.00 | $75.00 |
| 240 | (647.18010108) | 3 | $2,167.77 | $3,350.00 | $1,420.00 | $2,304.00 | $3,500.00 | |
| 241 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 21 | $371.80 | $355.00 | $406.00 | $450.00 | $321.00 |
| 242 | Relocate Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.32) | EACH | 2 | $1,389.92 | $1,350.00 | $1,520.00 | $3,240.00 | $1,200.00 |
| 243 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 2 | $144.79 | $140.00 | $158.00 | $3,240.00 | $125.00 |
| 244 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 23 | $115.83 | $110.00 | $126.00 | $180.00 | $100.00 |
| 245 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 2 | $579.13 | $555.00 | $632.00 | $1,350.00 | $500.00 |
| 246 | (655.05020008) | 12 | $2,447.45 | $2,150.00 | $3,040.00 | $2,700.00 | $2,000.00 | |
| 247 | Cast Frame F3, Mountable Curb Box CM3 & Reticuline Grate G3 (655.0703) | EACH | 1 | $2,829.68 | $3,650.00 | $3,470.00 | $4,140.00 | $2,600.00 |
| 248 | Cast Frame F3, UnMountable Curb Box CU3 & Reticuline Grate G3 (655.0706) | EACH | 29 | $2,945.50 | $3,650.00 | $3,590.00 | $4,140.00 | $2,600.00 |
| 249 | Welded Frame & Rectangular Grate 3 (655.1003) | EACH | 1 | $1,520.84 | $1,750.00 | $2,000.00 | $3,780.00 | $1,400.00 |
| 250 | Welded Frame & Reticuline Grate 3 (655.1103) | EACH | 1 | $1,520.84 | $2,000.00 | $2,000.00 | $3,780.00 | $1,400.00 |
| 251 | Welded Frame & Reticuline Grate 11 (655.1111) | EACH | 2 | $1,740.91 | $2,100.00 | $2,250.00 | $3,780.00 | $1,400.00 |
| 252 | Welded Frame & Reticuline Grate 22 (655.1122) | EACH | 40 | $2,053.64 | $2,600.00 | $2,600.00 | $3,780.00 | $1,200.00 |
| 253 | Manhole Frame & Grate (655.1201) | EACH | 3 | $1,520.84 | $2,000.00 | $2,000.00 | $3,780.00 | $1,500.00 |
| 254 | Manhole Frame & Cover (655.1202) | EACH | 20 | $1,532.42 | $1,900.00 | $2,000.00 | $2,403.00 | $1,500.00 |
| 255 | (659.70000101) | 1 | $1,329.31 | $2,300.00 | $2,430.00 | $6,300.00 | $5,500.00 | |
| 256 | (660.21160008) | 30 | $378.52 | $660.00 | $414.00 | $450.00 | $200.00 | |
| 257 | (661.01000108) | LS | 1 | $5,791.32 | $5,550.00 | $6,320.00 | $12,600 | $5,000.00 |
| 258 | (661.01000208) | LS | 1 | $5,820.49 | $11,100 | $5,000.00 | $15,300 | $7,500.00 |
| 259 | (662.60000108) | 2,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 260 | (663.0106) | LF | 5 | $627.95 | $355.00 | $1,000.00 | $423.00 | $100.00 |
| 261 | (663.0108) | LF | 165 | $324.64 | $130.00 | $100.00 | $234.00 | $450.00 |
| 262 | (663.07080108) | 2 | $17,656 | $15,300 | $16,900 | $11,520 | $20,000 | |
| 263 | (663.1006) | EACH | 1 | $1,844.36 | $4,500.00 | $5,000.00 | $11,520 | $2,000.00 |
| 264 | (663.1301) | EACH | 2 | $7,006.86 | $7,400.00 | $5,000.00 | $7,200.00 | $7,000.00 |
| 265 | Iron Water Main Fittings (3 - 8 inch diameter) (663.2001) | LB | 256 | $11.58 | $15.50 | $24.70 | $90.00 | $40.00 |
| 266 | (663.4108) | LF | 150 | $32.57 | $1.00 | $20.00 | $81.00 | $100.00 |
| 267 | (670.0106) | EACH | 11 | $1,389.92 | $1,350.00 | $2,560.00 | $2,520.00 | $3,500.00 |
| 268 | (670.01101202) | 4 | $694.96 | $665.00 | $853.00 | $810.00 | $600.00 | |
| 269 | (670.03020007) | 2 | $2,895.66 | $2,800.00 | $2,620.00 | $2,610.00 | $2,500.00 | |
| 270 | (670.15010005) | 8 | $7,412.89 | $7,100.00 | $10,700 | $10,800 | $6,400.00 | |
| 271 | (670.1530) | EACH | 4 | $3,474.79 | $3,350.00 | $4,990.00 | $5,040.00 | $3,000.00 |
| 272 | (670.1715) | EACH | 4 | $1,737.40 | $1,650.00 | $2,340.00 | $2,340.00 | $1,500.00 |
| 273 | Breakaway Transformer Base (Aluminum) (670.19) | EACH | 11 | $1,737.40 | $1,650.00 | $1,390.00 | $1,404.00 | $1,500.00 |
| 274 | (670.2005) | LF | 26 | $115.83 | $110.00 | $124.00 | $126.00 | $100.00 |
| 275 | (670.2602) | LF | 1,061 | $9.27 | $8.90 | $34.50 | $36.00 | $8.00 |
| 276 | Pullboxes 5 to 7 1/2 cubic feet, inside volume (Lighting) (670.3006) | EACH | 9 | $3,474.79 | $3,350.00 | $3,600.00 | $3,600.00 | $3,000.00 |
| 277 | (670.40230008) | 3 | $6,949.58 | $6,650.00 | $36,800 | $37,008 | $6,000.00 | |
| 278 | (670.40240008) | 2 | $4,053.92 | $3,900.00 | $3,570.00 | $3,600.00 | $3,500.00 | |
| 279 | (670.7002) | LF | 73 | $3.47 | $3.35 | $12.90 | $18.00 | $3.00 |
| 280 | (670.7004) | LF | 2,176 | $4.63 | $4.45 | $7.60 | $7.20 | $4.00 |
| 281 | Ground Wire No. 6 AWG. (670.7501) | LF | 1,089 | $4.63 | $4.45 | $7.10 | $7.20 | $4.00 |
| 282 | (670.75020011) | 26 | $11.58 | $11.00 | $10.10 | $10.70 | $10.00 | |
| 283 | Performance Concrete Quality Adjustment (670.99) | QUALITY UNIT | 1 | $14.68 | $14.68 | $14.68 | $14.68 | $14.68 |
| 284 | (675.99000023) | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 285 | (680.05010007) | 6 | $24,324 | $24,400 | $31,000 | $31,050 | $22,000 | |
| 286 | (680.05020007) | 6 | $4,633.05 | $4,450.00 | $6,930.00 | $7,020.00 | $4,000.00 | |
| 287 | Pole Excavation and Concrete Foundation (680.5001) | CY | 34 | $3,011.49 | $2,900.00 | $5,560.00 | $2,520.00 | $10,000 |
| 288 | (680.510501) | EACH | 10 | $2,432.35 | $2,350.00 | $2,810.00 | $2,808.00 | $2,100.00 |
| 289 | (680.51100010) | 1 | $694.96 | $665.00 | $405.00 | $405.00 | $600.00 | |
| 290 | (680.520106) | LF | 107 | $25.48 | $24.50 | $53.10 | $54.00 | $22.00 |
| 291 | (680.520108) | LF | 473 | $32.43 | $31.00 | $89.80 | $90.00 | $28.00 |
| 292 | (680.520110) | LF | 60 | $115.83 | $110.00 | $124.00 | $126.00 | $100.00 |
| 293 | (680.520203) | LF | 21 | $23.17 | $22.00 | $63.20 | $117.00 | $20.00 |
| 294 | (680.53010010) | 11 | $9.27 | $8.90 | $12.60 | $12.60 | $8.00 | |
| 295 | Inductance Loop Installation (680.54) | LF | 389 | $46.33 | $44.50 | $25.30 | $36.00 | $40.00 |
| 296 | (680.601530) | EACH | 1 | $26,640 | $25,600 | $35,500 | $35,100 | $23,000 |
| 297 | (680.601532) | EACH | 1 | $27,798 | $26,700 | $38,600 | $39,007 | $24,000 |
| 298 | (680.622055) | EACH | 2 | $22,007 | $21,100 | $30,200 | $30,060 | $19,000 |
| 299 | (680.6808) | EACH | 10 | $1,737.40 | $1,650.00 | $3,310.00 | $3,330.00 | $1,500.00 |
| 300 | (680.6812) | EACH | 1 | $2,316.53 | $2,200.00 | $3,350.00 | $3,330.00 | $2,000.00 |
| 301 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 1 | $4,633.05 | $4,450.00 | $2,250.00 | $2,070.00 | $4,000.00 |
| 302 | Riser Assembly, 4-inch Diameter (680.700610) | EACH | 2 | $926.61 | $890.00 | $2,780.00 | $2,700.00 | $800.00 |
| 303 | Inductance Loop Wire (680.72) | LF | 1,449 | $1.16 | $1.10 | $6.30 | $18.00 | $1.00 |
| 304 | (680.730514) | LF | 3,549 | $6.95 | $6.65 | $7.85 | $9.00 | $6.00 |
| 305 | (680.731014) | LF | 1,009 | $9.27 | $8.90 | $10.20 | $10.80 | $8.00 |
| 306 | (680.731514) | LF | 460 | $11.58 | $11.00 | $15.10 | $15.30 | $10.00 |
| 307 | (680.79000001) | LS | 1 | $6,949.58 | $6,650.00 | $8,980.00 | $9,000.00 | $6,000.00 |
| 308 | (680.80324515) | 6 | $3,474.79 | $3,350.00 | $7,490.00 | $7,560.00 | $3,000.00 | |
| 309 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 18 | $173.74 | $280.00 | $190.00 | $180.00 | $250.00 |
| 310 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 7 | $173.74 | $280.00 | $190.00 | $190.80 | $250.00 |
| 311 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 18 | $173.74 | $280.00 | $190.00 | $190.80 | $250.00 |
| 312 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 14 | $173.74 | $280.00 | $190.00 | $190.80 | $250.00 |
| 313 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 18 | $173.74 | $280.00 | $190.00 | $190.80 | $250.00 |
| 314 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 7 | $173.74 | $280.00 | $190.00 | $190.80 | $250.00 |
| 315 | Traffic Signal Section - Aluminum Type I, 12-inch (680.810107) | EACH | 82 | $115.83 | $110.00 | $392.00 | $396.00 | $100.00 |
| 316 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 8 | $694.96 | $665.00 | $809.00 | $810.00 | $600.00 |
| 317 | Traffic Signal Bracket Assembly - 2 Way (680.8112) | EACH | 2 | $926.61 | $1,000.00 | $1,130.00 | $1,143.00 | $900.00 |
| 318 | (680.81230008) | 4 | $810.79 | $1,000.00 | $879.00 | $810.00 | $900.00 | |
| 319 | (680.81240008) | 3 | $926.61 | $1,100.00 | $1,140.00 | $1,116.00 | $1,000.00 | |
| 320 | Pedestrian Signal Section - Aluminum Type I, 12 inch (680.813103) | EACH | 24 | $289.57 | $280.00 | $569.00 | $558.00 | $250.00 |
| 321 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 12 | $289.57 | $280.00 | $569.00 | $558.00 | $250.00 |
| 322 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 14 | $405.39 | $390.00 | $569.00 | $558.00 | $350.00 |
| 323 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 1 | $370.64 | $355.00 | $569.00 | $558.00 | $320.00 |
| 324 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 12 | $289.57 | $280.00 | $569.00 | $558.00 | $250.00 |
| 325 | (680.8151) | EACH | 12 | $1,274.09 | $1,200.00 | $2,470.00 | $2,430.00 | $1,100.00 |
| 326 | Backplates for Traffic Signal Heads (680.8199) | EACH | 25 | $370.64 | $355.00 | $822.00 | $810.00 | $320.00 |
| 327 | (680.8207) | EACH | 2 | $1,042.44 | $1,000.00 | $1,060.00 | $1,071.00 | $900.00 |
| 328 | (680.8210) | EACH | 4 | $926.61 | $890.00 | $1,260.00 | $1,071.00 | $800.00 |
| 329 | Breakaway Transformer Base (680.8223) | EACH | 11 | $1,389.92 | $1,350.00 | $1,390.00 | $1,071.00 | $1,200.00 |
| 330 | (680.82250408) | 1 | $4,633.05 | $4,450.00 | $1,630.00 | $1,710.00 | $4,000.00 | |
| 331 | (680.90920008) | 2 | $1,158.27 | $1,100.00 | $2,020.00 | $2,070.00 | $1,000.00 | |
| 332 | (680.94000008) | 2 | $1,737.40 | $1,650.00 | $2,430.00 | $2,430.00 | $1,500.00 | |
| 333 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 3 | $2,316.53 | $2,200.00 | $2,780.00 | $2,700.00 | $2,000.00 |
| 334 | (680.950206) | LF | 116 | $17.37 | $16.50 | $6.30 | $7.20 | $15.00 |
| 335 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 |
| 336 | (680.99050010) | 4 | $1,389.92 | $1,350.00 | $917.00 | $927.00 | $1,200.00 | |
| 337 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 181,551 | $0.75 | $0.32 | $0.52 | $1.35 | $0.31 |
| 338 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 129,734 | $0.75 | $0.32 | $0.52 | $1.35 | $0.31 |
| 339 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 25,849 | $3.07 | $2.60 | $4.75 | $1.35 | $2.55 |
| 340 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 8,209 | $3.07 | $2.60 | $4.75 | $1.35 | $2.55 |
| 341 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 128 | $144.78 | $54.50 | $99.50 | $180.00 | $53.11 |
| 342 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 31 | $173.74 | $2,350.00 | $285.00 | $180.00 | $227.61 |
| 343 | (691.04000020) | 110,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 344 | Field Change Payment (FCP) (697.03) | DOL | 1,884,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 345 | Asphalt Price Adjustment (698.04) | DOL | 126,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 346 | Fuel Price Adjustment (698.05) | DOL | 81,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 347 | Steel/Iron Price Adjustment (698.06) | DOL | 300 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 348 | (698.93940008) | LS | 1 | $70,000 | $70,000 | $70,000 | $70,000 | $70,000 |
| 349 | Mobilization (699.040001) | LS | 1 | $1,151,612 | $1,220,000 | $1,319,871 | $1,379,002 | $1,475,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of February 20, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.