Twin Tier Constructors Inc: NYSDOT bid record
Twin Tier Constructors Inc submitted 27 bids on New York State DOT contracts in the data, from 07 APR 2022 to 01 OCT 2026, and was the low bidder on 10 of them (37%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $47,664,770
- Latest bid
- 01 OCT 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 3 | 1 | 33% |
| 2023 | 5 | 2 | 40% |
| 2024 | 5 | 1 | 20% |
| 2025 | 11 | 5 | 45% |
| 2026 | 3 | 1 | 33% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 06 | 25 | 9 | 36% |
| Region 05 | 1 | 0 | 0% |
| Region 04 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 18 | 18 (100%) | $1.00 | $1.00 |
| Unclassified Excavation and Disposal | 203.02 | CY | 19 | 13 (68%) | $30.00 | $71.00 |
| Engineer’s Field Office – Type 1 | 637.11 | MONTH | 22 | 12 (55%) | $1,450.00 | $2,400.00 |
| Performance Concrete Quality Adjustment – Concrete for Structures | 555.9902 | QUALITY UNIT | 12 | 12 (100%) | $10.09 | $10.50 |
| Structure Excavation | 206.01 | CY | 16 | 11 (69%) | $20.00 | $38.00 |
| Select Structural Fill | 203.21 | CY | 16 | 10 (63%) | $82.50 | $93.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 10 | 10 (100%) | $75.00 | $90.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| The L C Whitford Co Inc | 19 | 9 of 19 |
| Cold Spring Construction Company | 11 | 3 of 11 |
| Sealand Contractors Corp. | 7 | 1 of 7 |
| Economy Paving Co Inc | 6 | 2 of 6 |
| Ramsey Constructors Inc | 5 | 3 of 5 |
| Bothar Construction LLC | 5 | 1 of 5 |
| Slate Hill Constructors Inc | 4 | 1 of 4 |
| Union Concrete & Construction Corp | 3 | 3 of 3 |
| C P Ward Inc | 3 | 1 of 3 |
| Dalrymple Gravel & Contracting Co Inc | 3 | 2 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 OCT 2026 | D265839 | Region 06 | BRIDGE JOINT REPAIRS 2026/27 | 2 of 3 | $1,753,000 | +47% |
| 09 APR 2026 | D265771 | Region 06 | Highway | 1 of 2 | $3,893,000 | Low, 1.0% under the second |
| 05 MAR 2026 | D265646 | Region 06 | Region 6 Culvert Replacements - NYS Rte 21 | 3 of 5 | $3,183,000 | +5.0% |
| 04 DEC 2025 | D265625 | Region 06 | BRIDGE REPLACEMENT - NY 371 over Kirkwood Creek | 2 of 5 | $4,193,000 | +9.0% |
| 06 NOV 2025 | D265613 | Region 06 | Where & When Highway Maintenance, Various Locations | 1 of 2 | $2,594,000 | Low, 0.0% under the second |
| 23 OCT 2025 | D265525 | Region 06 | CULVERT REPLACEMENTS - Various Locations. | 1 of 2 | $10,993,000 | Low, 11% under the second |
| 23 OCT 2025 | D265526 | Region 06 | CULVERT REPLACEMENTS - Routes NY 19, NY 275 & NY 305 | 2 of 3 | $11,313,000 | +3.0% |
| 11 SEP 2025 | D265518 | Region 06 | CULVERT REPLACEMENTS - Towns of Greenwood & Canisteo | 1 of 5 | $6,094,000 | Low, 8.0% under the second |
| 21 AUG 2025 | D265520 | Region 06 | Route 36 from Cass St. to Webbs Crossing Rd. - Phase 1 | 7 of 8 | $42,773,000 | +17% |
| 21 AUG 2025 | D265560 | Region 06 | CULVERT REPLACEMENT - NY 21, CIN 640470 | 4 of 4 | $2,444,000 | +8.0% |
| 07 AUG 2025 | D265555 | Region 06 | I-86 BRIDGE DECK TREATMENT AND JOINT REPLACEMENTS | 2 of 6 | $5,265,554 | +4.0% |
| 10 JUL 2025 | D265516 | Region 04 | BRIDGE REPAIR WHERE & WHEN - Various Locations | 1 of 1 | $4,949,975 | Low |
| 27 MAR 2025 | D265475 | Region 06 | BRIDGE REPLACEMENT - NY Rt 14 | 1 of 2 | $11,743,000 | Low, 17% under the second |
| 20 FEB 2025 | D265443 | Region 06 | Culvert Replacements & Retaining Wall Repairs | 2 of 3 | $2,644,000 | +38% |
| 19 DEC 2024 | D265390 | Region 06 | HAZARD MITIGATION & SAFETAP BACKLOG-Various Locations | 4 of 4 | $1,363,000 | +59% |
| 19 DEC 2024 | D265394 | Region 06 | PIN 6805.75 - D265394 - Bridge Bearing Repairs | 3 of 6 | $2,064,000 | +31% |
| 07 NOV 2024 | D265340 | Region 06 | Where and When Bridge Regional 04/2025 - 04/2027 | 1 of 3 | $379,795 | Low, 27% under the second |
| 10 OCT 2024 | D265334 | Region 06 | I-390/B&H RR Bridge Joint Repairs (1090651 & 1090652) | 2 of 5 | $2,096,356 | +12% |
| 25 JUL 2024 | D265293 | Region 05 | NY 280 (BRIDGE & LARGE CULVERTS) - SNI; CATT CO | 4 of 6 | $6,242,802 | +64% |
| 14 DEC 2023 | D265157 | Region 06 | Bridge Rehab - NY 248 over Bennett's Creek/Sugar Creek | 2 of 3 | $4,430,000 | +3.0% |
| 30 NOV 2023 | D265139 | Region 06 | NY 14A Over Rock Stream Bridge Replacement | 1 of 5 | $2,472,000 | Low, 5.0% under the second |
| 12 OCT 2023 | D265097 | Region 06 | NY 54 / WILLOW GROVE BRIDGE REPLACEMENT, BIN 1026940 | 2 of 6 | $3,192,289 | +4.0% |
| 10 AUG 2023 | D265067 | Region 06 | Culvert Replacement Route 417 | 1 of 3 | $1,273,000 | Low, 25% under the second |
| 09 MAR 2023 | D264997 | Region 06 | Bath Sidewalks and Ramps | 2 of 3 | $2,244,000 | +13% |
| 15 SEP 2022 | D264871 | Region 06 | Rte. 226 over Unknown Creek and Rte. 226 over Sonora Brook | 1 of 4 | $3,273,000 | Low, 7.0% under the second |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.