Crane Hogan Structural Systems Inc: NYSDOT bid record

Crane Hogan Structural Systems Inc submitted 15 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 19 DEC 2024, and was the low bidder on 7 of them (47%). When it was not low, its total sat a median +13% above the low bid.

Owner
New York State DOT
Low bid volume
$23,273,552
Latest bid
19 DEC 2024
Data through
15 OCT 2026
15Bids
7Low bids
47Win rate, percent
+13%Median gap to the low bid when not low, 8 bids

By year

YearBidsLow bidsWin rate
20228675%
2023300%
20244125%
Crane Hogan Structural Systems Inc, NYSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 0310440%
Region 045360%
Crane Hogan Structural Systems Inc, NYSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Office Technology and Supplies637.34DOL1010 (100%)$1.00$1.00
Field Change Payment (FCP)697.03DOL99 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL99 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL99 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL99 (100%)$1.00$1.00
Medical Testing570.02DOL66 (100%)$1.00$1.00
Personal-Exposure-Monitoring Sample Analysis570.03DOL66 (100%)$1.00$1.00
Construction Testing supplies – Consumables637.36DOL55 (100%)$1.00$1.00
Plant Production Quality Adjustment to Asphalt Items404.000011QUALITY UNIT55 (100%)$70.00$85.00
Decontamination Facilities570.04CALENDAR WEEK64 (67%)$100.00$150.00
Disposal of Hazardous Paint Removal Waste Containing Lead571.03LB64 (67%)$1.00$1.00
Unclassified Excavation and Disposal203.02CY73 (43%)$80.00$71.00
Crane Hogan Structural Systems Inc, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Crane Hogan Structural Systems Inc, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
19 DEC 2024D265372Region 03Where and When Bridge Repair Project1 of 3$2,457,900Low, 9.0% under the second
07 NOV 2024D265326Region 03Bridge Replacement - Rt 49 over Big Bay Creek5 of 5$2,333,968+18%
10 OCT 2024D265313Region 04Bridge Preventative Maintenance - Multi-Location2 of 3$3,640,936+24%
11 JAN 2024D265187Region 03Regional Work Zone Traffic Control3 of 3$1,277,755+35%
26 OCT 2023D265083Region 03SMALL CULVERT REHAB/REPLACE, I81-Tully Town Line to Rt113 of 3$1,391,449+5.0%
27 JUL 2023D265045Region 03BRIDGE REHABILITATION - I-81 OVER EAST COLVIN ST BIN 10315493 of 6$3,818,340+2.0%
20 APR 2023D265030Region 03AIRPORT ROAD OVER I-81 BRIDGES REHABILITATION4 of 6$12,194,203+16%
01 DEC 2022D264921Region 03Where & When Bridge Repair Project1 of 3$2,075,000Low, 5.0% under the second
17 NOV 2022D264912Region 04BRIDGE SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS1 of 4$9,358,958Low, 21% under the second
07 JUL 2022D264828Region 04STANDBY STRUCTURES REPAIR FOR 2022 TO 20252 of 2$1,396,451+1.0%
19 MAY 2022D264799Region 04Job Order Contract (JOC) Bridge and Guiderail, NYSDOT R-41 of 3$1,097,000Low, 5.0% under the second
05 MAY 2022D264789Region 03Job Order Contract: Bridge Maintenance, NYSDOT Region-32 of 4$1,014,948+10%
10 MAR 2022D264760Region 03BRIDGE REHABILITATION, TOWN OF PREBLE, NY 281 OVER I-811 of 2$3,249,449Low, 12% under the second
20 JAN 2022D264674Region 04BRIDGE REHABILITATION, NY ROUTE 31 OVER THE ERIE CANAL1 of 6$2,790,219Low, 1.0% under the second
06 JAN 2022D264632Region 03NYSDOT Region-3, BRIDGE DECK AND JOINT REPAIR1 of 4$2,245,025Low, 0.0% under the second
Crane Hogan Structural Systems Inc: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy