NYSDOT contract D265439 bid tabulation
Replacement of 7 Culverts. Let by New York State DOT on April 10, 2025, Genesee, Orleans, Region 04. 5 bids received; low bid $6,972,865 by Ramsey Constructors Inc.
- Owner
- New York State DOT
- Letting
- 10 APR 2025
- Pay items
- 143
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ramsey Constructors Inc | $6,972,865 | Low |
| 2 | Cold Spring Construction Company | $6,999,456 | 0.0% |
| 3 | Keeler Construction Co Inc | $7,162,146 | +3.0% |
| 4 | Villager Construction Inc | $7,180,900 | +3.0% |
| 5 | Sealand Contractors Corp. | $7,373,001 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ramsey Constructors Inc | 2. Cold Spring Construction Company | 3. Keeler Construction Co Inc | 4. Villager Construction Inc | 5. Sealand Contractors Corp. |
|---|---|---|---|---|---|---|---|---|
| 1 | (201.07000004) | 410 | $16.00 | $16.50 | $18.00 | $18.00 | $20.00 | |
| 2 | Removal of Substructures (202.19) | CY | 337 | $155.00 | $150.00 | $215.00 | $325.00 | $270.00 |
| 3 | Unclassified Excavation and Disposal (203.02) | CY | 2,100 | $65.00 | $36.00 | $40.00 | $54.00 | $46.00 |
| 4 | Embankment In Place (203.03) | CY | 4,270 | $65.00 | $28.00 | $88.00 | $47.00 | $33.00 |
| 5 | Select Granular Fill (203.07) | CY | 155 | $60.00 | $66.00 | $175.00 | $77.00 | $160.00 |
| 6 | Select Structural Fill (203.21) | CY | 1,060 | $145.00 | $130.00 | $121.00 | $106.00 | $120.00 |
| 7 | (203.24010017) | 4 | $250.00 | $400.00 | $426.00 | $400.00 | $600.00 | |
| 8 | Sand Backfill (203.25) | CY | 5 | $98.00 | $90.00 | $77.00 | $55.00 | $200.00 |
| 9 | Structure Excavation (206.01) | CY | 6,552 | $45.00 | $34.00 | $38.00 | $37.00 | $46.00 |
| 10 | Trench and Culvert Excavation (206.0201) | CY | 1,133 | $40.00 | $73.00 | $64.00 | $78.00 | $60.00 |
| 11 | Test Pit Excavation (206.05) | EACH | 10 | $1,750.00 | $3,000.00 | $1,900.00 | $1,700.00 | $1,600.00 |
| 12 | Geotextile Bedding (207.20) | SY | 740 | $3.00 | $0.35 | $11.00 | $5.00 | $5.00 |
| 13 | Prefabricated Composite Structural Drain (207.26) | SY | 770 | $22.00 | $14.00 | $32.00 | $38.00 | $25.00 |
| 14 | Seed and Mulch – Temporary (209.1003) | SY | 1,700 | $1.00 | $3.00 | $4.00 | $7.00 | $1.60 |
| 15 | Check Dam (Ditch Bottom Width 0.0 to 3′), Stone – Temporary (209.110101) | EACH | 14 | $165.00 | $700.00 | $1,000.00 | $550.00 | $1,800.00 |
| 16 | Check Dam (Ditch Bottom Width >3′ to 6′), Stone – Temporary (209.110102) | EACH | 3 | $175.00 | $1,350.00 | $1,300.00 | $1,100.00 | $2,600.00 |
| 17 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 971 | $11.00 | $9.50 | $6.00 | $16.00 | $11.25 |
| 18 | Sediment Filter Log, 12″ (209.2301) | LF | 1,355 | $7.00 | $13.00 | $16.00 | $10.00 | $10.00 |
| 19 | Removal and Disposal of Underground Pipe ACM (BV14) (210.3111) | LF | 62 | $165.00 | $44.00 | $72.00 | $295.00 | $135.00 |
| 20 | Subbase Course, Type 1 (304.11) | CY | 50 | $84.00 | $210.00 | $186.00 | $400.00 | $180.00 |
