NYSDOT contract D265689 bid tabulation
Replacement of Six Culverts. Let by New York State DOT on August 13, 2026, Livingston, Wyoming, Region 04. 8 bids received; low bid $7,247,025 by Ramsey Constructors Inc.
- Owner
- New York State DOT
- Letting
- 13 AUG 2026
- Pay items
- 125
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ramsey Constructors Inc | $7,247,025 | Low |
| 2 | The L C Whitford Co Inc | $8,805,239 | +22% |
| 3 | Cold Spring Construction Company | $8,949,980 | +23% |
| 4 | McLaughlin Construction Corp/DBA Edbauer Construction | $9,078,115 | +25% |
| 5 | Rochester Earth Inc | $9,227,000 | +27% |
| 6 | Keeler Construction Co Inc | $9,346,151 | +29% |
| 7 | Sealand Contractors Corp. | $10,817,001 | +49% |
| 8 | Villager Construction Inc | $11,395,200 | +57% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ramsey Constructors Inc | 2. The L C Whitford Co Inc | 3. Cold Spring Construction Company | 4. McLaughlin Construction Corp/DBA Edbauer Construction | 5. Rochester Earth Inc | 6. Keeler Construction Co Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | (201.07000004) | 2,339 | $6.00 | $23.95 | $7.00 | $8.00 | $13.00 | $8.00 | |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 2,384 | $28.00 | $48.66 | $35.00 | $53.00 | $45.00 | $38.00 |
| 3 | Embankment In Place (203.03) | CY | 10,957 | $25.00 | $28.29 | $41.00 | $34.00 | $80.00 | $64.00 |
| 4 | Select Granular Fill (203.07) | CY | 3,211 | $90.00 | $110.78 | $105.00 | $94.00 | $88.00 | $118.00 |
| 5 | (203.24010017) | 82 | $140.00 | $339.33 | $110.00 | $75.00 | $135.00 | $280.00 | |
| 6 | Structure Excavation (206.01) | CY | 18,403 | $22.00 | $44.18 | $25.00 | $28.00 | $30.00 | $46.00 |
| 7 | Trench and Culvert Excavation (206.0201) | CY | 467 | $65.00 | $142.83 | $80.00 | $45.00 | $56.00 | $72.00 |
| 8 | Test Pit Excavation (206.05) | EACH | 4 | $750.00 | $4,431.52 | $1,550.00 | $1,800.00 | $900.00 | $2,300.00 |
| 9 | Geotextile Bedding (207.20) | SY | 672 | $7.00 | $15.96 | $7.00 | $7.50 | $6.50 | $13.00 |
| 10 | Prefabricated Composite Structural Drain (207.26) | SY | 1,128 | $17.00 | $27.84 | $21.00 | $10.00 | $16.00 | $20.00 |
| 11 | Seed and Mulch – Temporary (209.1003) | SY | 3,133 | $4.00 | $4.36 | $3.00 | $0.50 | $2.50 | $1.00 |
| 12 | Check Dam (Ditch Bottom Width 0.0 to 3′), Stone – Temporary (209.110101) | EACH | 5 | $345.00 | $1,318.64 | $600.00 | $100.00 | $570.00 | $1,200.00 |
| 13 | Fiber Roll – Temporary, 12" (209.1341) | LF | 1,118 | $9.00 | $30.06 | $10.00 | $2.00 | $38.50 | $15.00 |
| 14 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 203 | $10.00 | $10.27 | $6.50 | $4.00 | $4.50 | $5.00 |
| 15 | (209.20120010) | 32 | $34.00 | $493.75 | $34.00 | $5.00 | $41.00 | $110.00 | |
| 16 | Soil Stabilizers, Class IV Type A (209.2101) | SY | 3,133 | $1.50 | $1.56 | $1.40 | $3.00 | $6.50 | $7.00 |
| 17 | Subbase Course, Type 2 (304.12) | CY | 1,723 | $90.00 | $154.20 | $90.00 | $78.00 | $84.00 | $132.00 |
| 18 | (404.0189) | TON | 171 | $146.00 | $192.94 | $175.00 | $150.00 | $255.00 | $206.00 |
| 19 | (404.0983) | TON | 690 | $117.00 | $237.04 | $150.00 | $280.00 | $230.00 | $206.00 |
| 20 | (404.1989) | TON | 578 | $125.00 | $231.53 | $150.00 | $270.00 | $200.00 | $193.00 |
| 21 | (404.3789) | TON | 953 | $120.00 | $226.01 | $120.00 | $230.00 | $175.00 | $167.00 |
| 22 | Diluted Tack Coat (407.0102) | GAL | 981 | $10.00 | $11.03 | $6.50 | $17.00 | $8.25 | $20.00 |
| 23 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 3,076 | $1.00 | $4.41 | $0.75 | $2.50 | $1.60 | $2.00 |
| 24 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 4,135 | $16.00 | $20.62 | $7.00 | $15.00 | $15.75 | $12.00 |
| 25 | (553.030001) | EACH | 1 | $20,000 | $29,357 | $1.00 | $100.00 | $54,000 | $5,000.00 |
| 26 | (553.030002) | EACH | 1 | $20,000 | $29,357 | $1.00 | $100.00 | $54,000 | $5,000.00 |
| 27 | (553.030003) | EACH | 1 | $20,000 | $29,357 | $1.00 | $100.00 | $54,000 | $5,000.00 |
| 28 | (553.030004) | EACH | 1 | $20,000 | $29,357 | $1.00 | $100.00 | $54,000 | $5,000.00 |
| 29 | (553.030005) | EACH | 1 | $20,000 | $29,357 | $1.00 | $100.00 | $54,000 | $5,000.00 |
| 30 | (553.030006) | EACH | 1 | $20,000 | $29,357 | $1.00 | $100.00 | $54,000 | $5,000.00 |
| 31 | Footing Concrete, Performance (555.0011) | CY | 650 | $950.00 | $1,093.38 | $1,300.00 | $1,256.00 | $1,500.00 | $1,070.00 |
| 32 | Concrete for Structures, Performance (555.0021) | CY | 276 | $1,900.00 | $2,195.16 | $2,800.00 | $2,775.00 | $2,450.00 | $2,300.00 |
| 33 | (555.05010001) | 23 | $1,300.00 | $1,430.67 | $925.00 | $3,450.00 | $1,430.00 | $2,500.00 | |
| 34 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 35 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $17.50 | $17.50 | $17.50 | $17.50 | $17.50 | $17.50 |
| 36 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 56,348 | $3.25 | $5.15 | $3.55 | $3.74 | $3.50 | $3.90 |
| 37 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 11,048 | $3.50 | $6.47 | $3.75 | $3.93 | $3.75 | $4.40 |
| 38 | (562.0101) | SY | 211 | $1,900.00 | $1,600.84 | $2,125.00 | $3,007.00 | $2,100.00 | $2,375.00 |
| 39 | Performance Concrete Quality Adjustment (562.99) | QUALITY UNIT | 1 | $27.50 | $27.50 | $27.50 | $27.50 | $27.50 | $27.50 |
| 40 | Steel Bridge Railing (Four-Rail) (568.51) | LF | 105 | $395.00 | $452.03 | $445.00 | $463.00 | $360.00 | $375.00 |
| 41 | Transition Bridge Railing (568.70) | LF | 320 | $325.00 | $255.23 | $230.00 | $263.00 | $295.00 | $308.00 |
| 42 | (595.50000018) | 12,092 | $5.00 | $8.19 | $12.50 | $12.00 | $9.25 | $9.00 | |
| 43 | (603.171216) | EACH | 2 | $200.00 | $1,261.09 | $750.00 | $600.00 | $620.00 | $490.00 |
| 44 | (603.171614) | EACH | 2 | $650.00 | $1,144.64 | $1,000.00 | $980.00 | $940.00 | $830.00 |
| 45 | (603.63080415) | 82 | $2,200.00 | $1,779.58 | $1,825.00 | $2,900.00 | $2,200.00 | $2,140.00 | |
| 46 | (603.64090515) | 93 | $2,500.00 | $2,324.73 | $2,950.00 | $3,300.00 | $2,700.00 | $2,540.00 | |
| 47 | (603.64160815) | 100 | $4,300.00 | $4,117.29 | $4,850.00 | $5,100.00 | $4,550.00 | $5,650.00 | |
| 48 | (603.67000001) | 55 | $1,500.00 | $3,171.64 | $2,425.00 | $2,680.00 | $1,600.00 | $4,725.00 | |
| 49 | (603.9815) | LF | 104 | $65.00 | $45.27 | $67.00 | $90.00 | $110.00 | $69.00 |
| 50 | (603.9824) | LF | 81 | $100.00 | $82.75 | $85.00 | $140.00 | $140.00 | $90.00 |
| 51 | (604.300691) | LF | 4 | $2,600.00 | $1,914.03 | $1,850.00 | $2,093.00 | $1,775.00 | $2,500.00 |
| 52 | Box Beam Guide Railing (606.10) | LF | 1,464 | $60.00 | $63.95 | $60.00 | $65.00 | $55.00 | $58.00 |
| 53 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 264 | $80.00 | $67.53 | $61.00 | $70.00 | $75.00 | $80.00 |
| 54 | Box Beam End Piece (606.120101) | EACH | 3 | $1,000.00 | $766.24 | $700.00 | $784.00 | $950.00 | $1,000.00 |
| 55 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 4 | $4,900.00 | $5,369.18 | $4,875.00 | $5,492.00 | $4,950.00 | $5,150.00 |
| 56 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 10 | $2,500.00 | $2,513.70 | $2,275.00 | $2,572.00 | $2,500.00 | $2,650.00 |
| 57 | Box Beam End Assembly Type III (606.1203) | EACH | 1 | $6,800.00 | $7,789.16 | $7,050.00 | $7,970.00 | $6,675.00 | $7,000.00 |
| 58 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 651 | $6.00 | $20.51 | $10.00 | $3.00 | $30.00 | $8.00 |
| 59 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 1,038 | $7.00 | $29.53 | $10.00 | $2.50 | $20.00 | $8.00 |
| 60 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 12 | $400.00 | $1,398.64 | $260.00 | $100.00 | $475.00 | $400.00 |
| 61 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 7 | $290.00 | $1,789.15 | $265.00 | $75.00 | $475.00 | $200.00 |
| 62 | (607.41010010) | 73 | $15.00 | $21.63 | $9.00 | $5.00 | $8.00 | $12.00 | |
| 63 | (607.96000008) | 90 | $22.00 | $53.97 | $11.50 | $7.00 | $29.00 | $24.00 | |
| 64 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 124 | $255.00 | $293.27 | $165.00 | $285.00 | $475.00 | $416.00 |
| 65 | Turf Establishment – Performance (610.1605) | SY | 3,509 | $22.00 | $15.63 | $24.00 | $12.00 | $20.00 | $21.00 |
| 66 | Watering Vegetation (610.19) | 1,000 GALLONS | 2 | $850.00 | $937.13 | $140.00 | $100.00 | $269.00 | $280.00 |
| 67 | (611.0151) | EACH | 3 | $1,300.00 | $1,234.80 | $1,050.00 | $1,090.00 | $905.00 | $940.00 |
| 68 | (611.0211) | EACH | 4 | $1,100.00 | $1,036.35 | $900.00 | $1,090.00 | $890.00 | $920.00 |
| 69 | (611.0391) | EACH | 2 | $1,900.00 | $1,775.03 | $1,550.00 | $1,373.00 | $1,015.00 | $1,050.00 |
| 70 | (611.19010024) | 3 | $400.00 | $441.00 | $200.00 | $100.00 | $54.00 | $55.00 | |
| 71 | (611.19020024) | 4 | $375.00 | $413.44 | $200.00 | $100.00 | $54.00 | $55.00 | |
| 72 | (611.19030024) | 2 | $645.00 | $711.12 | $300.00 | $100.00 | $54.00 | $55.00 | |
| 73 | (613.04000001) | 647 | $125.00 | $139.62 | $76.00 | $10.00 | $120.00 | $220.00 | |
| 74 | (614.060104) | EACH | 8 | $650.00 | $689.63 | $650.00 | $734.00 | $1,020.00 | $870.00 |
| 75 | (614.060204) | EACH | 23 | $925.00 | $479.74 | $950.00 | $1,071.00 | $1,330.00 | $1,350.00 |
| 76 | (614.060304) | EACH | 11 | $1,800.00 | $501.54 | $1,250.00 | $1,410.00 | $1,715.00 | $2,000.00 |
| 77 | (614.060404) | EACH | 2 | $2,300.00 | $1,379.27 | $1,600.00 | $1,804.00 | $2,350.00 | $2,400.00 |
| 78 | (614.060504) | EACH | 5 | $4,400.00 | $1,379.25 | $1,900.00 | $2,143.00 | $2,850.00 | $2,700.00 |
| 79 | (615.01010108) | 60 | $135.00 | $45.77 | $340.00 | $40.00 | $245.00 | $440.00 | |
| 80 | (616.08000024) | 85 | $38.00 | $41.07 | $36.00 | $73.00 | $13.00 | $14.00 | |
| 81 | (617.10000024) | 54 | $45.00 | $196.96 | $110.00 | $25.00 | $165.00 | $120.00 | |
| 82 | (617.11000024) | LS | 1 | $2,500.00 | $7,169.26 | $230.00 | $100.00 | $1,950.00 | $3,000.00 |
| 83 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $450,000 | $331,806 | $1,250,000 | $925,000 | $369,141 | $350,000 |
| 84 | Type III Construction Barricades (619.04) | EACH | 208 | $58.00 | $82.16 | $125.00 | $110.00 | $200.00 | $125.00 |
| 85 | (619.110611) | WEEK | 24 | $1,000.00 | $2,229.30 | $1,450.00 | $5,000.00 | $1,700.00 | $1,050.00 |
| 86 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 240 | $70.00 | $74.93 | $65.00 | $35.00 | $125.00 | $40.00 |
| 87 | Mailboxes (619.27) | EACH | 2 | $500.00 | $544.54 | $200.00 | $250.00 | $550.00 | $500.00 |
| 88 | Stone Filling (Fine) (620.02) | CY | 2 | $275.00 | $640.13 | $700.00 | $250.00 | $565.00 | $400.00 |
| 89 | Stone Filling (Light) (620.03) | CY | 76 | $150.00 | $375.00 | $250.00 | $150.00 | $235.00 | $184.00 |
| 90 | Stone Filling (Medium) (620.04) | CY | 676 | $155.00 | $238.44 | $170.00 | $130.00 | $190.00 | $193.00 |
| 91 | Stone Filling (Heavy) (620.05) | CY | 1,215 | $200.00 | $240.65 | $205.00 | $140.00 | $280.00 | $244.00 |
| 92 | Bedding Material, Type 1 (620.0801) | CY | 572 | $110.00 | $143.67 | $160.00 | $88.00 | $120.00 | $175.00 |
| 93 | (621.05020004) | 685 | $6.00 | $26.84 | $7.50 | $10.00 | $12.00 | $21.00 | |
| 94 | Crushed Stone (In-Place Measure) (623.12) | CY | 185 | $190.00 | $245.18 | $167.38 | $150.00 | $140.00 | $204.00 |
| 95 | Survey Operations (625.01) | LS | 1 | $175,000 | $80,318 | $115,000 | $135,000 | $55,500 | $143,000 |
| 96 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 28 | $1,800.00 | $1,250.82 | $1,050.00 | $1,150.00 | $1,400.00 | $1,600.00 |
| 97 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 7 | $1,800.00 | $1,757.45 | $1,050.00 | $1,125.00 | $1,375.00 | $1,800.00 |
| 98 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 1 | $2,100.00 | $3,307.50 | $425.00 | $750.00 | $1,935.00 | $3,350.00 |
| 99 | (627.50140008) | 814 | $5.00 | $24.82 | $6.50 | $12.00 | $4.00 | $18.00 | |
| 100 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $6,500.00 | $5,395.50 | $250.00 | $100.00 | $9,850.00 | $3,300.00 |
| 101 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 26 | $3,300.00 | $2,158.20 | $2,600.00 | $1,100.00 | $2,200.00 | $3,200.00 |
| 102 | Office Technology and Supplies (637.34) | DOL | 6,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 103 | Construction Testing supplies – Consumables (637.36) | DOL | 600 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 104 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 6,351 | $1.00 | $1.49 | $1.90 | $1.70 | $1.15 | $1.25 |
| 105 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 3,108 | $1.00 | $2.66 | $1.90 | $1.70 | $1.15 | $1.25 |
| 106 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 7 | $55.00 | $58.43 | $53.00 | $70.00 | $48.00 | $50.00 |
| 107 | Type A Sign Posts (645.81) | EACH | 9 | $200.00 | $292.16 | $265.00 | $300.00 | $200.00 | $207.00 |
| 108 | Reference Marker Panel (646.21) | EACH | 4 | $40.00 | $41.90 | $38.00 | $43.00 | $35.00 | $37.00 |
| 109 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 35 | $12.00 | $17.91 | $16.25 | $20.00 | $10.75 | $11.00 |
| 110 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 18 | $22.00 | $23.71 | $21.50 | $30.00 | $21.50 | $22.00 |
| 111 | Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24) | EACH | 1 | $13.00 | $16.54 | $15.00 | $25.00 | $11.75 | $12.00 |
| 112 | Steel Post, 2.0 lb/ft (646.32) | EACH | 47 | $75.00 | $91.51 | $83.00 | $95.00 | $70.00 | $73.00 |
| 113 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 10 | $230.00 | $165.38 | $150.00 | $170.00 | $210.00 | $260.00 |
| 114 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 1 | $60.00 | $244.79 | $80.00 | $1.00 | $525.00 | $42.00 |
| 115 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 8 | $245.00 | $244.79 | $80.00 | $200.00 | $525.00 | $42.00 |
| 116 | (647.83001002) | 13 | $155.00 | $188.29 | $27.00 | $50.00 | $40.00 | $42.00 | |
| 117 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 692 | $9.00 | $20.94 | $11.00 | $10.00 | $8.00 | $24.00 |
| 118 | Parallel Bar Frame 11 PCB & Parallel Bar Grate 11 PCB (655.0902) | EACH | 1 | $2,800.00 | $2,997.50 | $2,000.00 | $2,845.00 | $5,900.00 | $1,800.00 |
| 119 | (691.04000020) | 21,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 120 | Field Change Payment (FCP) (697.03) | DOL | 380,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 121 | Asphalt Price Adjustment (698.04) | DOL | 719 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 122 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 123 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 124 | (698.93940015) | LS | 1 | $15,000 | $15,000 | $15,000 | $15,000 | $15,000 | $15,000 |
| 125 | Mobilization (699.040001) | LS | 1 | $260,000 | $337,000 | $344,000 | $347,000 | $354,000 | $359,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of August 13, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.