NYSDOT contract D265646 bid tabulation
Region 6 Culvert Replacements - NYS Rte 21. Let by New York State DOT on March 5, 2026, Steuben, Region 06. 5 bids received; low bid $3,039,486 by Ramsey Constructors Inc.
- Owner
- New York State DOT
- Letting
- 05 MAR 2026
- Pay items
- 86
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ramsey Constructors Inc | $3,039,486 | Low |
| 2 | The L C Whitford Co Inc | $3,098,887 | +2.0% |
| 3 | Twin Tier Constructors Inc | $3,183,000 | +5.0% |
| 4 | C P Ward Inc | $3,831,303 | +26% |
| 5 | Rochester Earth Inc | $3,988,000 | +31% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ramsey Constructors Inc | 2. The L C Whitford Co Inc | 3. Twin Tier Constructors Inc | 4. C P Ward Inc | 5. Rochester Earth Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $15,000 | $21,172 | $30,000 | $11,000 | $7,375.00 |
| 2 | Removal of Substructures (202.19) | CY | 110 | $200.00 | $340.28 | $250.00 | $360.00 | $203.00 |
| 3 | Unclassified Excavation and Disposal (203.02) | CY | 695 | $35.00 | $64.82 | $30.00 | $48.00 | $33.50 |
| 4 | Embankment In Place (203.03) | CY | 1,450 | $21.00 | $47.62 | $16.00 | $62.00 | $74.50 |
| 5 | Select Structural Fill (203.21) | CY | 85 | $93.00 | $115.75 | $85.00 | $92.00 | $91.00 |
| 6 | Structure Excavation (206.01) | CY | 1,205 | $25.00 | $41.40 | $22.00 | $45.00 | $27.00 |
| 7 | Trench and Culvert Excavation (206.0201) | CY | 65 | $37.00 | $114.89 | $36.00 | $65.00 | $26.50 |
| 8 | Geotextile Separation (207.21) | SY | 2,665 | $1.00 | $3.78 | $2.00 | $3.00 | $1.50 |
| 9 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 115 | $18.00 | $28.73 | $22.00 | $25.00 | $21.00 |
| 10 | Seed and Mulch – Temporary (209.1003) | SY | 1,865 | $2.00 | $2.17 | $2.00 | $4.00 | $2.50 |
| 11 | Check Dam (Ditch Bottom Width >3′ to 6′), Stone – Temporary (209.110102) | EACH | 3 | $215.00 | $961.16 | $800.00 | $800.00 | $400.00 |
| 12 | Silt Fence - Temporary (209.13) | LF | 1,298 | $6.00 | $6.33 | $5.00 | $6.00 | $6.00 |
| 13 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 1,865 | $7.00 | $7.52 | $3.00 | $5.00 | $5.25 |
| 14 | Subbase Course, Optional Type (304.15) | CY | 870 | $75.00 | $90.59 | $70.00 | $92.00 | $77.00 |
| 15 | (404.0983) | TON | 210 | $140.00 | $181.91 | $180.00 | $160.00 | $174.00 |
| 16 | (404.1989) | TON | 295 | $140.00 | $154.35 | $165.00 | $158.00 | $150.00 |
| 17 | (404.3789) | TON | 875 | $115.00 | $128.99 | $145.00 | $150.00 | $135.00 |
| 18 | Diluted Tack Coat (407.0102) | GAL | 285 | $10.00 | $27.56 | $33.00 | $22.00 | $7.50 |
| 19 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 760 | $3.00 | $2.21 | $2.00 | $6.00 | $1.60 |
| 20 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 581 | $22.00 | $17.95 | $15.00 | $27.00 | $15.00 |
| 21 | Cast-In-Place Concrete Piles (551.11) | LF | 1,020 | $25.00 | $115.52 | $100.00 | $167.00 | $102.00 |
| 22 | Furnishing Equipment for Driving Piles (551.13) | LS | 1 | $345,000 | $90,606 | $100,000 | $115,000 | $115,000 |
| 23 | Dynamic Pile Load Testing (551.14) | EACH | 2 | $1,500.00 | $3,528.00 | $5,000.00 | $5,000.00 | $1,625.00 |
| 24 | Splices for CIP Piles (551.15) | EACH | 24 | $10.00 | $12.37 | $1.00 | $2.00 | $1,625.00 |
| 25 | Performance Concrete Quality Adjustment - Cast In Place Piles (551.9902) | QUALITY UNIT | 1 | $4.42 | $4.42 | $4.42 | $4.42 | $4.42 |
| 26 | (553.020001) | EACH | 1 | $9,000.00 | $28,274 | $30,000 | $15,000 | $52,000 |
| 27 | (553.020002) | EACH | 1 | $9,000.00 | $26,147 | $30,000 | $15,000 | $52,000 |
| 28 | Concrete for Structures, Performance (555.0021) | CY | 110 | $1,600.00 | $1,855.76 | $2,000.00 | $1,400.00 | $2,170.00 |
| 29 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $10.10 | $10.10 | $10.10 | $10.10 | $10.10 |
| 30 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 15,477 | $3.50 | $3.31 | $3.00 | $5.00 | $3.00 |
| 31 | (557.1013) | SY | 122 | $450.00 | $612.19 | $750.00 | $510.00 | $815.00 |
| 32 | (557.1213) | SY | 240 | $600.00 | $855.78 | $800.00 | $700.00 | $690.00 |
| 33 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 362 | $0.10 | $0.34 | $0.01 | $1.00 | $112.00 |
| 34 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $7.15 | $7.15 | $7.15 | $7.15 | $7.15 |
| 35 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 342 | $28.00 | $25.08 | $35.00 | $26.00 | $20.00 |
| 36 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 3,075 | $1.00 | $1.84 | $1.00 | $1.00 | $1.10 |
| 37 | Protective Sealing of New Structural Concrete (559.02) | SF | 1,415 | $1.50 | $2.51 | $2.00 | $2.00 | $1.10 |
| 38 | Prestressed Concrete Hollow Slab Units (563.03) | SF | 1,994 | $125.00 | $112.18 | $130.00 | $105.00 | $160.00 |
| 39 | (565.30130101) | 24 | $325.00 | $366.69 | $600.00 | $500.00 | $815.00 | |
| 40 | Transition Bridge Railing (568.70) | LF | 160 | $210.00 | $231.53 | $230.00 | $250.00 | $195.00 |
| 41 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 117 | $450.00 | $580.92 | $550.00 | $726.00 | $445.00 |
| 42 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $13.56 | $13.56 | $13.56 | $13.56 | $13.56 |
| 43 | (603.171116) | EACH | 4 | $125.00 | $609.25 | $400.00 | $900.00 | $225.00 |
| 44 | (603.9812) | LF | 70 | $33.00 | $33.80 | $45.00 | $75.00 | $58.00 |
| 45 | Box Beam Guide Railing (606.10) | LF | 155 | $51.00 | $54.02 | $54.00 | $60.00 | $55.00 |
| 46 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 2 | $5,000.00 | $4,795.88 | $6,000.00 | $6,000.00 | $4,780.00 |
| 47 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 2 | $2,500.00 | $2,480.63 | $4,000.00 | $3,000.00 | $2,435.00 |
| 48 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 320 | $7.00 | $8.68 | $5.00 | $20.00 | $18.75 |
| 49 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 24 | $345.00 | $220.50 | $300.00 | $275.00 | $650.00 |
| 50 | Stone Curb – Bridge (Type A) (609.0301) | LF | 60 | $185.00 | $166.95 | $130.00 | $350.00 | $140.00 |
| 51 | Turf Establishment – Performance (610.1605) | SY | 1,865 | $17.00 | $3.59 | $20.00 | $19.00 | $16.00 |
| 52 | (613.04000001) | 10 | $215.00 | $212.73 | $100.00 | $250.00 | $105.00 | |
| 53 | (617.11000024) | LS | 1 | $4,100.00 | $6,045.12 | $100.00 | $3,000.00 | $1,200.00 |
| 54 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $250,000 | $55,307 | $50,000 | $175,000 | $50,000 |
| 55 | (619.0501) | LS | 1 | $385,000 | $552,329 | $680,000 | $993,000 | $1,195,000 |
| 56 | (619.080101) | LF | 600 | $1.00 | $5.51 | $6.00 | $6.00 | $1.10 |
| 57 | (619.100101) | LF | 5,570 | $0.25 | $1.10 | $2.00 | $1.00 | $0.30 |
| 58 | (619.110511) | EACH | 2 | $10,000 | $3,812.94 | $10,000 | $2,000.00 | $18,500 |
| 59 | (619.130101) | EACH | 1 | $74,000 | $63,040 | $115,000 | $110,000 | $73,000 |
| 60 | Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802) | EACH | 3 | $6,500.00 | $9,001.30 | $6,000.00 | $15,000 | $20,000 |
| 61 | Mailboxes (619.27) | EACH | 1 | $435.00 | $491.71 | $800.00 | $700.00 | $530.00 |
| 62 | Stone Filling (Light) (620.03) | CY | 35 | $115.00 | $268.37 | $130.00 | $140.00 | $130.00 |
| 63 | Stone Filling (Heavy) (620.05) | CY | 470 | $195.00 | $188.47 | $150.00 | $190.00 | $210.00 |
| 64 | Bedding Material, Type 2 (620.0802) | CY | 145 | $75.00 | $87.04 | $80.00 | $133.00 | $98.00 |
| 65 | (621.05020004) | 570 | $3.00 | $13.05 | $1.00 | $27.00 | $8.00 | |
| 66 | Survey Operations (625.01) | LS | 1 | $70,000 | $36,521 | $40,000 | $30,000 | $7,000.00 |
| 67 | (627.50140008) | 100 | $15.00 | $17.36 | $4.00 | $25.00 | $3.00 | |
| 68 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,600.00 | $2,697.75 | $2,500.00 | $2,500.00 | $2,950.00 |
| 69 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 12 | $3,000.00 | $2,158.20 | $1,000.00 | $3,200.00 | $1,000.00 |
| 70 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 71 | (637.41000115) | 12 | $125.00 | $184.85 | $50.00 | $230.00 | $345.00 | |
| 72 | (637.41000215) | 12 | $135.00 | $184.85 | $50.00 | $230.00 | $345.00 | |
| 73 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 33 | $40.00 | $38.59 | $38.00 | $60.00 | $45.00 |
| 74 | Type A Sign Posts (645.81) | EACH | 4 | $165.00 | $159.86 | $180.00 | $322.00 | $220.00 |
| 75 | Reference Marker Panel (646.21) | EACH | 1 | $40.00 | $38.59 | $38.00 | $50.00 | $30.00 |
| 76 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 7 | $11.00 | $11.03 | $11.00 | $25.00 | $13.00 |
| 77 | Steel Post, 2.0 lb/ft (646.32) | EACH | 6 | $75.00 | $74.97 | $75.00 | $115.00 | $70.00 |
| 78 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 2 | $200.00 | $57.00 | $50.00 | $12.00 | $21.75 |
| 79 | (647.83001002) | 6 | $62.00 | $19.00 | $20.00 | $12.00 | $20.00 | |
| 80 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 1,920 | $3.00 | $2.46 | $3.00 | $3.50 | $4.00 |
| 81 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 1,920 | $3.00 | $2.46 | $3.00 | $3.50 | $4.00 |
| 82 | Field Change Payment (FCP) (697.03) | DOL | 263,015 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 83 | Asphalt Price Adjustment (698.04) | DOL | 1,755 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 84 | Fuel Price Adjustment (698.05) | DOL | 475 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 85 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 86 | Mobilization (699.040001) | LS | 1 | $105,000 | $116,239 | $100,167 | $147,000 | $142,303 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 5, 2026. Compiled by Mirage Metrics.