| 21 | Subbase Course, Type 2 (304.12) | CY | 1,613 | $110.00 | $95.00 | $124.00 | $82.00 | $105.00 |
| 22 | (404.0001) | TON | 122 | $95.00 | $95.00 | $95.00 | $95.00 | $95.00 |
| 23 | (404.0189) | TON | 150 | $225.00 | $180.00 | $228.00 | $280.00 | $240.00 |
| 24 | (404.0983) | TON | 630 | $165.00 | $155.00 | $187.00 | $240.00 | $180.00 |
| 25 | (404.1989) | TON | 680 | $155.00 | $140.00 | $171.00 | $225.00 | $160.00 |
| 26 | (404.3789) | TON | 1,080 | $166.00 | $125.00 | $169.00 | $225.00 | $135.00 |
| 27 | Diluted Tack Coat (407.0102) | GAL | 1,800 | $11.00 | $12.00 | $8.00 | $60.00 | $16.00 |
| 28 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 4,620 | $1.25 | $1.00 | $1.00 | $0.80 | $2.00 |
| 29 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 2,920 | $24.00 | $10.00 | $25.00 | $22.00 | $32.00 |
| 30 | Shields and Shoring (552.17) | SF | 7,169 | $0.25 | $2.50 | $1.00 | $0.50 | $1.00 |
| 31 | (552.2001) | LF | 67 | $155.00 | $155.00 | $283.00 | $375.00 | $190.00 |
| 32 | (552.2101) | LF | 48 | $665.00 | $1,550.00 | $1,145.00 | $1,350.00 | $760.00 |
| 33 | (552.2201) | LF | 119 | $490.00 | $220.00 | $532.00 | $140.00 | $570.00 |
| 34 | (552.230201) | SF | 810 | $15.00 | $1.00 | $17.00 | $35.00 | $17.00 |
| 35 | (553.010001) | EACH | 1 | $1,000.00 | $0.01 | $16,000 | $5,500.00 | $5,000.00 |
| 36 | (553.030001) | EACH | 1 | $25,000 | $20,000 | $16,000 | $40,000 | $5,000.00 |
| 37 | (553.030002) | EACH | 1 | $25,000 | $20,000 | $32,000 | $40,000 | $5,000.00 |
| 38 | (553.030003) | EACH | 1 | $25,000 | $20,000 | $32,000 | $40,000 | $5,000.00 |
| 39 | (553.030004) | EACH | 1 | $25,000 | $20,000 | $32,000 | $40,000 | $5,000.00 |
| 40 | (553.030005) | EACH | 1 | $25,000 | $20,000 | $32,000 | $40,000 | $5,000.00 |
| 41 | (553.030006) | EACH | 1 | $25,000 | $20,000 | $32,000 | $40,000 | $5,000.00 |
| 42 | (553.030007) | EACH | 1 | $25,000 | $20,000 | $32,000 | $40,000 | $5,000.00 |
| 43 | (554.3001) | SF | 40 | $140.00 | $250.00 | $60.00 | $215.00 | $400.00 |
| 44 | Footing Concrete, Performance (555.0011) | CY | 106 | $1,400.00 | $1,500.00 | $1,270.00 | $840.00 | $1,900.00 |
| 45 | (555.05000001) | 12 | $3,200.00 | $3,000.00 | $2,400.00 | $1,400.00 | $2,500.00 | |
| 46 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 47 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $2.44 | $2.44 | $2.44 | $2.44 | $2.44 |
| 48 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 6,618 | $5.00 | $3.50 | $3.00 | $3.00 | $6.50 |
| 49 | (562.0101) | SY | 67 | $3,000.00 | $2,300.00 | $2,175.00 | $2,000.00 | $3,150.00 |
| 50 | Performance Concrete Quality Adjustment (562.99) | QUALITY UNIT | 1 | $17.50 | $17.50 | $17.50 | $17.50 | $17.50 |
| 51 | Steel Bridge Railing (Four-Rail) (568.51) | LF | 164 | $475.00 | $435.00 | $440.00 | $440.00 | $480.00 |
| 52 | Transition Bridge Railing (568.70) | LF | 704 | $225.00 | $190.00 | $210.00 | $210.00 | $205.00 |
| 53 | (595.50000018) | 8,390 | $3.00 | $10.00 | $7.50 | $7.00 | $4.00 | |
| 54 | (603.171116) | EACH | 4 | $500.00 | $200.00 | $410.00 | $920.00 | $800.00 |
| 55 | (603.171416) | EACH | 1 | $500.00 | $1,500.00 | $525.00 | $1,800.00 | $1,000.00 |
| 56 | (603.63080415) | 45 | $4,100.00 | $3,500.00 | $2,700.00 | $2,700.00 | $3,400.00 | |
| 57 | (603.63110415) | 35 | $4,900.00 | $4,250.00 | $3,500.00 | $3,300.00 | $4,350.00 | |
| 58 | (603.63120515) | 48 | $3,600.00 | $4,250.00 | $3,500.00 | $3,700.00 | $4,250.00 | |
| 59 | (603.63130515) | 36 | $4,900.00 | $4,250.00 | $3,800.00 | $3,700.00 | $4,650.00 | |
| 60 | (603.64090415) | 36 | $4,900.00 | $3,900.00 | $3,250.00 | $3,000.00 | $4,150.00 | |
| 61 | (603.64120715) | 68 | $2,700.00 | $3,700.00 | $3,450.00 | $3,400.00 | $4,200.00 | |
| 62 | (603.67000001) | 318 | $2,000.00 | $2,600.00 | $3,050.00 | $2,500.00 | $2,800.00 | |
| 63 | Concrete Collars (603.77) | EACH | 1 | $1,500.00 | $2,600.00 | $5,500.00 | $1,950.00 | $4,000.00 |
| 64 | (603.9812) | LF | 78 | $55.00 | $65.00 | $47.00 | $50.00 | $100.00 |
| 65 | (603.9818) | LF | 98 | $55.00 | $75.00 | $54.00 | $85.00 | $110.00 |
| 66 | Box Beam Guide Railing (606.10) | LF | 2,077 | $55.00 | $50.00 | $53.00 | $55.00 | $52.50 |
| 67 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 110 | $65.00 | $55.00 | $59.00 | $60.00 | $59.00 |
| 68 | Box Beam End Piece (606.120101) | EACH | 1 | $735.00 | $625.00 | $700.00 | $690.00 | $675.00 |
| 69 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 9 | $5,000.00 | $4,200.00 | $4,500.00 | $4,500.00 | $4,450.00 |
| 70 | Box Beam Guide Railing End Assembly Type I with 18 ft Extension (606.120103) | EACH | 1 | $7,100.00 | $6,200.00 | $6,700.00 | $6,700.00 | $6,570.00 |
| 71 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 15 | $2,300.00 | $2,000.00 | $2,200.00 | $2,200.00 | $2,150.00 |
| 72 | Resetting Box Beam Guide Railing (New Posts) (606.5348) | LF | 83 | $40.00 | $50.00 | $37.00 | $37.00 | $46.00 |
| 73 | Removing and Storing Precast Concrete Barrier (606.65) | LF | 560 | $16.00 | $7.00 | $10.00 | $8.00 | $14.00 |
| 74 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 1,100 | $8.00 | $10.00 | $13.00 | $10.00 | $5.00 |
| 75 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 1,368 | $8.00 | $10.00 | $13.00 | $6.00 | $5.00 |
| 76 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 10 | $400.00 | $300.00 | $325.00 | $550.00 | $500.00 |
| 77 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 10 | $100.00 | $300.00 | $650.00 | $550.00 | $500.00 |
| 78 | (607.41010010) | 476 | $5.00 | $7.50 | $8.00 | $7.50 | $10.00 | |
| 79 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 10 | $95.00 | $95.00 | $95.00 | $95.00 | $95.00 |
| 80 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 190 | $165.00 | $275.00 | $426.00 | $380.00 | $400.00 |
| 81 | Turf Establishment – Performance (610.1605) | SY | 1,700 | $25.00 | $39.00 | $31.00 | $28.00 | $23.00 |
| 82 | (613.04000001) | 180 | $210.00 | $70.00 | $180.00 | $395.00 | $350.00 | |
| 83 | (614.060201) | EACH | 3 | $2,000.00 | $1,200.00 | $1,250.00 | $1,250.00 | $1,700.00 |
| 84 | (614.060301) | EACH | 3 | $2,000.00 | $1,500.00 | $1,450.00 | $1,450.00 | $2,000.00 |
| 85 | (614.060401) | EACH | 2 | $2,300.00 | $1,600.00 | $1,700.00 | $1,700.00 | $2,300.00 |
| 86 | (615.01010108) | 100 | $135.00 | $375.00 | $290.00 | $340.00 | $370.00 | |
| 87 | (617.10000024) | 1,060 | $45.00 | $120.00 | $35.00 | $170.00 | $83.00 | |
| 88 | (617.11000024) | LS | 1 | $18,000 | $1,000.00 | $4,400.00 | $6,000.00 | $3,000.00 |
| 89 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $600,000 | $900,000 | $402,000 | $390,224 | $553,000 |
| 90 | Type III Construction Barricades (619.04) | EACH | 163 | $100.00 | $65.00 | $75.00 | $100.00 | $200.00 |
| 91 | (619.080101) | LF | 1,300 | $1.00 | $1.00 | $3.50 | $1.70 | $1.60 |
| 92 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 72 | $4.00 | $4.00 | $12.50 | $17.00 | $16.00 |
| 93 | (619.100101) | LF | 2,472 | $0.25 | $0.25 | $1.00 | $1.70 | $1.60 |
| 94 | (619.111211) | WEEK | 18 | $1,100.00 | $1,425.00 | $1,100.00 | $425.00 | $1,500.00 |
| 95 | (619.1301) | EACH | 1 | $75,000 | $42,000 | $58,000 | $45,000 | $40,000 |
| 96 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 477 | $60.00 | $50.00 | $18.00 | $43.00 | $55.00 |
| 97 | Temporary Positive Barrier – Category 3 (Pinning Prohibited) (619.1713) | LF | 452 | $54.00 | $48.00 | $29.00 | $77.00 | $35.00 |
| 98 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 316 | $65.00 | $72.00 | $53.00 | $83.00 | $45.00 |
| 99 | Mailboxes (619.27) | EACH | 1 | $500.00 | $250.00 | $400.00 | $425.00 | $500.00 |
| 100 | Stone Filling (Medium) (620.04) | CY | 602 | $165.00 | $165.00 | $185.00 | $325.00 | $240.00 |
| 101 | Bedding Material, Type 1 (620.0801) | CY | 20 | $140.00 | $195.00 | $240.00 | $190.00 | $210.00 |
| 102 | Crushed Stone (In-Place Measure) (623.12) | CY | 178 | $215.00 | $90.00 | $175.00 | $230.00 | $250.00 |
| 103 | Survey Operations (625.01) | LS | 1 | $150,000 | $115,000 | $142,000 | $115,000 | $115,000 |
| 104 | Permanent Survey Markers (625.06) | EACH | 38 | $440.00 | $265.00 | $300.00 | $300.00 | $1,500.00 |
| 105 | (627.50140008) | 1,172 | $11.00 | $7.50 | $13.00 | $17.00 | $10.00 | |
| 106 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $10,000 | $300.00 | $2,500.00 | $2,500.00 | $10,000 |
| 107 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 24 | $3,000.00 | $2,300.00 | $2,900.00 | $2,500.00 | $2,200.00 |
| 108 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 2,842 | $0.25 | $0.25 | $1.00 | $1.70 | $1.58 |
| 109 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 1,069 | $0.25 | $0.25 | $1.00 | $1.70 | $1.58 |
| 110 | Reference Marker Panel (646.21) | EACH | 8 | $50.00 | $47.00 | $50.00 | $50.00 | $50.00 |
| 111 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 46 | $18.00 | $16.00 | $17.00 | $17.00 | $17.00 |
| 112 | Steel Post, 2.0 lb/ft (646.32) | EACH | 37 | $82.00 | $86.00 | $100.00 | $92.00 | $91.00 |
| 113 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 2 | $205.00 | $75.00 | $115.00 | $74.00 | $200.00 |
| 114 | (647.83001002) | 15 | $165.00 | $50.00 | $35.00 | $18.00 | $50.00 | |
| 115 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 608 | $4.00 | $30.00 | $9.00 | $4.50 | $8.25 |
| 116 | Secondary Highway Audible Roadway Delineators (SHARDs) (649.21) | LF | 400 | $4.00 | $30.00 | $9.00 | $4.50 | $8.25 |
| 117 | (663.0112) | LF | 83 | $375.00 | $450.00 | $490.00 | $310.00 | $410.00 |
| 118 | (663.0408) | LF | 367 | $165.00 | $225.00 | $275.00 | $140.00 | $290.00 |
| 119 | (663.07080108) | 3 | $17,000 | $6,500.00 | $16,000 | $25,000 | $21,000 | |
| 120 | (663.09100001) | 85 | $275.00 | $500.00 | $510.00 | $210.00 | $530.00 | |
| 121 | (663.1008) | EACH | 1 | $4,000.00 | $3,500.00 | $6,000.00 | $2,500.00 | $4,400.00 |
| 122 | (663.160808) | EACH | 3 | $18,000 | $9,000.00 | $15,000 | $18,000 | $11,000 |
| 123 | (663.161212) | EACH | 1 | $19,000 | $11,000 | $24,000 | $27,000 | $22,024 |
| 124 | (663.1808) | EACH | 1 | $1,000.00 | $500.00 | $600.00 | $4,900.00 | $3,500.00 |
| 125 | Iron Water Main Fittings (3 - 8 inch diameter) (663.2001) | LB | 420 | $50.00 | $10.00 | $28.00 | $10.00 | $30.00 |
| 126 | Iron Water Main Fittings (10 - 16 inch diameter) (663.2002) | LB | 1,120 | $21.00 | $6.25 | $12.00 | $10.00 | $20.00 |
| 127 | (663.2108) | EACH | 24 | $78.00 | $150.00 | $160.00 | $45.00 | $200.00 |
| 128 | (663.2110) | EACH | 6 | $150.00 | $200.00 | $300.00 | $130.00 | $325.00 |
| 129 | (663.2112) | EACH | 18 | $145.00 | $250.00 | $300.00 | $140.00 | $350.00 |
| 130 | (663.2312) | LF | 83 | $9.00 | $5.00 | $12.00 | $3.00 | $5.00 |
| 131 | (663.29010001) | LS | 1 | $21,000 | $45,000 | $20,000 | $40,000 | $40,500 |
| 132 | Disconnect and Cap Existing Water Main (663.40) | EACH | 3 | $5,200.00 | $100.00 | $2,600.00 | $5,000.00 | $2,500.00 |
| 133 | (663.4108) | LF | 361 | $5.00 | $17.00 | $30.00 | $37.00 | $35.00 |
| 134 | (663.4112) | LF | 82 | $9.00 | $23.00 | $28.00 | $68.00 | $50.00 |
| 135 | Remove and Dispose of Existing Water Valve & Valve Box (663.42) | EACH | 1 | $165.00 | $350.00 | $300.00 | $850.00 | $1,000.00 |
| 136 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 641 | $5.00 | $10.00 | $11.00 | $5.00 | $5.00 |
| 137 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 642 | $5.00 | $10.00 | $11.00 | $5.00 | $5.00 |
| 138 | Field Change Payment (FCP) (697.03) | DOL | 234,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 139 | Asphalt Price Adjustment (698.04) | DOL | 6,448 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 140 | Fuel Price Adjustment (698.05) | DOL | 5,060 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 141 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 142 | (698.93940015) | LS | 1 | $20,000 | $20,000 | $20,000 | $20,000 | $20,000 |
| 143 | Mobilization (699.040001) | LS | 1 | $255,000 | $269,000 | $275,000 | $265,000 | $283,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of April 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way