NYSDOT contract D265590 bid tabulation
STRUCTURE REPLACEMENT - NY Route 5 (S.H. 62-20). Let by New York State DOT on December 4, 2025, Erie, Region 05. 4 bids received; low bid $8,325,000 by Cold Spring Construction Company.
- Owner
- New York State DOT
- Letting
- 04 DEC 2025
- Pay items
- 164
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Cold Spring Construction Company | $8,325,000 | Low |
| 2 | Union Concrete & Construction Corp | $8,380,518 | +1.0% |
| 3 | Concrete Applied Technologies Corp/DBA:Catco | $8,702,230 | +5.0% |
| 4 | Oakgrove Construction Inc | $10,998,328 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cold Spring Construction Company | 2. Union Concrete & Construction Corp | 3. Concrete Applied Technologies Corp/DBA:Catco | 4. Oakgrove Construction Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $10,000 | $15,000 | $7,000.00 | $5,000.00 |
| 2 | (202.120001) | LS | 1 | $200,000 | $375,000 | $245,000 | $250,000 |
| 3 | Removal of Substructures (202.19) | CY | 259 | $80.00 | $200.00 | $2.00 | $500.00 |
| 4 | Unclassified Excavation and Disposal (203.02) | CY | 13,429 | $30.00 | $17.00 | $35.00 | $25.00 |
| 5 | Embankment In Place (203.03) | CY | 2,121 | $8.00 | $13.00 | $35.00 | $35.00 |
| 6 | (203.03950017) | 301,213 | $3.25 | $4.10 | $4.15 | $6.00 | |
| 7 | Select Granular Fill (203.07) | CY | 172 | $52.50 | $110.00 | $65.00 | $100.00 |
| 8 | Select Structural Fill (203.21) | CY | 5,940 | $60.00 | $83.50 | $60.00 | $70.00 |
| 9 | (203.24010017) | 416 | $55.00 | $70.00 | $70.00 | $60.00 | |
| 10 | (203.51990006) | 125 | $10.00 | $11.00 | $15.00 | $20.00 | |
| 11 | (205.0201) | LS | 1 | $2,000.00 | $2,000.00 | $5,000.00 | $1,500.00 |
| 12 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 8 | $125.00 | $215.00 | $115.00 | $150.00 |
| 13 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 2 | $250.00 | $520.00 | $285.00 | $350.00 |
| 14 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 1 | $500.00 | $2,100.00 | $200.00 | $800.00 |
| 15 | Laboratory Analysis for Ignitability (205.0403) | EACH | 1 | $55.00 | $85.00 | $60.00 | $50.00 |
| 16 | Laboratory Analysis for ph (205.0404) | EACH | 1 | $30.00 | $85.00 | $30.00 | $35.00 |
| 17 | Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405) | EACH | 1 | $90.00 | $195.00 | $110.00 | $125.00 |
| 18 | Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406) | EACH | 1 | $110.00 | $147.00 | $110.00 | $125.00 |
| 19 | Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407) | EACH | 1 | $110.00 | $120.00 | $100.00 | $125.00 |
| 20 | (205.050201) | TON | 24 | $110.00 | $98.00 | $150.00 | $95.00 |
| 21 | Structure Excavation (206.01) | CY | 6,788 | $40.00 | $22.00 | $28.00 | $35.00 |
| 22 | Trench and Culvert Excavation (206.0201) | CY | 192 | $25.00 | $60.00 | $37.00 | $75.00 |
| 23 | (206.03060005) | 864 | $25.00 | $126.00 | $110.00 | $100.00 | |
| 24 | (206.04000001) | 4 | $250.00 | $915.00 | $2,500.00 | $1,500.00 | |
| 25 | Geotextile Separation (207.21) | SY | 800 | $2.25 | $3.00 | $3.00 | $3.00 |
| 26 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 504 | $8.00 | $18.00 | $15.00 | $15.00 |
| 27 | Seed and Mulch – Temporary (209.1003) | SY | 5,430 | $0.01 | $0.60 | $0.10 | $1.00 |
| 28 | Drainage Structure Inlet Protection, Gravel Bag – Temporary (209.1702) | CY | 3 | $750.00 | $300.00 | $670.00 | $1,000.00 |
| 29 | Stabilized Construction Access (209.22) | SY | 80 | $50.00 | $21.00 | $38.00 | $50.00 |
| 30 | (209.23010009) | 880 | $5.00 | $7.50 | $7.00 | $10.00 | |
| 31 | Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3312) | SF | 485 | $15.00 | $48.00 | $67.00 | $50.00 |
| 32 | Subbase Course, Optional Type (304.15) | CY | 709 | $85.00 | $110.00 | $85.00 | $125.00 |
| 33 | (304.15010005) | 616 | $85.00 | $78.00 | $65.00 | $100.00 | |
| 34 | (404.0189) | TON | 133 | $125.00 | $150.00 | $170.00 | $125.00 |
| 35 | (404.0982) | TON | 445 | $135.00 | $150.00 | $155.00 | $200.00 |
| 36 | (404.1989) | TON | 562 | $100.00 | $130.00 | $115.00 | $200.00 |
| 37 | (404.3789) | TON | 1,930 | $90.00 | $100.00 | $105.00 | $90.00 |
| 38 | Diluted Tack Coat (407.0102) | GAL | 1,346 | $16.00 | $6.50 | $5.50 | $8.00 |
| 39 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 2,516 | $1.00 | $0.50 | $1.30 | $0.50 |
| 40 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 1,246 | $6.25 | $9.50 | $6.00 | $10.00 |
| 41 | Miscellaneous Cold Milling of Portland Cement Concrete (490.40) | SY | 10 | $125.00 | $85.00 | $30.00 | $75.00 |
| 42 | (502.12120018) | 3 | $4,000.00 | $7,500.00 | $4,400.00 | $2,500.00 | |
| 43 | (520.51000006) | 4 | $300.00 | $55.00 | $250.00 | $500.00 | |
| 44 | Temporary Steel Sheeting (552.13) | SF | 4,800 | $25.00 | $20.00 | $0.01 | $20.00 |
| 45 | Shields and Shoring (552.17) | SF | 3,640 | $0.25 | $0.10 | $0.50 | $0.01 |
| 46 | Fill Type Retaining Wall (Greater than 30 ft.) (554.45) | SF | 6,875 | $150.00 | $90.00 | $115.00 | $90.00 |
| 47 | Fill Type Retaining Wall Aesthetic Treatment - Textured Surface (Hand Tooled, Raked, etc.), Integral Color (554.5002) | SF | 7,760 | $5.00 | $2.75 | $2.15 | $2.00 |
| 48 | Footing Concrete, Performance (555.0011) | CY | 210 | $800.00 | $725.00 | $990.00 | $1,200.00 |
| 49 | Concrete for Structures, Performance (555.0021) | CY | 433 | $1,500.00 | $1,550.00 | $1,050.00 | $800.00 |
| 50 | (555.72940001) | 1,170 | $40.00 | $31.00 | $81.00 | $30.00 | |
| 51 | (555.72950010) | 1,170 | $13.00 | $20.00 | $21.40 | $45.00 | |
| 52 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $3.75 | $3.75 | $3.75 | $3.75 |
| 53 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $6.25 | $6.25 | $6.25 | $6.25 |
| 54 | Uncoated Steel Fabric Reinforcement for Structures (556.0101) | SY | 1,985 | $8.00 | $9.00 | $6.35 | $7.00 |
| 55 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 20,766 | $2.00 | $1.80 | $3.15 | $2.25 |
| 56 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 65,953 | $2.00 | $1.95 | $3.30 | $2.50 |
| 57 | Protective Sealing of New Structural Concrete (559.02) | SF | 12,900 | $1.50 | $0.70 | $1.30 | $1.50 |
| 58 | Protective Sealing of Concrete with Coating Type Protective Sealer (559.04) | SQUAREFOOT | 2,340 | $2.00 | $3.00 | $2.20 | $3.00 |
| 59 | (559.90010011) | 895 | $18.00 | $19.00 | $2.90 | $20.00 | |
| 60 | (562.0101) | SY | 205 | $2,500.00 | $2,100.00 | $1,230.00 | $2,800.00 |
| 61 | Performance Concrete Quality Adjustment (562.99) | QUALITY UNIT | 1 | $31.00 | $31.00 | $31.00 | $31.00 |
| 62 | (569.10010011) | 412 | $500.00 | $665.00 | $930.00 | $750.00 | |
| 63 | Lead-Exposure Control Plan (570.01) | LS | 1 | $2,500.00 | $250.00 | $6,100.00 | $5,000.00 |
| 64 | Medical Testing (570.02) | DOL | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 65 | Personal-Exposure-Monitoring Sample Analysis (570.03) | DOL | 4,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 66 | Decontamination Facilities (570.04) | CALENDAR WEEK | 8 | $200.00 | $100.00 | $415.00 | $1.00 |
| 67 | (570.09) | LS | 1 | $5,000.00 | $100.00 | $1,100.00 | $1.00 |
| 68 | Disposal of Hazardous Paint Removal Waste Containing Lead (571.03) | LB | 1,000 | $0.50 | $2.00 | $8.80 | $1.00 |
| 69 | Removal of Concrete Approach Slab (580.04) | SF | 2,634 | $5.00 | $7.00 | $11.00 | $10.00 |
| 70 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 160 | $35.00 | $35.00 | $70.00 | $50.00 |
| 71 | (595.50000018) | 8,664 | $5.00 | $6.50 | $3.90 | $2.00 | |
| 72 | (603.9812) | LF | 52 | $100.00 | $19.00 | $54.00 | $75.00 |
| 73 | (604.300103) | LF | 8 | $1,200.00 | $725.00 | $1,100.00 | $1,400.00 |
| 74 | (604.300203) | LF | 16 | $1,200.00 | $715.00 | $1,100.00 | $1,400.00 |
| 75 | Underdrain Filter, Type II (605.1001) | CY | 250 | $80.00 | $68.00 | $100.00 | $125.00 |
| 76 | (605.1502) | LF | 108 | $55.00 | $3.75 | $13.00 | $12.00 |
| 77 | (605.1701) | LF | 1,678 | $30.00 | $3.00 | $9.80 | $15.00 |
| 78 | (605.98101218) | 299 | $85.00 | $18.50 | $32.00 | $45.00 | |
| 79 | Box Beam Guide Railing (606.10) | LF | 425 | $75.00 | $75.00 | $55.00 | $55.00 |
| 80 | Single-Slope Concrete Median Barrier (Precast) (606.3042) | LF | 620 | $110.00 | $171.00 | $130.00 | $250.00 |
| 81 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 425 | $10.00 | $5.00 | $6.30 | $10.00 |
| 82 | Removing and Disposing Concrete Barrier (606.75) | LF | 200 | $20.00 | $23.00 | $25.00 | $50.00 |
| 83 | Transition Between Single Slope Half Section Concrete Barrier and Box Beam Guide Rail (One Way - Trailing End of Barrier) (606.8804) | EACH | 4 | $0.01 | $620.00 | $22,600 | $1.00 |
| 84 | (607.06410016) | 60 | $75.00 | $93.00 | $80.00 | $100.00 | |
| 85 | (607.41010010) | 342 | $7.00 | $6.50 | $5.00 | $5.00 | |
| 86 | Concrete Sidewalks and Driveways (608.0101) | CY | 36 | $750.00 | $700.00 | $1,200.00 | $700.00 |
| 87 | (609.02110011) | 95 | $100.00 | $128.00 | $195.00 | $100.00 | |
| 88 | (609.02130011) | 74 | $100.00 | $130.00 | $195.00 | $100.00 | |
| 89 | Stone Curb – Bridge (Type A) (609.0301) | LF | 47 | $100.00 | $128.00 | $215.00 | $100.00 |
| 90 | (609.06000008) | 76 | $25.00 | $10.00 | $12.50 | $25.00 | |
| 91 | Compost (610.10) | CY | 145 | $130.00 | $130.00 | $140.00 | $125.00 |
| 92 | Topsoil - Roadside (610.1402) | CY | 792 | $95.00 | $75.00 | $82.00 | $100.00 |
| 93 | Turf Establishment -Lawns (610.1602) | SY | 10,860 | $2.00 | $1.50 | $2.20 | $2.00 |
| 94 | Watering Vegetation (610.19) | 1,000 GALLONS | 125 | $60.00 | $12.00 | $0.10 | $55.00 |
| 95 | (611.0151) | EACH | 17 | $1,500.00 | $1,575.00 | $1,250.00 | $1,500.00 |
| 96 | (611.0281) | EACH | 11 | $1,250.00 | $1,315.00 | $1,300.00 | $1,250.00 |
| 97 | (611.0452) | EACH | 4 | $150.00 | $158.00 | $250.00 | $200.00 |
| 98 | Portable Drip Irrigation System (611.17) | EACH | 32 | $75.00 | $78.00 | $80.00 | $100.00 |
| 99 | (611.19010024) | 17 | $50.00 | $53.00 | $200.00 | $50.00 | |
| 100 | (611.19020024) | 11 | $50.00 | $53.00 | $200.00 | $50.00 | |
| 101 | (611.19040024) | 4 | $4.00 | $10.50 | $55.00 | $10.00 | |
| 102 | Rodent Guard (611.21) | EACH | 28 | $35.00 | $15.75 | $32.00 | $25.00 |
| 103 | (617.10000024) | 129 | $15.00 | $25.00 | $120.00 | $150.00 | |
| 104 | (617.11000024) | LS | 1 | $500.00 | $100.00 | $1,700.00 | $1,500.00 |
| 105 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $300,000 | $450,000 | $529,000 | $1,846,000 |
| 106 | Type III Construction Barricades (619.04) | EACH | 49 | $110.00 | $125.00 | $135.00 | $125.00 |
| 107 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 2,515 | $4.00 | $2.75 | $6.10 | $5.00 |
| 108 | (619.100103) | LF | 6,302 | $2.25 | $2.00 | $4.80 | $4.00 |
| 109 | (619.111113) | EACH | 11 | $5,000.00 | $3,300.00 | $3,100.00 | $5,100.00 |
| 110 | (619.130201) | EACH | 1 | $17,500 | $75,000 | $65,000 | $25,000 |
| 111 | (619.130202) | EACH | 1 | $17,500 | $75,000 | $65,000 | $25,000 |
| 112 | (619.17060005) | 660 | $0.50 | $1.00 | $2.50 | $5.00 | |
| 113 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 145 | $45.00 | $38.00 | $45.00 | $25.00 |
| 114 | Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715) | LF | 725 | $45.00 | $30.00 | $26.00 | $50.00 |
| 115 | Warning Lights on Temporary Positive Barriers (619.1719) | EACH | 169 | $25.00 | $20.00 | $90.00 | $25.00 |
| 116 | Stone Filling (Light) (620.03) | CY | 48 | $165.00 | $155.00 | $175.00 | $150.00 |
| 117 | Bedding Material, Type 2 (620.0802) | CY | 44 | $160.00 | $123.00 | $195.00 | $200.00 |
| 118 | Crushed Gravel (In-Place Measure) (623.11) | CY | 151 | $150.00 | $105.00 | $105.00 | $100.00 |
| 119 | Crushed Stone (In-Place Measure) (623.12) | CY | 336 | $175.00 | $155.00 | $115.00 | $300.00 |
| 120 | Survey Operations (625.01) | LS | 1 | $50,000 | $41,000 | $80,000 | $75,000 |
| 121 | (627.50140008) | 237 | $8.00 | $6.00 | $10.00 | $10.00 | |
| 122 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $1,000.00 | $750.00 | $3,900.00 | $2,000.00 |
| 123 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 15 | $2,500.00 | $2,600.00 | $2,400.00 | $2,000.00 |
| 124 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 125 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 126 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 127 | (637.41000115) | 15 | $85.00 | $115.00 | $75.00 | $150.00 | |
| 128 | (637.41000215) | 15 | $85.00 | $115.00 | $75.00 | $150.00 | |
| 129 | (645.35010010) | 6 | $1,750.00 | $810.00 | $1,500.00 | $2,000.00 | |
| 130 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 2 | $200.00 | $205.00 | $215.00 | $750.00 |
| 131 | Milled-In Audible Roadway Delineators (MIARDs) (649.01) | LF | 840 | $12.00 | $6.20 | $6.50 | $8.00 |
| 132 | (662.61060008) | 4 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | |
| 133 | (663.0116) | LF | 220 | $275.00 | $275.00 | $280.00 | $500.00 |
| 134 | (663.1816) | EACH | 2 | $2,500.00 | $2,200.00 | $2,200.00 | $1,500.00 |
| 135 | Iron Water Main Fittings (10 - 16 inch diameter) (663.2002) | LB | 565 | $8.00 | $11.25 | $11.30 | $5.00 |
| 136 | (663.2116) | EACH | 14 | $750.00 | $285.00 | $500.00 | $300.00 |
| 137 | Disconnect and Cap Existing Water Main (663.40) | EACH | 2 | $2,000.00 | $1,315.00 | $3,300.00 | $500.00 |
| 138 | (663.4116) | LF | 40 | $50.00 | $1.00 | $34.00 | $75.00 |
| 139 | (670.0106) | EACH | 2 | $5,500.00 | $2,785.00 | $2,500.00 | $3,500.00 |
| 140 | (670.2003) | LF | 476 | $40.00 | $42.00 | $38.00 | $75.00 |
| 141 | Pullboxes less than 5 cubic feet, inside volume (Lighting) (670.3001) | EACH | 6 | $1,750.00 | $2,940.00 | $2,800.00 | $3,000.00 |
| 142 | (670.502410) | 4 | $3,500.00 | $2,835.00 | $2,500.00 | $2,000.00 | |
| 143 | (670.7007) | LF | 1,296 | $7.00 | $3.15 | $3.00 | $8.00 |
| 144 | Remove and Store Lamppost Assembly (670.80) | EACH | 4 | $1,000.00 | $2,100.00 | $2,000.00 | $1,500.00 |
| 145 | Relocate Lamppost Assembly (670.90) | EACH | 4 | $2,000.00 | $3,150.00 | $3,000.00 | $5,000.00 |
| 146 | Performance Concrete Quality Adjustment (670.99) | QUALITY UNIT | 1 | $22.92 | $22.92 | $22.92 | $22.92 |
| 147 | (680.52010611) | 420 | $35.00 | $42.00 | $41.00 | $30.00 | |
| 148 | (680.520510) | LF | 370 | $55.00 | $1.05 | $1.00 | $40.00 |
| 149 | (680.78010005) | 1 | $1,000.00 | $2,625.00 | $1,500.00 | $750.00 | |
| 150 | (680.79000105) | 1 | $6,000.00 | $10,500 | $10,000 | $10,000 | |
| 151 | (683.06020005) | 1,480 | $7.00 | $17.85 | $17.00 | $15.00 | |
| 152 | (683.08010505) | 136 | $350.00 | $225.00 | $200.00 | $200.00 | |
| 153 | (683.08010905) | 1 | $4,500.00 | $8,000.00 | $6,000.00 | $15,000 | |
| 154 | (683.08011305) | 10 | $1,500.00 | $210.00 | $125.00 | $300.00 | |
| 155 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 1,598 | $2.25 | $5.90 | $4.15 | $4.00 |
| 156 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 1,375 | $2.25 | $6.20 | $4.15 | $4.00 |
| 157 | (690.01000105) | LS | 1 | $150,000 | $70,000 | $100,000 | $200,000 |
| 158 | (695.33110105) | LS | 1 | $35,000 | $1.00 | $26,500 | $10,000 |
| 159 | Field Change Payment (FCP) (697.03) | DOL | 390,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 160 | Asphalt Price Adjustment (698.04) | DOL | 7,531 | $1.00 | $1.00 | $1.00 | $1.00 |
| 161 | Fuel Price Adjustment (698.05) | DOL | 5,682 | $1.00 | $1.00 | $1.00 | $1.00 |
| 162 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 163 | (698.93940008) | LS | 1 | $60,000 | $60,000 | $60,000 | $60,000 |
| 164 | Mobilization (699.040001) | LS | 1 | $314,757 | $322,000 | $334,000 | $423,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of December 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.