Dalrymple Gravel & Contracting Co Inc: NYSDOT bid record
Dalrymple Gravel & Contracting Co Inc submitted 17 bids on New York State DOT contracts in the data, from 17 FEB 2022 to 07 MAY 2026, and was the low bidder on 4 of them (24%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $69,742,121
- Latest bid
- 07 MAY 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 2 | 1 | 50% |
| 2023 | 3 | 1 | 33% |
| 2024 | 3 | 0 | 0% |
| 2025 | 4 | 0 | 0% |
| 2026 | 5 | 2 | 40% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 06 | 12 | 2 | 17% |
| Region 09 | 5 | 2 | 40% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 17 | 17 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 17 | 17 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 17 | 17 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 17 | 17 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 17 | 17 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 11 | 11 (100%) | $1.00 | $1.00 |
| Unclassified Excavation and Disposal | 203.02 | CY | 14 | 10 (71%) | $66.00 | $71.00 |
| Asphalt Pavement Joint Adhesive | 418.7603 | LF | 17 | 9 (53%) | $0.40 | $1.00 |
| Type A Sign Posts | 645.81 | EACH | 14 | 9 (64%) | $220.00 | $250.00 |
| Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars | 645.5102 | SF | 12 | 8 (67%) | $40.00 | $45.44 |
| Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) | 647.61 | EACH | 11 | 7 (64%) | $40.00 | $50.00 |
| Steel Post, 2.0 lb/ft | 646.32 | EACH | 9 | 7 (78%) | $75.00 | $85.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Bothar Construction LLC | 9 | 4 of 9 |
| Sealand Contractors Corp. | 4 | 2 of 4 |
| Dolomite Products Co Inc/DBA A L Blades | 3 | 2 of 3 |
| Barrett Paving Materials Inc | 3 | 2 of 3 |
| The L C Whitford Co Inc | 3 | 1 of 3 |
| Cold Spring Construction Company | 3 | 2 of 3 |
| D&H Excavating Inc | 3 | 2 of 3 |
| Lancaster Development and Tully Construction Co LLC | 3 | 2 of 3 |
| Twin Tier Constructors Inc | 3 | 1 of 3 |
| Villager Construction Inc | 3 | 2 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 MAY 2026 | D265792 | Region 06 | NY 14, NY 962E, NY 962F MbC; Miracle Mile | 2 of 2 | $6,026,322 | +7.0% |
| 12 MAR 2026 | D265719 | Region 06 | I-86 Paving Friendship to Belvidere | 2 of 3 | $7,414,072 | +6.0% |
| 12 MAR 2026 | D265736 | Region 09 | I86 CRACK & SEAT, OWEGO TO APALACHIN | 1 of 2 | $53,173,398 | Low, 9.0% under the second |
| 12 MAR 2026 | D265752 | Region 06 | I-86 Paving Horseheads to Elmira | 1 of 2 | $5,957,054 | Low, 19% under the second |
| 05 FEB 2026 | D265682 | Region 09 | HIGHWAY MILL & FILL - I-81 Exit 13B to 21 | 3 of 4 | $22,253,985 | +20% |
| 21 AUG 2025 | D265520 | Region 06 | Route 36 from Cass St. to Webbs Crossing Rd. - Phase 1 | 5 of 8 | $40,594,738 | +11% |
| 21 AUG 2025 | D265560 | Region 06 | CULVERT REPLACEMENT - NY 21, CIN 640470 | 2 of 4 | $2,313,444 | +2.0% |
| 10 JUL 2025 | D265492 | Region 06 | Mill & Fill Paving on I-86 | 2 of 4 | $3,927,678 | +8.0% |
| 24 APR 2025 | D265481 | Region 06 | NY14A Paving and Safety System Improvements | 4 of 5 | $6,043,008 | +9.0% |
| 10 OCT 2024 | D265334 | Region 06 | I-390/B&H RR Bridge Joint Repairs (1090651 & 1090652) | 3 of 5 | $2,244,015 | +19% |
| 23 MAY 2024 | D265266 | Region 06 | HIGHWAY - RESURFACING - I-86 in Town of Cuba & NY 305 | 3 of 3 | $2,053,050 | +29% |
| 29 FEB 2024 | D265195 | Region 09 | US RT11 - (COURT ST) Resurfacing, Binghamton | 4 of 4 | $5,232,928 | +32% |
| 23 MAR 2023 | D264983 | Region 09 | RT 96 & RT 17C, MILLING AND RESURFACING, VILLAGE OF OWEGO | 1 of 2 | $2,392,152 | Low, 14% under the second |
| 09 MAR 2023 | D265002 | Region 06 | NY 417 Wellsville MBC | 3 of 3 | $1,099,588 | +17% |
| 16 FEB 2023 | D264975 | Region 06 | FEMA DRAINAGE IMPROVEMENTS, NY54A Project | 3 of 4 | $14,132,835 | +19% |
| 04 AUG 2022 | D264837 | Region 09 | RTE 434, Marshland Road to Broome County Line, Resurfacing | 3 of 3 | $7,246,497 | +29% |
| 17 FEB 2022 | D264738 | Region 06 | MBC Paving - I86, concrete slab replacement and Mill&Fill | 1 of 3 | $8,219,518 | Low, 10% under the second |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.