NYSDOT contract D265549 bid tabulation

Replacement/Repair of 7 Culverts in Ontario County. Let by New York State DOT on September 25, 2025, Ontario, Region 04. 5 bids received; low bid $8,027,963 by C P Ward Inc.

Owner
New York State DOT
Letting
25 SEP 2025
Pay items
121
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1C P Ward Inc$8,027,963Low
2Cold Spring Construction Company$8,927,303+11%
3Sealand Contractors Corp.$9,061,000+13%
4Ramsey Constructors Inc$9,152,571+14%
5Slate Hill Constructors Inc$11,622,955+45%
NYSDOT contract D265549: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. C P Ward Inc2. Cold Spring Construction Company3. Sealand Contractors Corp.4. Ramsey Constructors Inc5. Slate Hill Constructors Inc
1Clearing and Grubbing (201.06)LS1$200,000$125,000$75,000$125,000$2,500,000
2Removal of Substructures (202.19)CY70$400.00$250.00$500.00$230.00$375.00
3Unclassified Excavation and Disposal (203.02)CY621$50.00$60.00$70.00$41.00$50.00
4Embankment In Place (203.03)CY3,738$65.00$35.00$31.00$45.00$35.00
5Select Granular Fill (203.07)CY954$98.00$90.00$170.00$120.00$110.00
6Select Structural Fill (203.21)CY350$102.00$90.00$110.00$118.00$120.00
7 (203.24010017)7$77.00$300.00$400.00$165.00$300.00
8Controlled Low Strength Material (CLSM) (204.01)CY29$600.00$300.00$500.00$260.00$970.00
9Structure Excavation (206.01)CY7,547$53.00$45.00$48.00$55.00$50.00
10Trench and Culvert Excavation (206.0201)CY483$80.00$90.00$300.00$50.00$50.00
11Geotextile Bedding (207.20)SY1,182$11.00$3.50$6.00$4.00$8.00
12Prefabricated Composite Structural Drain (207.26)SY740$25.00$12.00$27.00$14.00$18.00
13Seed and Mulch – Temporary (209.1003)SY4,189$9.00$3.50$2.35$2.25$2.50
14Check Dam (Ditch Bottom Width 0.0 to 3′), Stone – Temporary (209.110101)EACH3$800.00$1,000.00$2,500.00$600.00$600.00
15Drainage Structure Inlet Protection, Gravel Bag – Temporary (209.1702)CY4$550.00$750.00$1,500.00$1,100.00$1,200.00
16Rolled Erosion Control Product, Class II Type A, Intermediate (209.1901)SY3,698$3.00$4.00$7.65$8.00$8.00
17Stabilized Construction Access (209.22)SY670$60.00$80.00$80.00$55.00$52.00
18Sediment Filter Log, 12″ (209.2301)LF843$20.00$10.00$11.50$12.00$12.00
19Subbase Course, Type 2 (304.12)CY1,060$90.00$125.00$115.00$90.00$120.00
20 (404.0001)TON66$95.00$95.00$95.00$95.00$95.00
21 (404.0189)TON41$200.00$250.00$400.00$210.00$260.00
22 (404.0983)TON300$260.00$200.00$220.00$175.00$260.00
23 (404.1989)TON365$240.00$180.00$205.00$165.00$260.00
24 (404.3789)TON610$195.00$150.00$170.00$165.00$260.00
25Diluted Tack Coat (407.0102)GAL473$27.00$15.00$40.00$12.00$11.00
26Asphalt Pavement Joint Adhesive (418.7603)LF2,480$5.00$1.50$2.80$1.00$2.00
27Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY971$50.00$25.00$60.00$52.00$45.00
28 (553.030002)EACH1$5,000.00$5,000.00$10,000$35,000$1.00
29 (553.030003)EACH1$5,000.00$5,000.00$10,000$35,000$1.00
30 (553.030004)EACH1$15,000$5,000.00$10,000$35,000$1.00
31 (553.030005)EACH1$15,000$5,000.00$10,000$35,000$1.00
32 (553.030006)EACH1$5,000.00$5,000.00$10,000$35,000$1.00
33 (553.030007)EACH1$10,000$5,000.00$10,000$35,000$1.00
34Footing Concrete, Performance (555.0011)CY186$1,100.00$1,100.00$1,800.00$800.00$1,500.00
35Concrete for Structures, Performance (555.0021)CY30$3,000.00$5,000.00$6,000.00$2,400.00$3,300.00
36 (555.05010001)40$700.00$1,000.00$2,000.00$1,300.00$1,700.00
37Performance Concrete Quality Adjustment – Footing Concrete (555.9901)QUALITY UNIT2$7.50$7.50$7.50$7.50$7.50
38Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT2$8.04$8.04$8.04$8.04$8.04
39Epoxy-Coated Steel Fabric Reinforcement (556.0102)SY107$90.00$50.00$60.00$26.00$200.00
40Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB10,993$4.00$10.00$4.00$4.00$4.00
41 (562.0101)SY61$3,000.00$4,500.00$3,000.00$3,100.00$2,800.00
42Performance Concrete Quality Adjustment (562.99)QUALITY UNIT1$40.00$40.00$40.00$40.00$40.00
43Steel Bridge Railing (Four-Rail) (568.51)LF74$350.00$375.00$395.00$400.00$345.00
44Transition Bridge Railing (568.70)LF271$200.00$225.00$215.00$250.00$210.00
45Removal of Structural Concrete (580.01)CY6$13,000$6,000.00$5,500.00$2,500.00$10,000
46Removal and Replacement of Structural Concrete (582.0051)CY1$30,000$25,000$33,000$7,000.00$21,500
47Removal of Structural Concrete- Replacement with Vertical and Overhead Patching Material (582.0061)SF71$600.00$1,400.00$900.00$140.00$550.00
48Drilling and Grouting Bolts or Reinforcing Bars (586.0201)EACH1,003$40.00$60.00$105.00$36.00$75.00
49 (595.50000018)6,470$6.00$7.00$4.00$4.00$5.00
50 (602.90100707)131$6,200.00$6,500.00$6,600.00$6,000.00$5,600.00
51 (602.90200307)196$6,200.00$6,750.00$5,850.00$6,000.00$4,800.00
52 (602.90200407)141$4,200.00$4,250.00$4,200.00$4,300.00$3,600.00
53 (603.171316)EACH2$1,000.00$1,500.00$1,000.00$190.00$600.00
54 (603.63140515)38$4,000.00$5,000.00$4,000.00$5,000.00$4,500.00
55 (603.64120515)40$4,000.00$5,000.00$4,030.00$5,000.00$4,500.00
56 (603.64120715)112$2,400.00$3,500.00$2,800.00$4,000.00$2,800.00
57 (603.67000001)178$1,200.00$2,750.00$2,750.00$2,200.00$2,500.00
58 (603.9818)LF31$400.00$165.00$200.00$95.00$60.00
59 (603.9824)LF28$625.00$165.00$250.00$300.00$80.00
60 (603.99050002)4$1,200.00$2,500.00$1,000.00$600.00$2,600.00
61 (604.070401)EACH5$1,000.00$7,500.00$6,000.00$2,200.00$5,800.00
62Box Beam Guide Railing (606.10)LF2,530$50.00$55.00$52.00$62.00$50.00
63Box Beam Guide Railing (Shop Mitered) (606.100003)LF47$145.00$150.00$155.00$180.00$150.00
64Box Beam End Piece (606.120101)EACH4$650.00$1,000.00$670.00$785.00$650.00
65Box Beam Guide Railing End Assembly Type I (606.120102)EACH9$4,200.00$5,000.00$4,400.00$5,000.00$4,200.00
66Box Beam Guide Railing End Assembly Type IIA (606.120201)EACH10$2,100.00$2,500.00$2,150.00$2,400.00$2,100.00
67Removing and Disposing Corrugated Beam Guide Railing (606.71)LF2,157$8.00$20.00$5.00$3.00$12.00
68Removing and Disposing Box Beam Guide Railing (606.73)LF201$8.00$25.00$6.00$7.00$12.00
69Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910)EACH22$500.00$1,250.00$500.00$600.00$600.00
70Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920)EACH3$500.00$1,250.00$500.00$70.00$850.00
71Guide Rail Transition Weak-Post Corrugated Beam to Box Beam Guide Rail (One or Two Way Operation) (606.8101)EACH1$6,800.00$7,500.00$7,400.00$8,000.00$7,000.00
72 (607.41010010)160$15.00$10.00$30.00$2.00$16.00
73 (607.96000008)33$20.00$20.00$20.00$25.00$35.00
74Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT1$95.00$95.00$95.00$95.00$95.00
75Concrete Sidewalks and Driveways (608.0101)CY8$2,600.00$2,500.00$2,700.00$2,400.00$3,800.00
76Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON72$300.00$500.00$400.00$350.00$260.00
77Stone Curb – Near Vertical Face (NVF) (609.0212)LF92$150.00$150.00$250.00$170.00$130.00
78Turf Establishment – Performance (610.1605)SY4,218$22.00$25.00$20.00$24.00$36.00
79 (613.04000001)171$100.00$65.00$300.00$200.00$90.00
80 (614.060101)EACH21$230.00$1,000.00$300.00$500.00$800.00
81 (614.060201)EACH22$370.00$1,000.00$425.00$600.00$900.00
82 (614.060301)EACH20$725.00$1,500.00$850.00$1,000.00$1,200.00
83 (614.060401)EACH21$1,400.00$1,750.00$1,500.00$1,600.00$1,400.00
84 (615.01010108)43$30.00$60.00$400.00$215.00$240.00
85 (617.10000024)760$15.00$15.00$100.00$37.00$90.00
86 (617.11000024)LS1$3,000.00$1,500.00$3,000.00$24,000$12,000
87Basic Work Zone Traffic Control (619.01)LS1$250,000$400,000$443,060$920,000$1,300,000
88Type III Construction Barricades (619.04)EACH96$100.00$125.00$350.00$250.00$60.00
89 (619.110611)WEEK22$900.00$1,200.00$1,500.00$1,800.00$7,000.00
90Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711)LF270$100.00$80.00$80.00$90.00$115.00
91Mailboxes (619.27)EACH1$600.00$500.00$500.00$400.00$110.00
92Stone Filling (Medium) (620.04)CY280$190.00$250.00$270.00$115.00$130.00
93Stone Filling (Heavy) (620.05)CY351$200.00$300.00$370.00$300.00$160.00
94Bedding Material, Type 1 (620.0801)CY71$125.00$125.00$240.00$145.00$160.00
95 (620.14020009)146$220.00$350.00$480.00$360.00$275.00
96Crushed Stone (In-Place Measure) (623.12)CY159$160.00$150.00$280.00$200.00$150.00
97Survey Operations (625.01)LS1$90,000$75,000$62,000$250,000$60,000
98Concrete Right of Way Markers Type H (High) (625.03)EACH24$1,300.00$500.00$1,150.00$1,300.00$1,500.00
99Concrete Right of Way Markers Type L (Low) (625.04)EACH4$1,700.00$500.00$1,450.00$1,800.00$1,400.00
100Steel Pin and Cap Right of Way Markers (625.05)EACH6$1,500.00$250.00$720.00$500.00$1,000.00
101 (625.09010015)LS1$28,000$2,500.00$10,400$6,000.00$2,000.00
102 (627.50140008)853$9.00$15.00$12.00$12.00$7.00
103Concrete Cylinder Curing Equipment (637.04)EACH1$5,000.00$1,500.00$10,000$4,000.00$800.00
104Engineer’s Field Office – Type 2 (637.12)MONTH36$2,200.00$3,100.00$2,000.00$3,200.00$3,400.00
105White Paint Reflectorized Pavement Stripes – 20 mils (640.20)LF1,690$4.00$3.25$0.30$3.00$4.00
106Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21)LF1,580$4.00$3.25$0.30$3.00$4.00
107Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF18$70.00$70.00$75.00$75.00$70.00
108Type A Sign Posts (645.81)EACH4$400.00$450.00$430.00$500.00$400.00
109Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22)EACH39$19.00$20.00$20.00$24.00$19.00
110Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23)EACH18$23.00$25.00$26.00$30.00$25.00
111Steel Post, 2.0 lb/ft (646.32)EACH45$88.00$100.00$96.00$115.00$90.00
112Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH3$300.00$300.00$300.00$350.00$280.00
113Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH2$25.00$30.00$30.00$33.00$11.00
114 (647.83001002)13$160.00$80.00$55.00$30.00$11.00
115Centerline Audible Roadway Delineators (CARDs) (649.11)LF520$38.00$30.00$51.00$12.00$50.00
116Welded Frame & Rectangular Grate 11 (655.1011)EACH1$1,200.00$2,500.00$2,000.00$2,500.00$1,500.00
117Field Change Payment (FCP) (697.03)DOL370,000$1.00$1.00$1.00$1.00$1.00
118Asphalt Price Adjustment (698.04)DOL2,550$1.00$1.00$1.00$1.00$1.00
119Fuel Price Adjustment (698.05)DOL4,373$1.00$1.00$1.00$1.00$1.00
120Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00
121Mobilization (699.040001)LS1$300,000$343,001$348,000$315,000$400,000
NYSDOT contract D265549: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of September 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy