The L C Whitford Co Inc: NYSDOT bid record
The L C Whitford Co Inc submitted 52 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 01 OCT 2026, and was the low bidder on 18 of them (35%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $45,522,261
- Latest bid
- 01 OCT 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 13 | 5 | 38% |
| 2023 | 16 | 8 | 50% |
| 2024 | 11 | 2 | 18% |
| 2025 | 9 | 3 | 33% |
| 2026 | 3 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 06 | 34 | 14 | 41% |
| Region 05 | 11 | 1 | 9% |
| Region 04 | 6 | 3 | 50% |
| Region 01, 02, 03, 04, 05, 06, 07, 08, 09, 10 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 34 | 34 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 34 | 34 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 34 | 34 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 34 | 34 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 34 | 34 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 28 | 28 (100%) | $1.00 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 15 | 15 (100%) | $75.00 | $85.00 |
| Engineer’s Field Office – Type 1 | 637.11 | MONTH | 24 | 13 (54%) | $1,639.30 | $2,400.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 11 | 11 (100%) | $85.00 | $90.00 |
| Performance Concrete Quality Adjustment – Concrete for Structures | 555.9902 | QUALITY UNIT | 11 | 11 (100%) | $12.02 | $10.50 |
| Drilling and Grouting Bolts or Reinforcing Bars | 586.0201 | EACH | 15 | 8 (53%) | $33.00 | $60.00 |
| 610.16010020 | 9 | 8 (89%) | $6.00 | $13.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Cold Spring Construction Company | 22 | 4 of 22 |
| Twin Tier Constructors Inc | 19 | 10 of 19 |
| McLaughlin Construction Corp/DBA Edbauer Construction | 12 | 6 of 12 |
| Economy Paving Co Inc | 10 | 8 of 10 |
| Concrete Applied Technologies Corp/DBA:Catco | 9 | 8 of 9 |
| Sealand Contractors Corp. | 8 | 0 of 8 |
| Slate Hill Constructors Inc | 7 | 2 of 7 |
| C P Ward Inc | 7 | 2 of 7 |
| Oakgrove Construction Inc | 6 | 5 of 6 |
| Union Concrete & Construction Corp | 6 | 6 of 6 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 OCT 2026 | D265839 | Region 06 | BRIDGE JOINT REPAIRS 2026/27 | 3 of 3 | $2,148,887 | +81% |
| 13 AUG 2026 | D265689 | Region 04 | Replacement of Six Culverts | 2 of 8 | $8,805,239 | +22% |
| 05 MAR 2026 | D265646 | Region 06 | Region 6 Culvert Replacements - NYS Rte 21 | 2 of 5 | $3,098,887 | +2.0% |
| 04 DEC 2025 | D265625 | Region 06 | BRIDGE REPLACEMENT - NY 371 over Kirkwood Creek | 1 of 5 | $3,839,886 | Low, 9.0% under the second |
| 06 NOV 2025 | D265613 | Region 06 | Where & When Highway Maintenance, Various Locations | 2 of 2 | $2,602,089 | 0.0% |
| 23 OCT 2025 | D265526 | Region 06 | CULVERT REPLACEMENTS - Routes NY 19, NY 275 & NY 305 | 3 of 3 | $11,554,887 | +6.0% |
| 11 SEP 2025 | D265518 | Region 06 | CULVERT REPLACEMENTS - Towns of Greenwood & Canisteo | 2 of 5 | $6,588,887 | +8.0% |
| 21 AUG 2025 | D265560 | Region 06 | CULVERT REPLACEMENT - NY 21, CIN 640470 | 3 of 4 | $2,336,477 | +3.0% |
| 07 AUG 2025 | D265555 | Region 06 | I-86 BRIDGE DECK TREATMENT AND JOINT REPLACEMENTS | 5 of 6 | $7,369,887 | +46% |
| 13 MAR 2025 | D265429 | Region 05 | BRIDGE REPLACEMENT - U.S. Route 219 over Great Valley Creek | 4 of 4 | $6,880,987 | +6.0% |
| 13 MAR 2025 | D265450 | Region 04 | Highway Repair Where/When Contract for 2025 and 2026 | 1 of 4 | $2,206,065 | Low, 3.0% under the second |
| 20 FEB 2025 | D265443 | Region 06 | Culvert Replacements & Retaining Wall Repairs | 1 of 3 | $1,912,985 | Low, 38% under the second |
| 19 DEC 2024 | D265390 | Region 06 | HAZARD MITIGATION & SAFETAP BACKLOG-Various Locations | 2 of 4 | $972,573 | +14% |
| 19 DEC 2024 | D265394 | Region 06 | PIN 6805.75 - D265394 - Bridge Bearing Repairs | 4 of 6 | $2,349,655 | +49% |
| 07 NOV 2024 | D265340 | Region 06 | Where and When Bridge Regional 04/2025 - 04/2027 | 3 of 3 | $2,483,411 | +554% |
| 10 OCT 2024 | D265334 | Region 06 | I-390/B&H RR Bridge Joint Repairs (1090651 & 1090652) | 4 of 5 | $2,494,242 | +33% |
| 25 JUL 2024 | D265293 | Region 05 | NY 280 (BRIDGE & LARGE CULVERTS) - SNI; CATT CO | 5 of 6 | $7,058,883 | +86% |
| 28 MAR 2024 | D265194 | Region 05 | Bridge Replacement Project, BIN 6600230 | 1 of 4 | $1,610,182 | Low, 14% under the second |
| 14 MAR 2024 | D265223 | Region 05 | Small Culvert Rehabilitations and Replacements | 5 of 5 | $6,116,581 | +46% |
| 08 FEB 2024 | D265158 | Region 05 | HIGHWAY JOB ORDER CONTRACT | 2 of 3 | $623,877 | +9.0% |
| 25 JAN 2024 | D265186 | Region 01, 02, 03, 04, 05, 06, 07, 08, 09, 10 | 2024-2027 - STATEWIDE EMERGENCY BRIDGE CONTRACT | 2 of 4 | $6,631,966 | +3.0% |
| 11 JAN 2024 | D265167 | Region 06 | BRIDGE MAINTENANCE- Job Order Contract, Various Locations. | 3 of 3 | $987,992 | +8.0% |
| 11 JAN 2024 | D265168 | Region 06 | CULVERT MAINTENANCE - JOB ORDER CONTRACT | 1 of 1 | $493,996 | Low |
| 14 DEC 2023 | D265157 | Region 06 | Bridge Rehab - NY 248 over Bennett's Creek/Sugar Creek | 1 of 3 | $4,288,887 | Low, 3.0% under the second |
| 14 DEC 2023 | D265170 | Region 05 | BRIDGE WHERE & WHEN CONTRACT SFY 23-24 & 24-25 | 4 of 4 | $1,055,827 | +7.0% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.