Twin Tier Constructors Inc: NYSDOT bid record

Twin Tier Constructors Inc submitted 27 bids on New York State DOT contracts in the data, from 07 APR 2022 to 01 OCT 2026, and was the low bidder on 10 of them (37%). When it was not low, its total sat a median +12% above the low bid.

Owner
New York State DOT
Low bid volume
$47,664,770
Latest bid
01 OCT 2026
Data through
15 OCT 2026
27Bids
10Low bids
37Win rate, percent
+12%Median gap to the low bid when not low, 17 bids

By year

YearBidsLow bidsWin rate
20223133%
20235240%
20245120%
202511545%
20263133%
Twin Tier Constructors Inc, NYSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 0625936%
Region 05100%
Region 0411100%
Twin Tier Constructors Inc, NYSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Field Change Payment (FCP)697.03DOL2424 (100%)$1.00$1.00
Office Technology and Supplies637.34DOL2424 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL2424 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL2424 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL2424 (100%)$1.00$1.00
Construction Testing supplies – Consumables637.36DOL1818 (100%)$1.00$1.00
Unclassified Excavation and Disposal203.02CY1913 (68%)$30.00$71.00
Engineer’s Field Office – Type 1637.11MONTH2212 (55%)$1,450.00$2,400.00
Performance Concrete Quality Adjustment – Concrete for Structures555.9902QUALITY UNIT1212 (100%)$10.09$10.50
Structure Excavation206.01CY1611 (69%)$20.00$38.00
Select Structural Fill203.21CY1610 (63%)$82.50$93.00
Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips608.000013QUALITY UNIT1010 (100%)$75.00$90.00
Twin Tier Constructors Inc, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Twin Tier Constructors Inc, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
01 OCT 2026D265839Region 06BRIDGE JOINT REPAIRS 2026/272 of 3$1,753,000+47%
09 APR 2026D265771Region 06Highway1 of 2$3,893,000Low, 1.0% under the second
05 MAR 2026D265646Region 06Region 6 Culvert Replacements - NYS Rte 213 of 5$3,183,000+5.0%
04 DEC 2025D265625Region 06BRIDGE REPLACEMENT - NY 371 over Kirkwood Creek2 of 5$4,193,000+9.0%
06 NOV 2025D265613Region 06Where & When Highway Maintenance, Various Locations1 of 2$2,594,000Low, 0.0% under the second
23 OCT 2025D265525Region 06CULVERT REPLACEMENTS - Various Locations.1 of 2$10,993,000Low, 11% under the second
23 OCT 2025D265526Region 06CULVERT REPLACEMENTS - Routes NY 19, NY 275 & NY 3052 of 3$11,313,000+3.0%
11 SEP 2025D265518Region 06CULVERT REPLACEMENTS - Towns of Greenwood & Canisteo1 of 5$6,094,000Low, 8.0% under the second
21 AUG 2025D265520Region 06Route 36 from Cass St. to Webbs Crossing Rd. - Phase 17 of 8$42,773,000+17%
21 AUG 2025D265560Region 06CULVERT REPLACEMENT - NY 21, CIN 6404704 of 4$2,444,000+8.0%
07 AUG 2025D265555Region 06I-86 BRIDGE DECK TREATMENT AND JOINT REPLACEMENTS2 of 6$5,265,554+4.0%
10 JUL 2025D265516Region 04BRIDGE REPAIR WHERE & WHEN - Various Locations1 of 1$4,949,975Low
27 MAR 2025D265475Region 06BRIDGE REPLACEMENT - NY Rt 141 of 2$11,743,000Low, 17% under the second
20 FEB 2025D265443Region 06Culvert Replacements & Retaining Wall Repairs2 of 3$2,644,000+38%
19 DEC 2024D265390Region 06HAZARD MITIGATION & SAFETAP BACKLOG-Various Locations4 of 4$1,363,000+59%
19 DEC 2024D265394Region 06PIN 6805.75 - D265394 - Bridge Bearing Repairs3 of 6$2,064,000+31%
07 NOV 2024D265340Region 06Where and When Bridge Regional 04/2025 - 04/20271 of 3$379,795Low, 27% under the second
10 OCT 2024D265334Region 06I-390/B&H RR Bridge Joint Repairs (1090651 & 1090652)2 of 5$2,096,356+12%
25 JUL 2024D265293Region 05NY 280 (BRIDGE & LARGE CULVERTS) - SNI; CATT CO4 of 6$6,242,802+64%
14 DEC 2023D265157Region 06Bridge Rehab - NY 248 over Bennett's Creek/Sugar Creek2 of 3$4,430,000+3.0%
30 NOV 2023D265139Region 06NY 14A Over Rock Stream Bridge Replacement1 of 5$2,472,000Low, 5.0% under the second
12 OCT 2023D265097Region 06NY 54 / WILLOW GROVE BRIDGE REPLACEMENT, BIN 10269402 of 6$3,192,289+4.0%
10 AUG 2023D265067Region 06Culvert Replacement Route 4171 of 3$1,273,000Low, 25% under the second
09 MAR 2023D264997Region 06Bath Sidewalks and Ramps2 of 3$2,244,000+13%
15 SEP 2022D264871Region 06Rte. 226 over Unknown Creek and Rte. 226 over Sonora Brook1 of 4$3,273,000Low, 7.0% under the second
Twin Tier Constructors Inc: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy