Villager Construction Inc: NYSDOT bid record
Villager Construction Inc submitted 28 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 13 AUG 2026, and was the low bidder on 5 of them (18%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $30,925,851
- Latest bid
- 13 AUG 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 6 | 2 | 33% |
| 2023 | 7 | 1 | 14% |
| 2024 | 2 | 1 | 50% |
| 2025 | 9 | 1 | 11% |
| 2026 | 4 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 04 | 23 | 4 | 17% |
| Region 06 | 3 | 1 | 33% |
| Region 03 | 1 | 0 | 0% |
| Region 03, 04 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 23 | 23 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 21 | 21 (100%) | $1.00 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 16 | 16 (100%) | $85.00 | $90.00 |
| 691.04000020 | 13 | 13 (100%) | $1.00 | $1.00 | ||
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 13 | 13 (100%) | $85.00 | $85.00 |
| 662.60010004 | 13 | 13 (100%) | $1.00 | $1.00 | ||
| Longitudinal Joint Density Quality Adjustment to Asphalt Items | 404.000031 | QUALITY UNIT | 12 | 12 (100%) | $85.00 | $85.00 |
| Shields and Shoring | 552.17 | SF | 12 | 11 (92%) | $0.15 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Cold Spring Construction Company | 21 | 13 of 21 |
| Sealand Contractors Corp. | 21 | 10 of 21 |
| Keeler Construction Co Inc | 15 | 12 of 15 |
| Seneca Stone Corp | 6 | 5 of 6 |
| Ramsey Constructors Inc | 6 | 4 of 6 |
| The L C Whitford Co Inc | 3 | 3 of 3 |
| McLaughlin Construction Corp/DBA Edbauer Construction | 3 | 2 of 3 |
| Dalrymple Gravel & Contracting Co Inc | 3 | 1 of 3 |
| Concrete Applied Technologies Corp/DBA:Catco | 2 | 2 of 2 |
| Bothar Construction LLC | 2 | 1 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 AUG 2026 | D265689 | Region 04 | Replacement of Six Culverts | 8 of 8 | $11,395,200 | +57% |
| 21 MAY 2026 | D265777 | Region 04 | Standby Where & When Highway Repair Contract | 2 of 2 | $3,797,473 | +1.0% |
| 09 APR 2026 | D265755 | Region 04 | Route 14 from Route 31 to Former Village of Lyons North Line | 3 of 3 | $6,515,450 | +38% |
| 08 JAN 2026 | D265634 | Region 04 | PAVEMENT RESURFACING & SIGNAL IMPROVEMENTS - Route 15 | 3 of 4 | $7,199,500 | +25% |
| 23 OCT 2025 | D265561 | Region 04 | Large Culvert Resiliency Replacement | 7 of 7 | $5,585,500 | +23% |
| 21 AUG 2025 | D265520 | Region 06 | Route 36 from Cass St. to Webbs Crossing Rd. - Phase 1 | 8 of 8 | $46,415,500 | +27% |
| 10 JUL 2025 | D265492 | Region 06 | Mill & Fill Paving on I-86 | 1 of 4 | $3,623,800 | Low, 8.0% under the second |
| 24 APR 2025 | D265481 | Region 06 | NY14A Paving and Safety System Improvements | 2 of 5 | $5,869,900 | +6.0% |
| 10 APR 2025 | D265439 | Region 04 | Replacement of 7 Culverts | 4 of 5 | $7,180,900 | +3.0% |
| 13 MAR 2025 | D265450 | Region 04 | Highway Repair Where/When Contract for 2025 and 2026 | 4 of 4 | $2,450,976 | +11% |
| 13 MAR 2025 | D265454 | Region 04 | N.Y. Route 77 Pavement Resurfacing | 8 of 9 | $5,254,560 | +25% |
| 13 MAR 2025 | D265470 | Region 04 | Drainage Requirements Where and When Contract | 3 of 3 | $2,450,976 | +5.0% |
| 27 FEB 2025 | D265425 | Region 04 | Pavement Resurfacing and Drainage Rehabilitation I-490 | 2 of 3 | $26,890,000 | +12% |
| 24 OCT 2024 | D265302 | Region 04 | PAVEMENT REHABILITATION - Route 204 | 1 of 4 | $9,675,000 | Low, 2.0% under the second |
| 11 JAN 2024 | D265166 | Region 03, 04 | RESURFACING - NY Rte. 5 & US Rte. 20 | 4 of 6 | $1,590,564 | +14% |
| 14 DEC 2023 | D265115 | Region 04 | ROUTES 5 & 20 CULVERT IMPROVEMENTS | 3 of 3 | $2,207,320 | +21% |
| 09 NOV 2023 | D265104 | Region 04 | Hwy Improvements-Route 104 from Ridgeway Ave to Culver Road | 3 of 3 | $29,297,000 | +5.0% |
| 09 NOV 2023 | D265111 | Region 04 | Hwy Improvements-Route 31 from Route 19 to Transit Way | 2 of 3 | $3,396,500 | +21% |
| 26 OCT 2023 | D265089 | Region 04 | Route 18 at North Greece Road Intersection Improvements | 1 of 4 | $2,502,700 | Low, 10% under the second |
| 18 MAY 2023 | D265025 | Region 04 | Route 31 from Wayne/Monroe County Line to Hamlet of Macedon | 3 of 5 | $5,231,265 | +6.0% |
| 06 APR 2023 | D265015 | Region 04 | STANDBY HIGHWAY REPAIR CONTRACT FOR 2023 AND 2024 | 2 of 3 | $2,583,960 | +31% |
| 02 FEB 2023 | D264962 | Region 04 | RESURFACING OF NEW YORK STATE ROUTES 31, 104, AND 260 | 4 of 4 | $6,675,425 | +26% |
| 19 MAY 2022 | D264808 | Region 03 | ROUTE 96A MBC, TOWNS OF FAYETTE & WATERLOO | 5 of 5 | $8,996,000 | +26% |
| 05 MAY 2022 | D264790 | Region 04 | NY Routes 96 and 250 Pavement Resurfacing, Town of Perinton | 1 of 3 | $5,745,000 | Low, 3.0% under the second |
| 17 FEB 2022 | D264734 | Region 04 | NY Route 590 & NY Route 104 Pavement Rehabilitation | 1 of 3 | $9,379,351 | Low, 16% under the second |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.