C P Ward Inc: NYSDOT bid record

C P Ward Inc submitted 25 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 16 APR 2026, and was the low bidder on 13 of them (52%). When it was not low, its total sat a median +22% above the low bid.

Owner
New York State DOT
Low bid volume
$27,519,422
Latest bid
16 APR 2026
Data through
15 OCT 2026
25Bids
13Low bids
52Win rate, percent
+22%Median gap to the low bid when not low, 12 bids

By year

YearBidsLow bidsWin rate
20229333%
20234250%
202411100%
20259667%
20262150%
C P Ward Inc, NYSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 0411764%
Region 06700%
Region 034375%
Region 0722100%
Region 02, 03, 07, 0911100%
C P Ward Inc, NYSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Field Change Payment (FCP)697.03DOL1717 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL1717 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL1515 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL1515 (100%)$1.00$1.00
Office Technology and Supplies637.34DOL1111 (100%)$1.00$1.00
Construction Testing supplies – Consumables637.36DOL1010 (100%)$1.00$1.00
Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips608.000013QUALITY UNIT88 (100%)$95.00$90.00
627.50140008106 (60%)$3.50$6.00
404.0001TON55 (100%)$95.00$95.00
Performance Concrete Quality Adjustment – Concrete for Structures555.9902QUALITY UNIT55 (100%)$8.04$10.50
Unclassified Excavation and Disposal203.02CY93 (33%)$44.00$71.00
Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips608.020102TON93 (33%)$300.00$307.93
C P Ward Inc, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

C P Ward Inc, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
16 APR 2026D265782Region 03WORK ZONE TRAFFIC CONTROL REQUIREMENTS - Regionwide1 of 2$1,099,424Low, 10% under the second
05 MAR 2026D265646Region 06Region 6 Culvert Replacements - NYS Rte 214 of 5$3,831,303+26%
18 DEC 2025D265622Region 04CULVERT REPLACEMENTS - Various Locations3 of 3$6,290,088+39%
04 DEC 2025D265625Region 06BRIDGE REPLACEMENT - NY 371 over Kirkwood Creek4 of 5$4,544,654+18%
04 DEC 2025D265644Region 07BRIDGE Work Zone Traffic Control (2026-27)-Various Locations1 of 1$1,172,256Low
20 NOV 2025D265577Region 04BRIDGE REPLACEMENT - NY Rt 19 over Black Creek Overflow1 of 2$2,494,428Low, 24% under the second
06 NOV 2025D265599Region 04Where & When - Regional WZTC 2026 And 20271 of 2$526,083Low, 6.0% under the second
23 OCT 2025D265561Region 04Large Culvert Resiliency Replacement6 of 7$5,096,493+12%
25 SEP 2025D265549Region 04Replacement/Repair of 7 Culverts in Ontario County.1 of 5$8,027,963Low, 11% under the second
10 JUL 2025D265539Region 04WHERE & WHEN - O'RORKE LIFT BRIDGE OPERATIONS & MAINTENANCE1 of 1$651,515Low
26 JUN 2025D265503Region 02, 03, 07, 09WORK ZONE TRAFFIC CONTROL REQUIREMENTS1 of 1$814,358Low
11 JAN 2024D265187Region 03Regional Work Zone Traffic Control1 of 3$943,938Low, 3.0% under the second
14 DEC 2023D265145Region 06NHS CULVERT REPAIRS - SFY 2023/242 of 2$874,580+30%
30 NOV 2023D265163Region 07WZTC FOR BRIDGE INSPECTION AND GEOTECHNICAL OPS1 of 1$1,009,635Low
26 OCT 2023D265105Region 04Standby Regional Work Zone Traffic Control - 2024/20252 of 2$547,220+2.0%
05 JAN 2023D264938Region 04BRIDGE REPLACEMENT PROJECT - BIN 1043330 - NYS ROUTE 3861 of 4$3,968,438Low, 2.0% under the second
17 NOV 2022D264913Region 04Overhead Sign Structure Replacements,I-390, I-490, and I-5901 of 3$4,455,731Low, 3.0% under the second
06 OCT 2022D264886Region 06Overhead Sign Replacement2 of 5$1,498,514+2.0%
06 OCT 2022D264889Region 06NY 352 Retaining Wall2 of 6$831,022+4.0%
06 OCT 2022D264891Region 04O'RORKE LIFT BRIDGE OPERATIONS AND MAINTENANCE1 of 1$1,503,382Low
19 MAY 2022D264799Region 04Job Order Contract (JOC) Bridge and Guiderail, NYSDOT R-43 of 3$1,395,000+27%
07 APR 2022D264771Region 06Culvert Repair (Clarksville) NY 305 & NY 417 (Andover) NY4 of 5$1,290,716+32%
10 MAR 2022D264709Region 03NYS Canal Navigation Lights Repair and Replacement2 of 4$658,957+2.0%
17 FEB 2022D264745Region 06Bridge Bearing Project, Three Locations NYSDOT R-65 of 6$1,720,634+36%
06 JAN 2022D264687Region 03NYSDOT Region-3, Regional Work Zone Traffic Control1 of 2$852,270Low, 12% under the second
C P Ward Inc: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy