BRIDGE REPLACEMENT - NY 371 over Kirkwood Creek. Let by New York State DOT on December 4, 2025, Steuben, Region 06. 5 bids received; low bid $3,839,886 by The L C Whitford Co Inc.
- Owner
- New York State DOT
- Letting
- 04 DEC 2025
- Pay items
- 123
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | The L C Whitford Co Inc | $3,839,886 | Low |
| 2 | Twin Tier Constructors Inc | $4,193,000 | +9.0% |
| 3 | Cold Spring Construction Company | $4,531,038 | +18% |
| 4 | C P Ward Inc | $4,544,654 | +18% |
| 5 | Rochester Earth Inc | $5,700,000 | +48% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. The L C Whitford Co Inc | 2. Twin Tier Constructors Inc | 3. Cold Spring Construction Company | 4. C P Ward Inc | 5. Rochester Earth Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $55,966 | $60,000 | $20,000 | $18,000 | $21,350 |
| 2 | (202.120001) | LS | 1 | $48,068 | $90,000 | $125,000 | $65,000 | $47,625 |
| 3 | Removal of Substructures (202.19) | CY | 60 | $214.73 | $170.00 | $275.00 | $300.00 | $385.00 |
| 4 | Unclassified Excavation and Disposal (203.02) | CY | 1,114 | $33.17 | $23.00 | $36.00 | $42.00 | $34.00 |
| 5 | Embankment In Place (203.03) | CY | 1,303 | $29.23 | $60.00 | $37.00 | $60.00 | $85.00 |
| 6 | Select Structural Fill (203.21) | CY | 150 | $86.96 | $85.00 | $125.00 | $95.00 | $125.00 |
| 7 | Structure Excavation (206.01) | CY | 1,250 | $32.65 | $20.00 | $29.00 | $40.00 | $32.75 |
| 8 | Trench and Culvert Excavation (206.0201) | CY | 150 | $78.94 | $40.00 | $72.00 | $52.00 | $19.00 |
| 9 | Geotextile Bedding (207.20) | SY | 18 | $8.39 | $10.00 | $23.00 | $30.00 | $32.50 |
| 10 | Geotextile Separation (207.21) | SY | 3,426 | $3.62 | $2.25 | $2.25 | $2.00 | $3.00 |
| 11 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 146 | $28.33 | $14.00 | $20.00 | $25.00 | $23.50 |
| 12 | Seed and Mulch – Temporary (209.1003) | SY | 2,121 | $2.08 | $0.25 | $1.85 | $3.00 | $2.00 |
| 13 | Check Dam (Ditch Bottom Width 0.0 to 3′), Gravel Bag – Temporary (209.110201) | EACH | 2 | $686.54 | $400.00 | $1,100.00 | $800.00 | $540.00 |
| 14 | Silt Fence - Temporary (209.13) | LF | 2,295 | $5.34 | $5.00 | $5.25 | $4.00 | $5.25 |
| 15 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 415 | $10.48 | $6.00 | $10.25 | $5.00 | $10.25 |
| 16 | (209.20120010) | 310 | $49.07 | $15.00 | $48.00 | $25.00 | $48.50 | |
| 17 | Removal and Disposal of Concrete-Encased Pipe ACM (BV14) (210.3011) | LF | 32 | $155.04 | $300.00 | $115.00 | $255.00 | $465.00 |
| 18 | (210.481201) | SF | 1,542 | $25.02 | $20.00 | $55.00 | $30.00 | $104.00 |
| 19 | Subbase Course, Optional Type (304.15) | CY | 2,353 | $79.60 | $60.00 | $90.00 | $98.00 | $83.50 |
| 20 | (404.0001) | TON | 166 | $95.00 | $95.00 | $95.00 | $95.00 | $95.00 |
| 21 | (404.0973) | TON | 372 | $228.44 | $155.00 | $145.00 | $140.00 | $150.00 |
| 22 | (404.2579) | TON | 666 | $137.81 | $140.00 | $120.00 | $125.00 | $146.00 |
| 23 | (404.3779) | TON | 1,899 | $115.76 | $125.00 | $110.00 | $118.00 | $140.00 |
| 24 | (404.4389) | TON | 491 | $121.28 | $125.00 | $130.00 | $120.00 | $166.00 |
| 25 | Diluted Tack Coat (407.0102) | GAL | 860 | $9.92 | $10.00 | $10.00 | $15.00 | $17.50 |
| 26 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,121 | $2.76 | $5.00 | $1.00 | $5.00 | $2.50 |
| 27 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 646 | $15.61 | $15.00 | $11.75 | $18.00 | $28.00 |
| 28 | Micropiles (Contractor Designed) – With Extended Lengths (551.31) | EACH | 26 | $11,576 | $14,000 | $8,400.00 | $12,000 | $9,200.00 |
| 29 | (551.33) | 317 | $110.25 | $100.00 | $200.00 | $210.00 | $219.00 | |
| 30 | Furnishing Equipment for Installing Micropiles (551.34) | LS | 1 | $68,563 | $50,000 | $95,000 | $100,000 | $38,325 |
| 31 | Static Pile Compressive Load Test (551.35) | EACH | 1 | $33,075 | $50,000 | $40,000 | $40,000 | $43,800 |
| 32 | (553.020001) | EACH | 1 | $0.01 | $500.00 | $0.01 | $5,000.00 | $20,000 |
| 33 | (553.020002) | EACH | 1 | $0.01 | $500.00 | $0.01 | $5,000.00 | $20,000 |
| 34 | (553.030001) | EACH | 1 | $36,690 | $1,000.00 | $0.01 | $5,000.00 | $12,250 |
| 35 | Concrete for Structures, Performance (555.0021) | CY | 185 | $1,116.72 | $1,650.00 | $1,500.00 | $1,300.00 | $1,800.00 |
| 36 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 |
| 37 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 26,600 | $2.99 | $3.50 | $3.00 | $3.00 | $2.80 |
| 38 | (557.1019) | SY | 157 | $506.24 | $600.00 | $525.00 | $410.00 | $535.00 |
| 39 | (557.1119) | SY | 298 | $951.84 | $700.00 | $800.00 | $730.00 | $1,050.00 |
| 40 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 455 | $0.02 | $0.01 | $0.01 | $1.00 | $71.00 |
| 41 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $11.07 | $11.07 | $11.07 | $11.07 | $11.07 |
| 42 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 434 | $18.34 | $16.00 | $18.00 | $25.00 | $15.00 |
| 43 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 3,903 | $1.14 | $1.00 | $0.90 | $0.75 | $1.00 |
| 44 | Protective Sealing of New Structural Concrete (559.02) | SF | 3,189 | $1.67 | $2.00 | $1.60 | $5.00 | $1.00 |
| 45 | Prestressed Concrete New England Bulb Tee Units (563.05) | LF | 350 | $728.72 | $900.00 | $1,000.00 | $1,150.00 | $3,300.00 |
| 46 | (564.20010008) | 3,200 | $1.06 | $10.00 | $0.01 | $1.00 | $2.75 | |
| 47 | (565.30130101) | 10 | $866.75 | $400.00 | $1,100.00 | $250.00 | $815.00 | |
| 48 | Transition Bridge Railing (568.70) | LF | 160 | $220.50 | $190.00 | $190.00 | $180.00 | $180.00 |
| 49 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 148 | $513.14 | $400.00 | $375.00 | $500.00 | $400.00 |
| 50 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $11.57 | $11.57 | $11.57 | $11.57 | $11.57 |
| 51 | Lead-Exposure Control Plan (570.01) | LS | 1 | $2,997.50 | $500.00 | $0.01 | $1,500.00 | $2,715.00 |
| 52 | Medical Testing (570.02) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 53 | Personal-Exposure-Monitoring Sample Analysis (570.03) | DOL | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 54 | Decontamination Facilities (570.04) | CALENDAR WEEK | 1 | $599.50 | $1.00 | $550.00 | $500.00 | $630.00 |
| 55 | (570.10) | LS | 1 | $1,560.62 | $3,000.00 | $0.01 | $1,500.00 | $7,248.00 |
| 56 | Disposal of Hazardous Paint Removal Waste Containing Lead (571.03) | LB | 600 | $1.24 | $0.20 | $2.50 | $5.00 | $4.00 |
| 57 | Box Beam Guide Railing (606.10) | LF | 444 | $47.41 | $50.00 | $50.00 | $50.00 | $51.25 |
| 58 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 24 | $62.84 | $70.00 | $65.00 | $65.00 | $65.50 |
| 59 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 4 | $4,189.50 | $4,500.00 | $4,450.00 | $4,500.00 | $4,600.00 |
| 60 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 1 | $2,205.00 | $2,500.00 | $2,350.00 | $2,500.00 | $2,385.00 |
| 61 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 340 | $6.46 | $6.00 | $8.00 | $8.00 | $10.00 |
| 62 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 4 | $392.26 | $50.00 | $350.00 | $600.00 | $210.00 |
| 63 | (607.41010010) | 80 | $14.64 | $4.00 | $7.00 | $7.00 | $8.50 | |
| 64 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 1 | $95.00 | $95.00 | $95.00 | $95.00 | $95.00 |
| 65 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 22 | $192.94 | $190.00 | $600.00 | $300.00 | $490.00 |
| 66 | Stone Curb – Bridge (Type A) (609.0301) | LF | 60 | $146.09 | $140.00 | $135.00 | $150.00 | $202.00 |
| 67 | Mycorrhizal Fungi (610.0701) | LB | 26 | $66.15 | $45.00 | $63.00 | $90.00 | $65.00 |
| 68 | Turf Establishment – Performance (610.1605) | SY | 4,644 | $1.98 | $20.00 | $12.00 | $16.00 | $8.80 |
| 69 | Turf Establishment – Nurse Crops (610.1606) | SY | 280 | $3.31 | $22.00 | $13.00 | $16.00 | $3.25 |
| 70 | Wildflower Seeding (610.17) | SY | 280 | $26.45 | $3.00 | $9.00 | $8.00 | $9.25 |
| 71 | Watering Vegetation (610.19) | 1,000 GALLONS | 117 | $77.18 | $0.01 | $25.00 | $30.00 | $76.50 |
| 72 | (611.0141) | EACH | 7 | $1,163.14 | $800.00 | $1,100.00 | $1,000.00 | $1,155.00 |
| 73 | (611.0291) | EACH | 6 | $1,091.48 | $800.00 | $1,050.00 | $950.00 | $1,080.00 |
| 74 | (611.19010024) | 7 | $347.29 | $100.00 | $250.00 | $250.00 | $340.00 | |
| 75 | (611.19020024) | 6 | $328.55 | $100.00 | $250.00 | $250.00 | $325.00 | |
| 76 | (615.01010108) | 40 | $143.99 | $80.00 | $350.00 | $90.00 | $160.00 | |
| 77 | (616.07000024) | 240 | $35.84 | $24.00 | $35.00 | $18.00 | $35.00 | |
| 78 | (617.11000024) | LS | 1 | $5,995.00 | $1.00 | $353.64 | $1.00 | $3,350.00 |
| 79 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $38,061 | $50,000 | $100,000 | $40,000 | $82,000 |
| 80 | (619.0501) | LS | 1 | $316,499 | $470,000 | $700,000 | $650,000 | $600,000 |
| 81 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 150 | $6.62 | $7.50 | $7.00 | $9.00 | $11.50 |
| 82 | (619.100103) | LF | 6,630 | $6.62 | $6.50 | $5.50 | $3.00 | $11.50 |
| 83 | (619.130101) | EACH | 1 | $60,125 | $80,000 | $74,000 | $110,000 | $90,000 |
| 84 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 80 | $213.20 | $40.00 | $32.00 | $80.00 | $200.00 |
| 85 | Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715) | LF | 880 | $35.97 | $40.00 | $42.00 | $60.00 | $43.00 |
| 86 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 240 | $39.57 | $40.00 | $40.00 | $70.00 | $89.00 |
| 87 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 46 | $59.95 | $20.00 | $150.00 | $80.00 | $79.00 |
| 88 | Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803) | EACH | 6 | $2,646.00 | $10,000 | $16,000 | $8,500.00 | $8,480.00 |
| 89 | Mailboxes (619.27) | EACH | 1 | $480.08 | $500.00 | $325.00 | $500.00 | $675.00 |
| 90 | Stone Filling (Light) (620.03) | CY | 30 | $294.03 | $125.00 | $250.00 | $200.00 | $160.00 |
| 91 | Stone Filling (Heavy) (620.05) | CY | 405 | $170.17 | $165.00 | $85.00 | $165.00 | $270.00 |
| 92 | Bedding Material, Type 2 (620.0802) | CY | 105 | $89.98 | $100.00 | $115.00 | $120.00 | $110.00 |
| 93 | Cleaning Culverts with Span of 50 in. or Less (621.01) | LF | 57 | $65.90 | $50.00 | $80.00 | $40.00 | $120.00 |
| 94 | Clean, Grade and Shape Existing Roadside Section (621.05) | LF | 200 | $28.18 | $1.00 | $13.00 | $25.00 | $25.00 |
| 95 | Survey Operations (625.01) | LS | 1 | $37,816 | $40,000 | $62,000 | $45,000 | $54,000 |
| 96 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 1 | $3,197.25 | $700.00 | $1,250.00 | $1,500.00 | $2,250.00 |
| 97 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 2 | $1,929.38 | $600.00 | $1,200.00 | $1,900.00 | $1,400.00 |
| 98 | (625.09010015) | LS | 1 | $12,128 | $1.00 | $0.01 | $3,400.00 | $5,400.00 |
| 99 | (627.50140008) | 68 | $12.44 | $6.00 | $10.00 | $3.00 | $3.75 | |
| 100 | Cleaning Existing Pavement and/or Shoulder (633.11) | SY | 378 | $10.10 | $0.50 | $1.30 | $2.00 | $14.00 |
| 101 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,697.75 | $5,000.00 | $400.00 | $1,000.00 | $2,300.00 |
| 102 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 12 | $1,199.00 | $800.00 | $2,500.00 | $2,750.00 | $2,800.00 |
| 103 | Office Technology and Supplies (637.34) | DOL | 200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 104 | Construction Testing supplies – Consumables (637.36) | DOL | 200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 105 | (637.41000115) | 12 | $184.85 | $150.00 | $200.00 | $200.00 | $345.00 | |
| 106 | (637.41000215) | 12 | $184.85 | $150.00 | $200.00 | $200.00 | $345.00 | |
| 107 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 3,363 | $0.93 | $1.40 | $0.50 | $1.00 | $2.00 |
| 108 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 1,777 | $0.93 | $1.40 | $0.50 | $1.00 | $2.00 |
| 109 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 22 | $33.08 | $50.00 | $46.00 | $45.00 | $46.00 |
| 110 | Type A Sign Posts (645.81) | EACH | 3 | $159.86 | $250.00 | $250.00 | $250.00 | $220.00 |
| 111 | Reference Marker Panel (646.21) | EACH | 2 | $33.08 | $40.00 | $39.00 | $30.00 | $30.00 |
| 112 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 6 | $119.90 | $18.00 | $17.00 | $12.00 | $12.00 |
| 113 | Steel Post, 2.0 lb/ft (646.32) | EACH | 8 | $68.36 | $90.00 | $90.00 | $75.00 | $70.00 |
| 114 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 7 | $17.64 | $75.00 | $65.00 | $100.00 | $22.00 |
| 115 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 5 | $17.64 | $60.00 | $90.00 | $100.00 | $22.00 |
| 116 | (648.50010008) | 35 | $36.91 | $30.00 | $125.00 | $150.00 | $714.21 | |
| 117 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 982 | $10.97 | $5.00 | $11.00 | $7.00 | $4.75 |
| 118 | (691.04000020) | 14,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 119 | Field Change Payment (FCP) (697.03) | DOL | 247,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 120 | Asphalt Price Adjustment (698.04) | DOL | 3,744.31 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 121 | Fuel Price Adjustment (698.05) | DOL | 1,239 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 122 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 123 | Mobilization (699.040001) | LS | 1 | $146,430 | $159,587 | $174,000 | $172,000 | $148,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of December 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.