NYSDOT contract D265682 bid tabulation
HIGHWAY MILL & FILL - I-81 Exit 13B to 21. Let by New York State DOT on February 5, 2026, Broome, Region 09. 4 bids received; low bid $18,621,020 by Suit-Kote Corporation.
- Owner
- New York State DOT
- Letting
- 05 FEB 2026
- Pay items
- 103
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Suit-Kote Corporation | $18,621,020 | Low |
| 2 | Lancaster Development and Tully Construction Co LLC | $21,177,450 | +14% |
| 3 | Dalrymple Gravel & Contracting Co Inc | $22,253,985 | +20% |
| 4 | Barrett Paving Materials Inc | $27,512,506 | +48% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Suit-Kote Corporation | 2. Lancaster Development and Tully Construction Co LLC | 3. Dalrymple Gravel & Contracting Co Inc | 4. Barrett Paving Materials Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.07) | ACRE | 2 | $7,500.00 | $10,000 | $33,000 | $30,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 3,600 | $110.00 | $100.00 | $60.00 | $95.00 |
| 3 | (203.24010017) | 7,000 | $35.00 | $30.60 | $30.00 | $58.00 | |
| 4 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 120 | $46.50 | $35.00 | $77.00 | $49.00 |
| 5 | (304.00010018) | 104,500 | $1.00 | $0.01 | $0.15 | $0.20 | |
| 6 | Subbase Course, Optional Type (304.15) | CY | 900 | $69.00 | $80.00 | $55.00 | $66.00 |
| 7 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 1,774 | $100.00 | $100.00 | $100.00 | $100.00 |
| 8 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 753 | $100.00 | $100.00 | $100.00 | $100.00 |
| 9 | (404.1989) | TON | 2,050 | $140.33 | $171.00 | $140.00 | $187.00 |
| 10 | (404.2589) | TON | 3,400 | $133.00 | $141.00 | $132.00 | $161.00 |
| 11 | (406.0189) | TON | 950 | $152.00 | $199.00 | $150.00 | $228.00 |
| 12 | (407.01040009) | 32,000 | $5.00 | $1.00 | $4.50 | $3.84 | |
| 13 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 140,000 | $0.90 | $2.00 | $0.20 | $0.65 |
| 14 | (421.09520109) | 56,000 | $119.00 | $120.00 | $137.00 | $209.00 | |
| 15 | (490.17011018) | 475,100 | $3.50 | $3.70 | $3.00 | $4.30 | |
| 16 | Transition Bridge Railing (568.70) | LF | 275 | $220.00 | $251.00 | $220.00 | $189.53 |
| 17 | Box Beam Guide Railing (606.10) | LF | 17,000 | $42.00 | $48.00 | $42.00 | $43.57 |
| 18 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 108 | $58.00 | $66.30 | $58.00 | $50.60 |
| 19 | Box Beam Median Barrier (606.11) | LF | 15,450 | $58.00 | $66.30 | $58.00 | $57.00 |
| 20 | Box Beam End Piece (606.120101) | EACH | 6 | $800.00 | $914.00 | $800.00 | $617.75 |
| 21 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 9 | $4,100.00 | $4,680.00 | $4,100.00 | $3,882.72 |
| 22 | Box Beam Guide Railing End Assembly Type I with 18 ft Extension (606.120103) | EACH | 2 | $4,800.00 | $5,480.00 | $4,800.00 | $4,682.36 |
| 23 | Box Beam Median Barrier End Assembly, Type C (606.1403) | EACH | 4 | $12,065 | $13,100 | $12,000 | $6,796.89 |
| 24 | Single-Slope Concrete Median Barrier - Wide (Optional) (606.3051) | LF | 100 | $377.04 | $242.00 | $200.00 | $400.00 |
| 25 | Single-Slope Concrete Half Section Barrier (Optional) (606.3061) | LF | 320 | $248.68 | $187.00 | $150.00 | $220.00 |
| 26 | Resetting Box Beam Guide Railing (New Posts) (606.5348) | LF | 450 | $33.00 | $37.70 | $33.00 | $28.81 |
| 27 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 13,000 | $3.00 | $3.45 | $3.00 | $3.00 |
| 28 | Removing and Disposing HPBO (Mod.) Corrugated Beam Guide Railing (606.7101) | LF | 300 | $4.00 | $4.55 | $4.00 | $4.00 |
| 29 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 5,000 | $5.00 | $5.70 | $5.00 | $3.50 |
| 30 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 7 | $310.00 | $354.00 | $310.00 | $250.00 |
| 31 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 18 | $45.00 | $51.40 | $45.00 | $75.00 |
| 32 | Removing and Disposing Box Beam Energy-Absorbing Terminal (606.7921) | EACH | 9 | $155.00 | $177.00 | $155.00 | $250.00 |
| 33 | Removing and Disposing Anchorage Units for HPBO(Mod) Corrugated Beam Guide Railing (606.7941) | EACH | 1 | $310.00 | $354.00 | $310.00 | $250.00 |
| 34 | (606.85020001) | 7 | $200.00 | $229.00 | $200.00 | $500.00 | |
| 35 | Transition from Box Beam Guide Rail to Jersey-shaped Concrete Barrier (One- or Two-Way Operation) (606.8801) | EACH | 2 | $17,276 | $22,900 | $13,000 | $16,990 |
| 36 | Transition from Jersey-shaped Concrete Barrier to Box Beam Guide Rail (One Way - Trailing End of Barrier) (606.8802) | EACH | 3 | $11,618 | $19,800 | $11,000 | $14,020 |
| 37 | Transition Between Box Beam Guide Rail and Single Slope Half Section Concrete Barrier (One or Two Way Operation) (606.8803) | EACH | 2 | $14,709 | $15,900 | $12,000 | $16,000 |
| 38 | Transition Between Single Slope Half Section Concrete Barrier and Box Beam Guide Rail (One Way - Trailing End of Barrier) (606.8804) | EACH | 2 | $12,009 | $12,800 | $10,000 | $13,500 |
| 39 | Transition Between Box Beam Median Barrier and Single Slope Concrete Median Barrier (606.8805) | EACH | 2 | $16,819 | $16,700 | $15,000 | $18,990 |
| 40 | Transition from Box Beam Guide Rail to Full-Section Single-Slope Concrete Barrier (One- or Two-Way Operation) (606.8806) | EACH | 2 | $15,359 | $16,300 | $15,000 | $17,800 |
| 41 | Weed Removal (610.13) | SY | 2,700 | $0.80 | $0.95 | $0.80 | $0.80 |
| 42 | Topsoil - Roadside (610.1402) | CY | 160 | $108.00 | $212.00 | $110.00 | $100.00 |
| 43 | Turf Establishment – Restoration/High Traffic (610.1603) | SY | 2,800 | $1.75 | $2.05 | $2.00 | $1.75 |
| 44 | Watering Vegetation (610.19) | 1,000 GALLONS | 110 | $10.00 | $1.00 | $10.00 | $10.00 |
| 45 | Mowing (610.21) | SY | 2,500 | $1.00 | $0.72 | $1.00 | $1.00 |
| 46 | (617.01010024) | 1,250 | $1.50 | $1.75 | $1.50 | $8.00 | |
| 47 | (617.10000024) | 22 | $76.82 | $109.00 | $300.00 | $502.00 | |
| 48 | (617.11000024) | LS | 1 | $2,350.00 | $1,250.00 | $15,000 | $1,900.00 |
| 49 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $1,100,000 | $3,000,000 | $2,964,000 | $3,009,252 |
| 50 | (619.0901) | LF | 540,000 | $0.24 | $0.26 | $0.40 | $0.27 |
| 51 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $250,000 | $255,000 | $270,000 | $480,000 |
| 52 | (621.05020004) | 16,000 | $4.78 | $1.65 | $0.15 | $14.50 | |
| 53 | Survey Operations (625.01) | LS | 1 | $50,000 | $56,546 | $75,000 | $75,000 |
| 54 | (627.50140008) | 1,050 | $5.30 | $10.90 | $10.00 | $6.00 | |
| 55 | Stress Relieving Pavement Repairs (633.16) | SY | 7,200 | $219.00 | $204.00 | $360.00 | $286.00 |
| 56 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $200.00 | $3,830.00 | $2,500.00 | $1,495.00 |
| 57 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 12 | $2,000.00 | $6,940.00 | $4,000.00 | $3,900.00 |
| 58 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 59 | (637.41000115) | 12 | $316.69 | $148.00 | $200.00 | $200.00 | |
| 60 | (637.41000215) | 12 | $316.69 | $148.00 | $200.00 | $200.00 | |
| 61 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 240 | $70.00 | $80.00 | $70.00 | $38.75 |
| 62 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 1,800 | $40.00 | $45.70 | $40.00 | $39.00 |
| 63 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 550 | $38.00 | $43.40 | $38.00 | $42.10 |
| 64 | Type A Sign Posts (645.81) | EACH | 345 | $227.00 | $259.00 | $230.00 | $198.81 |
| 65 | (645.81090003) | 80 | $56.00 | $64.00 | $56.00 | $65.00 | |
| 66 | Reference Marker Panel (646.21) | EACH | 165 | $32.00 | $36.60 | $32.00 | $24.00 |
| 67 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 1,290 | $17.00 | $19.40 | $17.00 | $14.50 |
| 68 | Steel Post, 2.0 lb/ft (646.32) | EACH | 1,115 | $65.00 | $74.30 | $65.00 | $65.00 |
| 69 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 270 | $60.00 | $68.60 | $60.00 | $20.00 |
| 70 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 4 | $310.00 | $354.00 | $310.00 | $20.00 |
| 71 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size III (Over 100 Square Feet) (647.63) | EACH | 1 | $620.00 | $708.00 | $650.00 | $125.00 |
| 72 | (647.83001002) | 1,145 | $30.00 | $34.30 | $30.00 | $13.50 | |
| 73 | Milled-In Audible Roadway Delineators (MIARDs) (649.01) | LF | 205,000 | $0.38 | $0.28 | $0.70 | $0.27 |
| 74 | Pavement Ride Quality Adjustment to Asphalt Level 1 (653.1010) | QUALITY UNIT | 1,406 | $100.00 | $100.00 | $100.00 | $100.00 |
| 75 | (662.60000115) | LS | 1 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 76 | (670.0106) | EACH | 1 | $9,985.00 | $5,490.00 | $6,500.00 | $4,805.00 |
| 77 | (670.1130) | EACH | 1 | $3,720.00 | $5,040.00 | $4,410.00 | $4,410.00 |
| 78 | Breakaway Transformer Base (Aluminum) (670.19) | EACH | 1 | $1,750.00 | $1,280.00 | $1,120.00 | $1,117.00 |
| 79 | Ground Wire No. 6 AWG. (670.7501) | LF | 120 | $4.10 | $7.55 | $6.75 | $6.60 |
| 80 | (670.75010005) | 1 | $135.00 | $76.60 | $67.00 | $67.00 | |
| 81 | Performance Concrete Quality Adjustment (670.99) | QUALITY UNIT | 1 | $25.07 | $25.07 | $25.07 | $25.07 |
| 82 | Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003) | EACH | 1 | $5,670.79 | $2,790.00 | $4,500.00 | $2,440.00 |
| 83 | (680.510501) | EACH | 1 | $2,175.00 | $2,500.00 | $2,200.00 | $2,190.00 |
| 84 | (680.520106) | LF | 120 | $13.65 | $35.40 | $31.00 | $31.00 |
| 85 | (680.520203) | LF | 30 | $30.60 | $20.60 | $18.00 | $18.00 |
| 86 | (680.52080325) | 120 | $14.65 | $19.40 | $17.00 | $17.00 | |
| 87 | Trenchless Installation Method for Conduit (680.5301) | LF | 120 | $142.00 | $191.00 | $157.00 | $157.00 |
| 88 | Inductance Loop Installation (680.54) | LF | 110 | $32.75 | $38.50 | $34.00 | $33.70 |
| 89 | Inductance Loop Wire (680.72) | LF | 210 | $0.60 | $2.45 | $2.15 | $2.15 |
| 90 | (680.81423001) | 1 | $6,875.00 | $7,660.00 | $10,000 | $6,700.00 | |
| 91 | (680.82000008) | 1 | $9,290.00 | $4,230.00 | $4,000.00 | $3,700.00 | |
| 92 | (680.950206) | LF | 60 | $8.50 | $16.00 | $14.00 | $14.00 |
| 93 | (683.06010013) | 1 | $9,450.00 | $17,900 | $20,000 | $15,700 | |
| 94 | (685.16010014) | 252,150 | $1.12 | $1.15 | $1.20 | $1.12 | |
| 95 | (685.17010014) | 161,000 | $1.12 | $1.15 | $1.20 | $1.12 | |
| 96 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 18,500 | $2.45 | $3.40 | $2.50 | $2.45 |
| 97 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 2,700 | $2.45 | $3.40 | $2.50 | $2.45 |
| 98 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 9 | $195.00 | $460.00 | $200.00 | $195.00 |
| 99 | Field Change Payment (FCP) (697.03) | DOL | 800,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 100 | Asphalt Price Adjustment (698.04) | DOL | 55,819.50 | $1.00 | $1.00 | $1.00 | $1.00 |
| 101 | Fuel Price Adjustment (698.05) | DOL | 7,778 | $1.00 | $1.00 | $1.00 | $1.00 |
| 102 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 103 | Mobilization (699.040001) | LS | 1 | $600,000 | $812,559 | $825,000 | $1,050,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of February 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.