NYSDOT contract D265481 bid tabulation

NY14A Paving and Safety System Improvements. Let by New York State DOT on April 24, 2025, Yates, Region 06. 5 bids received; low bid $5,530,890 by Bothar Construction LLC.

Owner
New York State DOT
Letting
24 APR 2025
Pay items
167
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Bothar Construction LLC$5,530,890Low
2Villager Construction Inc$5,869,900+6.0%
3Ramsey Constructors Inc$5,977,106+8.0%
4Dalrymple Gravel & Contracting Co Inc$6,043,008+9.0%
5Sealand Contractors Corp.$6,504,000+18%
NYSDOT contract D265481: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Bothar Construction LLC2. Villager Construction Inc3. Ramsey Constructors Inc4. Dalrymple Gravel & Contracting Co Inc5. Sealand Contractors Corp.
1Clearing and Grubbing (201.06)LS1$32,200$4,500.00$5,000.00$15,000$20,000
2Unclassified Excavation and Disposal (203.02)CY6,040$38.00$77.00$40.00$72.00$56.00
3Embankment In Place (203.03)CY410$30.00$98.00$21.00$30.00$67.00
4Select Granular Fill (203.07)CY2,550$63.45$72.00$90.00$130.00$115.00
5Trench and Culvert Excavation (206.0201)CY5,050$36.80$31.00$27.00$60.00$47.00
6Conduit Excavation and Backfill including Surface Restoration (206.03)LF286$119.60$160.00$155.00$141.00$148.00
7Test Pit Excavation (206.05)EACH2$1,955.00$1,385.00$1,000.00$2,666.00$2,800.00
8Geotextile Bedding (207.20)SY10$84.60$50.00$95.00$130.00$20.00
9Geotextile Drainage (207.22)SY800$2.50$1.15$2.00$5.00$3.00
10 (208.01030022)100$143.40$190.00$175.00$150.00$225.00
11Seed and Mulch – Temporary (209.1003)SY6,010$3.45$3.20$3.00$2.90$3.05
12Check Dam (Ditch Bottom Width 0.0 to 3′), Gravel Bag – Temporary (209.110201)EACH4$743.35$650.00$800.00$500.00$1,500.00
13Silt Fence - Temporary (209.13)LF2,079$5.00$5.00$5.00$4.42$5.00
14Drainage Structure Inlet Protection, Silt Fence – Temporary (209.1701)LF356$5.00$10.00$8.00$25.00$22.00
15Drainage Structure Inlet Protection, Gravel Bag – Temporary (209.1702)CY25$800.00$650.00$265.00$250.00$750.00
16Subbase Course, Type 2 (304.12)CY3,420$79.00$131.00$64.00$125.00$136.00
17 (404.0001)TON244$85.00$85.00$85.00$85.00$85.00
18 (404.0189)TON250$116.65$220.00$155.00$130.00$157.00
19 (404.1989)TON1,350$115.45$148.00$125.00$130.00$130.00
20 (404.3789)TON1,670$108.25$135.00$120.00$130.00$125.00
21 (404.4389)TON240$110.25$150.00$200.00$240.00$190.00
22 (406.0982)TON1,990$130.65$175.00$140.00$130.00$146.00
23Diluted Tack Coat (407.0102)GAL2,940$3.15$13.00$7.00$5.00$9.50
24Asphalt Pavement Joint Adhesive (418.7603)LF15,860$1.25$0.50$0.65$0.50$0.90
25Production Cold Milling of Bituminous Concrete (490.10)SY22,500$1.75$5.00$2.50$4.00$3.30
26Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY1,780$15.85$23.00$9.75$10.00$16.00
27Shields and Shoring (552.17)SF37,313$0.35$0.10$0.45$0.20$0.50
28 (555.05000001)25$933.00$565.00$620.00$1,500.00$1,250.00
29Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$1.98$1.98$1.98$1.98$1.98
30 (603.171116)EACH2$1,688.50$425.00$400.00$350.00$650.00
31 (603.171416)EACH1$1,841.50$575.00$400.00$450.00$848.00
32 (603.6102)LF70$117.65$144.00$125.00$100.00$150.00
33 (603.6103)LF382$129.25$165.00$115.00$110.00$115.00
34 (603.6105)LF100$166.00$230.00$150.00$140.00$160.00
35 (603.9812)LF1,131$83.15$41.00$34.00$40.00$56.00
36 (603.9815)LF2,045$87.00$54.00$45.00$45.00$72.00
37 (603.9818)LF416$92.00$53.00$45.00$50.00$74.00
38 (603.9824)LF122$107.25$76.00$68.00$70.00$91.00
39 (604.070601)EACH1$2,100.00$1,785.00$2,500.00$6,000.00$5,000.00
40 (604.070602)EACH7$1,100.00$1,630.00$2,000.00$1,300.00$1,200.00
41 (604.070603)EACH12$1,100.00$1,840.00$2,300.00$1,300.00$2,200.00
42 (604.300103)LF10$735.00$1,230.00$530.00$825.00$1,050.00
43 (604.300311)LF6$780.00$1,260.00$610.00$935.00$1,400.00
44 (604.301911)LF142$620.00$670.00$200.00$700.00$870.00
45 (604.4048)LF5$1,300.00$1,080.00$2,000.00$800.00$2,200.00
46 (604.500601)LF120$730.00$585.00$360.00$750.00$450.00
47Underdrain Filter, Type II (605.1001)CY835$92.25$88.00$75.00$150.00$145.00
48 (605.1501)LF6,386$5.15$7.00$14.00$3.00$8.00
49 (605.1504)LF206$16.45$39.00$38.00$45.00$44.00
50 (605.98101218)310$15.15$68.00$45.00$45.00$45.00
51Resetting Box Beam Guide Railing (New Posts) (606.5348)LF25$172.50$145.00$150.00$50.00$160.00
52 (607.41010010)640$7.75$6.50$4.75$5.90$7.00
53Concrete Sidewalks and Driveways (608.0101)CY400$1,313.50$990.00$1,400.00$1,250.00$1,370.00
54Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON250$214.75$290.00$175.00$300.00$285.00
55 (608.10080008)10$31.35$55.00$38.00$25.00$120.00
56 (608.21000003)22$507.85$375.00$575.00$405.00$530.00
57Stone Curb – Near Vertical Face (NVF) (609.0212)LF7,075$69.00$57.00$75.00$63.00$65.50
58 (609.0401)LF188$126.25$60.00$125.00$130.00$175.00
59Mycorrhizal Fungi (610.0701)LB5$74.75$72.00$65.00$65.00$69.00
60Compost (610.10)CY100$81.30$130.00$165.00$150.00$150.00
61Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101)CY15$212.75$205.00$185.00$185.00$195.00
62Topsoil - Roadside (610.1402)CY580$87.50$110.00$145.00$175.00$140.00
63Topsoil - Special Planting Mix (610.1404)CY75$117.65$150.00$155.00$250.00$198.00
64Turf Establishment -Lawns (610.1602)SY6,010$3.55$3.30$3.00$3.09$3.25
65Watering Vegetation (610.19)1,000 GALLONS91$138.00$120.00$120.00$120.00$120.00
66Mowing (610.21)SY6,010$0.60$0.60$0.50$0.50$0.53
67 (611.0161)EACH27$851.00$800.00$900.00$740.00$760.00
68Portable Drip Irrigation System (611.17)EACH27$69.00$67.00$72.00$60.00$63.00
69 (611.19010024)27$253.00$240.00$265.00$220.00$220.00
70 (614.060104)EACH3$1,535.00$775.00$850.00$700.00$1,000.00
71 (614.060204)EACH6$1,920.00$1,160.00$1,500.00$1,050.00$1,500.00
72 (614.060304)EACH4$2,560.00$1,440.00$1,650.00$1,300.00$1,800.00
73 (614.060404)EACH6$3,100.00$1,830.00$2,300.00$1,650.00$2,300.00
74 (614.060504)EACH2$4,000.00$2,380.00$3,000.00$2,150.00$3,000.00
75Pre-Existing Stump Removal up to 24” diameter at 6 inches above grade (614.0701)EACH3$3,800.00$1,260.00$800.00$650.00$950.00
76 (615.02060124)1$2,400.00$1,800.00$845.00$750.00$700.00
77Basic Work Zone Traffic Control (619.01)LS1$175,000$407,313$680,000$325,000$608,800
78Type III Construction Barricades (619.04)EACH12$125.00$100.00$180.00$450.00$350.00
79 (619.080101)LF15,750$0.60$0.55$0.50$0.49$0.52
80 (619.080102)LF12,388$0.60$0.55$0.50$0.49$0.52
81 (619.100101)LF33,514$0.30$0.30$0.25$0.24$0.25
82 (619.110513)EACH2$22,600$10,000$35,000$25,000$15,000
83Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611)MONTH12$454.25$320.00$400.00$300.00$315.00
84 (619.161401)EACH1$5,405.00$8,100.00$4,800.00$16,070$16,900
85 (619.27000007)8$660.00$800.00$400.00$750.00$450.00
86Stone Filling (Light) (620.03)CY8$128.00$230.00$800.00$650.00$1,650.00
87Cleaning Closed Drainage Systems (621.03)LF88$20.00$9.00$39.00$60.00$50.00
88Crushed Stone (In-Place Measure) (623.12)CY370$122.50$80.00$92.00$165.00$155.00
89Survey Operations (625.01)LS1$95,000$45,000$175,000$74,000$41,000
90Steel Pin and Cap Right of Way Markers (625.05)EACH23$1,225.00$255.00$225.00$231.00$270.00
91Permanent Survey Markers (625.06)EACH2$4,346.60$3,400.00$5,000.00$2,500.00$3,100.00
92 (627.50140008)7,520$7.50$3.50$9.00$5.00$7.00
93Concrete Cylinder Curing Equipment (637.04)EACH1$8,150.00$1,000.00$4,800.00$1,500.00$10,000
94Engineer’s Field Office – Type 2 (637.12)MONTH16$2,500.00$2,000.00$3,000.00$2,000.00$2,000.00
95Office Technology and Supplies (637.34)DOL5,000$1.00$1.00$1.00$1.00$1.00
96Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00$1.00
97 (637.41000115)16$3,200.00$110.00$165.00$100.00$80.00
98 (637.41000215)16$3,200.00$110.00$165.00$100.00$80.00
99Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF412$40.25$40.00$42.00$35.00$37.00
100Type A Sign Posts (645.81)EACH61$195.50$250.00$200.00$170.00$178.00
101 (645.81090003)36$71.30$84.00$75.00$62.00$65.00
102Pole-Mounted Sign Support System (Band Mounting) (645.85)EACH4$212.75$163.00$200.00$185.00$195.00
103Reference Marker Panel (646.21)EACH7$39.10$45.00$40.00$34.00$36.00
104Steel Post, 1.1 lb/ft (646.31)EACH4$65.55$86.00$65.00$57.00$60.00
105Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH23$40.25$155.00$40.00$35.00$37.00
106Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH23$29.90$7.00$28.00$26.00$28.00
107Welded Frame & Reticuline Grate 3 (655.1103)EACH1$1,893.60$1,840.00$3,000.00$1,000.00$1,000.00
108Welded Frame & Reticuline Grate 11 (655.1111)EACH27$1,605.85$1,770.00$2,200.00$1,100.00$1,050.00
109Manhole Frame & Cover (655.1202)EACH2$1,392.00$1,800.00$3,000.00$1,250.00$900.00
110 (662.60010004)1,000$1.00$1.00$1.00$1.00$1.00
111 (663.0106)LF36$403.00$63.00$100.00$250.00$105.00
112 (663.0704)LF34$165.00$3.50$20.00$100.00$300.00
113 (663.1306)EACH5$8,100.00$8,100.00$12,000$7,500.00$9,500.00
114Iron Water Main Fittings (3 - 8 inch diameter) (663.2001)LB625$4.25$11.00$1.00$10.00$8.00
115 (663.2604)EACH7$1,608.00$2,400.00$1,200.00$1,000.00$900.00
116Adjust Existing Valve Box Elevation (663.33)EACH32$440.00$340.00$900.00$200.00$600.00
117Adjust Existing Curb Box Elevation (663.35)EACH14$375.00$440.00$300.00$200.00$500.00
118Remove and Dispose of Existing Water Service Connection (663.44)EACH7$1,600.00$150.00$400.00$1,000.00$500.00
119 (680.05010007)1$26,910$22,500$28,000$22,341$23,400
120 (680.05020007)1$4,945.00$4,300.00$5,500.00$3,811.00$4,000.00
121Pole Excavation and Concrete Foundation (680.5001)CY11$3,438.50$2,500.00$3,600.00$3,158.00$3,320.00
122Concrete Base for Controller Cabinet (680.5002)EACH1$3,323.50$4,000.00$3,400.00$4,037.00$4,250.00
123 (680.50500005)32$529.00$425.00$500.00$453.00$475.00
124 (680.510501)EACH4$2,173.50$2,400.00$2,000.00$2,474.00$2,600.00
125 (680.520105)LF68$27.60$23.00$26.00$13.08$14.00
126 (680.520108)LF398$49.45$43.00$45.00$34.78$37.00
127 (680.520110)LF28$70.15$84.00$65.00$53.21$56.00
128 (680.520203)LF35$13.80$19.00$13.00$9.66$11.00
129 (680.56050008)1$2,242.50$3,970.00$2,100.00$2,214.00$2,300.00
130 (680.622046)EACH2$26,910$19,000$35,000$10,260$10,700
131 (680.670802)EACH4$1,633.00$2,170.00$1,700.00$2,406.00$2,500.00
132Single Span Wire Assembly (680.7001)EACH2$3,467.25$3,300.00$3,500.00$1,910.00$2,000.00
133Riser Assembly, 1-1/ 2-inch Diameter (680.700604)EACH2$985.55$1,100.00$1,000.00$788.00$825.00
134Shielded Lead-in Cable (680.71)LF930$3.16$4.75$3.00$2.50$2.65
135 (680.730514)LF950$3.75$4.50$3.25$3.66$3.85
136 (680.730518)LF60$3.75$4.25$3.25$4.80$5.05
137 (680.731014)LF1,050$5.70$6.25$5.00$7.05$7.40
138 (680.79000105)1$7,130.00$6,600.00$8,500.00$6,428.00$6,750.00
139 (680.80324515)1$3,565.00$2,500.00$4,000.00$2,687.00$2,820.00
140 (680.80324603)1$1,615.75$1,200.00$2,500.00$1,214.00$1,270.00
141Install Ball/Arrow LED Traffic Signal Module (680.810308)EACH30$46.00$24.00$40.00$3.34$3.50
142Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601)EACH30$310.50$265.00$275.00$352.00$370.00
143Traffic Signal Bracket Assembly - 1 Way (680.8111)EACH10$569.25$540.00$500.00$195.00$205.00
144Install Pedestrian Signal Module (680.813104)EACH8$46.00$24.00$45.00$5.01$6.00
145Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106)EACH8$327.75$380.00$315.00$364.00$380.00
146Pedestrian Signal Bracket Mount Assembly (680.8141)EACH4$626.75$525.00$600.00$432.00$450.00
147Pedestrian Signal Post Top Mount Assembly (680.8142)EACH4$391.00$465.00$400.00$290.00$305.00
148 (680.8151)EACH8$1,460.50$1,200.00$1,350.00$1,312.00$1,375.00
149Backplates for Traffic Signal Heads (680.8199)EACH10$382.95$320.00$400.00$276.00$290.00
150 (680.8207)EACH3$851.00$885.00$800.00$867.00$910.00
151 (680.90920103)1$1,431.75$1,800.00$1,350.00$1,460.00$1,530.00
152Watertight Disconnect Box (680.9401)EACH1$824.55$1,100.00$800.00$250.00$265.00
153Meter Pan (680.9402)EACH1$1,431.75$1,100.00$1,400.00$1,460.00$1,530.00
154 (680.94350008)1$4,312.50$2,200.00$4,200.00$2,218.00$2,320.00
155Install Electrical Disconnect/Generator Transfer Switch (680.9499)EACH1$431.25$375.00$425.00$185.00$195.00
156 (680.950206)LF100$8.90$3.65$8.00$6.59$7.00
157Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$10.14$10.14$10.14$10.14$10.14
158 (683.09230208)1$2,035.50$6,400.00$1,800.00$3,264.00$3,420.00
159White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF9,450$0.55$0.50$0.50$0.47$0.49
160Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF10,760$0.55$0.50$0.50$0.47$0.49
161White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104)LF9,910$3.35$3.20$3.00$2.90$3.05
162White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404)EACH12$310.50$300.00$300.00$270.00$285.00
163Field Change Payment (FCP) (697.03)DOL248,617$1.00$1.00$1.00$1.00$1.00
164Asphalt Price Adjustment (698.04)DOL23,560$1.00$1.00$1.00$1.00$1.00
165Fuel Price Adjustment (698.05)DOL10,720$1.00$1.00$1.00$1.00$1.00
166Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00
167Mobilization (699.040001)LS1$212,000$217,000$220,000$200,000$250,000
NYSDOT contract D265481: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of April 24, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy