Ramsey Constructors Inc: NYSDOT bid record
Ramsey Constructors Inc submitted 21 bids on New York State DOT contracts in the data, from 20 JAN 2022 to 13 AUG 2026, and was the low bidder on 9 of them (43%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $81,243,135
- Latest bid
- 13 AUG 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 8 | 2 | 25% |
| 2023 | 2 | 1 | 50% |
| 2024 | 3 | 3 | 100% |
| 2025 | 5 | 1 | 20% |
| 2026 | 3 | 2 | 67% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 04 | 14 | 6 | 43% |
| Region 06 | 7 | 3 | 43% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 21 | 21 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 21 | 21 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 21 | 21 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 20 | 20 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 18 | 18 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 14 | 14 (100%) | $1.00 | $1.00 |
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 11 | 11 (100%) | $90.00 | $90.00 |
| Seed and Mulch – Temporary | 209.1003 | SY | 17 | 10 (59%) | $2.00 | $1.75 |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 9 | 9 (100%) | $90.00 | $85.00 |
| Performance Concrete Quality Adjustment – Concrete for Structures | 555.9902 | QUALITY UNIT | 9 | 9 (100%) | $10.00 | $10.50 |
| Trench and Culvert Excavation | 206.0201 | CY | 15 | 8 (53%) | $40.00 | $55.00 |
| Asphalt Pavement Joint Adhesive | 418.7603 | LF | 18 | 7 (39%) | $1.00 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Sealand Contractors Corp. | 17 | 4 of 17 |
| Cold Spring Construction Company | 16 | 7 of 16 |
| Villager Construction Inc | 6 | 2 of 6 |
| The L C Whitford Co Inc | 6 | 1 of 6 |
| Twin Tier Constructors Inc | 5 | 2 of 5 |
| Slate Hill Constructors Inc | 4 | 2 of 4 |
| Keeler Construction Co Inc | 4 | 2 of 4 |
| C P Ward Inc | 4 | 1 of 4 |
| Crane Hogan Structural Systems Inc | 3 | 2 of 3 |
| Bothar Construction LLC | 3 | 2 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 AUG 2026 | D265689 | Region 04 | Replacement of Six Culverts | 1 of 8 | $7,247,025 | Low, 22% under the second |
| 09 APR 2026 | D265771 | Region 06 | Highway | 2 of 2 | $3,929,320 | +1.0% |
| 05 MAR 2026 | D265646 | Region 06 | Region 6 Culvert Replacements - NYS Rte 21 | 1 of 5 | $3,039,486 | Low, 2.0% under the second |
| 23 OCT 2025 | D265561 | Region 04 | Large Culvert Resiliency Replacement | 5 of 7 | $4,868,560 | +7.0% |
| 25 SEP 2025 | D265549 | Region 04 | Replacement/Repair of 7 Culverts in Ontario County. | 4 of 5 | $9,152,571 | +14% |
| 21 AUG 2025 | D265520 | Region 06 | Route 36 from Cass St. to Webbs Crossing Rd. - Phase 1 | 6 of 8 | $40,982,349 | +12% |
| 24 APR 2025 | D265481 | Region 06 | NY14A Paving and Safety System Improvements | 3 of 5 | $5,977,106 | +8.0% |
| 10 APR 2025 | D265439 | Region 04 | Replacement of 7 Culverts | 1 of 5 | $6,972,865 | Low, 0.0% under the second |
| 19 DEC 2024 | D265336 | Region 04 | BRIDGE & ROAD DECK REPLACEMENTS | 1 of 3 | $51,261,310 | Low, 2.0% under the second |
| 10 OCT 2024 | D265313 | Region 04 | Bridge Preventative Maintenance - Multi-Location | 1 of 3 | $2,944,331 | Low, 24% under the second |
| 25 JUL 2024 | D265284 | Region 04 | BRIDGE REPLACEMENT RT 250 OVER THOMAS CREEK | 1 of 2 | $3,464,028 | Low, 23% under the second |
| 12 OCT 2023 | D265097 | Region 06 | NY 54 / WILLOW GROVE BRIDGE REPLACEMENT, BIN 1026940 | 4 of 6 | $3,234,799 | +6.0% |
| 14 SEP 2023 | D265077 | Region 04 | I-390 NB over Erie Canal-Bridge Barrier & Fascia Replacement | 1 of 3 | $2,638,633 | Low, 16% under the second |
| 17 NOV 2022 | D264912 | Region 04 | BRIDGE SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS | 3 of 4 | $11,348,599 | +21% |
| 03 NOV 2022 | D264890 | Region 04 | BRIDGE SUPERSTRUCTURE REPLACEMENTS - I-390 over Plaza Dr. in | 2 of 4 | $6,584,633 | +8.0% |
| 06 OCT 2022 | D264889 | Region 06 | NY 352 Retaining Wall | 1 of 6 | $798,153 | Low, 4.0% under the second |
| 07 JUL 2022 | D264829 | Region 06 | NY 21 Over Cohocton River Bridge Replacement | 1 of 5 | $2,877,305 | Low, 2.0% under the second |
| 24 MAR 2022 | D264769 | Region 04 | Pavement Resurfacing on State Routes 36, 63, 256, and 436 | 2 of 3 | $5,169,079 | +3.0% |
| 03 FEB 2022 | D264720 | Region 04 | RTE 408/63 AT I-390 PAVEMENT REHAB. & CULVERT REPLACEMENT. | 2 of 4 | $5,496,787 | +16% |
| 20 JAN 2022 | D264674 | Region 04 | BRIDGE REHABILITATION, NY ROUTE 31 OVER THE ERIE CANAL | 5 of 6 | $3,073,720 | +10% |
| 20 JAN 2022 | D264701 | Region 04 | Pavement Resurfacing and Signal Improvements: Route 104. | 6 of 7 | $8,997,752 | +16% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.