NYSDOT contract D265590 bid tabulation

STRUCTURE REPLACEMENT - NY Route 5 (S.H. 62-20). Let by New York State DOT on December 4, 2025, Erie, Region 05. 4 bids received; low bid $8,325,000 by Cold Spring Construction Company.

Owner
New York State DOT
Letting
04 DEC 2025
Pay items
164
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Cold Spring Construction Company$8,325,000Low
2Union Concrete & Construction Corp$8,380,518+1.0%
3Concrete Applied Technologies Corp/DBA:Catco$8,702,230+5.0%
4Oakgrove Construction Inc$10,998,328+32%
NYSDOT contract D265590: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Cold Spring Construction Company2. Union Concrete & Construction Corp3. Concrete Applied Technologies Corp/DBA:Catco4. Oakgrove Construction Inc
1Clearing and Grubbing (201.06)LS1$10,000$15,000$7,000.00$5,000.00
2 (202.120001)LS1$200,000$375,000$245,000$250,000
3Removal of Substructures (202.19)CY259$80.00$200.00$2.00$500.00
4Unclassified Excavation and Disposal (203.02)CY13,429$30.00$17.00$35.00$25.00
5Embankment In Place (203.03)CY2,121$8.00$13.00$35.00$35.00
6 (203.03950017)301,213$3.25$4.10$4.15$6.00
7Select Granular Fill (203.07)CY172$52.50$110.00$65.00$100.00
8Select Structural Fill (203.21)CY5,940$60.00$83.50$60.00$70.00
9 (203.24010017)416$55.00$70.00$70.00$60.00
10 (203.51990006)125$10.00$11.00$15.00$20.00
11 (205.0201)LS1$2,000.00$2,000.00$5,000.00$1,500.00
12Field Organic Vapor Monitoring of Contaminated Soil (205.03)HR8$125.00$215.00$115.00$150.00
13Petroleum Contamination Parameter Analysis (205.0401)EACH2$250.00$520.00$285.00$350.00
14Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402)EACH1$500.00$2,100.00$200.00$800.00
15Laboratory Analysis for Ignitability (205.0403)EACH1$55.00$85.00$60.00$50.00
16Laboratory Analysis for ph (205.0404)EACH1$30.00$85.00$30.00$35.00
17Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405)EACH1$90.00$195.00$110.00$125.00
18Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406)EACH1$110.00$147.00$110.00$125.00
19Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407)EACH1$110.00$120.00$100.00$125.00
20 (205.050201)TON24$110.00$98.00$150.00$95.00
21Structure Excavation (206.01)CY6,788$40.00$22.00$28.00$35.00
22Trench and Culvert Excavation (206.0201)CY192$25.00$60.00$37.00$75.00
23 (206.03060005)864$25.00$126.00$110.00$100.00
24 (206.04000001)4$250.00$915.00$2,500.00$1,500.00
25Geotextile Separation (207.21)SY800$2.25$3.00$3.00$3.00
26Prefabricated Composite Integral Abutment Drain (207.27)SY504$8.00$18.00$15.00$15.00
27Seed and Mulch – Temporary (209.1003)SY5,430$0.01$0.60$0.10$1.00
28Drainage Structure Inlet Protection, Gravel Bag – Temporary (209.1702)CY3$750.00$300.00$670.00$1,000.00
29Stabilized Construction Access (209.22)SY80$50.00$21.00$38.00$50.00
30 (209.23010009)880$5.00$7.50$7.00$10.00
31Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3312)SF485$15.00$48.00$67.00$50.00
32Subbase Course, Optional Type (304.15)CY709$85.00$110.00$85.00$125.00
33 (304.15010005)616$85.00$78.00$65.00$100.00
34 (404.0189)TON133$125.00$150.00$170.00$125.00
35 (404.0982)TON445$135.00$150.00$155.00$200.00
36 (404.1989)TON562$100.00$130.00$115.00$200.00
37 (404.3789)TON1,930$90.00$100.00$105.00$90.00
38Diluted Tack Coat (407.0102)GAL1,346$16.00$6.50$5.50$8.00
39Asphalt Pavement Joint Adhesive (418.7603)LF2,516$1.00$0.50$1.30$0.50
40Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY1,246$6.25$9.50$6.00$10.00
41Miscellaneous Cold Milling of Portland Cement Concrete (490.40)SY10$125.00$85.00$30.00$75.00
42 (502.12120018)3$4,000.00$7,500.00$4,400.00$2,500.00
43 (520.51000006)4$300.00$55.00$250.00$500.00
44Temporary Steel Sheeting (552.13)SF4,800$25.00$20.00$0.01$20.00
45Shields and Shoring (552.17)SF3,640$0.25$0.10$0.50$0.01
46Fill Type Retaining Wall (Greater than 30 ft.) (554.45)SF6,875$150.00$90.00$115.00$90.00
47Fill Type Retaining Wall Aesthetic Treatment - Textured Surface (Hand Tooled, Raked, etc.), Integral Color (554.5002)SF7,760$5.00$2.75$2.15$2.00
48Footing Concrete, Performance (555.0011)CY210$800.00$725.00$990.00$1,200.00
49Concrete for Structures, Performance (555.0021)CY433$1,500.00$1,550.00$1,050.00$800.00
50 (555.72940001)1,170$40.00$31.00$81.00$30.00
51 (555.72950010)1,170$13.00$20.00$21.40$45.00
52Performance Concrete Quality Adjustment – Footing Concrete (555.9901)QUALITY UNIT1$3.75$3.75$3.75$3.75
53Performance Concrete Quality Adjustment – Concrete for Structures (555.9902)QUALITY UNIT1$6.25$6.25$6.25$6.25
54Uncoated Steel Fabric Reinforcement for Structures (556.0101)SY1,985$8.00$9.00$6.35$7.00
55Uncoated Bar Reinforcement for Concrete Structures (556.0201)LB20,766$2.00$1.80$3.15$2.25
56Epoxy-Coated Bar Reinforcement for Structures (556.0202)LB65,953$2.00$1.95$3.30$2.50
57Protective Sealing of New Structural Concrete (559.02)SF12,900$1.50$0.70$1.30$1.50
58Protective Sealing of Concrete with Coating Type Protective Sealer (559.04)SQUAREFOOT2,340$2.00$3.00$2.20$3.00
59 (559.90010011)895$18.00$19.00$2.90$20.00
60 (562.0101)SY205$2,500.00$2,100.00$1,230.00$2,800.00
61Performance Concrete Quality Adjustment (562.99)QUALITY UNIT1$31.00$31.00$31.00$31.00
62 (569.10010011)412$500.00$665.00$930.00$750.00
63Lead-Exposure Control Plan (570.01)LS1$2,500.00$250.00$6,100.00$5,000.00
64Medical Testing (570.02)DOL10,000$1.00$1.00$1.00$1.00
65Personal-Exposure-Monitoring Sample Analysis (570.03)DOL4,000$1.00$1.00$1.00$1.00
66Decontamination Facilities (570.04)CALENDAR WEEK8$200.00$100.00$415.00$1.00
67 (570.09)LS1$5,000.00$100.00$1,100.00$1.00
68Disposal of Hazardous Paint Removal Waste Containing Lead (571.03)LB1,000$0.50$2.00$8.80$1.00
69Removal of Concrete Approach Slab (580.04)SF2,634$5.00$7.00$11.00$10.00
70Drilling and Grouting Bolts or Reinforcing Bars (586.0201)EACH160$35.00$35.00$70.00$50.00
71 (595.50000018)8,664$5.00$6.50$3.90$2.00
72 (603.9812)LF52$100.00$19.00$54.00$75.00
73 (604.300103)LF8$1,200.00$725.00$1,100.00$1,400.00
74 (604.300203)LF16$1,200.00$715.00$1,100.00$1,400.00
75Underdrain Filter, Type II (605.1001)CY250$80.00$68.00$100.00$125.00
76 (605.1502)LF108$55.00$3.75$13.00$12.00
77 (605.1701)LF1,678$30.00$3.00$9.80$15.00
78 (605.98101218)299$85.00$18.50$32.00$45.00
79Box Beam Guide Railing (606.10)LF425$75.00$75.00$55.00$55.00
80Single-Slope Concrete Median Barrier (Precast) (606.3042)LF620$110.00$171.00$130.00$250.00
81Removing and Disposing Box Beam Guide Railing (606.73)LF425$10.00$5.00$6.30$10.00
82Removing and Disposing Concrete Barrier (606.75)LF200$20.00$23.00$25.00$50.00
83Transition Between Single Slope Half Section Concrete Barrier and Box Beam Guide Rail (One Way - Trailing End of Barrier) (606.8804)EACH4$0.01$620.00$22,600$1.00
84 (607.06410016)60$75.00$93.00$80.00$100.00
85 (607.41010010)342$7.00$6.50$5.00$5.00
86Concrete Sidewalks and Driveways (608.0101)CY36$750.00$700.00$1,200.00$700.00
87 (609.02110011)95$100.00$128.00$195.00$100.00
88 (609.02130011)74$100.00$130.00$195.00$100.00
89Stone Curb – Bridge (Type A) (609.0301)LF47$100.00$128.00$215.00$100.00
90 (609.06000008)76$25.00$10.00$12.50$25.00
91Compost (610.10)CY145$130.00$130.00$140.00$125.00
92Topsoil - Roadside (610.1402)CY792$95.00$75.00$82.00$100.00
93Turf Establishment -Lawns (610.1602)SY10,860$2.00$1.50$2.20$2.00
94Watering Vegetation (610.19)1,000 GALLONS125$60.00$12.00$0.10$55.00
95 (611.0151)EACH17$1,500.00$1,575.00$1,250.00$1,500.00
96 (611.0281)EACH11$1,250.00$1,315.00$1,300.00$1,250.00
97 (611.0452)EACH4$150.00$158.00$250.00$200.00
98Portable Drip Irrigation System (611.17)EACH32$75.00$78.00$80.00$100.00
99 (611.19010024)17$50.00$53.00$200.00$50.00
100 (611.19020024)11$50.00$53.00$200.00$50.00
101 (611.19040024)4$4.00$10.50$55.00$10.00
102Rodent Guard (611.21)EACH28$35.00$15.75$32.00$25.00
103 (617.10000024)129$15.00$25.00$120.00$150.00
104 (617.11000024)LS1$500.00$100.00$1,700.00$1,500.00
105Basic Work Zone Traffic Control (619.01)LS1$300,000$450,000$529,000$1,846,000
106Type III Construction Barricades (619.04)EACH49$110.00$125.00$135.00$125.00
107Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803)LF2,515$4.00$2.75$6.10$5.00
108 (619.100103)LF6,302$2.25$2.00$4.80$4.00
109 (619.111113)EACH11$5,000.00$3,300.00$3,100.00$5,100.00
110 (619.130201)EACH1$17,500$75,000$65,000$25,000
111 (619.130202)EACH1$17,500$75,000$65,000$25,000
112 (619.17060005)660$0.50$1.00$2.50$5.00
113Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711)LF145$45.00$38.00$45.00$25.00
114Temporary Positive Barrier – Category 5 (Pinning Prohibited) (619.1715)LF725$45.00$30.00$26.00$50.00
115Warning Lights on Temporary Positive Barriers (619.1719)EACH169$25.00$20.00$90.00$25.00
116Stone Filling (Light) (620.03)CY48$165.00$155.00$175.00$150.00
117Bedding Material, Type 2 (620.0802)CY44$160.00$123.00$195.00$200.00
118Crushed Gravel (In-Place Measure) (623.11)CY151$150.00$105.00$105.00$100.00
119Crushed Stone (In-Place Measure) (623.12)CY336$175.00$155.00$115.00$300.00
120Survey Operations (625.01)LS1$50,000$41,000$80,000$75,000
121 (627.50140008)237$8.00$6.00$10.00$10.00
122Concrete Cylinder Curing Equipment (637.04)EACH1$1,000.00$750.00$3,900.00$2,000.00
123Engineer’s Field Office – Type 2 (637.12)MONTH15$2,500.00$2,600.00$2,400.00$2,000.00
124Office Technology and Supplies (637.34)DOL500$1.00$1.00$1.00$1.00
125Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00
126Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00
127 (637.41000115)15$85.00$115.00$75.00$150.00
128 (637.41000215)15$85.00$115.00$75.00$150.00
129 (645.35010010)6$1,750.00$810.00$1,500.00$2,000.00
130Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH2$200.00$205.00$215.00$750.00
131Milled-In Audible Roadway Delineators (MIARDs) (649.01)LF840$12.00$6.20$6.50$8.00
132 (662.61060008)4$1,000.00$1,000.00$1,000.00$1,000.00
133 (663.0116)LF220$275.00$275.00$280.00$500.00
134 (663.1816)EACH2$2,500.00$2,200.00$2,200.00$1,500.00
135Iron Water Main Fittings (10 - 16 inch diameter) (663.2002)LB565$8.00$11.25$11.30$5.00
136 (663.2116)EACH14$750.00$285.00$500.00$300.00
137Disconnect and Cap Existing Water Main (663.40)EACH2$2,000.00$1,315.00$3,300.00$500.00
138 (663.4116)LF40$50.00$1.00$34.00$75.00
139 (670.0106)EACH2$5,500.00$2,785.00$2,500.00$3,500.00
140 (670.2003)LF476$40.00$42.00$38.00$75.00
141Pullboxes less than 5 cubic feet, inside volume (Lighting) (670.3001)EACH6$1,750.00$2,940.00$2,800.00$3,000.00
142 (670.502410)4$3,500.00$2,835.00$2,500.00$2,000.00
143 (670.7007)LF1,296$7.00$3.15$3.00$8.00
144Remove and Store Lamppost Assembly (670.80)EACH4$1,000.00$2,100.00$2,000.00$1,500.00
145Relocate Lamppost Assembly (670.90)EACH4$2,000.00$3,150.00$3,000.00$5,000.00
146Performance Concrete Quality Adjustment (670.99)QUALITY UNIT1$22.92$22.92$22.92$22.92
147 (680.52010611)420$35.00$42.00$41.00$30.00
148 (680.520510)LF370$55.00$1.05$1.00$40.00
149 (680.78010005)1$1,000.00$2,625.00$1,500.00$750.00
150 (680.79000105)1$6,000.00$10,500$10,000$10,000
151 (683.06020005)1,480$7.00$17.85$17.00$15.00
152 (683.08010505)136$350.00$225.00$200.00$200.00
153 (683.08010905)1$4,500.00$8,000.00$6,000.00$15,000
154 (683.08011305)10$1,500.00$210.00$125.00$300.00
155White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102)LF1,598$2.25$5.90$4.15$4.00
156Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202)LF1,375$2.25$6.20$4.15$4.00
157 (690.01000105)LS1$150,000$70,000$100,000$200,000
158 (695.33110105)LS1$35,000$1.00$26,500$10,000
159Field Change Payment (FCP) (697.03)DOL390,000$1.00$1.00$1.00$1.00
160Asphalt Price Adjustment (698.04)DOL7,531$1.00$1.00$1.00$1.00
161Fuel Price Adjustment (698.05)DOL5,682$1.00$1.00$1.00$1.00
162Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00
163 (698.93940008)LS1$60,000$60,000$60,000$60,000
164Mobilization (699.040001)LS1$314,757$322,000$334,000$423,000
NYSDOT contract D265590: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of December 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy