NYSDOT contract D265561 bid tabulation

Large Culvert Resiliency Replacement. Let by New York State DOT on October 23, 2025, Monroe, Region 04. 7 bids received; low bid $4,541,001 by Sealand Contractors Corp..

Owner
New York State DOT
Letting
23 OCT 2025
Pay items
131
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Sealand Contractors Corp.$4,541,001Low
2Cold Spring Construction Company$4,635,536+2.0%
3Rochester Earth Inc$4,677,000+3.0%
4Keeler Construction Co Inc$4,773,856+5.0%
5Ramsey Constructors Inc$4,868,560+7.0%
6C P Ward Inc$5,096,493+12%
7Villager Construction Inc$5,585,500+23%
NYSDOT contract D265561: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Sealand Contractors Corp.2. Cold Spring Construction Company3. Rochester Earth Inc4. Keeler Construction Co Inc5. Ramsey Constructors Inc6. C P Ward Inc
1 (201.07000004)3,876.50$12.00$15.00$18.00$11.00$10.00$15.00
2Unclassified Excavation and Disposal (203.02)CY2,552$37.00$35.00$17.00$36.00$30.00$44.00
3Embankment In Place (203.03)CY10,233$22.00$30.00$40.00$43.00$25.00$60.00
4Select Granular Fill (203.07)CY688$140.00$100.00$105.00$107.00$80.00$100.00
5 (203.24010017)38$250.00$125.00$405.00$151.00$100.00$90.00
6Sand Backfill (203.25)CY41$190.00$100.00$100.00$83.00$80.00$200.00
7Controlled Low Strength Material (CLSM) (204.01)CY1.80$2,000.00$550.00$1,555.00$2,600.00$1,200.00$2,500.00
8Structure Excavation (206.01)CY10,007$30.00$35.00$48.00$34.00$27.00$44.00
9Trench and Culvert Excavation (206.0201)CY1,765$42.00$25.00$22.00$37.00$50.00$64.00
10Conduit Excavation and Backfill including Surface Restoration (206.03)LF380$32.00$10.00$17.50$35.00$30.00$33.00
11Test Pit Excavation (206.05)EACH8$2,500.00$3,000.00$635.00$1,400.00$1,200.00$2,000.00
12Geotextile Bedding (207.20)SY590$8.00$3.00$5.75$8.00$6.00$10.00
13Prefabricated Composite Structural Drain (207.26)SY478$30.00$10.00$22.00$27.00$22.00$22.00
14Seed and Mulch – Temporary (209.1003)SY4,515$2.30$0.50$1.50$2.00$2.25$3.00
15Check Dam (Ditch Bottom Width >3′ to 6′), Gravel Bag – Temporary (209.110202)EACH2$3,000.00$500.00$985.00$1,100.00$500.00$800.00
16Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY77$20.00$10.00$13.00$5.00$16.00$14.00
17Soil Stabilizers, Class IV Type A (209.2101)SY4,515$2.25$2.00$5.25$3.00$2.50$2.00
18Sediment Filter Log, 12″ (209.2301)LF465$15.00$10.00$15.25$14.00$4.00$26.00
19Removal and Disposal of Underground Pipe ACM (BV14) (210.3111)LF12$525.00$250.00$635.00$245.00$315.00$800.00
20Subbase Course, Type 2 (304.12)CY1,511$95.00$100.00$83.00$89.00$78.00$90.00
21 (404.0001)TON82$95.00$95.00$95.00$95.00$95.00$95.00
22 (404.0189)TON31$180.00$250.00$312.00$205.00$250.00$210.00
23 (404.0983)TON499$138.00$200.00$155.00$151.00$180.00$161.00
24 (404.1989)TON438$132.00$175.00$155.00$148.00$170.00$181.00
25 (404.3789)TON665$128.00$150.00$180.00$131.00$145.00$157.00
26Diluted Tack Coat (407.0102)GAL665$23.00$15.00$3.75$11.00$11.00$18.00
27Asphalt Pavement Joint Adhesive (418.7603)LF4,541$1.45$1.50$2.75$1.00$0.65$4.00
28Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY2,937$12.00$20.00$9.50$10.00$11.00$15.00
29Shields and Shoring (552.17)SF20,207$0.50$0.01$1.00$0.50$0.30$0.25
30 (553.030001)EACH1$5,000.00$5,000.00$17,700$51,000$18,000$10,000
31 (553.030002)EACH1$5,000.00$5,000.00$17,700$30,000$18,000$8,000.00
32 (553.030003)EACH1$5,000.00$5,000.00$17,700$51,000$18,000$30,000
33 (555.05010001)16$2,000.00$1,750.00$3,000.00$1,125.00$1,800.00$3,300.00
34Steel Bridge Railing (Four-Rail) (568.51)LF30$430.00$450.00$460.00$467.00$360.00$420.00
35Transition Bridge Railing (568.70)LF128$255.00$180.00$185.00$187.00$250.00$190.00
36 (595.50000018)7,534$6.00$8.00$5.00$6.00$6.00$6.00
37 (603.171216)EACH2$1,000.00$1,000.00$300.00$325.00$200.00$800.00
38 (603.64080515)147$1,700.00$2,000.00$2,175.00$1,800.00$2,300.00$1,800.00
39 (603.64080715)101$2,150.00$2,150.00$2,750.00$2,900.00$3,100.00$2,100.00
40 (603.64110515)40$3,350.00$2,750.00$4,200.00$2,800.00$3,800.00$3,000.00
41 (603.67000001)168$2,525.00$2,200.00$1,575.00$2,600.00$1,700.00$1,670.00
42 (603.98100804)212$250.00$120.00$78.00$240.00$200.00$100.00
43 (603.9815)LF28$120.00$125.00$82.50$37.00$75.00$100.00
44 (604.070401)EACH1$2,500.00$0.01$2,400.00$1.00$3,000.00$2,000.00
45 (604.070402)EACH1$5,000.00$10,000$3,450.00$2,100.00$3,000.00$2,000.00
46Box Beam Guide Railing (606.10)LF803$47.00$50.00$48.00$49.00$55.00$45.00
47Box Beam Guide Railing (Shop Mitered) (606.100003)LF17$135.00$70.00$71.00$72.00$145.00$70.00
48Box Beam End Piece (606.120101)EACH1$800.00$1,000.00$615.00$61.00$800.00$600.00
49Box Beam Guide Railing End Assembly Type I (606.120102)EACH3$4,000.00$4,500.00$4,450.00$4,500.00$4,300.00$4,500.00
50Box Beam Guide Railing End Assembly Type I with 18 ft Extension (606.120103)EACH2$4,700.00$5,500.00$5,700.00$5,700.00$5,000.00$5,500.00
51Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH4$2,100.00$2,250.00$2,300.00$2,400.00$2,200.00$2,100.00
52HPBO (Mod.) Corrugated Beam Guide Railing (606.2701)LF355$27.00$35.00$34.00$35.00$26.00$34.00
53Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703)EACH2$2,550.00$3,000.00$2,500.00$2,800.00$2,700.00$2,300.00
54Removing and Disposing Corrugated Beam Guide Railing (606.71)LF813$5.00$10.00$32.00$12.00$4.00$10.00
55Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910)EACH8$500.00$500.00$395.00$320.00$600.00$500.00
56 (607.41010010)1,321$7.00$2.00$11.00$7.00$5.00$5.00
57Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT1$95.00$95.00$95.00$95.00$95.00$95.00
58Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON55.20$400.00$425.00$575.00$209.00$235.00$450.00
59Turf Establishment – Performance (610.1605)SY4,515$18.00$35.00$2.00$14.00$13.00$20.00
60 (613.04000001)235$260.00$75.00$305.00$183.00$150.00$99.00
61 (614.060104)EACH6$500.00$1,250.00$920.00$500.00$600.00$325.00
62 (614.060204)EACH7$900.00$1,500.00$1,150.00$1,200.00$900.00$650.00
63 (614.060304)EACH1$1,800.00$1,800.00$1,550.00$1,900.00$2,000.00$1,300.00
64 (614.060404)EACH1$2,700.00$2,500.00$1,900.00$2,500.00$2,800.00$2,000.00
65 (615.01010108)30$360.00$45.00$165.00$380.00$245.00$99.00
66 (617.10000024)34$150.00$50.00$415.00$85.00$190.00$50.00
67 (617.11000024)LS1$500.00$250.00$4,200.00$1,000.00$5,900.00$2,500.00
68Basic Work Zone Traffic Control (619.01)LS1$164,857$175,000$197,779$196,000$495,000$236,000
69Type III Construction Barricades (619.04)EACH84$250.00$125.00$160.00$110.00$75.00$100.00
70 (619.110611)WEEK72$1,000.00$1,000.00$930.00$1,200.00$700.00$700.00
71Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711)LF320$80.00$50.00$85.00$20.00$38.00$55.00
72Mailboxes (619.27)EACH1$500.00$300.00$1,150.00$425.00$350.00$500.00
73Stone Filling (Light) (620.03)CY162$225.00$200.00$155.00$137.00$135.00$130.00
74Stone Filling (Medium) (620.04)CY480$250.00$250.00$250.00$184.00$145.00$150.00
75Bedding Material, Type 2 (620.0802)CY226$190.00$125.00$170.00$140.00$145.00$120.00
76 (621.05020004)195$30.00$5.00$22.50$12.00$10.00$10.00
77 (621.51000015)37$60.00$10.00$34.00$82.00$52.00$45.00
78Crushed Stone (In-Place Measure) (623.12)CY153$200.00$175.00$100.50$128.00$145.00$250.00
79Survey Operations (625.01)LS1$45,000$85,000$40,000$70,000$150,000$75,000
80Concrete Right of Way Markers Type H (High) (625.03)EACH20$1,250.00$700.00$665.00$1,000.00$1,700.00$1,500.00
81Steel Pin and Cap Right of Way Markers (625.05)EACH7$360.00$275.00$315.00$725.00$400.00$1,550.00
82 (625.09010015)LS1$10,000$1,000.00$27,500$8,000.00$6,000.00$20,000
83 (627.50140008)596$15.00$10.00$5.19$16.00$5.00$8.00
84Engineer’s Field Office – Type 2 (637.12)MONTH22$2,000.00$3,500.00$2,500.00$1,500.00$2,900.00$2,600.00
85Office Technology and Supplies (637.34)DOL1,000$1.00$1.00$1.00$1.00$1.00$1.00
86Construction Testing supplies – Consumables (637.36)DOL300$1.00$1.00$1.00$1.00$1.00$1.00
87White Paint Reflectorized Pavement Stripes – 20 mils (640.20)LF3,854$0.51$1.00$1.00$1.50$0.50$1.00
88Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21)LF1,684$0.51$1.00$1.00$1.50$0.50$1.00
89Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF5$32.00$50.00$48.00$48.00$35.00$45.00
90Type A Sign Posts (645.81)EACH7$195.00$250.00$230.00$230.00$200.00$210.00
91Reference Marker Panel (646.21)EACH2$35.00$50.00$44.00$45.00$35.00$45.00
92Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22)EACH18$11.00$15.00$16.00$16.00$12.00$15.00
93Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH10$17.00$20.00$21.00$21.00$20.00$20.00
94Steel Post, 2.0 lb/ft (646.32)EACH23$65.00$80.00$85.00$85.00$65.00$80.00
95Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH3$158.00$150.00$140.00$140.00$165.00$125.00
96Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH2$350.00$10.00$105.00$9.00$125.00$50.00
97 (647.83001002)12$58.00$10.00$22.00$9.00$38.00$100.00
98Centerline Audible Roadway Delineators (CARDs) (649.11)LF860$9.00$5.00$5.25$8.00$7.00$5.00
99Secondary Highway Audible Roadway Delineators (SHARDs) (649.21)LF1,720$9.00$5.00$5.25$7.00$7.00$5.00
100Manhole Frame & Cover (655.1202)EACH3$1,200.00$1,500.00$580.54$830.00$2,700.00$1,500.00
101 (663.0112)LF117$225.00$250.00$275.00$180.00$275.00$300.00
102 (663.0116)LF384$255.00$300.00$315.00$203.00$300.00$425.00
103 (663.1006)EACH3$2,500.00$3,000.00$3,500.00$2,500.00$2,100.00$5,200.00
104 (663.1301)EACH2$8,000.00$8,000.00$10,600$6,000.00$9,000.00$11,000
105 (663.1302)EACH1$8,000.00$8,000.00$10,150$6,000.00$10,000$11,000
106 (663.1303)EACH1$8,000.00$8,000.00$10,150$6,000.00$11,000$11,000
107 (663.161212)EACH1$14,000$15,000$15,700$15,000$15,000$18,000
108 (663.161606)EACH1$8,000.00$10,000$11,300$9,500.00$11,000$13,000
109 (663.161616)EACH2$27,000$27,500$26,500$29,000$27,000$30,000
110 (663.1812)EACH2$2,200.00$1,500.00$491.00$2,700.00$1,200.00$5,000.00
111 (663.1816)EACH4$2,500.00$2,000.00$1,100.00$2,700.00$1,400.00$5,000.00
112Iron Water Main Fittings (10 - 16 inch diameter) (663.2002)LB4,364$14.00$6.00$7.25$15.00$14.00$7.00
113 (663.2106)EACH12$120.00$100.00$92.00$63.00$40.00$100.00
114 (663.2112)EACH19$260.00$200.00$190.00$240.00$125.00$350.00
115 (663.2116)EACH46$460.00$375.00$335.00$380.00$225.00$350.00
116 (663.2312)LF117$5.00$5.00$3.50$2.00$7.00$2.00
117 (663.2316)LF384$5.50$5.00$1.25$2.00$4.00$3.00
118Disconnect and Cap Existing Water Main (663.40)EACH9$1,700.00$4,000.00$895.00$950.00$6,500.00$2,400.00
119 (663.4112)LF90$42.00$10.00$33.00$100.00$17.00$30.00
120 (663.4116)LF329$47.00$10.00$19.00$80.00$18.00$30.00
121 (664.40480006)43.50$1,600.00$1,500.00$685.00$790.00$2,000.00$1,100.00
122 (680.510401)EACH2$2,500.00$2,500.00$2,500.00$2,700.00$2,500.00$3,000.00
123 (680.520706)LF380$6.75$10.00$45.00$7.00$11.00$15.00
124White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF2,684$1.00$3.25$5.00$2.50$1.00$3.00
125Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF1,307$1.00$3.25$5.00$2.50$1.00$3.00
126 (691.04000020)45,000$1.00$1.00$1.00$1.00$1.00$1.00
127Field Change Payment (FCP) (697.03)DOL247,000$1.00$1.00$1.00$1.00$1.00$1.00
128Asphalt Price Adjustment (698.04)DOL2,208$1.00$1.00$1.00$1.00$1.00$1.00
129Fuel Price Adjustment (698.05)DOL5,398$1.00$1.00$1.00$1.00$1.00$1.00
130Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
131Mobilization (699.040001)LS1$174,000$178,100$65,000$183,000$175,000$194,000
NYSDOT contract D265561: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of October 23, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy