NYSDOT contract D265374 bid tabulation
BRIDGE REHABILITATIONS - NY Routes 5 & 277. Let by New York State DOT on March 13, 2025, Erie, Region 05. 2 bids received; low bid $5,380,951 by Oakgrove Construction Inc.
- Owner
- New York State DOT
- Letting
- 13 MAR 2025
- Pay items
- 101
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Oakgrove Construction Inc | $5,380,951 | Low |
| 2 | Cold Spring Construction Company | $5,486,061 | +2.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Oakgrove Construction Inc | 2. Cold Spring Construction Company |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $2,500.00 | $6,250.00 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 1 | $500.00 | $125.00 |
| 3 | (203.24010017) | 13 | $150.00 | $175.00 | |
| 4 | Trench and Culvert Excavation (206.0201) | CY | 34 | $60.00 | $60.00 |
| 5 | (304.15010005) | 23 | $100.00 | $160.00 | |
| 6 | Miscellaneous Cold Milling of Portland Cement Concrete (490.40) | SY | 72 | $15.00 | $16.00 |
| 7 | (520.51000006) | 250 | $2.00 | $6.50 | |
| 8 | (553.030001) | EACH | 1 | $10,000 | $0.01 |
| 9 | Concrete for Structures, Performance (555.0021) | CY | 1 | $3,000.00 | $5,000.00 |
| 10 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $40.00 | $40.00 |
| 11 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 863 | $3.00 | $3.50 |
| 12 | Sidewalks and Safety Walks (557.30) | SY | 217 | $245.00 | $175.00 |
| 13 | (557.60010004) | 1,413 | $20.00 | $29.00 | |
| 14 | Performance Concrete Quality Adjustment – Sidewalks and Safety Walks (557.9902) | QUALITY UNIT | 1 | $7.50 | $7.50 |
| 15 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 1,413 | $0.01 | $4.45 |
| 16 | Protective Sealing of Concrete with Coating Type Protective Sealer (559.04) | SQUAREFOOT | 115,193 | $3.00 | $2.15 |
| 17 | (564.11000010) | 2 | $2,500.00 | $2,700.00 | |
| 18 | (564.510001) | LB | 21,792 | $16.00 | $55.00 |
| 19 | (564.510002) | LB | 315 | $16.00 | $75.00 |
| 20 | (564.510003) | LB | 1,275 | $22.00 | $150.00 |
| 21 | (564.510004) | LB | 286 | $45.00 | $90.00 |
| 22 | (564.510005) | LB | 552 | $35.00 | $90.00 |
| 23 | (564.510006) | LB | 660 | $20.00 | $30.00 |
| 24 | (564.510007) | LB | 2,460 | $15.00 | $25.00 |
| 25 | Bridge Joint Header (567.62) | CF | 136 | $235.00 | $145.00 |
| 26 | Bridge Joint Seal (567.63) | LF | 164 | $60.00 | $45.00 |
| 27 | Performance Concrete Quality Adjustment (567.99) | QUALITY UNIT | 1 | $47.30 | $47.30 |
| 28 | Steel Bridge Railing (Four-Rail) (568.51) | LF | 273 | $300.00 | $275.00 |
| 29 | Transition Bridge Railing (568.70) | LF | 143 | $250.00 | $250.00 |
| 30 | Lead-Exposure Control Plan (570.01) | LS | 1 | $5,000.00 | $2,500.00 |
| 31 | Medical Testing (570.02) | DOL | 6,200 | $1.00 | $1.00 |
| 32 | Personal-Exposure-Monitoring Sample Analysis (570.03) | DOL | 20,000 | $1.00 | $1.00 |
| 33 | Decontamination Facilities (570.04) | CALENDAR WEEK | 40 | $200.00 | $100.00 |
| 34 | (570.150001) | LS | 1 | $165,000 | $0.01 |
| 35 | (570.150002) | LS | 1 | $50,000 | $25,000 |
| 36 | Disposal of Hazardous Paint Removal Waste Containing Lead (571.03) | LB | 6,300 | $2.00 | $1.00 |
| 37 | Disposal of Non-Hazardous Industrial Solid Paint Removal Waste (571.04) | LB | 2,788 | $2.00 | $2.00 |
| 38 | (572.010001) | SF | 1 | $7,000.00 | $500.00 |
| 39 | (573.010001) | LS | 1 | $325,000 | $110,000 |
| 40 | (574.030001) | SF | 960 | $400.00 | $500.00 |
| 41 | Structural Slab Scarification (579.01) | SF | 12,717 | $2.00 | $1.75 |
| 42 | Reinforcing Bar Exposure (579.02) | SF | 1,275 | $40.00 | $38.00 |
| 43 | (579.02000010) | 1,953 | $40.00 | $53.00 | |
| 44 | Removal of Structural Concrete (580.01) | CY | 6 | $3,000.00 | $3,500.00 |
| 45 | Removal of Structural Concrete - Replacement with Shotcrete, No Reinforcement Bar Encasement (583.02) | SF | 4,340 | $150.00 | $160.00 |
| 46 | Removal of Structural Concrete - Replacement with Shotcrete, with Reinforcement Bar Encasement (583.03) | SF | 1,733 | $175.00 | $212.00 |
| 47 | (584.032001) | 142 | $150.00 | $125.00 | |
| 48 | (584.40000005) | 12,717 | $23.00 | $20.00 | |
| 49 | (584.9901) | 1 | $90.04 | $90.04 | |
| 50 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 572 | $45.00 | $28.00 |
| 51 | Drilling and Grouting Bolts or Reinforcing Bars with Pullout Test (with Non- Destructive Investigation) (586.0302) | EACH | 92 | $75.00 | $125.00 |
| 52 | Field Drill Holes in Existing Structural Steel (586.10) | EACH | 2,896 | $25.00 | $32.00 |
| 53 | Bridge Railing Removal and Disposal (587.01) | LF | 253 | $25.00 | $11.00 |
| 54 | (589.520001) | EACH | 8 | $1,000.00 | $1,600.00 |
| 55 | (589.520002) | EACH | 4 | $2,500.00 | $900.00 |
| 56 | Box Beam Guide Railing (606.10) | LF | 131 | $50.00 | $53.00 |
| 57 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 20 | $55.00 | $63.00 |
| 58 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 4 | $2,500.00 | $2,200.00 |
| 59 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 437 | $10.00 | $9.00 |
| 60 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 4 | $300.00 | $300.00 |
| 61 | (608.01010002) | 660 | $25.00 | $45.00 | |
| 62 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 22 | $250.00 | $300.00 |
| 63 | Stone Curb – Bridge (Type F1) (609.0302) | LF | 252 | $125.00 | $90.00 |
| 64 | (609.06000008) | 125 | $6.00 | $17.00 | |
| 65 | (617.10000024) | 1 | $500.00 | $1,000.00 | |
| 66 | (617.11000024) | LS | 1 | $750.00 | $150.00 |
| 67 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $891,000 | $205,000 |
| 68 | Type III Construction Barricades (619.04) | EACH | 85 | $50.00 | $75.00 |
| 69 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 2,100 | $6.00 | $8.00 |
| 70 | Cover Existing Pavement Marking Letters or Symbols (Removable Tape) (619.0804) | EACH | 4 | $900.00 | $800.00 |
| 71 | (619.100103) | LF | 2,100 | $6.00 | $4.25 |
| 72 | (619.100203) | EACH | 12 | $400.00 | $550.00 |
| 73 | (619.111113) | EACH | 9 | $6,000.00 | $8,000.00 |
| 74 | (619.1301) | EACH | 1 | $40,000 | $10,000 |
| 75 | (619.1302) | EACH | 1 | $40,000 | $10,000 |
| 76 | (619.1303) | EACH | 1 | $3,000.00 | $10,000 |
| 77 | (619.1304) | EACH | 1 | $3,000.00 | $10,000 |
| 78 | (619.161401) | EACH | 1 | $4,500.00 | $10,000 |
| 79 | (619.161402) | EACH | 1 | $3,000.00 | $10,000 |
| 80 | (619.161403) | EACH | 1 | $3,000.00 | $10,000 |
| 81 | (619.161404) | EACH | 1 | $3,000.00 | $10,000 |
| 82 | Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715) | LF | 800 | $22.00 | $11.50 |
| 83 | Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802) | EACH | 2 | $4,500.00 | $6,000.00 |
| 84 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $5,000.00 | $20,000 |
| 85 | Traffic Control Supervisor (619.25) | MONTH | 3 | $1,500.00 | $0.01 |
| 86 | (621.05020004) | 402 | $3.00 | $3.00 | |
| 87 | Survey Operations (625.01) | LS | 1 | $10,000 | $25,000 |
| 88 | (625.09010015) | LS | 1 | $500.00 | $0.01 |
| 89 | (627.50140008) | 136 | $1.00 | $6.00 | |
| 90 | Concrete Cylinder Curing Equipment (637.04) | EACH | 2 | $2,000.00 | $300.00 |
| 91 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 18 | $2,000.00 | $2,200.00 |
| 92 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 |
| 93 | Construction Testing supplies – Consumables (637.36) | DOL | 200 | $1.00 | $1.00 |
| 94 | White Paint Reflectorized Pavement Stripes – 20 mils (640.20) | LF | 1,800 | $1.00 | $0.95 |
| 95 | Yellow Paint Reflectorized Pavement Stripes - 20 mils (640.21) | LF | 1,200 | $1.00 | $0.95 |
| 96 | White Paint Reflectorized Pavement Symbols - 20 mils (640.23) | EACH | 5 | $200.00 | $150.00 |
| 97 | Field Change Payment (FCP) (697.03) | DOL | 278,964.17 | $1.00 | $1.00 |
| 98 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 |
| 99 | Fuel Price Adjustment (698.05) | DOL | 100 | $1.00 | $1.00 |
| 100 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 101 | Mobilization (699.040001) | LS | 1 | $206,950 | $210,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 13, 2025. Compiled by Mirage Metrics.