NYSDOT contract D265451 bid tabulation
HIGHWAY MILL & FILL/CULVERT REPLACEMENT & REHAB. Let by New York State DOT on March 13, 2025, Erie, Region 05. 4 bids received; low bid $4,595,991 by Oakgrove Construction Inc.
- Owner
- New York State DOT
- Letting
- 13 MAR 2025
- Pay items
- 100
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Oakgrove Construction Inc | $4,595,991 | Low |
| 2 | Concrete Applied Technologies Corp/DBA:Catco | $4,777,709 | +4.0% |
| 3 | D&H Excavating Inc | $4,989,108 | +9.0% |
| 4 | McLaughlin Construction Corp/DBA Edbauer Construction | $4,997,918 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Oakgrove Construction Inc | 2. Concrete Applied Technologies Corp/DBA:Catco | 3. D&H Excavating Inc | 4. McLaughlin Construction Corp/DBA Edbauer Construction |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $15,000 | $11,000 | $4,000.00 | $10,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 84 | $100.00 | $127.00 | $70.00 | $130.00 |
| 3 | Embankment In Place (203.03) | CY | 14 | $50.00 | $165.00 | $140.00 | $100.00 |
| 4 | Select Granular Fill (203.07) | CY | 180 | $50.00 | $131.00 | $105.00 | $76.00 |
| 5 | (203.24010017) | 200 | $65.00 | $66.00 | $45.00 | $1.00 | |
| 6 | (205.0201) | LS | 1 | $1,500.00 | $6,000.00 | $21,000 | $20,000 |
| 7 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 3 | $360.00 | $288.00 | $175.00 | $686.00 |
| 8 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 3 | $800.00 | $204.00 | $115.00 | $686.00 |
| 9 | Laboratory Analysis for Ignitability (205.0403) | EACH | 3 | $50.00 | $60.00 | $75.00 | $528.00 |
| 10 | Laboratory Analysis for ph (205.0404) | EACH | 3 | $30.00 | $30.00 | $26.00 | $527.00 |
| 11 | Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405) | EACH | 3 | $125.00 | $98.00 | $95.00 | $527.00 |
| 12 | Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406) | EACH | 3 | $120.00 | $114.00 | $65.00 | $686.00 |
| 13 | Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407) | EACH | 3 | $130.00 | $98.00 | $46.00 | $686.00 |
| 14 | (205.050101) | TON | 37 | $85.00 | $685.00 | $525.00 | $1,170.00 |
| 15 | (205.050102) | TON | 81 | $85.00 | $685.00 | $525.00 | $1,170.00 |
| 16 | (205.050103) | TON | 183 | $85.00 | $685.00 | $525.00 | $1,170.00 |
| 17 | (205.050201) | TON | 19 | $85.00 | $107.00 | $135.00 | $102.00 |
| 18 | (205.050202) | TON | 41 | $85.00 | $107.00 | $135.00 | $102.00 |
| 19 | (205.050203) | TON | 92 | $85.00 | $107.00 | $110.00 | $102.00 |
| 20 | (205.0601) | CY | 4 | $85.00 | $144.00 | $200.00 | $1,108.00 |
| 21 | (205.0602) | CY | 3 | $85.00 | $144.00 | $200.00 | $1,108.00 |
| 22 | (205.0603) | CY | 8 | $85.00 | $144.00 | $200.00 | $1,108.00 |
| 23 | Trench and Culvert Excavation (206.0201) | CY | 300 | $25.00 | $50.00 | $60.00 | $24.00 |
| 24 | (207.96000017) | 4,420 | $0.25 | $0.35 | $0.70 | $1.54 | |
| 25 | Seed and Mulch – Temporary (209.1003) | SY | 1,134 | $1.00 | $1.00 | $3.00 | $0.01 |
| 26 | (304.15200005) | 176 | $125.00 | $129.00 | $140.00 | $94.00 | |
| 27 | (404.0001) | TON | 936 | $100.00 | $100.00 | $100.00 | $100.00 |
| 28 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 876 | $100.00 | $100.00 | $100.00 | $100.00 |
| 29 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 1,200 | $100.00 | $100.00 | $100.00 | $100.00 |
| 30 | (404.0952) | TON | 18,540 | $105.00 | $100.70 | $104.25 | $119.00 |
| 31 | (404.0982) | TON | 110 | $275.00 | $226.00 | $240.00 | $170.00 |
| 32 | (404.1989) | TON | 17 | $200.00 | $180.00 | $260.00 | $435.00 |
| 33 | (404.3789) | TON | 40 | $150.00 | $155.00 | $225.00 | $300.00 |
| 34 | Diluted Tack Coat (407.0102) | GAL | 22,800 | $4.00 | $3.90 | $5.00 | $4.90 |
| 35 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 160,900 | $0.25 | $0.01 | $0.30 | $0.10 |
| 36 | Production Cold-Mill Surface Planing of Bituminous Concrete (490.15) | SY | 217,000 | $1.45 | $1.65 | $1.40 | $1.36 |
| 37 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 570 | $20.00 | $18.00 | $15.00 | $20.00 |
| 38 | Shields and Shoring (552.17) | SF | 450 | $10.00 | $0.80 | $4.00 | $1.00 |
| 39 | (602.3624) | LF | 85 | $300.00 | $313.00 | $300.00 | $302.00 |
| 40 | (602.3630) | LF | 280 | $325.00 | $340.00 | $356.00 | $309.00 |
| 41 | (602.3642) | LF | 100 | $550.00 | $553.00 | $650.00 | $620.00 |
| 42 | Culvert-End Safety Grate (603.0101) | SF | 800 | $24.00 | $31.00 | $31.00 | $33.00 |
| 43 | (603.171416) | EACH | 2 | $750.00 | $1,550.00 | $880.00 | $882.00 |
| 44 | (603.171614) | EACH | 8 | $1,000.00 | $1,700.00 | $1,800.00 | $1,819.00 |
| 45 | (603.171912) | EACH | 4 | $2,000.00 | $3,900.00 | $3,350.00 | $2,734.00 |
| 46 | (603.9824) | LF | 55 | $100.00 | $114.00 | $115.00 | $350.00 |
| 47 | (603.9836) | LF | 60 | $120.00 | $125.00 | $130.00 | $515.00 |
| 48 | (604.070501) | EACH | 2 | $7,500.00 | $3,950.00 | $3,800.00 | $2,734.00 |
| 49 | Concrete Sidewalks and Driveways (608.0101) | CY | 80 | $750.00 | $900.00 | $1,050.00 | $789.00 |
| 50 | (608.13000008) | 500 | $50.00 | $42.00 | $73.00 | $70.00 | |
| 51 | (609.0401) | LF | 300 | $75.00 | $125.00 | $115.00 | $98.00 |
| 52 | (609.0501) | LF | 250 | $125.00 | $125.00 | $160.00 | $105.00 |
| 53 | Topsoil - Roadside (610.1402) | CY | 186 | $45.00 | $135.00 | $130.00 | $74.00 |
| 54 | Topsoil - Lawns (610.1403) | CY | 62 | $125.00 | $123.00 | $130.00 | $140.00 |
| 55 | Turf Establishment - Roadside (610.1601) | SY | 1,692 | $3.00 | $2.50 | $3.00 | $0.01 |
| 56 | Turf Establishment -Lawns (610.1602) | SY | 576 | $3.00 | $2.50 | $4.50 | $2.00 |
| 57 | (617.11000024) | LS | 1 | $750.00 | $500.00 | $700.00 | $500.00 |
| 58 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $330,000 | $212,500 | $175,000 | $172,000 |
| 59 | Type III Construction Barricades (619.04) | EACH | 4 | $100.00 | $210.00 | $175.00 | $200.00 |
| 60 | (619.0901) | LF | 13,000 | $1.50 | $0.32 | $0.33 | $0.31 |
| 61 | (619.111113) | EACH | 6 | $2,500.00 | $10,700 | $1.00 | $1,200.00 |
| 62 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $40,000 | $35,000 | $350,000 | $50,000 |
| 63 | Stone Filling (Fine) (620.02) | CY | 100 | $200.00 | $193.00 | $250.00 | $105.00 |
| 64 | Stone Filling (Medium) (620.04) | CY | 100 | $175.00 | $251.00 | $310.00 | $110.00 |
| 65 | Clean, Grade and Shape Existing Roadside Section (621.05) | LF | 1,000 | $4.00 | $1.70 | $12.00 | $2.00 |
| 66 | (621.51000015) | 1,000 | $10.00 | $9.20 | $12.00 | $2.00 | |
| 67 | Survey Operations (625.01) | LS | 1 | $7,500.00 | $38,000 | $13,000 | $15,000 |
| 68 | (625.09010015) | LS | 1 | $500.00 | $500.00 | $2,500.00 | $0.01 |
| 69 | (627.50140008) | 140 | $5.00 | $9.00 | $35.00 | $10.00 | |
| 70 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 480 | $55.00 | $86.00 | $100.00 | $1.00 |
| 71 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 480 | $45.00 | $67.00 | $75.00 | $1.00 |
| 72 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 480 | $35.00 | $49.00 | $70.00 | $1.00 |
| 73 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 14 | $2,000.00 | $2,200.00 | $2,000.00 | $750.00 |
| 74 | Office Technology and Supplies (637.34) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 75 | Construction Testing supplies – Consumables (637.36) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 76 | White Paint Reflectorized Pavement Stripes – 15 mils (640.10) | LF | 92,212 | $0.25 | $0.25 | $0.26 | $0.25 |
| 77 | Yellow Paint Reflectorized Pavement Stripes - 15 mils (640.11) | LF | 75,450 | $0.25 | $0.25 | $0.26 | $0.25 |
| 78 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 416 | $35.00 | $37.00 | $38.00 | $35.00 |
| 79 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 1,227 | $35.00 | $39.00 | $40.00 | $37.00 |
| 80 | Ground-Mounted Sign Panels greater than 32 SF with Z-bars (645.5103) | SF | 190 | $35.00 | $39.00 | $40.00 | $37.00 |
| 81 | Type A Sign Posts (645.81) | EACH | 191 | $200.00 | $220.00 | $225.00 | $211.00 |
| 82 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 16 | $1,200.00 | $1,245.00 | $1,275.00 | $1,185.00 |
| 83 | (645.81090003) | 48 | $75.00 | $84.00 | $85.00 | $79.00 | |
| 84 | Reference Marker Panel (646.21) | EACH | 102 | $40.00 | $39.00 | $40.00 | $37.00 |
| 85 | Steel Post, 2.0 lb/ft (646.32) | EACH | 102 | $100.00 | $100.00 | $102.00 | $95.00 |
| 86 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 77 | $50.00 | $45.00 | $45.00 | $42.00 |
| 87 | Remove and Store Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.42) | EACH | 4 | $60.00 | $64.00 | $65.00 | $60.00 |
| 88 | (647.83001002) | 102 | $15.00 | $12.50 | $12.50 | $12.00 | |
| 89 | Milled-In Audible Roadway Delineators (MIARDs) (649.01) | LF | 85,500 | $0.40 | $0.38 | $0.40 | $0.36 |
| 90 | Pavement Ride Quality Adjustment to Asphalt Level 2 (653.1020) | QUALITY UNIT | 780 | $100.00 | $100.00 | $100.00 | $100.00 |
| 91 | Cast Frame F1, UnMountable Curb Box CU1 & Reticuline Grate G1 (655.0704) | EACH | 2 | $1,500.00 | $2,000.00 | $4,000.00 | $2,692.00 |
| 92 | (655.16000011) | 2 | $500.00 | $100.00 | $1,400.00 | $340.00 | |
| 93 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 78,150 | $0.35 | $0.38 | $0.40 | $0.35 |
| 94 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 50,300 | $0.35 | $0.38 | $0.40 | $0.36 |
| 95 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 3,550 | $3.00 | $3.30 | $3.35 | $3.13 |
| 96 | Field Change Payment (FCP) (697.03) | DOL | 207,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 97 | Asphalt Price Adjustment (698.04) | DOL | 21,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 98 | Fuel Price Adjustment (698.05) | DOL | 1,700 | $1.00 | $1.00 | $1.00 | $1.00 |
| 99 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 100 | Mobilization (699.040001) | LS | 1 | $176,700 | $182,000 | $50,000 | $192,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way