NYSDOT contract D265461 bid tabulation
NY-78 Mill & Resurface; Millersport Highway. Let by New York State DOT on March 27, 2025, Erie, Niagara, Region 05. 3 bids received; low bid $8,920,000 by Concrete Applied Technologies Corp/DBA:Catco.
- Owner
- New York State DOT
- Letting
- 27 MAR 2025
- Pay items
- 220
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Concrete Applied Technologies Corp/DBA:Catco | $8,920,000 | Low |
| 2 | Cold Spring Construction Company | $9,889,366 | +11% |
| 3 | Oakgrove Construction Inc | $11,983,416 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Concrete Applied Technologies Corp/DBA:Catco | 2. Cold Spring Construction Company | 3. Oakgrove Construction Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $5,000.00 | $10,000 | $5,000.00 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 547 | $125.00 | $60.00 | $50.00 |
| 3 | Embankment In Place (203.03) | CY | 103 | $90.00 | $43.00 | $20.00 |
| 4 | Select Granular Fill (203.07) | CY | 30 | $150.00 | $42.00 | $50.00 |
| 5 | (203.24010017) | 969 | $30.00 | $45.00 | $35.00 | |
| 6 | (205.0201) | LS | 1 | $2,500.00 | $2,000.00 | $1,500.00 |
| 7 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 16 | $114.40 | $75.00 | $155.00 |
| 8 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 2 | $283.80 | $75.00 | $350.00 |
| 9 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 1 | $200.47 | $75.00 | $800.00 |
| 10 | Laboratory Analysis for Ignitability (205.0403) | EACH | 1 | $59.40 | $75.00 | $50.00 |
| 11 | Laboratory Analysis for ph (205.0404) | EACH | 1 | $29.70 | $75.00 | $30.00 |
| 12 | Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405) | EACH | 1 | $95.53 | $75.00 | $125.00 |
| 13 | Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406) | EACH | 1 | $111.38 | $75.00 | $120.00 |
| 14 | Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407) | EACH | 1 | $96.53 | $75.00 | $130.00 |
| 15 | (205.050201) | TON | 46 | $100.00 | $40.00 | $85.00 |
| 16 | Trench and Culvert Excavation (206.0201) | CY | 120 | $85.00 | $60.00 | $75.00 |
| 17 | (206.03050005) | 1,919 | $100.00 | $48.00 | $225.00 | |
| 18 | (206.03060005) | 2,125 | $45.00 | $67.00 | $50.00 | |
| 19 | Test Pit Excavation (206.05) | EACH | 20 | $1,500.00 | $2,500.00 | $3,000.00 |
| 20 | Seed and Mulch – Temporary (209.1003) | SY | 260 | $2.00 | $5.00 | $1.00 |
| 21 | (209.23010009) | 340 | $9.00 | $18.00 | $8.00 | |
| 22 | (304.00010018) | 1,500 | $3.00 | $0.70 | $0.25 | |
| 23 | (304.15010005) | 435 | $15.00 | $175.00 | $150.00 | |
| 24 | (404.0001) | TON | 827 | $100.00 | $100.00 | $100.00 |
| 25 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 1 | $100.00 | $100.00 | $100.00 |
| 26 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 718 | $100.00 | $100.00 | $100.00 |
| 27 | (404.0962) | TON | 16,172 | $106.35 | $101.00 | $115.00 |
| 28 | (404.0982) | TON | 368 | $275.00 | $250.00 | $275.00 |
| 29 | Diluted Tack Coat (407.0102) | GAL | 20,433 | $4.50 | $5.50 | $4.00 |
| 30 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 144,218 | $0.01 | $0.62 | $0.20 |
| 31 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 199,789 | $1.75 | $1.40 | $2.00 |
| 32 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 4,535 | $14.00 | $11.50 | $8.00 |
| 33 | Concrete for Structures, Performance (555.0021) | CY | 6 | $2,000.00 | $2,250.00 | $3,200.00 |
| 34 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $10.00 | $10.00 | $10.00 |
| 35 | (602.90100107) | 400 | $995.00 | $1,050.00 | $850.00 | |
| 36 | (603.14493304) | 8 | $6,000.00 | $5,500.00 | $5,000.00 | |
| 37 | (603.171016) | EACH | 2 | $500.00 | $500.00 | $500.00 |
| 38 | Concrete Collars (603.77) | EACH | 4 | $2,000.00 | $1,950.00 | $2,000.00 |
| 39 | (603.9812) | LF | 15 | $150.00 | $60.00 | $60.00 |
| 40 | (603.9815) | LF | 10 | $156.00 | $170.00 | $100.00 |
| 41 | (603.9818) | LF | 75 | $75.00 | $65.00 | $100.00 |
| 42 | (604.070501) | EACH | 14 | $2,600.00 | $2,750.00 | $4,000.00 |
| 43 | (604.070502) | EACH | 30 | $3,000.00 | $3,900.00 | $6,000.00 |
| 44 | (604.070503) | EACH | 10 | $4,500.00 | $5,350.00 | $8,000.00 |
| 45 | (604.070504) | EACH | 7 | $2,000.00 | $2,650.00 | $1,500.00 |
| 46 | (604.500501) | LF | 5 | $1,000.00 | $825.00 | $550.00 |
| 47 | (604.500502) | LF | 5 | $1,000.00 | $825.00 | $550.00 |
| 48 | Underdrain Filter, Type II (605.1001) | CY | 173 | $10.00 | $80.00 | $75.00 |
| 49 | (605.98101818) | 85 | $80.00 | $35.00 | $50.00 | |
| 50 | Box Beam Guide Railing (606.10) | LF | 300 | $67.00 | $62.00 | $62.00 |
| 51 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 1 | $5,750.00 | $5,250.00 | $5,500.00 |
| 52 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 110 | $8.00 | $9.00 | $7.00 |
| 53 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 3 | $400.00 | $350.00 | $300.00 |
| 54 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 10 | $100.00 | $100.00 | $100.00 |
| 55 | Concrete Sidewalks and Driveways (608.0101) | CY | 88 | $1,100.00 | $1,400.00 | $1,600.00 |
| 56 | (608.01060415) | 325 | $60.00 | $80.00 | $110.00 | |
| 57 | (608.01070615) | 5,141 | $65.00 | $69.00 | $75.00 | |
| 58 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 182 | $300.00 | $165.00 | $230.00 |
| 59 | (608.21000003) | 10 | $500.00 | $525.00 | $1,500.00 | |
| 60 | (609.0401) | LF | 164 | $135.00 | $149.00 | $150.00 |
| 61 | (609.10010109) | 237 | $135.00 | $77.00 | $250.00 | |
| 62 | Fertilizer (610.0501) | LB | 24 | $12.00 | $8.50 | $5.00 |
| 63 | Compost (610.10) | CY | 15 | $150.00 | $140.00 | $125.00 |
| 64 | Topsoil - Roadside (610.1402) | CY | 175 | $140.00 | $129.00 | $75.00 |
| 65 | Turf Establishment -Lawns (610.1602) | SY | 1,400 | $6.00 | $5.40 | $2.00 |
| 66 | Watering Vegetation (610.19) | 1,000 GALLONS | 15 | $125.00 | $105.00 | $100.00 |
| 67 | (611.0151) | EACH | 3 | $1,320.00 | $1,250.00 | $700.00 |
| 68 | (611.0281) | EACH | 12 | $1,100.00 | $1,050.00 | $700.00 |
| 69 | Portable Drip Irrigation System (611.17) | EACH | 15 | $85.00 | $75.00 | $75.00 |
| 70 | (611.19010024) | 3 | $50.00 | $50.00 | $150.00 | |
| 71 | (611.19020024) | 12 | $50.00 | $50.00 | $150.00 | |
| 72 | (617.10000024) | 20 | $125.00 | $95.00 | $200.00 | |
| 73 | (617.11000024) | LS | 1 | $2,500.00 | $200.00 | $500.00 |
| 74 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $588,750 | $750,000 | $2,100,000 |
| 75 | (619.080102) | LF | 190 | $12.00 | $11.00 | $12.00 |
| 76 | (619.0901) | LF | 127,666 | $0.32 | $0.30 | $0.25 |
| 77 | (619.110513) | EACH | 5 | $10,000 | $4,500.00 | $10,000 |
| 78 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 144 | $20.00 | $350.00 | $300.00 |
| 79 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $140,000 | $50,000 | $200,000 |
| 80 | Stone Filling (Medium) (620.04) | CY | 23 | $170.00 | $155.00 | $200.00 |
| 81 | Bedding Material, Type 1 (620.0801) | CY | 10 | $130.00 | $190.00 | $250.00 |
| 82 | Cleaning Culverts with Span of 50 in. or Less (621.01) | LF | 97 | $54.00 | $2.65 | $15.00 |
| 83 | Cleaning Closed Drainage Systems (621.03) | LF | 16,940 | $4.75 | $2.65 | $8.00 |
| 84 | Cleaning Drainage Structures (621.04) | EACH | 99 | $180.00 | $150.00 | $350.00 |
| 85 | Survey Operations (625.01) | LS | 1 | $30,000 | $55,000 | $25,000 |
| 86 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 5 | $600.00 | $1,000.00 | $750.00 |
| 87 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 12 | $300.00 | $215.00 | $125.00 |
| 88 | Permanent Survey Markers (625.06) | EACH | 12 | $2,000.00 | $1,100.00 | $1,100.00 |
| 89 | (625.09010015) | LS | 1 | $100.00 | $17,000 | $1,000.00 |
| 90 | (627.50140008) | 629 | $8.00 | $7.00 | $4.00 | |
| 91 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 1,500 | $5.00 | $95.00 | $70.00 |
| 92 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 1,500 | $4.50 | $75.00 | $50.00 |
| 93 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 1,500 | $3.00 | $50.00 | $45.00 |
| 94 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $4,000.00 | $300.00 | $2,000.00 |
| 95 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 20 | $2,000.00 | $2,100.00 | $2,000.00 |
| 96 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 97 | White Paint Reflectorized Pavement Stripes – 15 mils (640.10) | LF | 66,530 | $0.32 | $0.30 | $0.30 |
| 98 | Yellow Paint Reflectorized Pavement Stripes - 15 mils (640.11) | LF | 61,136 | $0.32 | $0.30 | $0.30 |
| 99 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 297 | $38.00 | $35.00 | $40.00 |
| 100 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 2,716 | $41.00 | $37.00 | $40.00 |
| 101 | Overhead Sign Panels (645.61) | SF | 283 | $80.00 | $44.00 | $125.00 |
| 102 | Type A Sign Posts (645.81) | EACH | 543 | $220.00 | $200.00 | $200.00 |
| 103 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 14 | $1,250.00 | $1,150.00 | $1,200.00 |
| 104 | (645.81090003) | 99 | $80.00 | $75.00 | $75.00 | |
| 105 | Pole-Mounted Sign Support System (Band Mounting) (645.85) | EACH | 19 | $230.00 | $215.00 | $210.00 |
| 106 | Reference Marker Panel (646.21) | EACH | 290 | $42.00 | $39.00 | $50.00 |
| 107 | Steel Post, 2.0 lb/ft (646.32) | EACH | 290 | $85.00 | $80.00 | $100.00 |
| 108 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 300 | $43.00 | $40.00 | $50.00 |
| 109 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 1 | $135.00 | $120.00 | $125.00 |
| 110 | (647.83001002) | 290 | $10.00 | $9.50 | $10.00 | |
| 111 | Secondary Highway Audible Roadway Delineators (SHARDs) (649.21) | LF | 20,330 | $0.41 | $0.36 | $0.40 |
| 112 | Welded Frame & Reticuline Grate 3 (655.1103) | EACH | 2 | $1,500.00 | $1,850.00 | $2,000.00 |
| 113 | (662.60000108) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 114 | (662.60000308) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 115 | (662.60000408) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 116 | (662.60000508) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 117 | (662.60000608) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 118 | (662.60000708) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 119 | (662.60000808) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 120 | (662.60000908) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 121 | (662.60001008) | 2,500 | $1.00 | $1.00 | $1.00 | |
| 122 | Adjust Existing Valve Box Elevation (663.33) | EACH | 7 | $800.00 | $425.00 | $150.00 |
| 123 | (670.0106) | EACH | 1 | $3,000.00 | $6,500.00 | $10,000 |
| 124 | Performance Concrete Quality Adjustment (670.99) | QUALITY UNIT | 1 | $21.49 | $21.49 | $21.49 |
| 125 | (680.05010007) | 12 | $22,800 | $25,000 | $21,000 | |
| 126 | (680.05020007) | 12 | $4,000.00 | $5,000.00 | $5,000.00 | |
| 127 | (680.05040004) | 29 | $4,000.00 | $4,000.00 | $4,000.00 | |
| 128 | (680.11120814) | 6 | $9,100.00 | $17,000 | $12,000 | |
| 129 | (680.11131014) | 26 | $6,200.00 | $17,000 | $8,500.00 | |
| 130 | Pole Excavation and Concrete Foundation (680.5001) | CY | 69 | $3,000.00 | $2,500.00 | $4,200.00 |
| 131 | Concrete Base for Controller Cabinet (680.5002) | EACH | 8 | $3,500.00 | $2,750.00 | $2,000.00 |
| 132 | (680.50500005) | 21 | $500.00 | $285.00 | $1,000.00 | |
| 133 | (680.51000105) | 4 | $900.00 | $1,000.00 | $1,000.00 | |
| 134 | (680.510201) | EACH | 20 | $2,000.00 | $2,250.00 | $2,000.00 |
| 135 | (680.510301) | EACH | 33 | $2,300.00 | $2,750.00 | $2,500.00 |
| 136 | (680.51100010) | 5 | $400.00 | $500.00 | $500.00 | |
| 137 | (680.520103) | LF | 50 | $40.00 | $57.00 | $20.00 |
| 138 | (680.520105) | LF | 288 | $35.00 | $60.00 | $30.00 |
| 139 | (680.520506) | LF | 904 | $13.00 | $30.00 | $35.00 |
| 140 | (680.520508) | LF | 7,362 | $15.00 | $13.00 | $20.00 |
| 141 | (680.600732) | EACH | 1 | $13,700 | $12,000 | $16,000 |
| 142 | (680.622030) | EACH | 1 | $11,900 | $13,000 | $12,000 |
| 143 | (680.622033) | EACH | 1 | $12,100 | $14,000 | $12,000 |
| 144 | (680.622043) | EACH | 1 | $17,500 | $22,000 | $18,000 |
| 145 | (680.622048) | EACH | 2 | $18,900 | $23,000 | $20,000 |
| 146 | (680.622049) | EACH | 2 | $19,100 | $23,000 | $20,000 |
| 147 | (680.622050) | EACH | 1 | $19,600 | $25,000 | $20,000 |
| 148 | (680.622051) | EACH | 1 | $19,665 | $25,000 | $20,000 |
| 149 | (680.622052) | EACH | 1 | $19,775 | $25,000 | $21,000 |
| 150 | (680.622053) | EACH | 1 | $19,780 | $27,000 | $21,000 |
| 151 | (680.622054) | EACH | 1 | $21,100 | $26,000 | $22,000 |
| 152 | (680.622056) | EACH | 1 | $20,125 | $25,000 | $22,000 |
| 153 | (680.622062) | EACH | 2 | $23,800 | $25,000 | $24,000 |
| 154 | (680.622063) | EACH | 2 | $23,950 | $27,000 | $25,000 |
| 155 | (680.622065) | EACH | 2 | $24,150 | $29,000 | $26,000 |
| 156 | Single Span Wire Assembly (680.7001) | EACH | 1 | $3,800.00 | $22,000 | $3,000.00 |
| 157 | Dual Span Wire Assembly with Upper Tether Wire (680.7002) | EACH | 3 | $5,000.00 | $15,000 | $4,500.00 |
| 158 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 9 | $1,500.00 | $1,500.00 | $2,200.00 |
| 159 | (680.730512) | LF | 100 | $8.00 | $7.00 | $20.00 |
| 160 | (680.730514) | LF | 18,887 | $4.75 | $4.50 | $5.00 |
| 161 | (680.730714) | LF | 3,225 | $5.00 | $6.75 | $5.00 |
| 162 | (680.77000001) | LS | 1 | $6,000.00 | $2,500.00 | $7,500.00 |
| 163 | (680.77000105) | 1 | $5,500.00 | $4,500.00 | $2,500.00 | |
| 164 | (680.77000205) | 1 | $1,700.00 | $2,000.00 | $3,500.00 | |
| 165 | (680.77000305) | 1 | $1,700.00 | $2,000.00 | $1,500.00 | |
| 166 | (680.77000405) | 1 | $1,700.00 | $2,000.00 | $1,500.00 | |
| 167 | (680.77000505) | 1 | $1,700.00 | $2,000.00 | $1,600.00 | |
| 168 | (680.77000605) | 1 | $1,700.00 | $2,000.00 | $1,600.00 | |
| 169 | (680.77000705) | 1 | $1,700.00 | $2,000.00 | $1,600.00 | |
| 170 | (680.78010005) | 11 | $850.00 | $800.00 | $500.00 | |
| 171 | (680.78040005) | 3 | $2,500.00 | $2,500.00 | $3,000.00 | |
| 172 | (680.79000105) | 1 | $4,000.00 | $7,000.00 | $3,000.00 | |
| 173 | (680.79000205) | 1 | $3,000.00 | $8,000.00 | $750.00 | |
| 174 | (680.79000305) | 1 | $5,000.00 | $8,000.00 | $6,500.00 | |
| 175 | (680.79000405) | 1 | $5,000.00 | $8,000.00 | $6,500.00 | |
| 176 | (680.79000505) | 1 | $2,500.00 | $8,000.00 | $1,500.00 | |
| 177 | (680.79000605) | 1 | $5,000.00 | $8,000.00 | $6,500.00 | |
| 178 | (680.79000705) | 1 | $4,000.00 | $8,000.00 | $2,500.00 | |
| 179 | (680.79000805) | 1 | $5,000.00 | $8,000.00 | $6,500.00 | |
| 180 | (680.79000905) | 1 | $2,500.00 | $8,000.00 | $3,000.00 | |
| 181 | (680.79001005) | 1 | $3,000.00 | $8,000.00 | $1,500.00 | |
| 182 | (680.80324515) | 9 | $3,500.00 | $1,750.00 | $2,000.00 | |
| 183 | (680.80324708) | 8 | $1,600.00 | $2,000.00 | $1,500.00 | |
| 184 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 74 | $140.00 | $175.00 | $70.00 |
| 185 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 10 | $140.00 | $175.00 | $75.00 |
| 186 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 74 | $140.00 | $175.00 | $70.00 |
| 187 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 33 | $140.00 | $175.00 | $75.00 |
| 188 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 74 | $140.00 | $175.00 | $70.00 |
| 189 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 22 | $140.00 | $175.00 | $75.00 |
| 190 | Traffic Signal Section - Aluminum Type I, 12-inch (680.810107) | EACH | 27 | $175.00 | $175.00 | $400.00 |
| 191 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 260 | $160.00 | $175.00 | $350.00 |
| 192 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 86 | $425.00 | $625.00 | $650.00 |
| 193 | Traffic Signal Disconnect Hanger (680.8120) | EACH | 25 | $450.00 | $700.00 | $600.00 |
| 194 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 10 | $275.00 | $825.00 | $200.00 |
| 195 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 20 | $275.00 | $300.00 | $600.00 |
| 196 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 7 | $325.00 | $400.00 | $700.00 |
| 197 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 3 | $300.00 | $300.00 | $500.00 |
| 198 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 6 | $275.00 | $350.00 | $200.00 |
| 199 | (680.8151) | EACH | 10 | $1,150.00 | $1,900.00 | $1,500.00 |
| 200 | Backplates for Traffic Signal Heads (680.8199) | EACH | 53 | $325.00 | $350.00 | $500.00 |
| 201 | (680.8203) | EACH | 12 | $900.00 | $1,100.00 | $900.00 |
| 202 | (680.8205) | EACH | 22 | $900.00 | $1,100.00 | $1,000.00 |
| 203 | (680.82250801) | 53 | $375.00 | $475.00 | $1,300.00 | |
| 204 | (680.83010005) | 783 | $10.00 | $4.50 | $12.00 | |
| 205 | Meter Pan (680.9402) | EACH | 9 | $800.00 | $1,500.00 | $1,200.00 |
| 206 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 9 | $900.00 | $1,300.00 | $500.00 |
| 207 | (680.95010105) | 1 | $4,000.00 | $6,000.00 | $6,000.00 | |
| 208 | (680.950106) | LF | 3,396 | $4.00 | $8.50 | $15.00 |
| 209 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $10.00 | $10.00 | $10.00 |
| 210 | (680.99050010) | 1 | $1,200.00 | $900.00 | $1,500.00 | |
| 211 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 66,530 | $0.73 | $0.67 | $0.70 |
| 212 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 61,136 | $0.73 | $0.67 | $0.70 |
| 213 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 27,642 | $4.70 | $4.50 | $4.50 |
| 214 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 16 | $80.00 | $70.00 | $70.00 |
| 215 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 172 | $300.00 | $275.00 | $300.00 |
| 216 | Field Change Payment (FCP) (697.03) | DOL | 405,000 | $1.00 | $1.00 | $1.00 |
| 217 | Asphalt Price Adjustment (698.04) | DOL | 36,917 | $1.00 | $1.00 | $1.00 |
| 218 | Fuel Price Adjustment (698.05) | DOL | 8,758 | $1.00 | $1.00 | $1.00 |
| 219 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 220 | Mobilization (699.040001) | LS | 1 | $335,305 | $380,000 | $460,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 27, 2025. Compiled by Mirage Metrics.