Keeler Construction Co Inc: NYSDOT bid record
Keeler Construction Co Inc submitted 22 bids on New York State DOT contracts in the data, from 20 JAN 2022 to 13 AUG 2026, and was the low bidder on 12 of them (55%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $53,215,540
- Latest bid
- 13 AUG 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 1 | 1 | 100% |
| 2023 | 7 | 4 | 57% |
| 2024 | 3 | 1 | 33% |
| 2025 | 7 | 3 | 43% |
| 2026 | 4 | 3 | 75% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 04 | 20 | 11 | 55% |
| Region 06 | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 19 | 19 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 19 | 19 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 19 | 19 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 19 | 19 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 17 | 17 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 17 | 17 (100%) | $1.00 | $1.00 |
| Asphalt Pavement Joint Adhesive | 418.7603 | LF | 19 | 14 (74%) | $0.50 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 14 | 14 (100%) | $85.00 | $90.00 |
| Diluted Tack Coat | 407.0102 | GAL | 17 | 13 (76%) | $6.00 | $7.00 |
| 662.60010004 | 10 | 10 (100%) | $1.00 | $1.00 | ||
| 691.04000020 | 9 | 9 (100%) | $1.00 | $1.00 | ||
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 9 | 9 (100%) | $85.00 | $85.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Cold Spring Construction Company | 17 | 4 of 17 |
| Villager Construction Inc | 15 | 3 of 15 |
| Sealand Contractors Corp. | 13 | 3 of 13 |
| Ramsey Constructors Inc | 4 | 2 of 4 |
| The L C Whitford Co Inc | 4 | 3 of 4 |
| Seneca Stone Corp | 3 | 1 of 3 |
| Rochester Earth Inc | 3 | 3 of 3 |
| D&H Excavating Inc | 2 | 1 of 2 |
| McLaughlin Construction Corp/DBA Edbauer Construction | 2 | 1 of 2 |
| C P Ward Inc | 2 | 0 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 AUG 2026 | D265689 | Region 04 | Replacement of Six Culverts | 6 of 8 | $9,346,151 | +29% |
| 21 MAY 2026 | D265777 | Region 04 | Standby Where & When Highway Repair Contract | 1 of 2 | $3,746,724 | Low, 1.0% under the second |
| 08 JAN 2026 | D265627 | Region 04 | PAVEMENT RESURFACING - NYS Route 286 | 1 of 3 | $10,986,794 | Low, 6.0% under the second |
| 08 JAN 2026 | D265634 | Region 04 | PAVEMENT RESURFACING & SIGNAL IMPROVEMENTS - Route 15 | 1 of 4 | $5,761,106 | Low, 24% under the second |
| 18 DEC 2025 | D265622 | Region 04 | CULVERT REPLACEMENTS - Various Locations | 2 of 3 | $5,931,532 | +32% |
| 23 OCT 2025 | D265561 | Region 04 | Large Culvert Resiliency Replacement | 4 of 7 | $4,773,856 | +5.0% |
| 10 APR 2025 | D265439 | Region 04 | Replacement of 7 Culverts | 3 of 5 | $7,162,146 | +3.0% |
| 13 MAR 2025 | D265450 | Region 04 | Highway Repair Where/When Contract for 2025 and 2026 | 2 of 4 | $2,263,986 | +3.0% |
| 13 MAR 2025 | D265454 | Region 04 | N.Y. Route 77 Pavement Resurfacing | 1 of 9 | $4,188,170 | Low, 10% under the second |
| 13 MAR 2025 | D265470 | Region 04 | Drainage Requirements Where and When Contract | 1 of 3 | $2,335,983 | Low, 4.0% under the second |
| 09 JAN 2025 | D265381 | Region 04 | Intersection Safety Enhancements Rte 33A/Rte 259 | 1 of 3 | $4,135,263 | Low, 29% under the second |
| 19 DEC 2024 | D265390 | Region 06 | HAZARD MITIGATION & SAFETAP BACKLOG-Various Locations | 1 of 4 | $854,689 | Low, 14% under the second |
| 24 OCT 2024 | D265302 | Region 04 | PAVEMENT REHABILITATION - Route 204 | 2 of 4 | $9,837,898 | +2.0% |
| 29 FEB 2024 | D265196 | Region 04 | Route 15A from NYS Thruway to I-390 | 2 of 3 | $10,359,151 | +2.0% |
| 14 DEC 2023 | D265115 | Region 04 | ROUTES 5 & 20 CULVERT IMPROVEMENTS | 1 of 3 | $1,822,598 | Low, 8.0% under the second |
| 09 NOV 2023 | D265111 | Region 04 | Hwy Improvements-Route 31 from Route 19 to Transit Way | 1 of 3 | $2,798,959 | Low, 21% under the second |
| 26 OCT 2023 | D265089 | Region 04 | Route 18 at North Greece Road Intersection Improvements | 3 of 4 | $2,788,963 | +11% |
| 18 MAY 2023 | D265025 | Region 04 | Route 31 from Wayne/Monroe County Line to Hamlet of Macedon | 4 of 5 | $5,732,505 | +17% |
| 09 MAR 2023 | D264936 | Region 04 | I390 at Route 383 Interchange Safety Improvements | 1 of 3 | $3,553,693 | Low, 5.0% under the second |
| 02 FEB 2023 | D264962 | Region 04 | RESURFACING OF NEW YORK STATE ROUTES 31, 104, AND 260 | 1 of 4 | $5,291,688 | Low, 8.0% under the second |
| 05 JAN 2023 | D264964 | Region 06 | Hazard Mitigation and SAFETAP Backlog 2 | 3 of 3 | $1,145,620 | +28% |
| 20 JAN 2022 | D264701 | Region 04 | Pavement Resurfacing and Signal Improvements: Route 104. | 1 of 7 | $7,739,872 | Low, 7.0% under the second |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.