NYSDOT contract D265520 bid tabulation

Route 36 from Cass St. to Webbs Crossing Rd. - Phase 1. Let by New York State DOT on August 21, 2025, Steuben, Region 06. 8 bids received; low bid $36,550,671 by Union Concrete & Construction Corp.

Owner
New York State DOT
Letting
21 AUG 2025
Pay items
329
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Union Concrete & Construction Corp$36,550,671Low
2Concrete Applied Technologies Corp/DBA:Catco$38,144,554+4.0%
3Cold Spring Construction Company$39,034,348+7.0%
4Sealand Contractors Corp.$40,451,000+11%
5Dalrymple Gravel & Contracting Co Inc$40,594,738+11%
6Ramsey Constructors Inc$40,982,349+12%
7Twin Tier Constructors Inc$42,773,000+17%
8Villager Construction Inc$46,415,500+27%
NYSDOT contract D265520: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Union Concrete & Construction Corp2. Concrete Applied Technologies Corp/DBA:Catco3. Cold Spring Construction Company4. Sealand Contractors Corp.5. Dalrymple Gravel & Contracting Co Inc6. Ramsey Constructors Inc
1Clearing and Grubbing (201.06)LS1$150,000$20,000$30,000$20,000$150,000$20,000
2Removal of Substructures (202.19)CY40$380.00$580.00$250.00$460.00$325.00$300.00
3Removal of Steel Supported Structural Slabs (with shear connectors) – Type B (202.2202)SF19,325$22.50$18.10$32.00$24.00$23.00$20.00
4Unclassified Excavation and Disposal (203.02)CY64,583$22.50$23.00$20.00$31.00$20.00$22.00
5Embankment In Place (203.03)CY57,847$10.25$18.00$12.00$17.50$13.00$10.00
6Select Granular Fill (203.07)CY5,780$96.00$55.00$34.00$72.00$80.00$50.00
7Select Granular Subgrade (203.20)CY93$70.00$100.00$100.00$175.00$105.00$120.00
8Select Structural Fill (203.21)CY793$79.00$55.00$110.00$90.00$105.00$80.00
9Structure Excavation (206.01)CY2,440$19.00$23.00$52.00$36.00$30.00$25.00
10Trench and Culvert Excavation (206.0201)CY18,409$27.00$33.00$0.01$36.00$50.00$55.00
11Conduit Excavation and Backfill including Surface Restoration (206.03)LF9,799$40.00$32.00$28.00$27.25$26.00$28.00
12Test Pit Excavation (206.05)EACH61$1,000.00$1,000.00$2,100.00$1,420.00$800.00$1,200.00
13Geotextile Drainage (207.22)SY4,609$3.00$2.00$2.25$2.00$4.00$2.00
14Geotextile Stabilization (207.24)SY556$2.00$8.00$6.25$12.00$4.00$3.00
15Prefabricated Composite Structural Drain (207.26)SY380$30.00$16.00$23.00$25.00$30.00$15.00
16 (208.01030022)1,454$111.00$145.00$175.00$140.00$75.00$75.00
17Mulch – Temporary (209.100101)SY86,561$0.75$0.95$0.95$1.00$0.95$1.00
18Seed and Mulch – Temporary (209.1003)SY86,561$0.75$1.25$0.95$1.32$1.25$1.25
19 (209.11010024)150$210.00$320.00$225.00$400.00$500.00$180.00
20Check Dam, Prefabricated – Temporary (209.1105)LF532$19.50$121.00$29.00$20.00$50.00$235.00
21Check Dam, (Ditch Bottom Width >3′ to 6′), Stone – Permanent (209.110602)EACH30$358.00$1,220.00$400.00$1,800.00$750.00$700.00
22Silt Fence - Temporary (209.13)LF26,499$1.35$4.00$6.50$4.50$5.00$5.00
23Turbidity Curtain – Temporary (209.1501)LF180$35.00$60.00$18.00$40.00$50.00$32.00
24Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301)SY14,227$2.25$6.00$5.75$6.30$6.00$6.00
25Stabilized Construction Access (209.22)SY800$25.00$36.00$20.00$80.00$30.00$22.00
26 (304.04000004)5,546$8.50$2.40$2.40$4.00$5.00$4.00
27Subbase Course, Optional Type (304.15)CY31,177$82.00$57.00$57.00$75.00$60.00$56.00
28 (404.0179)TON3,285$120.00$145.00$120.00$112.00$120.00$125.00
29 (404.1262)TON11,181$130.00$115.00$125.00$124.00$120.00$150.00
30 (404.2569)TON16,913$115.00$106.00$105.00$110.00$110.00$110.00
31 (404.2589)TON1,936$149.00$140.00$115.00$133.00$110.00$115.00
32 (404.3769)TON18,812$110.00$101.00$100.00$108.00$110.00$105.00
33Diluted Tack Coat (407.0102)GAL25,659$8.00$5.00$6.50$7.30$6.00$7.00
34Asphalt Pavement Joint Adhesive (418.7603)LF51,267$0.20$0.50$0.85$0.95$0.50$0.90
35Production Cold Milling of Bituminous Concrete (490.10)SY7,269$1.85$8.00$9.25$8.00$4.00$8.00
36Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY100$30.00$40.00$25.00$100.00$75.00$30.00
37 (502.65960005)22,906$1.00$1.40$0.85$1.75$2.00$1.55
38PCC Foundation for Pavement, PEM Concrete (503.1013)CY8$2,625.00$1,600.00$2,550.00$1,500.00$2,500.00$1,000.00
39Micropiles (Contractor Designed) (551.30)EACH36$8,000.00$9,695.00$7,750.00$7,400.00$7,000.00$12,000
40 (551.33)864$53.00$38.00$50.00$52.00$50.00$50.00
41Furnishing Equipment for Installing Micropiles (551.34)LS1$50,000$44,000$50,000$40,000$90,000$200,000
42Static Pile Compressive Load Test (551.35)EACH2$38,000$19,800$40,000$37,000$35,000$35,000
43Temporary Steel Sheeting (552.13)SF340$475.00$500.00$55.00$40.00$323.00$400.00
44Shields and Shoring (552.17)SF110,577$0.10$0.01$1.00$0.50$0.50$0.45
45 (553.030001)EACH1$22,000$1.00$15.00$5,000.00$22,500$20,000
46 (553.030002)EACH1$22,000$1.00$15.00$5,000.00$22,500$20,000
47Footing Concrete, Performance (555.0011)CY158$1,220.00$1,800.00$1,200.00$1,600.00$1,500.00$800.00
48Concrete for Structures, Performance (555.0021)CY406$1,785.00$3,200.00$2,200.00$3,000.00$3,500.00$2,800.00
49 (555.80020001)295$50.00$216.00$225.00$150.00$250.00$140.00
50Performance Concrete Quality Adjustment – Footing Concrete (555.9901)QUALITY UNIT1$6.50$6.50$6.50$6.50$6.50$6.50
51Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$10.00$10.00$10.00$10.00$10.00$10.00
52Uncoated Bar Reinforcement for Concrete Structures (556.0201)LB1,445$3.50$3.40$4.25$2.95$5.00$2.75
53Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB42,367$2.75$3.00$2.40$3.00$5.00$3.00
54Stud Shear Connectors for Bridges (556.03)EACH3,945$5.50$5.20$18.00$4.20$7.00$6.00
55 (557.01040018)2,190$595.00$725.00$700.00$670.00$820.00$750.00
56 (557.1012)SY206$650.00$650.00$750.00$550.00$590.00$1,100.00
57 (557.1219)SY386$152.00$1.00$60.00$145.00$225.00$425.00
58 (557.26000016)1,590$34.50$29.00$40.00$32.00$30.00$26.00
59Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29)SY2,396$0.01$0.10$0.01$1.00$0.01$0.01
60 (557.60010004)1,479$33.00$26.10$24.00$22.00$21.00$24.00
61Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901)QUALITY UNIT1$14.01$14.01$14.01$14.01$14.01$14.01
62Longitudinal Sawcut Grooving of Structural Slab Surface (558.02)SY2,396$9.50$8.10$8.25$7.00$6.50$8.00
63Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01)SF26,671$1.00$1.20$0.60$1.05$1.00$0.65
64Protective Sealing of New Structural Concrete (559.02)SF1,320$2.00$3.50$2.75$5.50$3.00$2.00
65Protective Sealing of Existing Structural Concrete and Existing Bridge Decks (559.03)SF28,007$1.05$1.85$1.10$2.30$1.00$1.00
66Protective Sealing of Concrete with Coating Type Protective Sealer (559.04)SQUAREFOOT15,714$1.25$2.30$3.00$3.10$3.00$5.00
67 (564.100001)LB1,020$22.00$31.10$45.00$44.00$35.00$40.00
68 (564.100002)LB1,785$29.00$42.10$22.00$43.00$35.00$40.00
69 (564.100003)LB707$25.00$35.15$22.00$41.00$35.00$40.00
70 (564.100004)LB3,157$25.00$35.70$35.00$34.00$35.00$32.00
71 (564.80010016)1$600,000$460,000$750,000$320,000$850,000$600,000
72Type M.R. Expansion Bearing (0 to 225 k) (565.1521)EACH20$4,400.00$4,800.00$6,000.00$4,500.00$8,000.00$6,500.00
73Type M.R. Expansion Bearing (451 to 675 k) (565.1523)EACH10$7,670.00$6,700.00$6,500.00$7,400.00$10,000$9,000.00
74Type M.R. Fixed Bearing (451 to 675 k) (565.1723)EACH10$7,670.00$8,200.00$9,000.00$7,400.00$12,000$9,000.00
75Modular Expansion Joint System - Two Cell (566.02)LF59$2,460.00$2,560.00$4,500.00$3,400.00$4,000.00$3,800.00
76 (567.51000016)149$112.00$150.00$78.00$205.00$50.00$50.00
77Armorless Bridge Joint (567.60)LF59$245.00$420.00$235.00$510.00$300.00$300.00
78Bridge Joint Seal (567.63)LF191$333.00$330.00$20.00$190.00$100.00$100.00
79Transition Bridge Railing (568.70)LF175$182.00$212.00$175.00$184.00$200.00$200.00
80Pedestrian and Bicycle Railing (Five-Rail) (568.84)LF514$182.00$195.00$190.00$280.00$200.00$200.00
81Single Slope (Half-Section) Concrete Bridge Barrier (569.04)LF932$340.00$590.00$400.00$320.00$440.00$300.00
82 (569.10010011)101$1,065.00$1,950.00$1,900.00$1,400.00$2,000.00$1,600.00
83Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99)QUALITY UNIT1$11.57$11.57$11.57$11.57$11.57$11.57
84Lead-Exposure Control Plan (570.01)LS1$5,900.00$6,000.00$5,500.00$5,500.00$5,500.00$15,000
85Medical Testing (570.02)DOL15,000$1.00$1.00$1.00$1.00$1.00$1.00
86Personal-Exposure-Monitoring Sample Analysis (570.03)DOL11,000$1.00$1.00$1.00$1.00$1.00$1.00
87Decontamination Facilities (570.04)CALENDAR WEEK3$1,080.00$1,100.00$1,000.00$1,000.00$1,000.00$1,000.00
88 (570.090001)LS1$540.00$550.00$500.00$500.00$500.00$500.00
89 (570.090002)LS1$540.00$550.00$500.00$500.00$500.00$500.00
90 (570.100001)LS1$865.00$880.00$800.00$800.00$800.00$800.00
91 (570.100002)LS1$865.00$880.00$800.00$800.00$800.00$800.00
92 (570.150001)LS1$240,000$242,000$250,000$275,000$220,000$300,000
93 (570.150002)LS1$240,000$242,000$250,000$275,000$220,000$300,000
94Disposal of Hazardous Paint Removal Waste Containing Lead (571.03)LB39,830$0.22$0.22$0.20$0.25$0.20$0.20
95 (572.00020101)LS1$30,000$1.00$0.01$115,000$0.01$1,000.00
96 (572.020001)LS1$5,000.00$5,500.00$3,000.00$8,000.00$10,000$6,300.00
97 (572.020002)LS1$3,500.00$5,500.00$3,000.00$10,000$10,000$12,000
98 (573.010001)LS1$575,000$570,000$550,000$540,000$516,000$750,000
99 (573.010002)LS1$575,000$570,000$550,000$540,000$516,000$750,000
100Scuppers (Type A) (576.01)EACH8$4,500.00$4,050.00$4,500.00$4,000.00$5,000.00$4,500.00
101Removal of Structural Concrete (580.01)CY315$2,385.00$2,500.00$2,200.00$3,600.00$3,000.00$2,800.00
102Removal of Concrete Approach Slab (580.04)SF3,010$10.50$9.00$7.00$7.00$6.00$10.00
103Removal and Replacement of Structural Concrete (582.0051)CY5$8,000.00$9,000.00$18,000$23,500$10,000$6,500.00
104Removal of Structural Concrete- Replacement with Vertical and Overhead Patching Material (582.0061)SF240$195.00$400.00$220.00$650.00$500.00$130.00
105 (582.99)1$28.70$28.70$28.70$28.70$28.70$28.70
106 (585.01)EACH10$5,500.00$2,750.00$4,000.00$2,700.00$15,000$5,000.00
107 (585.02)EACH10$6,800.00$14,000$8,000.00$6,400.00$15,000$9,000.00
108 (585.03)EACH10$5,600.00$2,750.00$6,000.00$2,700.00$15,000$6,000.00
109 (585.04)EACH10$6,800.00$14,000$10,000$6,400.00$15,000$9,000.00
110Drilling and Grouting Bolts or Reinforcing Bars (586.0201)EACH813$50.00$52.00$26.00$110.00$40.00$105.00
111 (589.010001)LB15,178$0.90$7.70$2.00$7.75$3.00$7.00
112 (589.520001)EACH20$1,200.00$1,100.00$750.00$1,100.00$2,000.00$1,500.00
113 (589.520002)EACH20$1,200.00$1,100.00$750.00$1,100.00$2,000.00$1,500.00
114 (594.01000004)2,652$70.00$99.00$94.00$94.00$90.00$115.00
115 (595.50000018)750$11.00$7.40$5.00$9.00$5.00$7.00
116 (595.98200018)320$18.75$56.00$84.00$35.00$25.00$55.00
117 (603.541216)EACH1$610.00$1,360.00$1,000.00$1,000.00$700.00$650.00
118 (603.541316)EACH32$750.00$1,460.00$1,100.00$1,100.00$800.00$900.00
119 (603.541614)EACH8$1,400.00$2,420.00$2,000.00$1,800.00$1,400.00$2,500.00
120 (603.541912)EACH4$2,700.00$35,200$3,500.00$3,200.00$2,500.00$4,500.00
121 (603.542310)EACH4$6,000.00$6,950.00$6,500.00$6,700.00$5,700.00$12,000
122 (603.9815)LF24$23.00$42.00$135.00$125.00$80.00$18.00
123 (603.9818)LF5,861$20.00$41.40$125.00$52.00$80.00$75.00
124 (603.9824)LF712$30.00$58.00$145.00$95.00$90.00$110.00
125 (603.9836)LF377$58.00$95.00$245.00$140.00$110.00$125.00
126 (603.9848)LF819$96.00$122.00$305.00$175.00$150.00$145.00
127 (603.9860)LF328$138.00$165.00$285.00$260.00$190.00$250.00
128 (604.302122)LF654$475.00$600.00$900.00$900.00$725.00$900.00
129 (604.4048)LF34$415.00$800.00$700.00$1,100.00$500.00$1,200.00
130 (604.4072)LF45$748.00$1,000.00$1,050.00$1,400.00$800.00$1,300.00
131Underdrain Filter, Type I (605.0901)CY873$65.00$60.00$125.00$125.00$100.00$48.00
132Underdrain Filter, Type II (605.1001)CY2,066$71.00$55.00$140.00$72.00$100.00$55.00
133 (605.1701)LF27,677$2.00$4.00$6.50$9.00$10.00$15.00
134 (605.1702)LF3,358$3.15$8.00$3.00$10.00$25.00$9.00
135Box Beam Guide Railing (606.10)LF8,356$48.00$48.00$46.00$44.00$44.00$52.00
136Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002)LF201$56.00$56.00$54.00$56.00$51.00$62.00
137Box Beam Median Barrier (606.11)LF44$82.00$85.00$79.00$63.00$75.00$90.00
138Box Beam End Piece (606.120101)EACH9$635.00$630.00$600.00$790.00$575.00$700.00
139Box Beam Guide Railing End Assembly Type I (606.120102)EACH14$4,000.00$4,100.00$3,920.00$4,000.00$3,730.00$4,000.00
140Box Beam End Assembly Type III (606.1203)EACH4$6,700.00$6,800.00$6,450.00$6,050.00$6,160.00$7,300.00
141Single-Slope Concrete Half Section Barrier (Cast-in-Place) (606.3063)LF115$430.00$590.00$600.00$700.00$200.00$500.00
142Removing and Storing Box Beam Guide Railing (606.63)LF6,856$4.25$8.80$8.25$4.00$8.00$9.00
143Removing and Storing Box Beam Median Barrier (606.64)LF216$4.35$8.80$8.25$4.00$8.00$9.00
144Removing and Storing Box Beam Guide Railing End Assembly (606.6920)EACH40$35.00$105.00$100.00$500.00$95.00$100.00
145Removing and Storing Box Beam Median Barrier End Assembly-Type C (606.6932)EACH1$150.00$585.00$550.00$500.00$535.00$600.00
146Removing and Disposing Cable Guide Railing (606.70)LF3,068$2.35$4.00$4.00$3.50$3.75$7.00
147Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier (606.79)EACH4$90.00$585.00$550.00$500.00$535.00$900.00
148Transition Between Box Beam Guide Rail and Single Slope Half Section Concrete Barrier (One or Two Way Operation) (606.8803)EACH4$12,600$16,760$14,500$14,000$20,000$12,000
149 (607.41010010)2,067$5.25$4.00$5.00$6.00$8.00$3.00
150 (607.96000008)208$5.50$18.00$17.25$17.25$10.00$5.00
151Concrete Sidewalks and Driveways (608.0101)CY75$1,600.00$1,700.00$2,500.00$2,000.00$1,400.00$1,600.00
152 (608.01020005)83$2,000.00$2,600.00$3,250.00$2,000.00$1,800.00$3,000.00
153Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON1,365$200.00$500.00$375.00$200.00$250.00$225.00
154 (608.21000003)73$630.00$500.00$425.00$670.00$405.00$700.00
155Stone Curb – Near Vertical Face (NVF) (609.0212)LF18,679$90.00$70.00$65.00$69.00$65.00$80.00
156 (609.0407)LF939$210.00$75.00$90.00$95.00$85.00$100.00
157Mycorrhizal Fungi (610.0701)LB318$54.00$50.00$47.00$52.00$50.00$55.00
158Moisture Retention Additive (610.08)LB476$27.00$25.00$23.50$26.00$25.00$30.00
159Compost (610.10)CY5,128$67.00$65.00$67.00$68.00$65.00$69.00
160Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101)CY94$108.00$110.00$105.00$105.00$100.00$100.00
161Permeable Weed Control Landscape Fabric (610.1201)SY2,059$1.95$11.00$8.75$10.50$10.00$13.00
162Topsoil - Roadside (610.1402)CY10,154$62.00$50.00$125.00$88.00$100.00$48.00
163 (610.15060108)41,631$0.65$1.10$1.05$1.05$1.00$1.50
164 (610.15120108)354$11.50$5.50$5.25$5.25$5.00$5.00
165 (610.15120208)22,695$1.20$1.65$1.50$1.60$1.50$1.50
166Turf Establishment - Roadside (610.1601)SY29,291$1.15$1.25$1.05$1.20$1.15$1.25
167Turf Establishment -Lawns (610.1602)SY19,064$1.10$1.25$1.05$1.20$1.15$1.25
168Turf Establishment – Nurse Crops (610.1606)SY135$2.50$16.50$25.00$16.00$15.00$15.00
169Wildflower Seeding (610.17)SY41,631$1.25$1.25$1.05$1.20$1.15$1.25
170Watering Vegetation (610.19)1,000 GALLONS5,073$9.00$0.01$8.75$9.00$8.50$8.50
171Mowing (610.21)SY6,136$1.20$2.00$2.00$2.10$2.00$2.00
172 (611.0161)EACH69$1,075.00$1,100.00$950.00$1,025.00$995.00$1,100.00
173 (611.0201)EACH35$945.00$960.00$850.00$900.00$875.00$1,000.00
174 (611.0211)EACH28$675.00$690.00$600.00$645.00$625.00$900.00
175 (611.0342)EACH48$380.00$385.00$350.00$360.00$350.00$450.00
176 (611.0351)EACH45$675.00$680.00$600.00$645.00$625.00$700.00
177 (611.0361)EACH28$750.00$770.00$700.00$725.00$700.00$800.00
178 (611.0412)EACH309$135.00$140.00$75.00$130.00$125.00$125.00
179 (611.0512)EACH126$135.00$140.00$75.00$130.00$125.00$125.00
180Portable Drip Irrigation System (611.17)EACH253$54.00$55.00$45.00$53.00$50.00$50.00
181Removal of Portable Drip Irrigation System (611.18)EACH253$27.00$28.00$12.00$26.00$25.00$25.00
182 (611.19010024)62$54.00$55.00$40.00$50.00$50.00$55.00
183 (611.19020024)56$54.00$55.00$40.00$50.00$50.00$55.00
184 (611.19030024)114$54.00$55.00$40.00$50.00$50.00$55.00
185 (611.19040024)303$5.40$5.50$4.00$5.00$5.00$0.50
186 (611.19050024)120$5.40$5.50$4.00$5.00$5.00$0.50
187 (613.04000001)75$70.00$150.00$140.00$300.00$150.00$140.00
188 (614.060104)EACH1$300.00$500.00$900.00$1,000.00$1,000.00$1,000.00
189 (614.060204)EACH15$1,000.00$750.00$1,500.00$1,500.00$1,500.00$1,400.00
190 (614.060304)EACH1$2,750.00$1,000.00$2,000.00$2,000.00$2,000.00$1,800.00
191 (614.060404)EACH1$4,500.00$2,000.00$2,250.00$2,500.00$2,500.00$2,200.00
192 (615.01010110)5$1,800.00$2,400.00$2,750.00$1,850.00$2,500.00$2,000.00
193 (615.08010005)7$2,500.00$3,000.00$3,000.00$2,400.00$3,000.00$2,800.00
194 (615.27020010)3$635.00$1,810.00$1,200.00$550.00$1,000.00$700.00
195Basic Work Zone Traffic Control (619.01)LS1$572,000$978,600$1,250,000$1,453,490$1,240,000$1,800,000
196Type III Construction Barricades (619.04)EACH40$125.00$150.00$130.00$350.00$300.00$200.00
197 (619.080102)LF110$1.20$25.00$23.50$2.00$2.00$1.50
198Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF11,580$3.00$10.75$5.25$4.25$4.00$4.00
199 (619.100101)LF119,126$0.30$0.33$0.29$0.34$0.50$0.32
200 (619.110612)WEEK24$835.00$1,000.00$750.00$1,500.00$500.00$1,000.00
201 (619.130101)EACH1$60,156$50,500$50,000$26,000$25,000$30,000
202Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613)MONTH108$340.00$340.00$400.00$610.00$580.00$600.00
203 (619.161401)EACH1$13,135$3,400.00$8,000.00$4,900.00$4,632.00$5,500.00
204 (619.161402)EACH1$13,135$3,400.00$7,500.00$6,100.00$5,813.00$5,800.00
205 (619.161403)EACH1$5,185.00$3,400.00$7,500.00$6,100.00$5,813.00$5,800.00
206 (619.161404)EACH1$5,185.00$3,400.00$7,500.00$2,600.00$2,475.00$2,500.00
207 (619.161405)EACH1$5,185.00$3,400.00$7,500.00$4,900.00$4,632.00$4,600.00
208Stone Filling (Fine) (620.02)CY80$161.00$320.00$325.00$310.00$300.00$185.00
209Stone Filling (Light) (620.03)CY489$145.00$170.00$150.00$200.00$150.00$150.00
210Stone Filling (Medium) (620.04)CY154$192.00$265.00$225.00$260.00$225.00$275.00
211Stone Filling (Heavy) (620.05)CY684$168.00$260.00$175.00$265.00$175.00$165.00
212Bedding Material, Type 1 (620.0801)CY123$126.00$100.00$250.00$210.00$200.00$60.00
213Bedding Material, Type 2 (620.0802)CY148$80.00$100.00$150.00$140.00$130.00$100.00
214Cleaning Closed Drainage Systems (621.03)LF1,008$2.40$8.00$7.00$8.00$14.00$8.00
215Cleaning Drainage Structures (621.04)EACH23$290.00$235.00$275.00$250.00$600.00$215.00
216Survey Operations (625.01)LS1$300,000$300,000$425,000$270,000$715,000$465,000
217Permanent Survey Markers (625.06)EACH1$900.00$2,500.00$1,400.00$5,000.00$1,000.00$3,800.00
218 (627.50140008)44,905$1.00$4.00$3.50$3.00$5.00$5.00
219Concrete Cylinder Curing Equipment (637.04)EACH1$5,000.00$4,000.00$300.00$10,000$10,000$12,000
220Engineer’s Field Office – Type 3 (637.13)MONTH24$2,900.00$2,500.00$3,200.00$2,500.00$5,000.00$3,700.00
221Office Technology and Supplies (637.34)DOL3,300$1.00$1.00$1.00$1.00$1.00$1.00
222Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00$1.00$1.00
223 (637.41000115)24$90.00$30.00$150.00$60.00$50.00$100.00
224 (637.41000215)24$90.00$30.00$150.00$60.00$50.00$100.00
225 (637.41000315)24$90.00$30.00$150.00$60.00$50.00$100.00
226 (637.41000415)24$90.00$30.00$150.00$60.00$50.00$100.00
227Ground-Mounted Sign Panels without Z-bars (645.5101)SF69$60.00$40.00$39.00$58.00$36.75$75.00
228Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF2,014$38.00$45.00$43.00$37.00$41.00$50.00
229Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103)SF1,683$35.00$40.00$38.00$34.00$36.50$44.00
230Overhead Sign Panels (645.61)SF42$168.00$100.00$70.00$94.00$100.00$150.00
231Type A Sign Posts (645.81)EACH292$184.00$205.00$200.00$179.00$187.00$225.00
232High-Capacity Type A Sign Posts with Soil Plates Only (645.8106)EACH22$1,113.00$1,320.00$1,250.00$1,080.00$1,212.00$1,300.00
233 (645.830302)EACH12$3,132.00$2,930.00$4,900.00$3,050.00$2,667.00$2,700.00
234 (645.830402)EACH2$3,564.00$4,080.00$6,000.00$3,500.00$3,707.00$3,800.00
235 (645.830502)EACH4$4,320.00$5,090.00$7,000.00$4,200.00$4,624.00$5,000.00
236 (645.830602)EACH10$5,292.00$6,710.00$8,500.00$5,150.00$6,098.00$6,500.00
237 (645.830802)EACH4$8,100.00$9,480.00$11,200$7,900.00$8,616.00$10,000
238Pole-Mounted Sign Support System (Band Mounting) (645.85)EACH8$389.00$240.00$225.00$380.00$215.00$225.00
239Reference Marker Panel (646.21)EACH47$36.00$40.00$38.00$35.00$37.00$40.00
240Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22)EACH96$12.00$16.00$15.00$12.00$15.00$16.00
241Steel Post, 2.0 lb/ft (646.32)EACH59$67.00$94.00$90.00$65.00$86.00$100.00
242Removal of Single Span Overhead Sign Panel(s), Structure, and Foundations (647.21)EACH2$5,000.00$6,000.00$10,000$19,500$20,000$20,000
243Remove and Dispose Overhead Sign Panel, Sign Panel Assembly (647.25)EACH20$1,035.00$1,600.00$425.00$340.00$1,000.00$245.00
244Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH2$324.00$230.00$225.00$320.00$215.00$225.00
245Remove and Dispose Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.52)EACH5$216.00$14.00$15.00$340.00$13.00$13.00
246Remove and Dispose Sign Panel, Sign Panel Assembly Size III (Over 100 Square Feet) (647.53)EACH5$1,000.00$28.00$30.00$670.00$26.00$26.00
247Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH204$47.00$7.00$7.00$63.00$7.00$7.00
248Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62)EACH2$198.00$15.00$15.00$340.00$13.00$13.00
249Remove and Dispose Type B Ground Mounted Sign Support and Foundation (647.65)EACH25$450.00$29.00$30.00$320.00$26.00$26.00
250 (647.83001002)28$18.50$5.50$5.50$17.00$5.00$5.00
251Secondary Highway Audible Roadway Delineators (SHARDs) (649.21)LF19,770$0.51$0.39$1.00$0.60$1.00$0.40
252Welded Frame & Reticuline Grate 22 (655.1122)EACH105$1,923.00$1,500.00$1,700.00$1,400.00$1,500.00$2,500.00
253Manhole Frame & Cover (655.1202)EACH9$982.00$1,400.00$1,000.00$900.00$1,000.00$2,500.00
254 (662.60010004)25,000$1.00$1.00$1.00$1.00$1.00$1.00
255 (670.0105)EACH91$2,808.00$2,200.00$4,000.00$2,450.00$2,317.00$3,000.00
256 (670.01112202)41$643.00$780.00$1,400.00$545.00$520.00$600.00
257 (670.03020008)2$2,511.00$970.00$465.00$760.00$725.00$800.00
258 (670.03070008)1$864.00$970.00$1,800.00$500.00$460.00$500.00
259 (670.10010004)50$4,158.00$4,270.00$5,500.00$2,700.00$2,575.00$3,000.00
260 (670.1130)EACH41$3,540.00$4,170.00$4,600.00$3,700.00$3,540.00$4,000.00
261 (670.1206)EACH33$702.00$535.00$1,750.00$470.00$446.00$500.00
262 (670.1210)EACH4$1,230.00$655.00$2,000.00$600.00$570.00$650.00
263 (670.2003)LF950$29.15$24.20$28.00$21.00$20.00$20.00
264 (670.2602)LF15,910$12.05$7.00$8.00$6.55$7.00$7.00
265Pullboxes less than 5 cubic feet, inside volume (Lighting) (670.3001)EACH31$1,620.00$1,890.00$3,200.00$1,750.00$1,660.00$1,700.00
266Cast Iron Junction Boxes (670.40)EACH4$2,484.00$2,040.00$800.00$3,450.00$3,285.00$3,700.00
267 (670.42010005)3$10,260$10,800$14,000$8,000.00$7,620.00$8,000.00
268 (670.7004)LF32,587$3.25$2.30$1.65$3.20$3.00$3.15
269Ground Wire No. 6 AWG. (670.7501)LF7,350$3.50$2.30$1.80$2.00$2.00$3.00
270Performance Concrete Quality Adjustment (670.99)QUALITY UNIT1$16.33$16.33$16.33$16.33$16.33$16.33
271 (680.05010007)5$21,600$21,900$20,000$21,800$20,897$25,000
272 (680.05040004)10$3,780.00$4,850.00$3,000.00$4,200.00$3,995.00$4,500.00
273Pole Excavation and Concrete Foundation (680.5001)CY74$3,186.00$3,400.00$2,750.00$3,000.00$2,830.00$3,200.00
274Concrete Base for Controller Cabinet (680.5002)EACH5$3,672.00$3,880.00$3,000.00$4,000.00$3,770.00$4,500.00
275 (680.510501)EACH30$1,956.00$2,670.00$1,750.00$2,300.00$2,131.00$2,300.00
276 (680.520105)LF1,762$24.85$23.30$30.00$15.00$15.00$15.00
277 (680.520106)LF157$16.20$35.00$24.00$18.00$17.00$18.00
278 (680.520108)LF3,470$27.00$37.00$43.00$35.00$33.00$38.00
279 (680.520110)LF66$76.00$55.00$67.00$58.00$55.00$60.00
280 (680.622026)EACH1$13,500$13,360$12,000$11,900$11,371$13,000
281 (680.622034)EACH3$14,040$14,290$13,000$12,900$12,358$15,000
282 (680.622036)EACH2$14,688$15,220$14,000$13,700$13,126$15,000
283 (680.622038)EACH1$14,742$15,300$14,000$13,900$13,249$16,000
284 (680.622042)EACH1$15,500$16,000$15,000$14,900$14,214$16,000
285 (680.622048)EACH8$18,360$18,000$17,000$17,100$16,323$18,000
286 (680.622050)EACH4$21,384$19,100$20,000$15,200$14,557$17,000
287 (680.622052)EACH2$20,520$20,700$19,000$20,000$19,064$21,000
288 (680.670802)EACH14$1,512.00$2,600.00$1,850.00$1,625.00$1,555.00$1,900.00
289Riser Assembly, 1-1/ 2-inch Diameter (680.700604)EACH5$778.00$1,300.00$1,700.00$935.00$890.00$1,000.00
290Shielded Lead-in Cable (680.71)LF2,909$4.00$2.50$3.25$4.25$5.00$4.00
291 (680.730514)LF7,205$3.80$4.75$3.75$4.55$5.00$5.00
292 (680.730518)LF220$13.20$5.75$12.00$4.30$5.00$5.00
293 (680.730714)LF2,356$3.90$6.00$6.25$5.15$5.00$5.00
294 (680.78040008)4$2,484.00$2,900.00$4,000.00$1,830.00$1,743.00$2,000.00
295 (680.79000105)1$11,880$3,900.00$7,000.00$14,600$13,915$18,000
296 (680.79000205)1$9,720.00$3,900.00$7,000.00$11,000$10,517$12,000
297 (680.79000305)1$12,960$3,900.00$7,000.00$12,800$12,185$14,000
298 (680.79000405)1$12,960$3,900.00$7,000.00$20,400$19,420$21,000
299 (680.79000505)1$12,960$3,900.00$7,000.00$20,600$19,600$21,000
300 (680.79000605)1$11,880$3,900.00$10,000$15,200$14,495$16,000
301 (680.80324515)5$4,104.00$3,400.00$3,500.00$2,800.00$2,650.00$3,000.00
302 (680.80324603)5$1,404.00$1,500.00$1,600.00$1,230.00$1,173.00$1,300.00
303Install Ball/Arrow LED Traffic Signal Module (680.810308)EACH174$73.45$110.00$350.00$24.00$23.00$24.00
304Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601)EACH174$346.00$160.00$200.00$257.00$245.00$275.00
305Traffic Signal Bracket Assembly - 1 Way (680.8111)EACH54$594.00$370.00$325.00$570.00$543.00$600.00
306Install Pedestrian Signal Module (680.813104)EACH44$189.00$250.00$175.00$24.00$23.00$24.00
307Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106)EACH44$550.00$250.00$225.00$355.00$340.00$400.00
308Pedestrian Signal Bracket Mount Assembly (680.8141)EACH9$648.00$305.00$375.00$520.00$500.00$500.00
309Pedestrian Signal Post Top Mount Assembly (680.8142)EACH13$562.00$300.00$350.00$460.00$440.00$500.00
310 (680.8151)EACH22$1,350.00$1,100.00$1,700.00$1,300.00$1,245.00$1,300.00
311 (680.81990003)54$281.00$250.00$300.00$325.00$310.00$315.00
312 (680.8207)EACH32$1,155.00$1,050.00$900.00$1,020.00$970.00$1,000.00
313 (680.82254310)4$16,956$11,000$13,000$13,500$12,870$14,000
314Meter Pan (680.9402)EACH5$1,404.00$950.00$700.00$1,720.00$1,640.00$2,000.00
315Install Electrical Disconnect/Generator Transfer Switch (680.9499)EACH5$400.00$550.00$500.00$365.00$346.00$400.00
316 (680.950206)LF1,185$7.60$5.00$14.00$5.45$6.00$6.00
317Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$10.50$10.50$10.50$10.50$10.50$10.50
318 (680.99020010)8$4,860.00$1,450.00$1,700.00$1,270.00$1,208.00$1,350.00
319White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF57,149$0.42$0.43$0.39$0.41$0.60$0.45
320Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF47,453$0.42$0.43$0.39$0.41$0.60$0.45
321White Epoxy Reflectorized Pavement Letters - 15 mil Portable/Hand Application (685.2303)EACH108$53.00$54.00$50.00$52.00$100.00$55.00
322White Epoxy Reflectorized Pavement Symbols - 15 mil Portable/Hand Application (685.2403)EACH51$297.00$300.00$275.00$290.00$300.00$300.00
323White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104)LF10,258$3.20$3.25$3.00$3.10$3.00$3.00
324 (691.04000020)14,000$1.00$1.00$1.00$1.00$1.00$1.00
325Field Change Payment (FCP) (697.03)DOL1,970,000$1.00$1.00$1.00$1.00$1.00$1.00
326Asphalt Price Adjustment (698.04)DOL261,437$1.00$1.00$1.00$1.00$1.00$1.00
327Fuel Price Adjustment (698.05)DOL71,563$1.00$1.00$1.00$1.00$1.00$1.00
328Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
329Mobilization (699.040001)LS1$1,405,000$1,400,000$1,501,000$1,555,000$1,460,000$1,400,000
NYSDOT contract D265520: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of August 21, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way