NYSDOT contract D265839 bid tabulation
BRIDGE JOINT REPAIRS 2026/27. Let by New York State DOT on October 1, 2026, Allegany, Chemung, Steuben, Region 06. 3 bids received; low bid $1,189,981 by Cold Spring Construction Company.
- Owner
- New York State DOT
- Letting
- 01 OCT 2026
- Pay items
- 38
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Cold Spring Construction Company | $1,189,981 | Low |
| 2 | Twin Tier Constructors Inc | $1,753,000 | +47% |
| 3 | The L C Whitford Co Inc | $2,148,887 | +81% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cold Spring Construction Company | 2. Twin Tier Constructors Inc | 3. The L C Whitford Co Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $5,000.00 | $10,000 | $3,622.14 |
| 2 | Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3312) | SF | 480 | $20.00 | $1.00 | $51.68 |
| 3 | (404.0983) | TON | 87 | $325.00 | $450.00 | $603.62 |
| 4 | Diluted Tack Coat (407.0102) | GAL | 80 | $35.00 | $30.00 | $24.94 |
| 5 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 6,960 | $1.25 | $2.00 | $0.59 |
| 6 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 653 | $25.00 | $16.00 | $30.69 |
| 7 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 2,310 | $5.25 | $7.00 | $23.00 |
| 8 | (557.05013011) | 509 | $250.00 | $285.00 | $663.65 | |
| 9 | (566.27000008) | 2 | $7,500.00 | $10,000 | $9,407.21 | |
| 10 | (567.51000016) | 47 | $80.00 | $200.00 | $619.48 | |
| 11 | Bridge Joint Seal (567.63) | LF | 372 | $135.00 | $150.00 | $177.11 |
| 12 | (576.25000002) | 38 | $125.00 | $150.00 | $1,058.16 | |
| 13 | Removal of Structural Concrete (580.01) | CY | 23 | $2,500.00 | $2,000.00 | $11,635 |
| 14 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 835 | $30.00 | $44.00 | $61.40 |
| 15 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $375,000 | $419,262 | $286,980 |
| 16 | Type III Construction Barricades (619.04) | EACH | 5 | $150.00 | $100.00 | $158.11 |
| 17 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 7,567 | $4.00 | $9.00 | $8.82 |
| 18 | (619.100103) | LF | 18,862 | $3.50 | $8.00 | $8.82 |
| 19 | (619.110511) | EACH | 2 | $10,000 | $8,000.00 | $9,816.37 |
| 20 | (619.130201) | EACH | 1 | $30,000 | $80,000 | $40,407 |
| 21 | (619.130202) | EACH | 1 | $30,000 | $70,000 | $34,651 |
| 22 | (619.130203) | EACH | 1 | $30,000 | $90,000 | $62,708 |
| 23 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 1,460 | $16.00 | $45.00 | $54.46 |
| 24 | Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715) | LF | 1,720 | $16.00 | $70.00 | $67.97 |
| 25 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 125 | $40.00 | $30.00 | $165.72 |
| 26 | Survey Operations (625.01) | LS | 1 | $7,500.00 | $50,000 | $18,705 |
| 27 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 6 | $3,000.00 | $3,100.00 | $2,517.90 |
| 28 | Office Technology and Supplies (637.34) | DOL | 200 | $1.00 | $1.00 | $1.00 |
| 29 | Construction Testing supplies – Consumables (637.36) | DOL | 200 | $1.00 | $1.00 | $1.00 |
| 30 | (640.12020004) | 450 | $4.00 | $5.00 | $7.72 | |
| 31 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 4,977 | $2.00 | $2.00 | $1.87 |
| 32 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 2,224 | $4.00 | $7.00 | $26.16 |
| 33 | Secondary Highway Audible Roadway Delineators (SHARDs) (649.21) | LF | 1,116 | $4.00 | $9.00 | $4.41 |
| 34 | Field Change Payment (FCP) (697.03) | DOL | 90,000 | $1.00 | $1.00 | $1.00 |
| 35 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 36 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 37 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 38 | Mobilization (699.040001) | LS | 1 | $44,395 | $60,000 | $82,183 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of October 1, 2026. Compiled by Mirage Metrics.