NYSDOT contract D265682 bid tabulation

HIGHWAY MILL & FILL - I-81 Exit 13B to 21. Let by New York State DOT on February 5, 2026, Broome, Region 09. 4 bids received; low bid $18,621,020 by Suit-Kote Corporation.

Owner
New York State DOT
Letting
05 FEB 2026
Pay items
103
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Suit-Kote Corporation$18,621,020Low
2Lancaster Development and Tully Construction Co LLC$21,177,450+14%
3Dalrymple Gravel & Contracting Co Inc$22,253,985+20%
4Barrett Paving Materials Inc$27,512,506+48%
NYSDOT contract D265682: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Suit-Kote Corporation2. Lancaster Development and Tully Construction Co LLC3. Dalrymple Gravel & Contracting Co Inc4. Barrett Paving Materials Inc
1Clearing and Grubbing (201.07)ACRE2$7,500.00$10,000$33,000$30,000
2Unclassified Excavation and Disposal (203.02)CY3,600$110.00$100.00$60.00$95.00
3 (203.24010017)7,000$35.00$30.60$30.00$58.00
4Conduit Excavation and Backfill including Surface Restoration (206.03)LF120$46.50$35.00$77.00$49.00
5 (304.00010018)104,500$1.00$0.01$0.15$0.20
6Subbase Course, Optional Type (304.15)CY900$69.00$80.00$55.00$66.00
7Pavement Density Quality Adjustment to Asphalt Items (404.0002)QUALITY UNIT1,774$100.00$100.00$100.00$100.00
8Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003)QUALITY UNIT753$100.00$100.00$100.00$100.00
9 (404.1989)TON2,050$140.33$171.00$140.00$187.00
10 (404.2589)TON3,400$133.00$141.00$132.00$161.00
11 (406.0189)TON950$152.00$199.00$150.00$228.00
12 (407.01040009)32,000$5.00$1.00$4.50$3.84
13Asphalt Pavement Joint Adhesive (418.7603)LF140,000$0.90$2.00$0.20$0.65
14 (421.09520109)56,000$119.00$120.00$137.00$209.00
15 (490.17011018)475,100$3.50$3.70$3.00$4.30
16Transition Bridge Railing (568.70)LF275$220.00$251.00$220.00$189.53
17Box Beam Guide Railing (606.10)LF17,000$42.00$48.00$42.00$43.57
18Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF108$58.00$66.30$58.00$50.60
19Box Beam Median Barrier (606.11)LF15,450$58.00$66.30$58.00$57.00
20Box Beam End Piece (606.120101)EACH6$800.00$914.00$800.00$617.75
21Box Beam Guide Railing End Assembly Type I (606.120102)EACH9$4,100.00$4,680.00$4,100.00$3,882.72
22Box Beam Guide Railing End Assembly Type I with 18 ft Extension (606.120103)EACH2$4,800.00$5,480.00$4,800.00$4,682.36
23Box Beam Median Barrier End Assembly, Type C (606.1403)EACH4$12,065$13,100$12,000$6,796.89
24Single-Slope Concrete Median Barrier - Wide (Optional) (606.3051)LF100$377.04$242.00$200.00$400.00
25Single-Slope Concrete Half Section Barrier (Optional) (606.3061)LF320$248.68$187.00$150.00$220.00
26Resetting Box Beam Guide Railing (New Posts) (606.5348)LF450$33.00$37.70$33.00$28.81
27Removing and Disposing Corrugated Beam Guide Railing (606.71)LF13,000$3.00$3.45$3.00$3.00
28Removing and Disposing HPBO (Mod.) Corrugated Beam Guide Railing (606.7101)LF300$4.00$4.55$4.00$4.00
29Removing and Disposing Box Beam Guide Railing (606.73)LF5,000$5.00$5.70$5.00$3.50
30Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910)EACH7$310.00$354.00$310.00$250.00
31Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920)EACH18$45.00$51.40$45.00$75.00
32Removing and Disposing Box Beam Energy-Absorbing Terminal (606.7921)EACH9$155.00$177.00$155.00$250.00
33Removing and Disposing Anchorage Units for HPBO(Mod) Corrugated Beam Guide Railing (606.7941)EACH1$310.00$354.00$310.00$250.00
34 (606.85020001)7$200.00$229.00$200.00$500.00
35Transition from Box Beam Guide Rail to Jersey-shaped Concrete Barrier (One- or Two-Way Operation) (606.8801)EACH2$17,276$22,900$13,000$16,990
36Transition from Jersey-shaped Concrete Barrier to Box Beam Guide Rail (One Way - Trailing End of Barrier) (606.8802)EACH3$11,618$19,800$11,000$14,020
37Transition Between Box Beam Guide Rail and Single Slope Half Section Concrete Barrier (One or Two Way Operation) (606.8803)EACH2$14,709$15,900$12,000$16,000
38Transition Between Single Slope Half Section Concrete Barrier and Box Beam Guide Rail (One Way - Trailing End of Barrier) (606.8804)EACH2$12,009$12,800$10,000$13,500
39Transition Between Box Beam Median Barrier and Single Slope Concrete Median Barrier (606.8805)EACH2$16,819$16,700$15,000$18,990
40Transition from Box Beam Guide Rail to Full-Section Single-Slope Concrete Barrier (One- or Two-Way Operation) (606.8806)EACH2$15,359$16,300$15,000$17,800
41Weed Removal (610.13)SY2,700$0.80$0.95$0.80$0.80
42Topsoil - Roadside (610.1402)CY160$108.00$212.00$110.00$100.00
43Turf Establishment – Restoration/High Traffic (610.1603)SY2,800$1.75$2.05$2.00$1.75
44Watering Vegetation (610.19)1,000 GALLONS110$10.00$1.00$10.00$10.00
45Mowing (610.21)SY2,500$1.00$0.72$1.00$1.00
46 (617.01010024)1,250$1.50$1.75$1.50$8.00
47 (617.10000024)22$76.82$109.00$300.00$502.00
48 (617.11000024)LS1$2,350.00$1,250.00$15,000$1,900.00
49Basic Work Zone Traffic Control (619.01)LS1$1,100,000$3,000,000$2,964,000$3,009,252
50 (619.0901)LF540,000$0.24$0.26$0.40$0.27
51Nighttime Operations (Entire Project) (619.24)LS1$250,000$255,000$270,000$480,000
52 (621.05020004)16,000$4.78$1.65$0.15$14.50
53Survey Operations (625.01)LS1$50,000$56,546$75,000$75,000
54 (627.50140008)1,050$5.30$10.90$10.00$6.00
55Stress Relieving Pavement Repairs (633.16)SY7,200$219.00$204.00$360.00$286.00
56Concrete Cylinder Curing Equipment (637.04)EACH1$200.00$3,830.00$2,500.00$1,495.00
57Engineer’s Field Office – Type 2 (637.12)MONTH12$2,000.00$6,940.00$4,000.00$3,900.00
58Office Technology and Supplies (637.34)DOL2,000$1.00$1.00$1.00$1.00
59 (637.41000115)12$316.69$148.00$200.00$200.00
60 (637.41000215)12$316.69$148.00$200.00$200.00
61Ground-Mounted Sign Panels without Z-bars (645.5101)SF240$70.00$80.00$70.00$38.75
62Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF1,800$40.00$45.70$40.00$39.00
63Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103)SF550$38.00$43.40$38.00$42.10
64Type A Sign Posts (645.81)EACH345$227.00$259.00$230.00$198.81
65 (645.81090003)80$56.00$64.00$56.00$65.00
66Reference Marker Panel (646.21)EACH165$32.00$36.60$32.00$24.00
67Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH1,290$17.00$19.40$17.00$14.50
68Steel Post, 2.0 lb/ft (646.32)EACH1,115$65.00$74.30$65.00$65.00
69Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH270$60.00$68.60$60.00$20.00
70Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62)EACH4$310.00$354.00$310.00$20.00
71Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size III (Over 100 Square Feet) (647.63)EACH1$620.00$708.00$650.00$125.00
72 (647.83001002)1,145$30.00$34.30$30.00$13.50
73Milled-In Audible Roadway Delineators (MIARDs) (649.01)LF205,000$0.38$0.28$0.70$0.27
74Pavement Ride Quality Adjustment to Asphalt Level 1 (653.1010)QUALITY UNIT1,406$100.00$100.00$100.00$100.00
75 (662.60000115)LS1$1,500.00$1,500.00$1,500.00$1,500.00
76 (670.0106)EACH1$9,985.00$5,490.00$6,500.00$4,805.00
77 (670.1130)EACH1$3,720.00$5,040.00$4,410.00$4,410.00
78Breakaway Transformer Base (Aluminum) (670.19)EACH1$1,750.00$1,280.00$1,120.00$1,117.00
79Ground Wire No. 6 AWG. (670.7501)LF120$4.10$7.55$6.75$6.60
80 (670.75010005)1$135.00$76.60$67.00$67.00
81Performance Concrete Quality Adjustment (670.99)QUALITY UNIT1$25.07$25.07$25.07$25.07
82Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003)EACH1$5,670.79$2,790.00$4,500.00$2,440.00
83 (680.510501)EACH1$2,175.00$2,500.00$2,200.00$2,190.00
84 (680.520106)LF120$13.65$35.40$31.00$31.00
85 (680.520203)LF30$30.60$20.60$18.00$18.00
86 (680.52080325)120$14.65$19.40$17.00$17.00
87Trenchless Installation Method for Conduit (680.5301)LF120$142.00$191.00$157.00$157.00
88Inductance Loop Installation (680.54)LF110$32.75$38.50$34.00$33.70
89Inductance Loop Wire (680.72)LF210$0.60$2.45$2.15$2.15
90 (680.81423001)1$6,875.00$7,660.00$10,000$6,700.00
91 (680.82000008)1$9,290.00$4,230.00$4,000.00$3,700.00
92 (680.950206)LF60$8.50$16.00$14.00$14.00
93 (683.06010013)1$9,450.00$17,900$20,000$15,700
94 (685.16010014)252,150$1.12$1.15$1.20$1.12
95 (685.17010014)161,000$1.12$1.15$1.20$1.12
96White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104)LF18,500$2.45$3.40$2.50$2.45
97Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204)LF2,700$2.45$3.40$2.50$2.45
98White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404)EACH9$195.00$460.00$200.00$195.00
99Field Change Payment (FCP) (697.03)DOL800,000$1.00$1.00$1.00$1.00
100Asphalt Price Adjustment (698.04)DOL55,819.50$1.00$1.00$1.00$1.00
101Fuel Price Adjustment (698.05)DOL7,778$1.00$1.00$1.00$1.00
102Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00
103Mobilization (699.040001)LS1$600,000$812,559$825,000$1,050,000
NYSDOT contract D265682: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of February 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy