NYSDOT contract D265518 bid tabulation

CULVERT REPLACEMENTS - Towns of Greenwood & Canisteo. Let by New York State DOT on September 11, 2025, Allegany, Steuben, Region 06. 5 bids received; low bid $6,094,000 by Twin Tier Constructors Inc.

Owner
New York State DOT
Letting
11 SEP 2025
Pay items
105
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Twin Tier Constructors Inc$6,094,000Low
2The L C Whitford Co Inc$6,588,887+8.0%
3Cold Spring Construction Company$6,735,749+11%
4Sealand Contractors Corp.$7,269,001+19%
5Bothar Construction LLC$7,612,593+25%
NYSDOT contract D265518: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Twin Tier Constructors Inc2. The L C Whitford Co Inc3. Cold Spring Construction Company4. Sealand Contractors Corp.5. Bothar Construction LLC
1Clearing and Grubbing (201.06)LS1$85,000$55,909$14,500$25,000$41,000
2Removal of Substructures (202.19)CY250$130.00$249.88$155.00$200.00$83.80
3Unclassified Excavation and Disposal (203.02)CY3,030$30.00$54.09$30.00$36.00$35.40
4Embankment In Place (203.03)CY4,980$20.00$52.87$37.00$12.50$88.05
5Select Granular Fill (203.07)CY30$75.00$191.47$55.00$120.00$126.40
6Select Structural Fill (203.21)CY1,825$68.00$117.58$102.00$101.00$120.70
7Structure Excavation (206.01)CY13,295$18.00$28.44$18.00$36.00$34.45
8Trench and Culvert Excavation (206.0201)CY310$40.00$56.54$49.00$100.00$15.50
9Geotextile Bedding (207.20)SY880$3.50$6.00$4.50$6.00$10.30
10Geotextile Separation (207.21)SY6,240$1.75$6.00$2.00$2.00$2.15
11Geotextile Drainage (207.22)SY165$8.00$6.59$9.50$12.00$4.75
12Prefabricated Composite Structural Drain (207.26)SY285$25.00$35.27$18.00$35.00$17.70
13Seed and Mulch – Temporary (209.1003)SY490$2.50$5.96$5.00$4.00$5.30
14Check Dam (Ditch Bottom Width 0.0 to 3′), Stone – Temporary (209.110101)EACH15$450.00$279.83$700.00$1,800.00$374.80
15Silt Fence - Temporary (209.13)LF1,574$4.00$10.45$6.00$6.50$6.05
16Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY660$4.00$15.82$5.25$10.00$7.95
17Subbase Course, Type 1 (304.11)CY70$80.00$236.42$185.00$180.00$107.80
18Subbase Course, Optional Type (304.15)CY1,825$70.00$80.69$85.00$96.00$114.60
19 (404.0983)TON495$175.00$192.94$175.00$159.00$180.40
20 (404.1989)TON690$160.00$165.38$150.00$137.00$166.80
21 (404.3789)TON2,265$128.00$132.30$125.00$124.00$141.60
22Diluted Tack Coat (407.0102)GAL695$21.00$22.05$15.00$16.00$6.10
23Asphalt Pavement Joint Adhesive (418.7603)LF1,968$2.60$2.54$1.10$2.50$4.30
24Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY1,078$20.00$22.79$11.50$23.00$19.30
25 (553.010001)EACH1$1,000.00$1.20$0.01$10,000$46,000
26 (553.010002)EACH1$1,000.00$1.20$0.01$10,000$46,000
27 (553.010003)EACH1$1,000.00$1.20$0.01$10,000$46,000
28 (553.030001)EACH1$50,000$43,643$0.01$5,000.00$15,000
29 (553.030002)EACH1$50,000$43,643$0.01$5,000.00$15,000
30 (553.030003)EACH1$75,000$43,643$0.01$5,000.00$15,000
31Footing Concrete, Performance (555.0011)CY165$900.00$951.65$1,675.00$1,400.00$932.30
32Concrete for Structures, Performance (555.0021)CY190$1,800.00$1,476.07$1,850.00$3,800.00$1,153.00
33Performance Concrete Quality Adjustment – Footing Concrete (555.9901)QUALITY UNIT1$5.55$5.55$5.55$5.55$5.55
34Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$12.28$12.28$12.28$12.28$12.28
35Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB42,315$3.25$3.22$3.75$3.55$2.75
36Protective Sealing of New Structural Concrete (559.02)SF2,705$3.00$2.64$2.00$5.00$3.75
37 (562.0101)SY120$1,300.00$1,414.79$1,550.00$1,930.00$2,800.00
38Invert Slab With Cut-Off Wall (562.02)SY126$850.00$958.36$1,300.00$940.00$1,168.00
39Performance Concrete Quality Adjustment (562.99)QUALITY UNIT1$10.52$10.52$10.52$10.52$10.52
40Steel Bridge Railing (Three-Rail) (568.54)LF120$270.00$218.41$205.00$250.00$227.80
41Transition Bridge Railing (568.70)LF256$200.00$201.10$185.00$200.00$209.75
42 (595.50000018)9,660$3.50$6.03$8.00$3.60$2.95
43 (603.171416)EACH2$350.00$1,123.47$875.00$800.00$1,838.00
44 (603.64201015)130$3,600.00$4,154.72$6,000.00$4,600.00$5,382.00
45 (603.65240815)36$4,500.00$5,352.15$6,500.00$6,000.00$7,934.00
46 (603.9818)LF40$38.00$79.63$95.00$120.00$46.50
47Underdrain Filter, Type II (605.1001)CY20$75.00$244.33$165.00$150.00$105.70
48 (605.1701)LF210$6.00$34.60$2.00$20.00$3.60
49Box Beam Guide Railing (606.10)LF1,992$45.00$50.72$48.00$50.25$52.90
50Box Beam End Piece (606.120101)EACH2$850.00$661.50$618.00$670.00$690.00
51Box Beam Guide Railing End Assembly Type I (606.120102)EACH4$4,300.00$4,360.39$4,150.00$4,300.00$4,548.25
52Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH4$2,100.00$2,144.36$2,025.00$2,120.00$2,236.75
53Weak-Post, Corrugated Beam Guide Rail (606.18)LF26$27.00$38.59$36.00$40.00$40.25
54Anchorage Units for Corrugated Beam Guide Railing (606.22)EACH1$1,900.00$4,687.01$2,100.00$2,200.00$2,300.00
55Removing and Disposing Corrugated Beam Guide Railing (606.71)LF26$13.00$82.85$18.00$20.00$6.55
56Removing and Disposing Box Beam Guide Railing (606.73)LF2,207$5.00$7.80$8.25$5.00$3.05
57Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910)EACH1$400.00$2,482.01$325.00$500.00$815.80
58Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920)EACH10$100.00$465.91$325.00$500.00$815.80
59Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON136$180.00$192.94$200.00$350.00$210.80
60Stone Curb – Bridge (Type A) (609.0301)LF65$95.00$244.75$250.00$250.00$303.10
61Turf Establishment – Performance (610.1605)SY1,100$22.00$46.14$43.00$22.00$11.25
62 (613.04000001)430$50.00$80.08$43.00$115.00$101.20
63 (617.11000024)LS1$100.00$5,995.00$400.00$3,000.00$2,848.00
64Basic Work Zone Traffic Control (619.01)LS1$350,000$263,440$320,000$149,959$310,000
65Type III Construction Barricades (619.04)EACH68$70.00$78.27$125.00$300.00$126.30
66 (619.0501)LS1$780,000$513,013$550,000$500,000$772,909
67 (619.100101)LF2,565$3.00$0.83$2.90$0.80$0.90
68 (619.110511)EACH5$4,000.00$1,199.00$10,000$14,000$8,082.00
69Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711)LF240$35.00$45.56$40.00$50.00$50.90
70Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716)LF660$46.00$64.75$0.01$60.00$66.30
71Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802)EACH1$6,000.00$5,633.78$0.01$10,000$5,708.00
72Pavement Patching (Force Acount) (619.2601)DOL20,000$1.00$1.00$1.00$1.00$1.00
73Mailboxes (619.27)EACH1$300.00$482.28$350.00$500.00$267.30
74 (619.99230103)12$1,000.00$4,995.84$14,000$8,800.00$252.60
75Stone Filling (Light) (620.03)CY50$115.00$173.53$250.00$280.00$149.80
76Stone Filling (Heavy) (620.05)CY1,280$160.00$167.78$115.00$320.00$224.90
77Bedding Material, Type 2 (620.0802)CY510$80.00$87.10$160.00$155.00$130.20
78 (620.14010009)885$170.00$188.09$235.00$320.00$266.60
79 (621.05020004)2,525$1.00$18.81$4.00$11.00$9.00
80Crushed Stone (In-Place Measure) (623.12)CY230$95.00$146.78$120.00$145.00$119.40
81Survey Operations (625.01)LS1$100,000$60,472$90,000$64,000$85,284
82Steel Pin and Cap Right of Way Markers (625.05)EACH20$100.00$655.99$205.00$650.00$980.90
83 (627.50140008)382$3.00$17.10$6.00$12.00$14.95
84Concrete Cylinder Curing Equipment (637.04)EACH3$100.00$4,796.00$350.00$3,300.00$2,105.00
85Engineer’s Field Office – Type 1 (637.11)MONTH21$1,500.00$1,558.70$2,100.00$2,000.00$2,526.00
86Office Technology and Supplies (637.34)DOL1,000$1.00$1.00$1.00$1.00$1.00
87Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00$1.00
88 (637.41000115)21$50.00$131.31$190.00$62.00$90.20
89 (637.41000215)21$50.00$131.31$190.00$62.00$90.20
90Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF6$35.00$53.48$50.00$55.00$55.80
91Type A Sign Posts (645.81)EACH1$190.00$303.19$285.00$310.00$316.25
92Reference Marker Panel (646.21)EACH2$32.00$55.13$50.00$60.00$57.50
93Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22)EACH22$10.00$16.54$15.00$17.00$17.25
94Steel Post, 2.0 lb/ft (646.32)EACH19$65.00$92.88$85.00$92.00$96.90
95Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH1$180.00$187.43$175.00$185.00$195.50
96Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH5$35.00$17.64$130.00$200.00$113.00
97 (647.83001002)17$20.00$7.72$44.00$50.00$113.00
98White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF4,785$3.00$1.08$3.00$1.03$1.15
99Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF4,785$3.00$1.08$3.00$1.03$1.15
100 (691.04000020)21,000$1.00$1.00$1.00$1.00$1.00
101Field Change Payment (FCP) (697.03)DOL581,000$1.00$1.00$1.00$1.00$1.00
102Asphalt Price Adjustment (698.04)DOL4,483$1.00$1.00$1.00$1.00$1.00
103Fuel Price Adjustment (698.05)DOL4,059$1.00$1.00$1.00$1.00$1.00
104Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00
105Mobilization (699.040001)LS1$217,888$230,718$259,000$279,000$288,176
NYSDOT contract D265518: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of September 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy