NYSDOT contract D265520 bid tabulation
Route 36 from Cass St. to Webbs Crossing Rd. - Phase 1. Let by New York State DOT on August 21, 2025, Steuben, Region 06. 8 bids received; low bid $36,550,671 by Union Concrete & Construction Corp.
- Owner
- New York State DOT
- Letting
- 21 AUG 2025
- Pay items
- 329
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Union Concrete & Construction Corp | $36,550,671 | Low |
| 2 | Concrete Applied Technologies Corp/DBA:Catco | $38,144,554 | +4.0% |
| 3 | Cold Spring Construction Company | $39,034,348 | +7.0% |
| 4 | Sealand Contractors Corp. | $40,451,000 | +11% |
| 5 | Dalrymple Gravel & Contracting Co Inc | $40,594,738 | +11% |
| 6 | Ramsey Constructors Inc | $40,982,349 | +12% |
| 7 | Twin Tier Constructors Inc | $42,773,000 | +17% |
| 8 | Villager Construction Inc | $46,415,500 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Union Concrete & Construction Corp | 2. Concrete Applied Technologies Corp/DBA:Catco | 3. Cold Spring Construction Company | 4. Sealand Contractors Corp. | 5. Dalrymple Gravel & Contracting Co Inc | 6. Ramsey Constructors Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $150,000 | $20,000 | $30,000 | $20,000 | $150,000 | $20,000 |
| 2 | Removal of Substructures (202.19) | CY | 40 | $380.00 | $580.00 | $250.00 | $460.00 | $325.00 | $300.00 |
| 3 | Removal of Steel Supported Structural Slabs (with shear connectors) – Type B (202.2202) | SF | 19,325 | $22.50 | $18.10 | $32.00 | $24.00 | $23.00 | $20.00 |
| 4 | Unclassified Excavation and Disposal (203.02) | CY | 64,583 | $22.50 | $23.00 | $20.00 | $31.00 | $20.00 | $22.00 |
| 5 | Embankment In Place (203.03) | CY | 57,847 | $10.25 | $18.00 | $12.00 | $17.50 | $13.00 | $10.00 |
| 6 | Select Granular Fill (203.07) | CY | 5,780 | $96.00 | $55.00 | $34.00 | $72.00 | $80.00 | $50.00 |
| 7 | Select Granular Subgrade (203.20) | CY | 93 | $70.00 | $100.00 | $100.00 | $175.00 | $105.00 | $120.00 |
| 8 | Select Structural Fill (203.21) | CY | 793 | $79.00 | $55.00 | $110.00 | $90.00 | $105.00 | $80.00 |
| 9 | Structure Excavation (206.01) | CY | 2,440 | $19.00 | $23.00 | $52.00 | $36.00 | $30.00 | $25.00 |
| 10 | Trench and Culvert Excavation (206.0201) | CY | 18,409 | $27.00 | $33.00 | $0.01 | $36.00 | $50.00 | $55.00 |
| 11 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 9,799 | $40.00 | $32.00 | $28.00 | $27.25 | $26.00 | $28.00 |
| 12 | Test Pit Excavation (206.05) | EACH | 61 | $1,000.00 | $1,000.00 | $2,100.00 | $1,420.00 | $800.00 | $1,200.00 |
| 13 | Geotextile Drainage (207.22) | SY | 4,609 | $3.00 | $2.00 | $2.25 | $2.00 | $4.00 | $2.00 |
| 14 | Geotextile Stabilization (207.24) | SY | 556 | $2.00 | $8.00 | $6.25 | $12.00 | $4.00 | $3.00 |
| 15 | Prefabricated Composite Structural Drain (207.26) | SY | 380 | $30.00 | $16.00 | $23.00 | $25.00 | $30.00 | $15.00 |
| 16 | (208.01030022) | 1,454 | $111.00 | $145.00 | $175.00 | $140.00 | $75.00 | $75.00 | |
| 17 | Mulch – Temporary (209.100101) | SY | 86,561 | $0.75 | $0.95 | $0.95 | $1.00 | $0.95 | $1.00 |
| 18 | Seed and Mulch – Temporary (209.1003) | SY | 86,561 | $0.75 | $1.25 | $0.95 | $1.32 | $1.25 | $1.25 |
| 19 | (209.11010024) | 150 | $210.00 | $320.00 | $225.00 | $400.00 | $500.00 | $180.00 | |
| 20 | Check Dam, Prefabricated – Temporary (209.1105) | LF | 532 | $19.50 | $121.00 | $29.00 | $20.00 | $50.00 | $235.00 |
| 21 | Check Dam, (Ditch Bottom Width >3′ to 6′), Stone – Permanent (209.110602) | EACH | 30 | $358.00 | $1,220.00 | $400.00 | $1,800.00 | $750.00 | $700.00 |
| 22 | Silt Fence - Temporary (209.13) | LF | 26,499 | $1.35 | $4.00 | $6.50 | $4.50 | $5.00 | $5.00 |
| 23 | Turbidity Curtain – Temporary (209.1501) | LF | 180 | $35.00 | $60.00 | $18.00 | $40.00 | $50.00 | $32.00 |
| 24 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 14,227 | $2.25 | $6.00 | $5.75 | $6.30 | $6.00 | $6.00 |
| 25 | Stabilized Construction Access (209.22) | SY | 800 | $25.00 | $36.00 | $20.00 | $80.00 | $30.00 | $22.00 |
| 26 | (304.04000004) | 5,546 | $8.50 | $2.40 | $2.40 | $4.00 | $5.00 | $4.00 | |
| 27 | Subbase Course, Optional Type (304.15) | CY | 31,177 | $82.00 | $57.00 | $57.00 | $75.00 | $60.00 | $56.00 |
| 28 | (404.0179) | TON | 3,285 | $120.00 | $145.00 | $120.00 | $112.00 | $120.00 | $125.00 |
| 29 | (404.1262) | TON | 11,181 | $130.00 | $115.00 | $125.00 | $124.00 | $120.00 | $150.00 |
| 30 | (404.2569) | TON | 16,913 | $115.00 | $106.00 | $105.00 | $110.00 | $110.00 | $110.00 |
| 31 | (404.2589) | TON | 1,936 | $149.00 | $140.00 | $115.00 | $133.00 | $110.00 | $115.00 |
| 32 | (404.3769) | TON | 18,812 | $110.00 | $101.00 | $100.00 | $108.00 | $110.00 | $105.00 |
| 33 | Diluted Tack Coat (407.0102) | GAL | 25,659 | $8.00 | $5.00 | $6.50 | $7.30 | $6.00 | $7.00 |
| 34 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 51,267 | $0.20 | $0.50 | $0.85 | $0.95 | $0.50 | $0.90 |
| 35 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 7,269 | $1.85 | $8.00 | $9.25 | $8.00 | $4.00 | $8.00 |
| 36 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 100 | $30.00 | $40.00 | $25.00 | $100.00 | $75.00 | $30.00 |
| 37 | (502.65960005) | 22,906 | $1.00 | $1.40 | $0.85 | $1.75 | $2.00 | $1.55 | |
| 38 | PCC Foundation for Pavement, PEM Concrete (503.1013) | CY | 8 | $2,625.00 | $1,600.00 | $2,550.00 | $1,500.00 | $2,500.00 | $1,000.00 |
| 39 | Micropiles (Contractor Designed) (551.30) | EACH | 36 | $8,000.00 | $9,695.00 | $7,750.00 | $7,400.00 | $7,000.00 | $12,000 |
| 40 | (551.33) | 864 | $53.00 | $38.00 | $50.00 | $52.00 | $50.00 | $50.00 | |
| 41 | Furnishing Equipment for Installing Micropiles (551.34) | LS | 1 | $50,000 | $44,000 | $50,000 | $40,000 | $90,000 | $200,000 |
| 42 | Static Pile Compressive Load Test (551.35) | EACH | 2 | $38,000 | $19,800 | $40,000 | $37,000 | $35,000 | $35,000 |
| 43 | Temporary Steel Sheeting (552.13) | SF | 340 | $475.00 | $500.00 | $55.00 | $40.00 | $323.00 | $400.00 |
| 44 | Shields and Shoring (552.17) | SF | 110,577 | $0.10 | $0.01 | $1.00 | $0.50 | $0.50 | $0.45 |
| 45 | (553.030001) | EACH | 1 | $22,000 | $1.00 | $15.00 | $5,000.00 | $22,500 | $20,000 |
| 46 | (553.030002) | EACH | 1 | $22,000 | $1.00 | $15.00 | $5,000.00 | $22,500 | $20,000 |
| 47 | Footing Concrete, Performance (555.0011) | CY | 158 | $1,220.00 | $1,800.00 | $1,200.00 | $1,600.00 | $1,500.00 | $800.00 |
| 48 | Concrete for Structures, Performance (555.0021) | CY | 406 | $1,785.00 | $3,200.00 | $2,200.00 | $3,000.00 | $3,500.00 | $2,800.00 |
| 49 | (555.80020001) | 295 | $50.00 | $216.00 | $225.00 | $150.00 | $250.00 | $140.00 | |
| 50 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $6.50 | $6.50 | $6.50 | $6.50 | $6.50 | $6.50 |
| 51 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 52 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 1,445 | $3.50 | $3.40 | $4.25 | $2.95 | $5.00 | $2.75 |
| 53 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 42,367 | $2.75 | $3.00 | $2.40 | $3.00 | $5.00 | $3.00 |
| 54 | Stud Shear Connectors for Bridges (556.03) | EACH | 3,945 | $5.50 | $5.20 | $18.00 | $4.20 | $7.00 | $6.00 |
| 55 | (557.01040018) | 2,190 | $595.00 | $725.00 | $700.00 | $670.00 | $820.00 | $750.00 | |
| 56 | (557.1012) | SY | 206 | $650.00 | $650.00 | $750.00 | $550.00 | $590.00 | $1,100.00 |
| 57 | (557.1219) | SY | 386 | $152.00 | $1.00 | $60.00 | $145.00 | $225.00 | $425.00 |
| 58 | (557.26000016) | 1,590 | $34.50 | $29.00 | $40.00 | $32.00 | $30.00 | $26.00 | |
| 59 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 2,396 | $0.01 | $0.10 | $0.01 | $1.00 | $0.01 | $0.01 |
| 60 | (557.60010004) | 1,479 | $33.00 | $26.10 | $24.00 | $22.00 | $21.00 | $24.00 | |
| 61 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $14.01 | $14.01 | $14.01 | $14.01 | $14.01 | $14.01 |
| 62 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 2,396 | $9.50 | $8.10 | $8.25 | $7.00 | $6.50 | $8.00 |
| 63 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 26,671 | $1.00 | $1.20 | $0.60 | $1.05 | $1.00 | $0.65 |
| 64 | Protective Sealing of New Structural Concrete (559.02) | SF | 1,320 | $2.00 | $3.50 | $2.75 | $5.50 | $3.00 | $2.00 |
| 65 | Protective Sealing of Existing Structural Concrete and Existing Bridge Decks (559.03) | SF | 28,007 | $1.05 | $1.85 | $1.10 | $2.30 | $1.00 | $1.00 |
| 66 | Protective Sealing of Concrete with Coating Type Protective Sealer (559.04) | SQUAREFOOT | 15,714 | $1.25 | $2.30 | $3.00 | $3.10 | $3.00 | $5.00 |
| 67 | (564.100001) | LB | 1,020 | $22.00 | $31.10 | $45.00 | $44.00 | $35.00 | $40.00 |
| 68 | (564.100002) | LB | 1,785 | $29.00 | $42.10 | $22.00 | $43.00 | $35.00 | $40.00 |
| 69 | (564.100003) | LB | 707 | $25.00 | $35.15 | $22.00 | $41.00 | $35.00 | $40.00 |
| 70 | (564.100004) | LB | 3,157 | $25.00 | $35.70 | $35.00 | $34.00 | $35.00 | $32.00 |
| 71 | (564.80010016) | 1 | $600,000 | $460,000 | $750,000 | $320,000 | $850,000 | $600,000 | |
| 72 | Type M.R. Expansion Bearing (0 to 225 k) (565.1521) | EACH | 20 | $4,400.00 | $4,800.00 | $6,000.00 | $4,500.00 | $8,000.00 | $6,500.00 |
| 73 | Type M.R. Expansion Bearing (451 to 675 k) (565.1523) | EACH | 10 | $7,670.00 | $6,700.00 | $6,500.00 | $7,400.00 | $10,000 | $9,000.00 |
| 74 | Type M.R. Fixed Bearing (451 to 675 k) (565.1723) | EACH | 10 | $7,670.00 | $8,200.00 | $9,000.00 | $7,400.00 | $12,000 | $9,000.00 |
| 75 | Modular Expansion Joint System - Two Cell (566.02) | LF | 59 | $2,460.00 | $2,560.00 | $4,500.00 | $3,400.00 | $4,000.00 | $3,800.00 |
| 76 | (567.51000016) | 149 | $112.00 | $150.00 | $78.00 | $205.00 | $50.00 | $50.00 | |
| 77 | Armorless Bridge Joint (567.60) | LF | 59 | $245.00 | $420.00 | $235.00 | $510.00 | $300.00 | $300.00 |
| 78 | Bridge Joint Seal (567.63) | LF | 191 | $333.00 | $330.00 | $20.00 | $190.00 | $100.00 | $100.00 |
| 79 | Transition Bridge Railing (568.70) | LF | 175 | $182.00 | $212.00 | $175.00 | $184.00 | $200.00 | $200.00 |
| 80 | Pedestrian and Bicycle Railing (Five-Rail) (568.84) | LF | 514 | $182.00 | $195.00 | $190.00 | $280.00 | $200.00 | $200.00 |
| 81 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 932 | $340.00 | $590.00 | $400.00 | $320.00 | $440.00 | $300.00 |
| 82 | (569.10010011) | 101 | $1,065.00 | $1,950.00 | $1,900.00 | $1,400.00 | $2,000.00 | $1,600.00 | |
| 83 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $11.57 | $11.57 | $11.57 | $11.57 | $11.57 | $11.57 |
| 84 | Lead-Exposure Control Plan (570.01) | LS | 1 | $5,900.00 | $6,000.00 | $5,500.00 | $5,500.00 | $5,500.00 | $15,000 |
| 85 | Medical Testing (570.02) | DOL | 15,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 86 | Personal-Exposure-Monitoring Sample Analysis (570.03) | DOL | 11,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 87 | Decontamination Facilities (570.04) | CALENDAR WEEK | 3 | $1,080.00 | $1,100.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 88 | (570.090001) | LS | 1 | $540.00 | $550.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 89 | (570.090002) | LS | 1 | $540.00 | $550.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 90 | (570.100001) | LS | 1 | $865.00 | $880.00 | $800.00 | $800.00 | $800.00 | $800.00 |
| 91 | (570.100002) | LS | 1 | $865.00 | $880.00 | $800.00 | $800.00 | $800.00 | $800.00 |
| 92 | (570.150001) | LS | 1 | $240,000 | $242,000 | $250,000 | $275,000 | $220,000 | $300,000 |
| 93 | (570.150002) | LS | 1 | $240,000 | $242,000 | $250,000 | $275,000 | $220,000 | $300,000 |
| 94 | Disposal of Hazardous Paint Removal Waste Containing Lead (571.03) | LB | 39,830 | $0.22 | $0.22 | $0.20 | $0.25 | $0.20 | $0.20 |
| 95 | (572.00020101) | LS | 1 | $30,000 | $1.00 | $0.01 | $115,000 | $0.01 | $1,000.00 |
| 96 | (572.020001) | LS | 1 | $5,000.00 | $5,500.00 | $3,000.00 | $8,000.00 | $10,000 | $6,300.00 |
| 97 | (572.020002) | LS | 1 | $3,500.00 | $5,500.00 | $3,000.00 | $10,000 | $10,000 | $12,000 |
| 98 | (573.010001) | LS | 1 | $575,000 | $570,000 | $550,000 | $540,000 | $516,000 | $750,000 |
| 99 | (573.010002) | LS | 1 | $575,000 | $570,000 | $550,000 | $540,000 | $516,000 | $750,000 |
| 100 | Scuppers (Type A) (576.01) | EACH | 8 | $4,500.00 | $4,050.00 | $4,500.00 | $4,000.00 | $5,000.00 | $4,500.00 |
| 101 | Removal of Structural Concrete (580.01) | CY | 315 | $2,385.00 | $2,500.00 | $2,200.00 | $3,600.00 | $3,000.00 | $2,800.00 |
| 102 | Removal of Concrete Approach Slab (580.04) | SF | 3,010 | $10.50 | $9.00 | $7.00 | $7.00 | $6.00 | $10.00 |
| 103 | Removal and Replacement of Structural Concrete (582.0051) | CY | 5 | $8,000.00 | $9,000.00 | $18,000 | $23,500 | $10,000 | $6,500.00 |
| 104 | Removal of Structural Concrete- Replacement with Vertical and Overhead Patching Material (582.0061) | SF | 240 | $195.00 | $400.00 | $220.00 | $650.00 | $500.00 | $130.00 |
| 105 | (582.99) | 1 | $28.70 | $28.70 | $28.70 | $28.70 | $28.70 | $28.70 | |
| 106 | (585.01) | EACH | 10 | $5,500.00 | $2,750.00 | $4,000.00 | $2,700.00 | $15,000 | $5,000.00 |
| 107 | (585.02) | EACH | 10 | $6,800.00 | $14,000 | $8,000.00 | $6,400.00 | $15,000 | $9,000.00 |
| 108 | (585.03) | EACH | 10 | $5,600.00 | $2,750.00 | $6,000.00 | $2,700.00 | $15,000 | $6,000.00 |
| 109 | (585.04) | EACH | 10 | $6,800.00 | $14,000 | $10,000 | $6,400.00 | $15,000 | $9,000.00 |
| 110 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 813 | $50.00 | $52.00 | $26.00 | $110.00 | $40.00 | $105.00 |
| 111 | (589.010001) | LB | 15,178 | $0.90 | $7.70 | $2.00 | $7.75 | $3.00 | $7.00 |
| 112 | (589.520001) | EACH | 20 | $1,200.00 | $1,100.00 | $750.00 | $1,100.00 | $2,000.00 | $1,500.00 |
| 113 | (589.520002) | EACH | 20 | $1,200.00 | $1,100.00 | $750.00 | $1,100.00 | $2,000.00 | $1,500.00 |
| 114 | (594.01000004) | 2,652 | $70.00 | $99.00 | $94.00 | $94.00 | $90.00 | $115.00 | |
| 115 | (595.50000018) | 750 | $11.00 | $7.40 | $5.00 | $9.00 | $5.00 | $7.00 | |
| 116 | (595.98200018) | 320 | $18.75 | $56.00 | $84.00 | $35.00 | $25.00 | $55.00 | |
| 117 | (603.541216) | EACH | 1 | $610.00 | $1,360.00 | $1,000.00 | $1,000.00 | $700.00 | $650.00 |
| 118 | (603.541316) | EACH | 32 | $750.00 | $1,460.00 | $1,100.00 | $1,100.00 | $800.00 | $900.00 |
| 119 | (603.541614) | EACH | 8 | $1,400.00 | $2,420.00 | $2,000.00 | $1,800.00 | $1,400.00 | $2,500.00 |
| 120 | (603.541912) | EACH | 4 | $2,700.00 | $35,200 | $3,500.00 | $3,200.00 | $2,500.00 | $4,500.00 |
| 121 | (603.542310) | EACH | 4 | $6,000.00 | $6,950.00 | $6,500.00 | $6,700.00 | $5,700.00 | $12,000 |
| 122 | (603.9815) | LF | 24 | $23.00 | $42.00 | $135.00 | $125.00 | $80.00 | $18.00 |
| 123 | (603.9818) | LF | 5,861 | $20.00 | $41.40 | $125.00 | $52.00 | $80.00 | $75.00 |
| 124 | (603.9824) | LF | 712 | $30.00 | $58.00 | $145.00 | $95.00 | $90.00 | $110.00 |
| 125 | (603.9836) | LF | 377 | $58.00 | $95.00 | $245.00 | $140.00 | $110.00 | $125.00 |
| 126 | (603.9848) | LF | 819 | $96.00 | $122.00 | $305.00 | $175.00 | $150.00 | $145.00 |
| 127 | (603.9860) | LF | 328 | $138.00 | $165.00 | $285.00 | $260.00 | $190.00 | $250.00 |
| 128 | (604.302122) | LF | 654 | $475.00 | $600.00 | $900.00 | $900.00 | $725.00 | $900.00 |
| 129 | (604.4048) | LF | 34 | $415.00 | $800.00 | $700.00 | $1,100.00 | $500.00 | $1,200.00 |
| 130 | (604.4072) | LF | 45 | $748.00 | $1,000.00 | $1,050.00 | $1,400.00 | $800.00 | $1,300.00 |
| 131 | Underdrain Filter, Type I (605.0901) | CY | 873 | $65.00 | $60.00 | $125.00 | $125.00 | $100.00 | $48.00 |
| 132 | Underdrain Filter, Type II (605.1001) | CY | 2,066 | $71.00 | $55.00 | $140.00 | $72.00 | $100.00 | $55.00 |
| 133 | (605.1701) | LF | 27,677 | $2.00 | $4.00 | $6.50 | $9.00 | $10.00 | $15.00 |
| 134 | (605.1702) | LF | 3,358 | $3.15 | $8.00 | $3.00 | $10.00 | $25.00 | $9.00 |
| 135 | Box Beam Guide Railing (606.10) | LF | 8,356 | $48.00 | $48.00 | $46.00 | $44.00 | $44.00 | $52.00 |
| 136 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 201 | $56.00 | $56.00 | $54.00 | $56.00 | $51.00 | $62.00 |
| 137 | Box Beam Median Barrier (606.11) | LF | 44 | $82.00 | $85.00 | $79.00 | $63.00 | $75.00 | $90.00 |
| 138 | Box Beam End Piece (606.120101) | EACH | 9 | $635.00 | $630.00 | $600.00 | $790.00 | $575.00 | $700.00 |
| 139 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 14 | $4,000.00 | $4,100.00 | $3,920.00 | $4,000.00 | $3,730.00 | $4,000.00 |
| 140 | Box Beam End Assembly Type III (606.1203) | EACH | 4 | $6,700.00 | $6,800.00 | $6,450.00 | $6,050.00 | $6,160.00 | $7,300.00 |
| 141 | Single-Slope Concrete Half Section Barrier (Cast-in-Place) (606.3063) | LF | 115 | $430.00 | $590.00 | $600.00 | $700.00 | $200.00 | $500.00 |
| 142 | Removing and Storing Box Beam Guide Railing (606.63) | LF | 6,856 | $4.25 | $8.80 | $8.25 | $4.00 | $8.00 | $9.00 |
| 143 | Removing and Storing Box Beam Median Barrier (606.64) | LF | 216 | $4.35 | $8.80 | $8.25 | $4.00 | $8.00 | $9.00 |
| 144 | Removing and Storing Box Beam Guide Railing End Assembly (606.6920) | EACH | 40 | $35.00 | $105.00 | $100.00 | $500.00 | $95.00 | $100.00 |
| 145 | Removing and Storing Box Beam Median Barrier End Assembly-Type C (606.6932) | EACH | 1 | $150.00 | $585.00 | $550.00 | $500.00 | $535.00 | $600.00 |
| 146 | Removing and Disposing Cable Guide Railing (606.70) | LF | 3,068 | $2.35 | $4.00 | $4.00 | $3.50 | $3.75 | $7.00 |
| 147 | Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79) | EACH | 4 | $90.00 | $585.00 | $550.00 | $500.00 | $535.00 | $900.00 |
| 148 | Transition Between Box Beam Guide Rail and Single Slope Half Section Concrete Barrier (One or Two Way Operation) (606.8803) | EACH | 4 | $12,600 | $16,760 | $14,500 | $14,000 | $20,000 | $12,000 |
| 149 | (607.41010010) | 2,067 | $5.25 | $4.00 | $5.00 | $6.00 | $8.00 | $3.00 | |
| 150 | (607.96000008) | 208 | $5.50 | $18.00 | $17.25 | $17.25 | $10.00 | $5.00 | |
| 151 | Concrete Sidewalks and Driveways (608.0101) | CY | 75 | $1,600.00 | $1,700.00 | $2,500.00 | $2,000.00 | $1,400.00 | $1,600.00 |
| 152 | (608.01020005) | 83 | $2,000.00 | $2,600.00 | $3,250.00 | $2,000.00 | $1,800.00 | $3,000.00 | |
| 153 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 1,365 | $200.00 | $500.00 | $375.00 | $200.00 | $250.00 | $225.00 |
| 154 | (608.21000003) | 73 | $630.00 | $500.00 | $425.00 | $670.00 | $405.00 | $700.00 | |
| 155 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 18,679 | $90.00 | $70.00 | $65.00 | $69.00 | $65.00 | $80.00 |
| 156 | (609.0407) | LF | 939 | $210.00 | $75.00 | $90.00 | $95.00 | $85.00 | $100.00 |
| 157 | Mycorrhizal Fungi (610.0701) | LB | 318 | $54.00 | $50.00 | $47.00 | $52.00 | $50.00 | $55.00 |
| 158 | Moisture Retention Additive (610.08) | LB | 476 | $27.00 | $25.00 | $23.50 | $26.00 | $25.00 | $30.00 |
| 159 | Compost (610.10) | CY | 5,128 | $67.00 | $65.00 | $67.00 | $68.00 | $65.00 | $69.00 |
| 160 | Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101) | CY | 94 | $108.00 | $110.00 | $105.00 | $105.00 | $100.00 | $100.00 |
| 161 | Permeable Weed Control Landscape Fabric (610.1201) | SY | 2,059 | $1.95 | $11.00 | $8.75 | $10.50 | $10.00 | $13.00 |
| 162 | Topsoil - Roadside (610.1402) | CY | 10,154 | $62.00 | $50.00 | $125.00 | $88.00 | $100.00 | $48.00 |
| 163 | (610.15060108) | 41,631 | $0.65 | $1.10 | $1.05 | $1.05 | $1.00 | $1.50 | |
| 164 | (610.15120108) | 354 | $11.50 | $5.50 | $5.25 | $5.25 | $5.00 | $5.00 | |
| 165 | (610.15120208) | 22,695 | $1.20 | $1.65 | $1.50 | $1.60 | $1.50 | $1.50 | |
| 166 | Turf Establishment - Roadside (610.1601) | SY | 29,291 | $1.15 | $1.25 | $1.05 | $1.20 | $1.15 | $1.25 |
| 167 | Turf Establishment -Lawns (610.1602) | SY | 19,064 | $1.10 | $1.25 | $1.05 | $1.20 | $1.15 | $1.25 |
| 168 | Turf Establishment – Nurse Crops (610.1606) | SY | 135 | $2.50 | $16.50 | $25.00 | $16.00 | $15.00 | $15.00 |
| 169 | Wildflower Seeding (610.17) | SY | 41,631 | $1.25 | $1.25 | $1.05 | $1.20 | $1.15 | $1.25 |
| 170 | Watering Vegetation (610.19) | 1,000 GALLONS | 5,073 | $9.00 | $0.01 | $8.75 | $9.00 | $8.50 | $8.50 |
| 171 | Mowing (610.21) | SY | 6,136 | $1.20 | $2.00 | $2.00 | $2.10 | $2.00 | $2.00 |
| 172 | (611.0161) | EACH | 69 | $1,075.00 | $1,100.00 | $950.00 | $1,025.00 | $995.00 | $1,100.00 |
| 173 | (611.0201) | EACH | 35 | $945.00 | $960.00 | $850.00 | $900.00 | $875.00 | $1,000.00 |
| 174 | (611.0211) | EACH | 28 | $675.00 | $690.00 | $600.00 | $645.00 | $625.00 | $900.00 |
| 175 | (611.0342) | EACH | 48 | $380.00 | $385.00 | $350.00 | $360.00 | $350.00 | $450.00 |
| 176 | (611.0351) | EACH | 45 | $675.00 | $680.00 | $600.00 | $645.00 | $625.00 | $700.00 |
| 177 | (611.0361) | EACH | 28 | $750.00 | $770.00 | $700.00 | $725.00 | $700.00 | $800.00 |
| 178 | (611.0412) | EACH | 309 | $135.00 | $140.00 | $75.00 | $130.00 | $125.00 | $125.00 |
| 179 | (611.0512) | EACH | 126 | $135.00 | $140.00 | $75.00 | $130.00 | $125.00 | $125.00 |
| 180 | Portable Drip Irrigation System (611.17) | EACH | 253 | $54.00 | $55.00 | $45.00 | $53.00 | $50.00 | $50.00 |
| 181 | Removal of Portable Drip Irrigation System (611.18) | EACH | 253 | $27.00 | $28.00 | $12.00 | $26.00 | $25.00 | $25.00 |
| 182 | (611.19010024) | 62 | $54.00 | $55.00 | $40.00 | $50.00 | $50.00 | $55.00 | |
| 183 | (611.19020024) | 56 | $54.00 | $55.00 | $40.00 | $50.00 | $50.00 | $55.00 | |
| 184 | (611.19030024) | 114 | $54.00 | $55.00 | $40.00 | $50.00 | $50.00 | $55.00 | |
| 185 | (611.19040024) | 303 | $5.40 | $5.50 | $4.00 | $5.00 | $5.00 | $0.50 | |
| 186 | (611.19050024) | 120 | $5.40 | $5.50 | $4.00 | $5.00 | $5.00 | $0.50 | |
| 187 | (613.04000001) | 75 | $70.00 | $150.00 | $140.00 | $300.00 | $150.00 | $140.00 | |
| 188 | (614.060104) | EACH | 1 | $300.00 | $500.00 | $900.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 189 | (614.060204) | EACH | 15 | $1,000.00 | $750.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,400.00 |
| 190 | (614.060304) | EACH | 1 | $2,750.00 | $1,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $1,800.00 |
| 191 | (614.060404) | EACH | 1 | $4,500.00 | $2,000.00 | $2,250.00 | $2,500.00 | $2,500.00 | $2,200.00 |
| 192 | (615.01010110) | 5 | $1,800.00 | $2,400.00 | $2,750.00 | $1,850.00 | $2,500.00 | $2,000.00 | |
| 193 | (615.08010005) | 7 | $2,500.00 | $3,000.00 | $3,000.00 | $2,400.00 | $3,000.00 | $2,800.00 | |
| 194 | (615.27020010) | 3 | $635.00 | $1,810.00 | $1,200.00 | $550.00 | $1,000.00 | $700.00 | |
| 195 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $572,000 | $978,600 | $1,250,000 | $1,453,490 | $1,240,000 | $1,800,000 |
| 196 | Type III Construction Barricades (619.04) | EACH | 40 | $125.00 | $150.00 | $130.00 | $350.00 | $300.00 | $200.00 |
| 197 | (619.080102) | LF | 110 | $1.20 | $25.00 | $23.50 | $2.00 | $2.00 | $1.50 |
| 198 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 11,580 | $3.00 | $10.75 | $5.25 | $4.25 | $4.00 | $4.00 |
| 199 | (619.100101) | LF | 119,126 | $0.30 | $0.33 | $0.29 | $0.34 | $0.50 | $0.32 |
| 200 | (619.110612) | WEEK | 24 | $835.00 | $1,000.00 | $750.00 | $1,500.00 | $500.00 | $1,000.00 |
| 201 | (619.130101) | EACH | 1 | $60,156 | $50,500 | $50,000 | $26,000 | $25,000 | $30,000 |
| 202 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 108 | $340.00 | $340.00 | $400.00 | $610.00 | $580.00 | $600.00 |
| 203 | (619.161401) | EACH | 1 | $13,135 | $3,400.00 | $8,000.00 | $4,900.00 | $4,632.00 | $5,500.00 |
| 204 | (619.161402) | EACH | 1 | $13,135 | $3,400.00 | $7,500.00 | $6,100.00 | $5,813.00 | $5,800.00 |
| 205 | (619.161403) | EACH | 1 | $5,185.00 | $3,400.00 | $7,500.00 | $6,100.00 | $5,813.00 | $5,800.00 |
| 206 | (619.161404) | EACH | 1 | $5,185.00 | $3,400.00 | $7,500.00 | $2,600.00 | $2,475.00 | $2,500.00 |
| 207 | (619.161405) | EACH | 1 | $5,185.00 | $3,400.00 | $7,500.00 | $4,900.00 | $4,632.00 | $4,600.00 |
| 208 | Stone Filling (Fine) (620.02) | CY | 80 | $161.00 | $320.00 | $325.00 | $310.00 | $300.00 | $185.00 |
| 209 | Stone Filling (Light) (620.03) | CY | 489 | $145.00 | $170.00 | $150.00 | $200.00 | $150.00 | $150.00 |
| 210 | Stone Filling (Medium) (620.04) | CY | 154 | $192.00 | $265.00 | $225.00 | $260.00 | $225.00 | $275.00 |
| 211 | Stone Filling (Heavy) (620.05) | CY | 684 | $168.00 | $260.00 | $175.00 | $265.00 | $175.00 | $165.00 |
| 212 | Bedding Material, Type 1 (620.0801) | CY | 123 | $126.00 | $100.00 | $250.00 | $210.00 | $200.00 | $60.00 |
| 213 | Bedding Material, Type 2 (620.0802) | CY | 148 | $80.00 | $100.00 | $150.00 | $140.00 | $130.00 | $100.00 |
| 214 | Cleaning Closed Drainage Systems (621.03) | LF | 1,008 | $2.40 | $8.00 | $7.00 | $8.00 | $14.00 | $8.00 |
| 215 | Cleaning Drainage Structures (621.04) | EACH | 23 | $290.00 | $235.00 | $275.00 | $250.00 | $600.00 | $215.00 |
| 216 | Survey Operations (625.01) | LS | 1 | $300,000 | $300,000 | $425,000 | $270,000 | $715,000 | $465,000 |
| 217 | Permanent Survey Markers (625.06) | EACH | 1 | $900.00 | $2,500.00 | $1,400.00 | $5,000.00 | $1,000.00 | $3,800.00 |
| 218 | (627.50140008) | 44,905 | $1.00 | $4.00 | $3.50 | $3.00 | $5.00 | $5.00 | |
| 219 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $5,000.00 | $4,000.00 | $300.00 | $10,000 | $10,000 | $12,000 |
| 220 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 24 | $2,900.00 | $2,500.00 | $3,200.00 | $2,500.00 | $5,000.00 | $3,700.00 |
| 221 | Office Technology and Supplies (637.34) | DOL | 3,300 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 222 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 223 | (637.41000115) | 24 | $90.00 | $30.00 | $150.00 | $60.00 | $50.00 | $100.00 | |
| 224 | (637.41000215) | 24 | $90.00 | $30.00 | $150.00 | $60.00 | $50.00 | $100.00 | |
| 225 | (637.41000315) | 24 | $90.00 | $30.00 | $150.00 | $60.00 | $50.00 | $100.00 | |
| 226 | (637.41000415) | 24 | $90.00 | $30.00 | $150.00 | $60.00 | $50.00 | $100.00 | |
| 227 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 69 | $60.00 | $40.00 | $39.00 | $58.00 | $36.75 | $75.00 |
| 228 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 2,014 | $38.00 | $45.00 | $43.00 | $37.00 | $41.00 | $50.00 |
| 229 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 1,683 | $35.00 | $40.00 | $38.00 | $34.00 | $36.50 | $44.00 |
| 230 | Overhead Sign Panels (645.61) | SF | 42 | $168.00 | $100.00 | $70.00 | $94.00 | $100.00 | $150.00 |
| 231 | Type A Sign Posts (645.81) | EACH | 292 | $184.00 | $205.00 | $200.00 | $179.00 | $187.00 | $225.00 |
| 232 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 22 | $1,113.00 | $1,320.00 | $1,250.00 | $1,080.00 | $1,212.00 | $1,300.00 |
| 233 | (645.830302) | EACH | 12 | $3,132.00 | $2,930.00 | $4,900.00 | $3,050.00 | $2,667.00 | $2,700.00 |
| 234 | (645.830402) | EACH | 2 | $3,564.00 | $4,080.00 | $6,000.00 | $3,500.00 | $3,707.00 | $3,800.00 |
| 235 | (645.830502) | EACH | 4 | $4,320.00 | $5,090.00 | $7,000.00 | $4,200.00 | $4,624.00 | $5,000.00 |
| 236 | (645.830602) | EACH | 10 | $5,292.00 | $6,710.00 | $8,500.00 | $5,150.00 | $6,098.00 | $6,500.00 |
| 237 | (645.830802) | EACH | 4 | $8,100.00 | $9,480.00 | $11,200 | $7,900.00 | $8,616.00 | $10,000 |
| 238 | Pole-Mounted Sign Support System (Band Mounting) (645.85) | EACH | 8 | $389.00 | $240.00 | $225.00 | $380.00 | $215.00 | $225.00 |
| 239 | Reference Marker Panel (646.21) | EACH | 47 | $36.00 | $40.00 | $38.00 | $35.00 | $37.00 | $40.00 |
| 240 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 96 | $12.00 | $16.00 | $15.00 | $12.00 | $15.00 | $16.00 |
| 241 | Steel Post, 2.0 lb/ft (646.32) | EACH | 59 | $67.00 | $94.00 | $90.00 | $65.00 | $86.00 | $100.00 |
| 242 | Removal of Single Span Overhead Sign Panel(s), Structure, and Foundations (647.21) | EACH | 2 | $5,000.00 | $6,000.00 | $10,000 | $19,500 | $20,000 | $20,000 |
| 243 | Remove and Dispose Overhead Sign Panel, Sign Panel Assembly (647.25) | EACH | 20 | $1,035.00 | $1,600.00 | $425.00 | $340.00 | $1,000.00 | $245.00 |
| 244 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 2 | $324.00 | $230.00 | $225.00 | $320.00 | $215.00 | $225.00 |
| 245 | Remove and Dispose Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.52) | EACH | 5 | $216.00 | $14.00 | $15.00 | $340.00 | $13.00 | $13.00 |
| 246 | Remove and Dispose Sign Panel, Sign Panel Assembly Size III (Over 100 Square Feet) (647.53) | EACH | 5 | $1,000.00 | $28.00 | $30.00 | $670.00 | $26.00 | $26.00 |
| 247 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 204 | $47.00 | $7.00 | $7.00 | $63.00 | $7.00 | $7.00 |
| 248 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 2 | $198.00 | $15.00 | $15.00 | $340.00 | $13.00 | $13.00 |
| 249 | Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65) | EACH | 25 | $450.00 | $29.00 | $30.00 | $320.00 | $26.00 | $26.00 |
| 250 | (647.83001002) | 28 | $18.50 | $5.50 | $5.50 | $17.00 | $5.00 | $5.00 | |
| 251 | Secondary Highway Audible Roadway Delineators (SHARDs) (649.21) | LF | 19,770 | $0.51 | $0.39 | $1.00 | $0.60 | $1.00 | $0.40 |
| 252 | Welded Frame & Reticuline Grate 22 (655.1122) | EACH | 105 | $1,923.00 | $1,500.00 | $1,700.00 | $1,400.00 | $1,500.00 | $2,500.00 |
| 253 | Manhole Frame & Cover (655.1202) | EACH | 9 | $982.00 | $1,400.00 | $1,000.00 | $900.00 | $1,000.00 | $2,500.00 |
| 254 | (662.60010004) | 25,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 255 | (670.0105) | EACH | 91 | $2,808.00 | $2,200.00 | $4,000.00 | $2,450.00 | $2,317.00 | $3,000.00 |
| 256 | (670.01112202) | 41 | $643.00 | $780.00 | $1,400.00 | $545.00 | $520.00 | $600.00 | |
| 257 | (670.03020008) | 2 | $2,511.00 | $970.00 | $465.00 | $760.00 | $725.00 | $800.00 | |
| 258 | (670.03070008) | 1 | $864.00 | $970.00 | $1,800.00 | $500.00 | $460.00 | $500.00 | |
| 259 | (670.10010004) | 50 | $4,158.00 | $4,270.00 | $5,500.00 | $2,700.00 | $2,575.00 | $3,000.00 | |
| 260 | (670.1130) | EACH | 41 | $3,540.00 | $4,170.00 | $4,600.00 | $3,700.00 | $3,540.00 | $4,000.00 |
| 261 | (670.1206) | EACH | 33 | $702.00 | $535.00 | $1,750.00 | $470.00 | $446.00 | $500.00 |
| 262 | (670.1210) | EACH | 4 | $1,230.00 | $655.00 | $2,000.00 | $600.00 | $570.00 | $650.00 |
| 263 | (670.2003) | LF | 950 | $29.15 | $24.20 | $28.00 | $21.00 | $20.00 | $20.00 |
| 264 | (670.2602) | LF | 15,910 | $12.05 | $7.00 | $8.00 | $6.55 | $7.00 | $7.00 |
| 265 | Pullboxes less than 5 cubic feet, inside volume (Lighting) (670.3001) | EACH | 31 | $1,620.00 | $1,890.00 | $3,200.00 | $1,750.00 | $1,660.00 | $1,700.00 |
| 266 | Cast Iron Junction Boxes (670.40) | EACH | 4 | $2,484.00 | $2,040.00 | $800.00 | $3,450.00 | $3,285.00 | $3,700.00 |
| 267 | (670.42010005) | 3 | $10,260 | $10,800 | $14,000 | $8,000.00 | $7,620.00 | $8,000.00 | |
| 268 | (670.7004) | LF | 32,587 | $3.25 | $2.30 | $1.65 | $3.20 | $3.00 | $3.15 |
| 269 | Ground Wire No. 6 AWG. (670.7501) | LF | 7,350 | $3.50 | $2.30 | $1.80 | $2.00 | $2.00 | $3.00 |
| 270 | Performance Concrete Quality Adjustment (670.99) | QUALITY UNIT | 1 | $16.33 | $16.33 | $16.33 | $16.33 | $16.33 | $16.33 |
| 271 | (680.05010007) | 5 | $21,600 | $21,900 | $20,000 | $21,800 | $20,897 | $25,000 | |
| 272 | (680.05040004) | 10 | $3,780.00 | $4,850.00 | $3,000.00 | $4,200.00 | $3,995.00 | $4,500.00 | |
| 273 | Pole Excavation and Concrete Foundation (680.5001) | CY | 74 | $3,186.00 | $3,400.00 | $2,750.00 | $3,000.00 | $2,830.00 | $3,200.00 |
| 274 | Concrete Base for Controller Cabinet (680.5002) | EACH | 5 | $3,672.00 | $3,880.00 | $3,000.00 | $4,000.00 | $3,770.00 | $4,500.00 |
| 275 | (680.510501) | EACH | 30 | $1,956.00 | $2,670.00 | $1,750.00 | $2,300.00 | $2,131.00 | $2,300.00 |
| 276 | (680.520105) | LF | 1,762 | $24.85 | $23.30 | $30.00 | $15.00 | $15.00 | $15.00 |
| 277 | (680.520106) | LF | 157 | $16.20 | $35.00 | $24.00 | $18.00 | $17.00 | $18.00 |
| 278 | (680.520108) | LF | 3,470 | $27.00 | $37.00 | $43.00 | $35.00 | $33.00 | $38.00 |
| 279 | (680.520110) | LF | 66 | $76.00 | $55.00 | $67.00 | $58.00 | $55.00 | $60.00 |
| 280 | (680.622026) | EACH | 1 | $13,500 | $13,360 | $12,000 | $11,900 | $11,371 | $13,000 |
| 281 | (680.622034) | EACH | 3 | $14,040 | $14,290 | $13,000 | $12,900 | $12,358 | $15,000 |
| 282 | (680.622036) | EACH | 2 | $14,688 | $15,220 | $14,000 | $13,700 | $13,126 | $15,000 |
| 283 | (680.622038) | EACH | 1 | $14,742 | $15,300 | $14,000 | $13,900 | $13,249 | $16,000 |
| 284 | (680.622042) | EACH | 1 | $15,500 | $16,000 | $15,000 | $14,900 | $14,214 | $16,000 |
| 285 | (680.622048) | EACH | 8 | $18,360 | $18,000 | $17,000 | $17,100 | $16,323 | $18,000 |
| 286 | (680.622050) | EACH | 4 | $21,384 | $19,100 | $20,000 | $15,200 | $14,557 | $17,000 |
| 287 | (680.622052) | EACH | 2 | $20,520 | $20,700 | $19,000 | $20,000 | $19,064 | $21,000 |
| 288 | (680.670802) | EACH | 14 | $1,512.00 | $2,600.00 | $1,850.00 | $1,625.00 | $1,555.00 | $1,900.00 |
| 289 | Riser Assembly, 1-1/ 2-inch Diameter (680.700604) | EACH | 5 | $778.00 | $1,300.00 | $1,700.00 | $935.00 | $890.00 | $1,000.00 |
| 290 | Shielded Lead-in Cable (680.71) | LF | 2,909 | $4.00 | $2.50 | $3.25 | $4.25 | $5.00 | $4.00 |
| 291 | (680.730514) | LF | 7,205 | $3.80 | $4.75 | $3.75 | $4.55 | $5.00 | $5.00 |
| 292 | (680.730518) | LF | 220 | $13.20 | $5.75 | $12.00 | $4.30 | $5.00 | $5.00 |
| 293 | (680.730714) | LF | 2,356 | $3.90 | $6.00 | $6.25 | $5.15 | $5.00 | $5.00 |
| 294 | (680.78040008) | 4 | $2,484.00 | $2,900.00 | $4,000.00 | $1,830.00 | $1,743.00 | $2,000.00 | |
| 295 | (680.79000105) | 1 | $11,880 | $3,900.00 | $7,000.00 | $14,600 | $13,915 | $18,000 | |
| 296 | (680.79000205) | 1 | $9,720.00 | $3,900.00 | $7,000.00 | $11,000 | $10,517 | $12,000 | |
| 297 | (680.79000305) | 1 | $12,960 | $3,900.00 | $7,000.00 | $12,800 | $12,185 | $14,000 | |
| 298 | (680.79000405) | 1 | $12,960 | $3,900.00 | $7,000.00 | $20,400 | $19,420 | $21,000 | |
| 299 | (680.79000505) | 1 | $12,960 | $3,900.00 | $7,000.00 | $20,600 | $19,600 | $21,000 | |
| 300 | (680.79000605) | 1 | $11,880 | $3,900.00 | $10,000 | $15,200 | $14,495 | $16,000 | |
| 301 | (680.80324515) | 5 | $4,104.00 | $3,400.00 | $3,500.00 | $2,800.00 | $2,650.00 | $3,000.00 | |
| 302 | (680.80324603) | 5 | $1,404.00 | $1,500.00 | $1,600.00 | $1,230.00 | $1,173.00 | $1,300.00 | |
| 303 | Install Ball/Arrow LED Traffic Signal Module (680.810308) | EACH | 174 | $73.45 | $110.00 | $350.00 | $24.00 | $23.00 | $24.00 |
| 304 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 174 | $346.00 | $160.00 | $200.00 | $257.00 | $245.00 | $275.00 |
| 305 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 54 | $594.00 | $370.00 | $325.00 | $570.00 | $543.00 | $600.00 |
| 306 | Install Pedestrian Signal Module (680.813104) | EACH | 44 | $189.00 | $250.00 | $175.00 | $24.00 | $23.00 | $24.00 |
| 307 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 44 | $550.00 | $250.00 | $225.00 | $355.00 | $340.00 | $400.00 |
| 308 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 9 | $648.00 | $305.00 | $375.00 | $520.00 | $500.00 | $500.00 |
| 309 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 13 | $562.00 | $300.00 | $350.00 | $460.00 | $440.00 | $500.00 |
| 310 | (680.8151) | EACH | 22 | $1,350.00 | $1,100.00 | $1,700.00 | $1,300.00 | $1,245.00 | $1,300.00 |
| 311 | (680.81990003) | 54 | $281.00 | $250.00 | $300.00 | $325.00 | $310.00 | $315.00 | |
| 312 | (680.8207) | EACH | 32 | $1,155.00 | $1,050.00 | $900.00 | $1,020.00 | $970.00 | $1,000.00 |
| 313 | (680.82254310) | 4 | $16,956 | $11,000 | $13,000 | $13,500 | $12,870 | $14,000 | |
| 314 | Meter Pan (680.9402) | EACH | 5 | $1,404.00 | $950.00 | $700.00 | $1,720.00 | $1,640.00 | $2,000.00 |
| 315 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 5 | $400.00 | $550.00 | $500.00 | $365.00 | $346.00 | $400.00 |
| 316 | (680.950206) | LF | 1,185 | $7.60 | $5.00 | $14.00 | $5.45 | $6.00 | $6.00 |
| 317 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $10.50 | $10.50 | $10.50 | $10.50 | $10.50 | $10.50 |
| 318 | (680.99020010) | 8 | $4,860.00 | $1,450.00 | $1,700.00 | $1,270.00 | $1,208.00 | $1,350.00 | |
| 319 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 57,149 | $0.42 | $0.43 | $0.39 | $0.41 | $0.60 | $0.45 |
| 320 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 47,453 | $0.42 | $0.43 | $0.39 | $0.41 | $0.60 | $0.45 |
| 321 | White Epoxy Reflectorized Pavement Letters - 15 mil Portable/Hand Application (685.2303) | EACH | 108 | $53.00 | $54.00 | $50.00 | $52.00 | $100.00 | $55.00 |
| 322 | White Epoxy Reflectorized Pavement Symbols - 15 mil Portable/Hand Application (685.2403) | EACH | 51 | $297.00 | $300.00 | $275.00 | $290.00 | $300.00 | $300.00 |
| 323 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 10,258 | $3.20 | $3.25 | $3.00 | $3.10 | $3.00 | $3.00 |
| 324 | (691.04000020) | 14,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 325 | Field Change Payment (FCP) (697.03) | DOL | 1,970,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 326 | Asphalt Price Adjustment (698.04) | DOL | 261,437 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 327 | Fuel Price Adjustment (698.05) | DOL | 71,563 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 328 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 329 | Mobilization (699.040001) | LS | 1 | $1,405,000 | $1,400,000 | $1,501,000 | $1,555,000 | $1,460,000 | $1,400,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of August 21, 2025. Compiled by Mirage Metrics.