NYSDOT contract D265518 bid tabulation
CULVERT REPLACEMENTS - Towns of Greenwood & Canisteo. Let by New York State DOT on September 11, 2025, Allegany, Steuben, Region 06. 5 bids received; low bid $6,094,000 by Twin Tier Constructors Inc.
- Owner
- New York State DOT
- Letting
- 11 SEP 2025
- Pay items
- 105
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Twin Tier Constructors Inc | $6,094,000 | Low |
| 2 | The L C Whitford Co Inc | $6,588,887 | +8.0% |
| 3 | Cold Spring Construction Company | $6,735,749 | +11% |
| 4 | Sealand Contractors Corp. | $7,269,001 | +19% |
| 5 | Bothar Construction LLC | $7,612,593 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Twin Tier Constructors Inc | 2. The L C Whitford Co Inc | 3. Cold Spring Construction Company | 4. Sealand Contractors Corp. | 5. Bothar Construction LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $85,000 | $55,909 | $14,500 | $25,000 | $41,000 |
| 2 | Removal of Substructures (202.19) | CY | 250 | $130.00 | $249.88 | $155.00 | $200.00 | $83.80 |
| 3 | Unclassified Excavation and Disposal (203.02) | CY | 3,030 | $30.00 | $54.09 | $30.00 | $36.00 | $35.40 |
| 4 | Embankment In Place (203.03) | CY | 4,980 | $20.00 | $52.87 | $37.00 | $12.50 | $88.05 |
| 5 | Select Granular Fill (203.07) | CY | 30 | $75.00 | $191.47 | $55.00 | $120.00 | $126.40 |
| 6 | Select Structural Fill (203.21) | CY | 1,825 | $68.00 | $117.58 | $102.00 | $101.00 | $120.70 |
| 7 | Structure Excavation (206.01) | CY | 13,295 | $18.00 | $28.44 | $18.00 | $36.00 | $34.45 |
| 8 | Trench and Culvert Excavation (206.0201) | CY | 310 | $40.00 | $56.54 | $49.00 | $100.00 | $15.50 |
| 9 | Geotextile Bedding (207.20) | SY | 880 | $3.50 | $6.00 | $4.50 | $6.00 | $10.30 |
| 10 | Geotextile Separation (207.21) | SY | 6,240 | $1.75 | $6.00 | $2.00 | $2.00 | $2.15 |
| 11 | Geotextile Drainage (207.22) | SY | 165 | $8.00 | $6.59 | $9.50 | $12.00 | $4.75 |
| 12 | Prefabricated Composite Structural Drain (207.26) | SY | 285 | $25.00 | $35.27 | $18.00 | $35.00 | $17.70 |
| 13 | Seed and Mulch – Temporary (209.1003) | SY | 490 | $2.50 | $5.96 | $5.00 | $4.00 | $5.30 |
| 14 | Check Dam (Ditch Bottom Width 0.0 to 3′), Stone – Temporary (209.110101) | EACH | 15 | $450.00 | $279.83 | $700.00 | $1,800.00 | $374.80 |
| 15 | Silt Fence - Temporary (209.13) | LF | 1,574 | $4.00 | $10.45 | $6.00 | $6.50 | $6.05 |
| 16 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 660 | $4.00 | $15.82 | $5.25 | $10.00 | $7.95 |
| 17 | Subbase Course, Type 1 (304.11) | CY | 70 | $80.00 | $236.42 | $185.00 | $180.00 | $107.80 |
| 18 | Subbase Course, Optional Type (304.15) | CY | 1,825 | $70.00 | $80.69 | $85.00 | $96.00 | $114.60 |
| 19 | (404.0983) | TON | 495 | $175.00 | $192.94 | $175.00 | $159.00 | $180.40 |
| 20 | (404.1989) | TON | 690 | $160.00 | $165.38 | $150.00 | $137.00 | $166.80 |
| 21 | (404.3789) | TON | 2,265 | $128.00 | $132.30 | $125.00 | $124.00 | $141.60 |
| 22 | Diluted Tack Coat (407.0102) | GAL | 695 | $21.00 | $22.05 | $15.00 | $16.00 | $6.10 |
| 23 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,968 | $2.60 | $2.54 | $1.10 | $2.50 | $4.30 |
| 24 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 1,078 | $20.00 | $22.79 | $11.50 | $23.00 | $19.30 |
| 25 | (553.010001) | EACH | 1 | $1,000.00 | $1.20 | $0.01 | $10,000 | $46,000 |
| 26 | (553.010002) | EACH | 1 | $1,000.00 | $1.20 | $0.01 | $10,000 | $46,000 |
| 27 | (553.010003) | EACH | 1 | $1,000.00 | $1.20 | $0.01 | $10,000 | $46,000 |
| 28 | (553.030001) | EACH | 1 | $50,000 | $43,643 | $0.01 | $5,000.00 | $15,000 |
| 29 | (553.030002) | EACH | 1 | $50,000 | $43,643 | $0.01 | $5,000.00 | $15,000 |
| 30 | (553.030003) | EACH | 1 | $75,000 | $43,643 | $0.01 | $5,000.00 | $15,000 |
| 31 | Footing Concrete, Performance (555.0011) | CY | 165 | $900.00 | $951.65 | $1,675.00 | $1,400.00 | $932.30 |
| 32 | Concrete for Structures, Performance (555.0021) | CY | 190 | $1,800.00 | $1,476.07 | $1,850.00 | $3,800.00 | $1,153.00 |
| 33 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $5.55 | $5.55 | $5.55 | $5.55 | $5.55 |
| 34 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $12.28 | $12.28 | $12.28 | $12.28 | $12.28 |
| 35 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 42,315 | $3.25 | $3.22 | $3.75 | $3.55 | $2.75 |
| 36 | Protective Sealing of New Structural Concrete (559.02) | SF | 2,705 | $3.00 | $2.64 | $2.00 | $5.00 | $3.75 |
| 37 | (562.0101) | SY | 120 | $1,300.00 | $1,414.79 | $1,550.00 | $1,930.00 | $2,800.00 |
| 38 | Invert Slab With Cut-Off Wall (562.02) | SY | 126 | $850.00 | $958.36 | $1,300.00 | $940.00 | $1,168.00 |
| 39 | Performance Concrete Quality Adjustment (562.99) | QUALITY UNIT | 1 | $10.52 | $10.52 | $10.52 | $10.52 | $10.52 |
| 40 | Steel Bridge Railing (Three-Rail) (568.54) | LF | 120 | $270.00 | $218.41 | $205.00 | $250.00 | $227.80 |
| 41 | Transition Bridge Railing (568.70) | LF | 256 | $200.00 | $201.10 | $185.00 | $200.00 | $209.75 |
| 42 | (595.50000018) | 9,660 | $3.50 | $6.03 | $8.00 | $3.60 | $2.95 | |
| 43 | (603.171416) | EACH | 2 | $350.00 | $1,123.47 | $875.00 | $800.00 | $1,838.00 |
| 44 | (603.64201015) | 130 | $3,600.00 | $4,154.72 | $6,000.00 | $4,600.00 | $5,382.00 | |
| 45 | (603.65240815) | 36 | $4,500.00 | $5,352.15 | $6,500.00 | $6,000.00 | $7,934.00 | |
| 46 | (603.9818) | LF | 40 | $38.00 | $79.63 | $95.00 | $120.00 | $46.50 |
| 47 | Underdrain Filter, Type II (605.1001) | CY | 20 | $75.00 | $244.33 | $165.00 | $150.00 | $105.70 |
| 48 | (605.1701) | LF | 210 | $6.00 | $34.60 | $2.00 | $20.00 | $3.60 |
| 49 | Box Beam Guide Railing (606.10) | LF | 1,992 | $45.00 | $50.72 | $48.00 | $50.25 | $52.90 |
| 50 | Box Beam End Piece (606.120101) | EACH | 2 | $850.00 | $661.50 | $618.00 | $670.00 | $690.00 |
| 51 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 4 | $4,300.00 | $4,360.39 | $4,150.00 | $4,300.00 | $4,548.25 |
| 52 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 4 | $2,100.00 | $2,144.36 | $2,025.00 | $2,120.00 | $2,236.75 |
| 53 | Weak-Post, Corrugated Beam Guide Rail (606.18) | LF | 26 | $27.00 | $38.59 | $36.00 | $40.00 | $40.25 |
| 54 | Anchorage Units for Corrugated Beam Guide Railing (606.22) | EACH | 1 | $1,900.00 | $4,687.01 | $2,100.00 | $2,200.00 | $2,300.00 |
| 55 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 26 | $13.00 | $82.85 | $18.00 | $20.00 | $6.55 |
| 56 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 2,207 | $5.00 | $7.80 | $8.25 | $5.00 | $3.05 |
| 57 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 1 | $400.00 | $2,482.01 | $325.00 | $500.00 | $815.80 |
| 58 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 10 | $100.00 | $465.91 | $325.00 | $500.00 | $815.80 |
| 59 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 136 | $180.00 | $192.94 | $200.00 | $350.00 | $210.80 |
| 60 | Stone Curb – Bridge (Type A) (609.0301) | LF | 65 | $95.00 | $244.75 | $250.00 | $250.00 | $303.10 |
| 61 | Turf Establishment – Performance (610.1605) | SY | 1,100 | $22.00 | $46.14 | $43.00 | $22.00 | $11.25 |
| 62 | (613.04000001) | 430 | $50.00 | $80.08 | $43.00 | $115.00 | $101.20 | |
| 63 | (617.11000024) | LS | 1 | $100.00 | $5,995.00 | $400.00 | $3,000.00 | $2,848.00 |
| 64 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $350,000 | $263,440 | $320,000 | $149,959 | $310,000 |
| 65 | Type III Construction Barricades (619.04) | EACH | 68 | $70.00 | $78.27 | $125.00 | $300.00 | $126.30 |
| 66 | (619.0501) | LS | 1 | $780,000 | $513,013 | $550,000 | $500,000 | $772,909 |
| 67 | (619.100101) | LF | 2,565 | $3.00 | $0.83 | $2.90 | $0.80 | $0.90 |
| 68 | (619.110511) | EACH | 5 | $4,000.00 | $1,199.00 | $10,000 | $14,000 | $8,082.00 |
| 69 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 240 | $35.00 | $45.56 | $40.00 | $50.00 | $50.90 |
| 70 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 660 | $46.00 | $64.75 | $0.01 | $60.00 | $66.30 |
| 71 | Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802) | EACH | 1 | $6,000.00 | $5,633.78 | $0.01 | $10,000 | $5,708.00 |
| 72 | Pavement Patching (Force Acount) (619.2601) | DOL | 20,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 73 | Mailboxes (619.27) | EACH | 1 | $300.00 | $482.28 | $350.00 | $500.00 | $267.30 |
| 74 | (619.99230103) | 12 | $1,000.00 | $4,995.84 | $14,000 | $8,800.00 | $252.60 | |
| 75 | Stone Filling (Light) (620.03) | CY | 50 | $115.00 | $173.53 | $250.00 | $280.00 | $149.80 |
| 76 | Stone Filling (Heavy) (620.05) | CY | 1,280 | $160.00 | $167.78 | $115.00 | $320.00 | $224.90 |
| 77 | Bedding Material, Type 2 (620.0802) | CY | 510 | $80.00 | $87.10 | $160.00 | $155.00 | $130.20 |
| 78 | (620.14010009) | 885 | $170.00 | $188.09 | $235.00 | $320.00 | $266.60 | |
| 79 | (621.05020004) | 2,525 | $1.00 | $18.81 | $4.00 | $11.00 | $9.00 | |
| 80 | Crushed Stone (In-Place Measure) (623.12) | CY | 230 | $95.00 | $146.78 | $120.00 | $145.00 | $119.40 |
| 81 | Survey Operations (625.01) | LS | 1 | $100,000 | $60,472 | $90,000 | $64,000 | $85,284 |
| 82 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 20 | $100.00 | $655.99 | $205.00 | $650.00 | $980.90 |
| 83 | (627.50140008) | 382 | $3.00 | $17.10 | $6.00 | $12.00 | $14.95 | |
| 84 | Concrete Cylinder Curing Equipment (637.04) | EACH | 3 | $100.00 | $4,796.00 | $350.00 | $3,300.00 | $2,105.00 |
| 85 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 21 | $1,500.00 | $1,558.70 | $2,100.00 | $2,000.00 | $2,526.00 |
| 86 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 87 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 88 | (637.41000115) | 21 | $50.00 | $131.31 | $190.00 | $62.00 | $90.20 | |
| 89 | (637.41000215) | 21 | $50.00 | $131.31 | $190.00 | $62.00 | $90.20 | |
| 90 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 6 | $35.00 | $53.48 | $50.00 | $55.00 | $55.80 |
| 91 | Type A Sign Posts (645.81) | EACH | 1 | $190.00 | $303.19 | $285.00 | $310.00 | $316.25 |
| 92 | Reference Marker Panel (646.21) | EACH | 2 | $32.00 | $55.13 | $50.00 | $60.00 | $57.50 |
| 93 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 22 | $10.00 | $16.54 | $15.00 | $17.00 | $17.25 |
| 94 | Steel Post, 2.0 lb/ft (646.32) | EACH | 19 | $65.00 | $92.88 | $85.00 | $92.00 | $96.90 |
| 95 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 1 | $180.00 | $187.43 | $175.00 | $185.00 | $195.50 |
| 96 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 5 | $35.00 | $17.64 | $130.00 | $200.00 | $113.00 |
| 97 | (647.83001002) | 17 | $20.00 | $7.72 | $44.00 | $50.00 | $113.00 | |
| 98 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 4,785 | $3.00 | $1.08 | $3.00 | $1.03 | $1.15 |
| 99 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 4,785 | $3.00 | $1.08 | $3.00 | $1.03 | $1.15 |
| 100 | (691.04000020) | 21,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 101 | Field Change Payment (FCP) (697.03) | DOL | 581,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 102 | Asphalt Price Adjustment (698.04) | DOL | 4,483 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 103 | Fuel Price Adjustment (698.05) | DOL | 4,059 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 104 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 105 | Mobilization (699.040001) | LS | 1 | $217,888 | $230,718 | $259,000 | $279,000 | $288,176 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of September 11, 2025. Compiled by Mirage Metrics.