NYSDOT contract D265634 bid tabulation

PAVEMENT RESURFACING & SIGNAL IMPROVEMENTS - Route 15. Let by New York State DOT on January 8, 2026, Monroe, Region 04. 4 bids received; low bid $5,761,106 by Keeler Construction Co Inc.

Owner
New York State DOT
Letting
08 JAN 2026
Pay items
176
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Keeler Construction Co Inc$5,761,106Low
2Sealand Contractors Corp.$7,142,000+24%
3Villager Construction Inc$7,199,500+25%
4Cold Spring Construction Company$7,674,140+33%
NYSDOT contract D265634: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Keeler Construction Co Inc2. Sealand Contractors Corp.3. Villager Construction Inc4. Cold Spring Construction Company
1 (201.07010004)13$440.00$550.00$635.00$420.00
2Unclassified Excavation and Disposal (203.02)CY517$145.00$185.00$680.00$90.00
3Embankment In Place (203.03)CY5$144.00$500.00$280.00$130.00
4Select Granular Fill (203.07)CY93$220.00$100.00$65.00$60.00
5 (203.24010017)69$158.00$225.00$295.00$95.00
6Trench and Culvert Excavation (206.0201)CY187$47.00$110.00$140.00$80.00
7 (206.03060005)676$45.00$48.00$44.00$35.00
8Test Pit Excavation (206.05)EACH8$1,600.00$2,100.00$1,500.00$4,500.00
9Drainage Structure Inlet Protection, Gravel Bag – Temporary (209.1702)CY19$660.00$1,200.00$625.00$400.00
10Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY85$4.00$18.00$4.00$4.25
11Sediment Filter Log, 12″ (209.2301)LF270$15.00$16.00$17.00$14.00
12 (304.00010018)4,756$2.00$3.00$2.50$1.75
13Subbase Course, Type 2 (304.12)CY270$250.00$250.00$735.00$250.00
14Pavement Density Quality Adjustment to Asphalt Items (404.0002)QUALITY UNIT446$105.00$105.00$105.00$105.00
15Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003)QUALITY UNIT314$105.00$105.00$105.00$105.00
16 (404.0189)TON210.20$155.00$170.00$285.00$210.00
17 (404.2589)TON64$258.00$500.00$480.00$250.00
18 (404.3789)TON34$289.00$480.00$405.00$370.00
19 (406.0962)TON8,904$141.00$130.00$145.00$148.00
20 (407.01040009)5,351$5.00$12.00$9.00$16.00
21Asphalt Pavement Joint Adhesive (418.7603)LF41,331$0.25$1.10$0.25$0.01
22Production Cold Milling of Bituminous Concrete (490.10)SY78,792$1.65$3.60$4.50$5.75
23Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY3,531$14.00$15.00$14.00$27.00
24 (502.0022)174$1,100.00$1,150.00$985.00$1,100.00
25 (502.0222)18$1,400.00$1,650.00$1,260.00$1,475.00
26 (502.9100)371$77.00$25.00$70.00$72.00
27Longitudinal Joints (502.9110)LF384$47.00$25.00$42.00$44.00
28Sealing Transverse Joints- Highway Joint Sealant (502.9210)LF371$16.00$24.00$39.00$11.00
29Sealing Longitudinal Joints-Highway Joint Sealant (502.9310)LF509$23.00$24.00$39.00$11.00
30Performance Concrete Quality Adjustment - PCC Pavement (502.99)QUALITY UNIT1$4.19$4.19$4.19$4.19
31PCC Foundation for Pavement, PEM Concrete (503.1013)CY52$750.00$1,280.00$530.00$1,200.00
32 (510.20000018)529$118.00$130.00$125.00$35.00
33 (510.81000018)62$80.00$180.00$75.00$76.00
34Shields and Shoring (552.17)SF1,543$0.01$4.00$0.50$0.01
35Concrete Collars (603.77)EACH3$3,500.00$7,500.00$2,900.00$2,500.00
36 (603.9812)LF27$96.00$350.00$265.00$225.00
37 (603.9836)LF47$183.00$370.00$265.00$500.00
38 (604.070401)EACH8$4,700.00$6,500.00$3,000.00$3,200.00
39 (604.070402)EACH34$5,200.00$7,000.00$2,700.00$3,200.00
40 (604.070403)EACH2$5,200.00$6,700.00$4,400.00$4,400.00
41 (604.070404)EACH4$3,300.00$5,000.00$2,700.00$6,000.00
42 (604.302122)LF6$1,500.00$2,000.00$1,550.00$800.00
43Box Beam Guide Railing (606.10)LF250$56.00$53.00$55.00$66.00
44Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH2$2,300.00$2,250.00$2,320.00$2,200.00
45Resetting Box Beam Guide Railing (606.53)LF122$24.00$30.00$24.00$23.00
46Removing and Storing Box Beam Guide Railing (606.63)LF122$11.00$10.00$42.00$9.00
47Removing and Disposing Corrugated Beam Guide Railing (606.71)LF236$8.00$10.00$57.00$9.00
48Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910)EACH2$650.00$700.00$1,900.00$400.00
49 (607.41010010)125$9.00$12.00$10.00$7.00
50Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT1$105.00$105.00$105.00$105.00
51Concrete Sidewalks and Driveways (608.0101)CY133.20$1,340.00$2,250.00$1,860.00$2,000.00
52Accelerated Cure Sidewalks and Driveways (608.0102)CY25$1,225.00$1,750.00$1,915.00$1,400.00
53Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON10.30$460.00$500.00$1,000.00$850.00
54 (608.21000003)43$554.00$700.00$550.00$500.00
55 (609.0401)LF1,189$164.00$180.00$130.00$150.00
56Turf Establishment – Performance (610.1605)SY481$17.00$24.00$15.00$95.00
57 (614.060304)EACH1$1,450.00$2,000.00$1,300.00$1,500.00
58 (614.060404)EACH1$1,650.00$2,300.00$1,900.00$2,000.00
59Basic Work Zone Traffic Control (619.01)LS1$533,000$1,202,643$842,566$1,525,000
60Type III Construction Barricades (619.04)EACH90$100.00$300.00$100.00$90.00
61 (619.0901)LF68,741$0.29$0.58$0.40$0.26
62 (619.111211)WEEK12$1,000.00$1,200.00$765.00$1,000.00
63Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613)MONTH72$500.00$263.00$500.00$400.00
64Nighttime Operations (Entire Project) (619.24)LS1$18,000$90,000$100,000$100,000
65Cleaning Closed Drainage Systems (621.03)LF15,811$6.00$4.35$13.00$4.15
66Cleaning Drainage Structures (621.04)EACH95$166.00$185.00$660.00$220.00
67 (621.05020004)286$8.00$20.00$15.00$12.00
68Survey Operations (625.01)LS1$41,000$45,000$40,000$105,000
69Steel Pin and Cap Right of Way Markers (625.05)EACH23$195.00$470.00$195.00$285.00
70 (627.50140008)2,494$4.00$10.00$15.00$7.50
71Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402)SY412$60.00$225.00$215.00$190.00
72Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403)SY412$40.00$225.00$165.00$160.00
73Cleaning and Preparation of Pavement Surfaces-Symbols (635.0303)EACH1$222.00$220.00$220.00$4,000.00
74Concrete Cylinder Curing Equipment (637.04)EACH1$1,500.00$10,000$2,500.00$400.00
75Engineer’s Field Office – Type 2 (637.12)MONTH18$2,800.00$2,400.00$2,000.00$2,800.00
76Office Technology and Supplies (637.34)DOL1,000$1.00$1.00$1.00$1.00
77Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00
78White Paint Reflectorized Pavement Stripes – 20 mils (640.20)LF39,881$0.29$0.67$0.50$0.26
79Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21)LF28,860$0.29$0.51$0.50$0.26
80White Paint Reflectorized Pavement Symbols - 20 mils (640.23)EACH77$105.00$100.00$110.00$95.00
81Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF351$40.00$39.00$40.00$39.00
82Overhead Sign Panels (645.61)SF138.40$80.00$72.00$80.00$75.00
83Type A Sign Posts (645.81)EACH53$29.00$240.00$250.00$235.00
84 (645.81090003)4$60.00$60.00$60.00$58.00
85Breakaway Wooden Sign Posts (645.82)EACH3$610.00$380.00$600.00$250.00
86Reference Marker Panel (646.21)EACH40$37.00$35.00$35.00$36.00
87Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22)EACH3$11.00$11.00$11.00$10.00
88Steel Post, 2.0 lb/ft (646.32)EACH42$75.00$71.00$74.00$70.00
89Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH1$200.00$190.00$200.00$190.00
90Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41)EACH2$66.00$65.00$65.00$63.00
91Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51)EACH4$66.00$65.00$65.00$63.00
92Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH91$77.00$74.00$75.00$74.00
93Welded Frame & Rectangular Grate 22 (655.1022)EACH1$990.00$3,000.00$4,300.00$1,800.00
94 (662.60010004)6,000$1.00$1.00$1.00$1.00
95Adjust Existing Valve Box Elevation (663.33)EACH18$1,700.00$1,100.00$400.00$1,000.00
96 (670.1418)EACH2$2,200.00$2,450.00$2,100.00$5,500.00
97 (670.77000105)1$1,300.00$1,650.00$1,300.00$5,000.00
98 (670.77000205)1$2,000.00$1,650.00$2,000.00$5,000.00
99 (670.77000305)1$1,300.00$1,650.00$1,300.00$5,000.00
100 (670.91000010)1$1,400.00$2,060.00$1,400.00$2,500.00
101 (680.05010007)5$25,000$22,600$24,500$30,000
102 (680.05020007)4$5,300.00$3,800.00$5,200.00$6,000.00
103 (680.05040004)10$4,700.00$3,600.00$4,650.00$5,000.00
104Pole Excavation and Concrete Foundation (680.5001)CY47$3,300.00$3,630.00$3,200.00$2,900.00
105Concrete Base for Controller Cabinet (680.5002)EACH5$4,500.00$4,100.00$4,400.00$5,000.00
106Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003)EACH5$960.00$2,700.00$940.00$3,500.00
107 (680.510201)EACH2$2,100.00$1,830.00$2,000.00$2,500.00
108 (680.510301)EACH6$2,300.00$2,025.00$2,200.00$3,500.00
109 (680.510401)EACH2$2,800.00$2,850.00$2,700.00$4,000.00
110 (680.51100010)14$600.00$535.00$600.00$475.00
111 (680.520106)LF122$22.00$22.00$22.00$34.00
112 (680.520510)LF192$19.00$42.00$20.00$27.00
113 (680.520706)LF426$11.00$13.70$11.00$16.50
114 (680.520708)LF100$13.00$21.00$13.00$26.50
115Trenchless Installation Method for Conduit (680.5301)LF851$110.00$65.00$109.00$115.00
116 (680.621934)EACH1$15,000$14,000$15,000$20,000
117 (680.621940)EACH1$17,000$15,200$17,000$20,000
118 (680.621954)EACH1$31,000$26,900$30,000$25,000
119 (680.622044)EACH1$17,000$16,400$17,000$20,000
120 (680.622062)EACH1$35,000$29,200$34,000$35,000
121 (680.622156)EACH1$33,000$27,000$32,000$35,000
122 (680.622160)EACH1$35,000$28,700$35,000$35,000
123 (680.622164)EACH1$36,000$34,200$35,000$35,000
124 (680.6708)EACH25$1,590.00$1,220.00$1,600.00$1,500.00
125Single Span Wire Assembly (680.7001)EACH1$6,400.00$9,050.00$6,300.00$5,500.00
126Riser Assembly, 2-inch Diameter (680.700606)EACH3$1,175.00$855.00$1,200.00$2,000.00
127 (680.730514)LF9,160$5.50$5.80$5.50$3.00
128 (680.730714)LF1,750$5.75$6.05$6.00$6.70
129 (680.78010005)9$575.00$955.00$565.00$550.00
130 (680.78100108)LS1$5,200.00$3,700.00$5,100.00$30,000
131 (680.78100208)LS1$21,000$10,200$21,000$15,000
132 (680.78100308)LS1$8,000.00$5,400.00$8,000.00$15,000
133 (680.78100408)LS1$17,000$10,200$17,000$15,000
134 (680.78100508)LS1$2,000.00$3,000.00$2,100.00$15,000
135 (680.78100608)LS1$20,000$2,500.00$19,500$15,000
136 (680.80324515)5$3,100.00$3,300.00$3,000.00$4,000.00
137 (680.80324603)5$1,350.00$1,000.00$1,300.00$2,760.00
138Traffic Signal Module - 12-inch, Red Ball, LED (680.810101)EACH36$113.00$63.00$110.00$500.00
139Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102)EACH5$120.00$72.00$120.00$500.00
140Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103)EACH36$113.00$63.00$110.00$500.00
141Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104)EACH14$120.00$72.00$120.00$500.00
142Traffic Signal Module - 12-inch, Green Ball, LED (680.810105)EACH36$113.00$63.00$110.00$500.00
143Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106)EACH6$120.00$72.00$120.00$500.00
144Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601)EACH133$305.00$315.00$300.00$230.00
145Traffic Signal Bracket Assembly - 1 Way (680.8111)EACH1$644.00$550.00$630.00$2,100.00
146Traffic Signal Bracket Assembly - 2 Way (680.8112)EACH4$1,045.00$1,100.00$1,000.00$2,250.00
147 (680.81210004)32$690.00$465.00$675.00$650.00
148Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105)EACH30$215.00$155.00$210.00$350.00
149Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106)EACH60$390.00$540.00$380.00$300.00
150Pedestrian Signal Bracket Mount Assembly (680.8141)EACH2$590.00$625.00$580.00$550.00
151Pedestrian Signal Post Top Mount Assembly (680.8142)EACH25$510.00$490.00$500.00$525.00
152Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001)EACH30$240.00$190.00$230.00$350.00
153 (680.8151)EACH30$1,450.00$1,325.00$1,400.00$1,300.00
154Backplates for Traffic Signal Heads (680.8199)EACH37$380.00$450.00$375.00$425.00
155 (680.8202)EACH2$1,000.00$1,400.00$1,000.00$1,250.00
156 (680.8205)EACH9$950.00$780.00$930.00$1,200.00
157 (680.8206)EACH3$960.00$1,200.00$940.00$1,500.00
158 (680.8209)EACH2$890.00$780.00$870.00$1,200.00
159 (680.83010005)754$8.00$4.40$8.00$4.00
160Meter Pan (680.9402)EACH3$1,850.00$1,100.00$1,800.00$2,500.00
161 (680.94400008)1$2,600.00$2,730.00$2,500.00$7,750.00
162Install Electrical Disconnect/Generator Transfer Switch (680.9499)EACH3$430.00$390.00$420.00$1,400.00
163 (680.950106)LF1,270$3.85$3.90$4.00$4.00
164Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$10.00$10.00$10.00$10.00
165 (683.94000304)1,702$7.00$4.35$7.00$4.10
166White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF27,370$0.55$0.52$0.70$0.50
167Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF24,572$0.55$0.52$0.70$0.50
168White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104)LF11,211$2.75$2.58$3.00$2.50
169Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204)LF4,288$2.75$2.58$3.00$2.50
170White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404)EACH77$245.00$200.00$200.00$200.00
171 (691.04000020)44,800$1.00$1.00$1.00$1.00
172Field Change Payment (FCP) (697.03)DOL208,000$1.00$1.00$1.00$1.00
173Asphalt Price Adjustment (698.04)DOL8,529$1.00$1.00$1.00$1.00
174Fuel Price Adjustment (698.05)DOL2,290$1.00$1.00$1.00$1.00
175Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00
176Mobilization (699.040001)LS1$221,000$274,000$275,000$295,000
NYSDOT contract D265634: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of January 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy