C P Ward Inc: NYSDOT bid record
C P Ward Inc submitted 25 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 16 APR 2026, and was the low bidder on 13 of them (52%). When it was not low, its total sat a median +22% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $27,519,422
- Latest bid
- 16 APR 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 9 | 3 | 33% |
| 2023 | 4 | 2 | 50% |
| 2024 | 1 | 1 | 100% |
| 2025 | 9 | 6 | 67% |
| 2026 | 2 | 1 | 50% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 04 | 11 | 7 | 64% |
| Region 06 | 7 | 0 | 0% |
| Region 03 | 4 | 3 | 75% |
| Region 07 | 2 | 2 | 100% |
| Region 02, 03, 07, 09 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 17 | 17 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 17 | 17 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 11 | 11 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 8 | 8 (100%) | $95.00 | $90.00 |
| 627.50140008 | 10 | 6 (60%) | $3.50 | $6.00 | ||
| 404.0001 | TON | 5 | 5 (100%) | $95.00 | $95.00 | |
| Performance Concrete Quality Adjustment – Concrete for Structures | 555.9902 | QUALITY UNIT | 5 | 5 (100%) | $8.04 | $10.50 |
| Unclassified Excavation and Disposal | 203.02 | CY | 9 | 3 (33%) | $44.00 | $71.00 |
| Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.020102 | TON | 9 | 3 (33%) | $300.00 | $307.93 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Cold Spring Construction Company | 8 | 3 of 8 |
| The L C Whitford Co Inc | 7 | 5 of 7 |
| Slate Hill Constructors Inc | 4 | 1 of 4 |
| Economy Paving Co Inc | 4 | 1 of 4 |
| Ramsey Constructors Inc | 4 | 3 of 4 |
| US Traffic Control Inc | 4 | 1 of 4 |
| Rochester Earth Inc | 4 | 2 of 4 |
| Twin Tier Constructors Inc | 3 | 2 of 3 |
| Sealand Contractors Corp. | 3 | 1 of 3 |
| McLaughlin Construction Corp/DBA Edbauer Construction | 2 | 2 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 APR 2026 | D265782 | Region 03 | WORK ZONE TRAFFIC CONTROL REQUIREMENTS - Regionwide | 1 of 2 | $1,099,424 | Low, 10% under the second |
| 05 MAR 2026 | D265646 | Region 06 | Region 6 Culvert Replacements - NYS Rte 21 | 4 of 5 | $3,831,303 | +26% |
| 18 DEC 2025 | D265622 | Region 04 | CULVERT REPLACEMENTS - Various Locations | 3 of 3 | $6,290,088 | +39% |
| 04 DEC 2025 | D265625 | Region 06 | BRIDGE REPLACEMENT - NY 371 over Kirkwood Creek | 4 of 5 | $4,544,654 | +18% |
| 04 DEC 2025 | D265644 | Region 07 | BRIDGE Work Zone Traffic Control (2026-27)-Various Locations | 1 of 1 | $1,172,256 | Low |
| 20 NOV 2025 | D265577 | Region 04 | BRIDGE REPLACEMENT - NY Rt 19 over Black Creek Overflow | 1 of 2 | $2,494,428 | Low, 24% under the second |
| 06 NOV 2025 | D265599 | Region 04 | Where & When - Regional WZTC 2026 And 2027 | 1 of 2 | $526,083 | Low, 6.0% under the second |
| 23 OCT 2025 | D265561 | Region 04 | Large Culvert Resiliency Replacement | 6 of 7 | $5,096,493 | +12% |
| 25 SEP 2025 | D265549 | Region 04 | Replacement/Repair of 7 Culverts in Ontario County. | 1 of 5 | $8,027,963 | Low, 11% under the second |
| 10 JUL 2025 | D265539 | Region 04 | WHERE & WHEN - O'RORKE LIFT BRIDGE OPERATIONS & MAINTENANCE | 1 of 1 | $651,515 | Low |
| 26 JUN 2025 | D265503 | Region 02, 03, 07, 09 | WORK ZONE TRAFFIC CONTROL REQUIREMENTS | 1 of 1 | $814,358 | Low |
| 11 JAN 2024 | D265187 | Region 03 | Regional Work Zone Traffic Control | 1 of 3 | $943,938 | Low, 3.0% under the second |
| 14 DEC 2023 | D265145 | Region 06 | NHS CULVERT REPAIRS - SFY 2023/24 | 2 of 2 | $874,580 | +30% |
| 30 NOV 2023 | D265163 | Region 07 | WZTC FOR BRIDGE INSPECTION AND GEOTECHNICAL OPS | 1 of 1 | $1,009,635 | Low |
| 26 OCT 2023 | D265105 | Region 04 | Standby Regional Work Zone Traffic Control - 2024/2025 | 2 of 2 | $547,220 | +2.0% |
| 05 JAN 2023 | D264938 | Region 04 | BRIDGE REPLACEMENT PROJECT - BIN 1043330 - NYS ROUTE 386 | 1 of 4 | $3,968,438 | Low, 2.0% under the second |
| 17 NOV 2022 | D264913 | Region 04 | Overhead Sign Structure Replacements,I-390, I-490, and I-590 | 1 of 3 | $4,455,731 | Low, 3.0% under the second |
| 06 OCT 2022 | D264886 | Region 06 | Overhead Sign Replacement | 2 of 5 | $1,498,514 | +2.0% |
| 06 OCT 2022 | D264889 | Region 06 | NY 352 Retaining Wall | 2 of 6 | $831,022 | +4.0% |
| 06 OCT 2022 | D264891 | Region 04 | O'RORKE LIFT BRIDGE OPERATIONS AND MAINTENANCE | 1 of 1 | $1,503,382 | Low |
| 19 MAY 2022 | D264799 | Region 04 | Job Order Contract (JOC) Bridge and Guiderail, NYSDOT R-4 | 3 of 3 | $1,395,000 | +27% |
| 07 APR 2022 | D264771 | Region 06 | Culvert Repair (Clarksville) NY 305 & NY 417 (Andover) NY | 4 of 5 | $1,290,716 | +32% |
| 10 MAR 2022 | D264709 | Region 03 | NYS Canal Navigation Lights Repair and Replacement | 2 of 4 | $658,957 | +2.0% |
| 17 FEB 2022 | D264745 | Region 06 | Bridge Bearing Project, Three Locations NYSDOT R-6 | 5 of 6 | $1,720,634 | +36% |
| 06 JAN 2022 | D264687 | Region 03 | NYSDOT Region-3, Regional Work Zone Traffic Control | 1 of 2 | $852,270 | Low, 12% under the second |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.