Oakgrove Construction Inc: NYSDOT bid record

Oakgrove Construction Inc submitted 52 bids on New York State DOT contracts in the data, from 06 JAN 2022 to 21 MAY 2026, and was the low bidder on 14 of them (27%). When it was not low, its total sat a median +7.0% above the low bid.

Owner
New York State DOT
Low bid volume
$70,584,144
Latest bid
21 MAY 2026
Data through
15 OCT 2026
52Bids
14Low bids
27Win rate, percent
+7.0%Median gap to the low bid when not low, 38 bids

By year

YearBidsLow bidsWin rate
202216425%
20239111%
202410330%
202515533%
20262150%
Oakgrove Construction Inc, NYSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 05511427%
Region 04100%
Oakgrove Construction Inc, NYSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Field Change Payment (FCP)697.03DOL5050 (100%)$1.00$1.00
Fuel Price Adjustment698.05DOL5050 (100%)$1.00$1.00
Steel/Iron Price Adjustment698.06DOL5050 (100%)$1.00$1.00
Office Technology and Supplies637.34DOL4949 (100%)$1.00$1.00
Asphalt Price Adjustment698.04DOL4949 (100%)$1.00$1.00
Construction Testing supplies – Consumables637.36DOL3030 (100%)$1.00$1.00
Plant Production Quality Adjustment to Asphalt Items404.000011QUALITY UNIT2525 (100%)$85.00$85.00
Diluted Tack Coat407.0102GAL4424 (55%)$5.00$7.00
Asphalt Pavement Joint Adhesive418.7603LF4224 (57%)$0.28$1.00
627.501400084224 (57%)$4.00$6.00
Trench and Culvert Excavation206.0201CY4023 (57%)$40.00$55.00
Topsoil - Roadside610.1402CY3820 (53%)$75.00$105.00
Oakgrove Construction Inc, NYSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Oakgrove Construction Inc, NYSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
21 MAY 2026D265772Region 05Culvert Replacement & Signal Rehabilitation - I-990 & NY-2631 of 4$3,613,249Low, 9.0% under the second
12 MAR 2026D265690Region 05BRIDGE & CULVERT REPLACE; NY RT 5 & US RT 20, Twn of Evans2 of 4$24,347,307+2.0%
18 DEC 2025D265610Region 05BRIDGE REHABILITATION; 3 BINs on I-990, Town of Amherst1 of 2$8,667,991Low, 25% under the second
04 DEC 2025D265590Region 05STRUCTURE REPLACEMENT - NY Route 5 (S.H. 62-20)4 of 4$10,998,328+32%
20 NOV 2025D265603Region 05HIGHWAY RESURFACING; I-86, Southern Tier Expressway; SNI2 of 6$5,696,070+2.0%
06 NOV 2025D265588Region 05LARGE CULVERT REPLACEMENT/REHABILITATION2 of 3$3,547,729+8.0%
22 MAY 2025D265494Region 05INTERSECTION IMPROVEMENT PROJECT; NY-1794 of 5$4,398,143+15%
24 APR 2025D265480Region 05NY Route 5 from NY 249 Commercial Street to Kennedy Avenue4 of 5$1,937,810+15%
27 MAR 2025D265426Region 05BRIDGE DECK REHAB/PAINTING - NY Rt. 951A2 of 2$13,796,578+5.0%
27 MAR 2025D265461Region 05NY-78 Mill & Resurface; Millersport Highway3 of 3$11,983,416+34%
13 MAR 2025D265374Region 05BRIDGE REHABILITATIONS - NY Routes 5 & 2771 of 2$5,380,951Low, 2.0% under the second
13 MAR 2025D265434Region 05Highway Project; NY-242 & NY-353 in Little Valley2 of 5$5,538,797+1.0%
13 MAR 2025D265451Region 05HIGHWAY MILL & FILL/CULVERT REPLACEMENT & REHAB1 of 4$4,595,991Low, 4.0% under the second
13 MAR 2025D265454Region 04N.Y. Route 77 Pavement Resurfacing3 of 9$4,789,588+14%
27 FEB 2025D265422Region 05Bridge Replacement - BIN 1001240 - NY-5 over Canadaway Creek1 of 3$3,362,038Low, 11% under the second
27 FEB 2025D265453Region 05SAFETY IMPROVEMENT PROJECT - NY Route 2701 of 4$5,919,028Low, 10% under the second
09 JAN 2025D265408Region 05Pavement Resurfacing with Safety and Improvements5 of 6$4,358,264+10%
21 NOV 2024D265371Region 05CULVERT REPLACEMENT/PAVEMENT REHABILITATION, US RTE 2192 of 3$12,687,219+7.0%
12 SEP 2024D265314Region 05PAVEMENT PREVENTATIVE MAINTENANCE2 of 3$7,977,635+12%
29 AUG 2024D265294Region 05BRIDGE REPLACEMENTS & ELECTRIC SUBSTATION - NY Route 333 of 3$59,627,037+34%
28 MAR 2024D265194Region 05Bridge Replacement Project, BIN 66002302 of 4$1,833,887+14%
28 MAR 2024D265211Region 05PIN 581382 - Bridge MBC & Preservation; 23/243 of 3$5,228,635+7.0%
28 MAR 2024D265221Region 05PAVEMENT REHABILITATION PROJECT - NY 781 of 4$3,682,726Low, 15% under the second
14 MAR 2024D265224Region 05NY 438 PMI; SNI4 of 7$4,658,901+6.0%
08 FEB 2024D265158Region 05HIGHWAY JOB ORDER CONTRACT1 of 3$574,166Low, 9.0% under the second
Oakgrove Construction Inc: latest NYSDOT bids in the data

How this record was read

NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

  • Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way