NYSDOT contract D265389 bid tabulation
Large Culvert Rehabilitation Project. Let by New York State DOT on July 10, 2025, Broome, Otsego, Region 09. 7 bids received; low bid $9,074,029 by Vector Construction Corp.
- Owner
- New York State DOT
- Letting
- 10 JUL 2025
- Pay items
- 127
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vector Construction Corp | $9,074,029 | Low |
| 2 | R De Vincentis Construction Inc | $9,266,000 | +2.0% |
| 3 | Economy Paving Co Inc | $9,975,954 | +10% |
| 4 | Lancaster Development and Tully Construction Co LLC | $9,993,781 | +10% |
| 5 | Gorick Construction Co Inc | $10,137,552 | +12% |
| 6 | Slate Hill Constructors Inc | $10,491,026 | +16% |
| 7 | Rutledge Excavating Inc | $15,849,433 | +75% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vector Construction Corp | 2. R De Vincentis Construction Inc | 3. Economy Paving Co Inc | 4. Lancaster Development and Tully Construction Co LLC | 5. Gorick Construction Co Inc | 6. Slate Hill Constructors Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.07) | ACRE | 2.20 | $30,000 | $34,500 | $1,000.00 | $15,000 | $65,000 | $15,000 |
| 2 | (203.01990006) | 494 | $55.00 | $97.00 | $25.00 | $180.00 | $72.00 | $120.00 | |
| 3 | Unclassified Excavation and Disposal (203.02) | CY | 469 | $50.00 | $45.00 | $5.00 | $50.00 | $16.00 | $56.00 |
| 4 | Embankment In Place (203.03) | CY | 546 | $50.00 | $47.00 | $5.00 | $55.00 | $48.50 | $45.00 |
| 5 | Select Granular Fill (203.07) | CY | 417 | $50.00 | $88.00 | $55.00 | $129.00 | $48.00 | $80.00 |
| 6 | Structure Excavation (206.01) | CY | 2,957 | $20.00 | $33.00 | $5.00 | $70.40 | $18.00 | $56.00 |
| 7 | Geotextile Bedding (207.20) | SY | 266 | $5.00 | $13.00 | $5.00 | $9.50 | $4.00 | $8.00 |
| 8 | Geotextile Separation (207.21) | SY | 1,869 | $5.00 | $5.00 | $1.50 | $5.85 | $1.50 | $4.00 |
| 9 | Seed and Mulch – Temporary (209.1003) | SY | 57 | $13.00 | $6.00 | $10.00 | $18.70 | $15.50 | $6.00 |
| 10 | (209.11000001) | 1 | $600.00 | $450.00 | $500.00 | $738.00 | $900.00 | $30.00 | |
| 11 | Silt Fence - Temporary (209.13) | LF | 2,899 | $6.00 | $3.50 | $0.80 | $14.40 | $4.00 | $10.00 |
| 12 | Rolled Erosion Control Product, Class II Type A, Intermediate (209.1901) | SY | 4,390 | $5.00 | $5.50 | $5.00 | $7.55 | $8.50 | $6.00 |
| 13 | Soil Stabilizers, Class IV Type C (209.2103) | SY | 6,108 | $2.20 | $2.50 | $2.00 | $3.40 | $1.00 | $3.00 |
| 14 | Stabilized Construction Access (209.22) | SY | 1,181 | $25.00 | $42.00 | $55.00 | $81.60 | $24.00 | $34.00 |
| 15 | Sediment Filter Log, 18″ to 20″ (209.2302) | LF | 199 | $11.00 | $30.00 | $10.00 | $27.20 | $12.00 | $40.00 |
| 16 | Subbase Course, Type 1 (304.11) | CY | 125 | $120.00 | $105.00 | $50.00 | $149.00 | $64.00 | $85.00 |
| 17 | Subbase Course, Optional Type (304.15) | CY | 1,091 | $55.00 | $74.00 | $45.00 | $123.00 | $62.00 | $85.00 |
| 18 | Interim Steel Sheeting (552.15) | SF | 21,507 | $28.00 | $51.00 | $20.00 | $30.00 | $58.00 | $30.00 |
| 19 | (553.020001) | EACH | 2 | $1,000.00 | $12,000 | $1,000.00 | $14,000 | $1,260.00 | $1.00 |
| 20 | (553.020002) | EACH | 2 | $1,000.00 | $11,000 | $1,000.00 | $14,000 | $1,260.00 | $1.00 |
| 21 | (553.020003) | EACH | 2 | $1,000.00 | $12,000 | $1,000.00 | $14,000 | $1,260.00 | $1.00 |
| 22 | (553.020004) | EACH | 2 | $1,000.00 | $10,000 | $1,000.00 | $14,000 | $1,260.00 | $1.00 |
| 23 | (553.020005) | EACH | 2 | $1,000.00 | $18,000 | $1,000.00 | $14,000 | $1,260.00 | $1.00 |
| 24 | (553.020006) | EACH | 2 | $1,000.00 | $10,000 | $1,000.00 | $14,000 | $1,260.00 | $1.00 |
| 25 | (553.020007) | EACH | 2 | $1,000.00 | $9,000.00 | $1,000.00 | $14,000 | $1,260.00 | $1.00 |
| 26 | (553.020008) | EACH | 1 | $1,000.00 | $7,000.00 | $1,000.00 | $14,000 | $2,050.00 | $1.00 |
| 27 | (553.020009) | EACH | 2 | $1,000.00 | $7,000.00 | $1,000.00 | $14,000 | $1,260.00 | $1.00 |
| 28 | (553.020010) | EACH | 2 | $1.00 | $10,000 | $1,000.00 | $14,000 | $1,260.00 | $1.00 |
| 29 | (553.020011) | EACH | 4 | $1,000.00 | $11,000 | $1,000.00 | $14,000 | $1,260.00 | $1.00 |
| 30 | (553.030001) | EACH | 1 | $20,000 | $10,000 | $1,000.00 | $5,000.00 | $33,000 | $1.00 |
| 31 | (553.030002) | EACH | 1 | $20,000 | $12,000 | $1,000.00 | $5,000.00 | $33,000 | $1.00 |
| 32 | (553.030003) | EACH | 1 | $20,000 | $10,000 | $1,000.00 | $5,000.00 | $33,000 | $1.00 |
| 33 | (553.030004) | EACH | 1 | $20,000 | $8,000.00 | $1,000.00 | $5,000.00 | $33,000 | $1.00 |
| 34 | (553.030005) | EACH | 1 | $20,000 | $9,000.00 | $1,000.00 | $5,000.00 | $18,000 | $1.00 |
| 35 | (553.030006) | EACH | 1 | $20,000 | $9,000.00 | $1,000.00 | $5,000.00 | $23,000 | $1.00 |
| 36 | (553.030007) | EACH | 1 | $20,000 | $21,000 | $1,000.00 | $5,000.00 | $45,000 | $1.00 |
| 37 | (553.030008) | EACH | 1 | $20,000 | $21,000 | $1,000.00 | $5,000.00 | $38,000 | $1.00 |
| 38 | (553.030009) | EACH | 1 | $15,000 | $13,000 | $1,000.00 | $5,000.00 | $23,000 | $1.00 |
| 39 | (553.030010) | EACH | 1 | $1.00 | $14,000 | $1,000.00 | $5,000.00 | $33,000 | $1.00 |
| 40 | (553.030011) | EACH | 2 | $20,000 | $8,000.00 | $1,000.00 | $5,000.00 | $16,000 | $1.00 |
| 41 | (555.97130016) | 28 | $4,000.00 | $7,000.00 | $5,500.00 | $7,500.00 | $3,300.00 | $5,500.00 | |
| 42 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $17.50 | $17.50 | $17.50 | $17.50 | $17.50 | $17.50 |
| 43 | Transition Bridge Railing (568.70) | LF | 34 | $220.00 | $232.00 | $200.00 | $275.00 | $8,800.00 | $230.00 |
| 44 | Structural Paving of Inverts with Portland Cement Concrete (602.2002) | SF | 6,097 | $65.00 | $35.00 | $170.00 | $101.00 | $104.00 | $75.00 |
| 45 | Lining Culvert with Shotcrete (602.2101) | SF | 393 | $165.00 | $180.00 | $190.00 | $185.00 | $76.00 | $200.00 |
| 46 | (602.2748) | LF | 190 | $1,200.00 | $823.00 | $1,350.00 | $627.00 | $749.00 | $650.00 |
| 47 | (602.2760) | LF | 153 | $1,400.00 | $775.00 | $1,400.00 | $948.00 | $966.00 | $800.00 |
| 48 | (602.2772) | LF | 225 | $1,500.00 | $1,020.00 | $1,600.00 | $952.00 | $1,128.00 | $820.00 |
| 49 | (602.431001) | SF | 2,176 | $170.00 | $147.00 | $215.00 | $182.00 | $175.00 | $155.00 |
| 50 | (602.431002) | SF | 2,461 | $170.00 | $163.00 | $215.00 | $193.00 | $195.00 | $155.00 |
| 51 | (602.431003) | SF | 2,503 | $170.00 | $165.00 | $215.00 | $192.00 | $192.00 | $155.00 |
| 52 | (602.431004) | SF | 1,909 | $210.00 | $220.00 | $225.00 | $221.00 | $220.00 | $200.00 |
| 53 | (602.435001) | SF | 4,306 | $145.00 | $110.00 | $150.00 | $99.90 | $125.00 | $105.00 |
| 54 | (603.172212) | EACH | 1 | $6,000.00 | $7,500.00 | $5,000.00 | $6,000.00 | $4,200.00 | $5,000.00 |
| 55 | (603.67000001) | 294 | $1,600.00 | $2,195.00 | $1,850.00 | $1,600.00 | $1,750.00 | $1,650.00 | |
| 56 | Box Beam Guide Railing (606.10) | LF | 10,251 | $52.00 | $52.00 | $50.00 | $62.70 | $65.00 | $50.00 |
| 57 | Box Beam End Piece (606.120101) | EACH | 4 | $700.00 | $688.00 | $650.00 | $836.00 | $2,050.00 | $670.00 |
| 58 | Box Beam Guide Railing End Assembly Type I with 18 ft Extension (606.120103) | EACH | 2 | $6,000.00 | $5,500.00 | $5,000.00 | $6,640.00 | $6,200.00 | $5,400.00 |
| 59 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 4 | $2,200.00 | $2,250.00 | $2,000.00 | $2,650.00 | $2,500.00 | $2,200.00 |
| 60 | Resetting Box Beam Guide Railing (New Posts) (606.5348) | LF | 2,064 | $32.00 | $34.00 | $30.00 | $40.70 | $41.00 | $33.00 |
| 61 | Resetting Box Beam Guide Rail Turned-Down Terminal (606.5920) | EACH | 3 | $700.00 | $710.00 | $650.00 | $856.00 | $85.00 | $685.00 |
| 62 | Resetting Box Beam Guide Rail Energy-Absorbing Terminal (606.5921) | EACH | 1 | $2,300.00 | $2,425.00 | $2,250.00 | $2,920.00 | $3,000.00 | $2,400.00 |
| 63 | Removing and Disposing Cable Guide Railing (606.70) | LF | 2,390 | $1.75 | $2.00 | $15.00 | $7.15 | $2.00 | $5.00 |
| 64 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 7,901 | $2.20 | $2.25 | $10.00 | $2.80 | $2.50 | $2.30 |
| 65 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 40 | $5.00 | $2.35 | $10.00 | $2.90 | $2.80 | $2.40 |
| 66 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 8 | $250.00 | $270.00 | $250.00 | $929.00 | $300.00 | $260.00 |
| 67 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 3 | $230.00 | $250.00 | $250.00 | $305.00 | $280.00 | $250.00 |
| 68 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 2 | $32.00 | $33.00 | $50.00 | $424.00 | $50.00 | $40.00 |
| 69 | Transition Between Box Beam Guide Rail and Single Slope Half Section Concrete Barrier (One or Two Way Operation) (606.8803) | EACH | 1 | $8,000.00 | $8,200.00 | $5,000.00 | $16,600 | $9,000.00 | $14,000 |
| 70 | Right-of Way Fencing (607.19) | LF | 452 | $50.00 | $51.00 | $50.00 | $63.00 | $8.00 | $80.00 |
| 71 | (607.41010010) | 267 | $6.00 | $8.00 | $5.00 | $11.50 | $3.00 | $30.00 | |
| 72 | (607.99980007) | 452 | $8.00 | $15.00 | $10.00 | $18.60 | $1.00 | $22.00 | |
| 73 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 3 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 |
| 74 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 694 | $235.00 | $303.00 | $195.00 | $200.00 | $289.00 | $310.00 |
| 75 | Weed Removal (610.13) | SY | 14,152 | $0.40 | $0.45 | $0.10 | $0.53 | $2.25 | $0.75 |
| 76 | Topsoil – Reuse On-Site Materials (610.1401) | CY | 1,046 | $35.00 | $72.00 | $5.00 | $105.00 | $55.00 | $45.00 |
| 77 | Topsoil - Roadside (610.1402) | CY | 1,025 | $45.00 | $110.00 | $10.00 | $126.00 | $98.00 | $85.00 |
| 78 | Topsoil - Lawns (610.1403) | CY | 26 | $120.00 | $155.00 | $65.00 | $347.00 | $150.00 | $90.00 |
| 79 | Topsoil - Special Planting Mix (610.1404) | CY | 75 | $150.00 | $165.00 | $65.00 | $199.00 | $175.00 | $100.00 |
| 80 | Turf Establishment - Roadside (610.1601) | SY | 13,396 | $1.60 | $1.75 | $1.50 | $2.75 | $7.75 | $1.75 |
| 81 | Turf Establishment -Lawns (610.1602) | SY | 93 | $3.00 | $3.30 | $3.00 | $5.80 | $22.00 | $3.25 |
| 82 | (610.16092824) | 904 | $3.00 | $3.30 | $3.00 | $4.75 | $8.00 | $3.25 | |
| 83 | Watering Vegetation (610.19) | 1,000 GALLONS | 2,238 | $2.00 | $2.25 | $2.00 | $2.00 | $62.00 | $2.25 |
| 84 | Mowing (610.21) | SY | 15,273 | $0.50 | $0.60 | $0.50 | $0.66 | $1.00 | $0.75 |
| 85 | (611.0151) | EACH | 14 | $820.00 | $880.00 | $1,000.00 | $1,060.00 | $1,300.00 | $840.00 |
| 86 | (611.0292) | EACH | 31 | $720.00 | $770.00 | $750.00 | $929.00 | $662.00 | $735.00 |
| 87 | (611.0351) | EACH | 17 | $520.00 | $550.00 | $500.00 | $663.00 | $595.00 | $525.00 |
| 88 | (611.19010024) | 14 | $20.00 | $22.00 | $20.00 | $26.50 | $308.00 | $21.00 | |
| 89 | (611.19020024) | 31 | $10.00 | $11.00 | $10.00 | $13.30 | $220.00 | $10.50 | |
| 90 | (611.19030024) | 17 | $5.00 | $5.50 | $5.00 | $6.65 | $212.00 | $5.25 | |
| 91 | (613.04000001) | 572 | $35.00 | $62.00 | $5.00 | $104.00 | $43.00 | $80.00 | |
| 92 | (614.060504) | EACH | 2 | $1,200.00 | $4,000.00 | $3,000.00 | $5,390.00 | $5,500.00 | $2,350.00 |
| 93 | (616.08000024) | 335 | $12.00 | $14.00 | $10.00 | $15.90 | $31.00 | $13.00 | |
| 94 | (617.10000024) | 59 | $75.00 | $180.00 | $10.00 | $126.00 | $232.00 | $115.00 | |
| 95 | (617.11000024) | LS | 1 | $3,500.00 | $7,500.00 | $1,000.00 | $3,080.00 | $2,800.00 | $5,000.00 |
| 96 | (617.11100009) | LS | 1 | $3,500.00 | $7,500.00 | $1,000.00 | $2,940.00 | $3,100.00 | $5,000.00 |
| 97 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $940,000 | $426,000 | $1,215,000 | $243,000 | $335,500 | $2,600,000 |
| 98 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 3,127 | $40.00 | $62.00 | $50.00 | $76.90 | $50.00 | $65.00 |
| 99 | Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802) | EACH | 3 | $6,500.00 | $7,500.00 | $5,000.00 | $16,000 | $2,050.00 | $7,000.00 |
| 100 | Stone Filling (Light) (620.03) | CY | 15 | $110.00 | $162.00 | $155.00 | $221.00 | $140.00 | $145.00 |
| 101 | Stone Filling (Heavy) (620.05) | CY | 798 | $145.00 | $154.00 | $165.00 | $169.00 | $112.00 | $155.00 |
| 102 | Bedding Material, Type 1 (620.0801) | CY | 502 | $96.00 | $130.00 | $145.00 | $185.00 | $58.00 | $105.00 |
| 103 | Bedding Material, Type 2 (620.0802) | CY | 37 | $86.00 | $240.00 | $155.00 | $159.00 | $88.00 | $130.00 |
| 104 | (620.14020009) | 1,504 | $145.00 | $166.00 | $165.00 | $154.00 | $120.00 | $160.00 | |
| 105 | (620.29030006) | 80 | $150.00 | $165.00 | $115.00 | $180.00 | $95.00 | $200.00 | |
| 106 | (621.05020004) | 13,017 | $4.50 | $4.00 | $5.00 | $5.20 | $4.00 | $4.50 | |
| 107 | Survey Operations (625.01) | LS | 1 | $55,000 | $28,000 | $20,000 | $210,382 | $34,000 | $30,000 |
| 108 | (625.09010015) | LS | 1 | $1,000.00 | $16,500 | $1,000.00 | $44,800 | $1,400.00 | $2,000.00 |
| 109 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $4,000.00 | $5,000.00 | $5,000.00 | $4,440.00 | $2,500.00 | $2,500.00 |
| 110 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 26 | $2,200.00 | $1,900.00 | $2,500.00 | $7,520.00 | $2,500.00 | $2,600.00 |
| 111 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 112 | Construction Testing supplies – Consumables (637.36) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 113 | (637.41000115) | 26 | $75.00 | $175.00 | $100.00 | $143.00 | $250.00 | $110.00 | |
| 114 | (637.41000215) | 26 | $75.00 | $175.00 | $100.00 | $143.00 | $250.00 | $110.00 | |
| 115 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 1 | $67.00 | $73.00 | $100.00 | $121.00 | $110.00 | $100.00 |
| 116 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 4 | $60.00 | $67.00 | $100.00 | $76.90 | $72.00 | $62.00 |
| 117 | Type A Sign Posts (645.81) | EACH | 2 | $250.00 | $250.00 | $250.00 | $225.00 | $50.00 | $240.00 |
| 118 | Reference Marker Panel (646.21) | EACH | 21 | $45.00 | $47.00 | $50.00 | $55.70 | $52.00 | $45.00 |
| 119 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 34 | $16.00 | $17.00 | $15.00 | $19.90 | $18.50 | $17.00 |
| 120 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 90 | $22.00 | $24.00 | $20.00 | $27.20 | $26.00 | $22.00 |
| 121 | Steel Post, 2.0 lb/ft (646.32) | EACH | 95 | $83.00 | $95.00 | $100.00 | $113.00 | $100.00 | $95.00 |
| 122 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 72 | $11.00 | $12.00 | $10.00 | $13.30 | $14.00 | $11.00 |
| 123 | Field Change Payment (FCP) (697.03) | DOL | 670,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 124 | Asphalt Price Adjustment (698.04) | DOL | 1,870 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 125 | Fuel Price Adjustment (698.05) | DOL | 4,323 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 126 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 127 | Mobilization (699.040001) | LS | 1 | $340,000 | $351,505 | $311,682 | $383,452 | $345,000 | $350,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of July 10, 2025. Compiled by Mirage Metrics.