NYSDOT contract D265475 bid tabulation
BRIDGE REPLACEMENT - NY Rt 14. Let by New York State DOT on March 27, 2025, Chemung, Region 06. 2 bids received; low bid $11,743,000 by Twin Tier Constructors Inc.
- Owner
- New York State DOT
- Letting
- 27 MAR 2025
- Pay items
- 99
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Twin Tier Constructors Inc | $11,743,000 | Low |
| 2 | Economy Paving Co Inc | $13,735,195 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Twin Tier Constructors Inc | 2. Economy Paving Co Inc |
|---|---|---|---|---|---|
| 1 | (202.120001) | LS | 1 | $1,600,000 | $3,335,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 888 | $55.00 | $30.00 |
| 3 | Embankment In Place (203.03) | CY | 98 | $75.00 | $50.00 |
| 4 | Select Structural Fill (203.21) | CY | 95 | $85.00 | $75.00 |
| 5 | Geotextile Separation (207.21) | SY | 747 | $2.50 | $1.60 |
| 6 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 133 | $22.00 | $10.00 |
| 7 | Subbase Course, Optional Type (304.15) | CY | 414 | $90.00 | $50.00 |
| 8 | (404.0001) | TON | 117 | $75.00 | $75.00 |
| 9 | (404.0189) | TON | 1,011 | $150.00 | $165.00 |
| 10 | (404.0983) | TON | 841 | $160.00 | $170.00 |
| 11 | (404.1989) | TON | 93 | $320.00 | $165.00 |
| 12 | (404.3789) | TON | 370 | $210.00 | $160.00 |
| 13 | Diluted Tack Coat (407.0102) | GAL | 1,195 | $11.00 | $3.30 |
| 14 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 4,899 | $1.50 | $0.35 |
| 15 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 4,122 | $2.20 | $5.00 |
| 16 | Temporary Steel Sheeting (552.13) | SF | 675 | $55.00 | $1.00 |
| 17 | Concrete for Structures, Performance (555.0021) | CY | 268 | $3,000.00 | $2,000.00 |
| 18 | (555.10000006) | 7 | $400.00 | $100.00 | |
| 19 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $6.75 | $6.75 |
| 20 | Galvanized Bar Reinforcement for Structures (556.0203) | LB | 53,158 | $3.00 | $2.60 |
| 21 | Stud Shear Connectors for Bridges (556.03) | EACH | 14,504 | $5.50 | $4.00 |
| 22 | (557.1012) | SY | 335.70 | $550.00 | $650.00 |
| 23 | (557.1112) | SY | 2,346.90 | $725.00 | $780.00 |
| 24 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 2,599.10 | $0.01 | $1.00 |
| 25 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $13.03 | $13.03 |
| 26 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 2,490 | $14.00 | $8.20 |
| 27 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 22,451 | $0.65 | $0.85 |
| 28 | Protective Sealing of New Structural Concrete (559.02) | SF | 12,447 | $1.00 | $0.10 |
| 29 | Protective Sealing of Concrete with Coating Type Protective Sealer (559.04) | SQUAREFOOT | 8,988 | $3.50 | $4.00 |
| 30 | (564.0501) | LS | 1 | $2,875,000 | $3,035,000 |
| 31 | Type E.B. Expansion Bearing (Over 225 k) (565.2035) | EACH | 32 | $5,000.00 | $4,500.00 |
| 32 | Armorless Bridge Joint (567.60) | LF | 189 | $300.00 | $270.00 |
| 33 | Transition Bridge Railing (568.70) | LF | 160 | $210.00 | $220.00 |
| 34 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 630 | $250.00 | $200.00 |
| 35 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $7.28 | $7.28 |
| 36 | (572.00020101) | LS | 1 | $490,000 | $535,000 |
| 37 | Removal of Structural Concrete (580.01) | CY | 224 | $1,900.00 | $2,500.00 |
| 38 | Removal and Replacement of Structural Concrete (582.0051) | CY | 24 | $7,800.00 | $5,000.00 |
| 39 | (582.99) | 1 | $35.00 | $35.00 | |
| 40 | (582.99000016) | 105 | $36.00 | $30.00 | |
| 41 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 383 | $33.00 | $40.00 |
| 42 | Drilling and Grouting Bolts or Reinforcing Bars with Pullout Test (586.0301) | EACH | 55 | $75.00 | $50.00 |
| 43 | (604.070601) | EACH | 5 | $1,700.00 | $1,000.00 |
| 44 | (604.070602) | EACH | 3 | $1,700.00 | $1,000.00 |
| 45 | (604.13000011) | 3 | $900.00 | $100.00 | |
| 46 | Underdrain Filter, Type II (605.1001) | CY | 39 | $90.00 | $85.00 |
| 47 | (605.1701) | LF | 527 | $8.00 | $20.00 |
| 48 | Box Beam Guide Railing (606.10) | LF | 1,170 | $54.00 | $50.00 |
| 49 | Box Beam End Piece (606.120101) | EACH | 1 | $700.00 | $650.00 |
| 50 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 1 | $2,200.00 | $2,250.00 |
| 51 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 1,170 | $5.50 | $5.00 |
| 52 | (607.06400016) | 256 | $125.00 | $105.00 | |
| 53 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 1 | $75.00 | $75.00 |
| 54 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 15 | $290.00 | $210.00 |
| 55 | Stone Curb – Bridge (Type A) (609.0301) | LF | 53 | $100.00 | $150.00 |
| 56 | (609.0405) | LF | 1,305 | $50.00 | $50.00 |
| 57 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $270,000 | $535,000 |
| 58 | Type III Construction Barricades (619.04) | EACH | 3 | $85.00 | $250.00 |
| 59 | (619.080102) | LF | 3,392 | $2.25 | $2.00 |
| 60 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 700 | $8.00 | $6.00 |
| 61 | (619.0903) | LF | 9,529 | $5.50 | $4.00 |
| 62 | (619.100103) | LF | 7,864 | $5.00 | $4.00 |
| 63 | (619.100203) | EACH | 20 | $420.00 | $280.00 |
| 64 | (619.100302) | EACH | 24 | $260.00 | $240.00 |
| 65 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 2,320 | $35.00 | $55.00 |
| 66 | (619.70030011) | 8,251 | $40.00 | $40.00 | |
| 67 | Stone Filling (Light) (620.03) | CY | 13 | $160.00 | $100.00 |
| 68 | Bedding Material, Type 1 (620.0801) | CY | 15 | $100.00 | $100.00 |
| 69 | Cleaning Drainage Structures (621.04) | EACH | 4 | $700.00 | $750.00 |
| 70 | (621.05020004) | 1,305 | $5.00 | $1.00 | |
| 71 | Survey Operations (625.01) | LS | 1 | $80,000 | $40,000 |
| 72 | (627.50140008) | 1,513 | $4.00 | $1.00 | |
| 73 | Cleaning Existing Pavement and/or Shoulder (633.11) | SY | 8,305 | $0.90 | $0.10 |
| 74 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $3,000.00 | $5,000.00 |
| 75 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 18 | $2,300.00 | $3,600.00 |
| 76 | Office Technology and Supplies (637.34) | DOL | 200 | $1.00 | $1.00 |
| 77 | Construction Testing supplies – Consumables (637.36) | DOL | 200 | $1.00 | $1.00 |
| 78 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 177.60 | $65.00 | $60.00 |
| 79 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 2 | $50.00 | $50.00 |
| 80 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 136 | $45.00 | $50.00 |
| 81 | Type A Sign Posts (645.81) | EACH | 34 | $175.00 | $160.00 |
| 82 | (645.830701) | EACH | 2 | $9,500.00 | $7,500.00 |
| 83 | Reference Marker Panel (646.21) | EACH | 4 | $50.00 | $50.00 |
| 84 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 16 | $14.00 | $15.00 |
| 85 | Steel Post, 2.0 lb/ft (646.32) | EACH | 20 | $85.00 | $80.00 |
| 86 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 34 | $7.00 | $35.00 |
| 87 | Remove and Dispose Sign Panel, Sign Panel Assembly Size III (Over 100 Square Feet) (647.53) | EACH | 1 | $110.97 | $2,000.00 |
| 88 | Manhole Frame & Cover (655.1202) | EACH | 3 | $2,000.00 | $1,650.00 |
| 89 | (675.99000023) | 100,000 | $1.00 | $1.00 | |
| 90 | (680.05010007) | 2 | $30,000 | $25,000 | |
| 91 | White Epoxy Reflectorized Pavement Stripes - 15 mil (685.0101) | LF | 11,960 | $2.00 | $1.60 |
| 92 | Yellow Epoxy Reflectorized Pavement Stripes - 15 mil (685.0201) | LF | 12,304 | $6.00 | $1.60 |
| 93 | White Epoxy Reflectorized Pavement Letters - 15 mil Portable/Hand Application (685.2303) | EACH | 12 | $200.00 | $160.00 |
| 94 | White Epoxy Reflectorized Pavement Symbols - 15 mil Portable/Hand Application (685.2403) | EACH | 15 | $390.00 | $360.00 |
| 95 | Field Change Payment (FCP) (697.03) | DOL | 255,000 | $1.00 | $1.00 |
| 96 | Asphalt Price Adjustment (698.04) | DOL | 5,147.93 | $1.00 | $1.00 |
| 97 | Fuel Price Adjustment (698.05) | DOL | 2,503 | $1.00 | $1.00 |
| 98 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 99 | Mobilization (699.040001) | LS | 1 | $400,000 | $525,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 27, 2025. Compiled by Mirage Metrics.