D&H Excavating Inc: NYSDOT bid record
D&H Excavating Inc submitted 40 bids on New York State DOT contracts in the data, from 20 JAN 2022 to 07 MAY 2026, and was the low bidder on 7 of them (18%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- New York State DOT
- Low bid volume
- $29,091,071
- Latest bid
- 07 MAY 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 11 | 0 | 0% |
| 2023 | 3 | 2 | 67% |
| 2024 | 8 | 0 | 0% |
| 2025 | 15 | 4 | 27% |
| 2026 | 3 | 1 | 33% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 05 | 34 | 5 | 15% |
| Region 06 | 5 | 2 | 40% |
| Region 04 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 40 | 40 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 40 | 40 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 40 | 40 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 39 | 39 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 38 | 38 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 21 | 21 (100%) | $1.00 | $1.00 |
| 404.0001 | TON | 15 | 15 (100%) | $100.00 | $95.00 | |
| Plant Production Quality Adjustment to Asphalt Items | 404.000011 | QUALITY UNIT | 14 | 14 (100%) | $85.00 | $85.00 |
| 662.60000108 | 14 | 14 (100%) | $1.00 | $1.00 | ||
| Type III Construction Barricades | 619.04 | EACH | 16 | 13 (81%) | $36.00 | $115.00 |
| Pavement Density Quality Adjustment to Asphalt Items | 404.0002 | QUALITY UNIT | 11 | 11 (100%) | $100.00 | $110.00 |
| Longitudinal Joint Density Quality Adjustment to Asphalt Items | 404.0003 | QUALITY UNIT | 11 | 11 (100%) | $100.00 | $110.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| McLaughlin Construction Corp/DBA Edbauer Construction | 26 | 17 of 26 |
| Concrete Applied Technologies Corp/DBA:Catco | 22 | 9 of 22 |
| Oakgrove Construction Inc | 20 | 13 of 20 |
| Union Concrete & Construction Corp | 18 | 15 of 18 |
| Cold Spring Construction Company | 13 | 1 of 13 |
| Lake Shore Paving Inc | 10 | 7 of 10 |
| Occhino Corp | 6 | 2 of 6 |
| Dalrymple Gravel & Contracting Co Inc | 3 | 1 of 3 |
| Amherst Paving Inc | 3 | 0 of 3 |
| Nova Site Co LLC | 2 | 0 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 MAY 2026 | D265770 | Region 05 | US 219 Crack & Seat & C540082 Rehabilitation | 1 of 4 | $10,277,777 | Low, 7.0% under the second |
| 12 MAR 2026 | D265719 | Region 06 | I-86 Paving Friendship to Belvidere | 3 of 3 | $8,407,000 | +20% |
| 12 MAR 2026 | D265759 | Region 05 | NY-280; Highway Rehabilitation & Drainage Improvement | 4 of 4 | $9,710,694 | +13% |
| 18 DEC 2025 | D265642 | Region 05 | Centerline Audible Roadway Delineators; SFY 25/26 | 1 of 4 | $663,698 | Low, 22% under the second |
| 20 NOV 2025 | D265603 | Region 05 | HIGHWAY RESURFACING; I-86, Southern Tier Expressway; SNI | 1 of 6 | $5,562,375 | Low, 2.0% under the second |
| 23 OCT 2025 | D265576 | Region 05 | Small Culvert Replacements -NY Route 950A | 5 of 6 | $1,997,000 | +71% |
| 21 AUG 2025 | D265547 | Region 05 | SAFETY IMPROVEMENTS - US Route 20, NY Routes 5 & 952H | 1 of 5 | $5,649,777 | Low, 2.0% under the second |
| 10 JUL 2025 | D265505 | Region 05 | HIGHWAY RECONSTRUCTION - US 219 & Miller Rd Site Number: 01 Days Road User Cost Per Time Unit: $ 10000 | 4 of 5 | $6,223,237 | +22% |
| 26 JUN 2025 | D265504 | Region 05 | INTERSECTION IMPROVEMENTS; NY 952J at Murphy Rd and Duerr Rd | 3 of 4 | $3,796,553 | +23% |
| 22 MAY 2025 | D265494 | Region 05 | INTERSECTION IMPROVEMENT PROJECT; NY-179 | 3 of 5 | $4,234,568 | +11% |
| 24 APR 2025 | D265480 | Region 05 | NY Route 5 from NY 249 Commercial Street to Kennedy Avenue | 2 of 5 | $1,723,633 | +2.0% |
| 27 MAR 2025 | D265452 | Region 05 | HIGHWAY/DRAINAGE SIGNAL & SAFETY IMPROVEMENTS - NY Rt 240 | 1 of 5 | $5,098,917 | Low, 4.0% under the second |
| 13 MAR 2025 | D265434 | Region 05 | Highway Project; NY-242 & NY-353 in Little Valley | 3 of 5 | $5,651,565 | +3.0% |
| 13 MAR 2025 | D265451 | Region 05 | HIGHWAY MILL & FILL/CULVERT REPLACEMENT & REHAB | 3 of 4 | $4,989,108 | +9.0% |
| 13 MAR 2025 | D265454 | Region 04 | N.Y. Route 77 Pavement Resurfacing | 2 of 9 | $4,602,777 | +10% |
| 27 FEB 2025 | D265453 | Region 05 | SAFETY IMPROVEMENT PROJECT - NY Route 270 | 2 of 4 | $6,518,808 | +10% |
| 09 JAN 2025 | D265396 | Region 06 | Small Culvert Relines | 3 of 3 | $2,147,775 | +56% |
| 09 JAN 2025 | D265408 | Region 05 | Pavement Resurfacing with Safety and Improvements | 4 of 6 | $4,269,278 | +8.0% |
| 22 AUG 2024 | D265296 | Region 05 | HIGHWAY - GUIDERAIL REPLACEMENT - Various Locations | 2 of 3 | $1,588,842 | +19% |
| 08 AUG 2024 | D265288 | Region 05 | NY 240 (Orchard Park Rd) @ Fisher Rd. Intersection | 4 of 5 | $5,405,777 | +48% |
| 20 JUN 2024 | D265259 | Region 05 | SAFETY IMPROVEMENT ON US ROUTE 20 AND NY ROUTE 5 | 4 of 4 | $5,712,671 | +33% |
| 23 MAY 2024 | D265266 | Region 06 | HIGHWAY - RESURFACING - I-86 in Town of Cuba & NY 305 | 2 of 3 | $1,897,000 | +19% |
| 28 MAR 2024 | D265236 | Region 05 | RESURFACING NY 240; Boston-Colden Road to Ellicott Road | 2 of 3 | $11,398,777 | +7.0% |
| 14 MAR 2024 | D265223 | Region 05 | Small Culvert Rehabilitations and Replacements | 3 of 5 | $4,479,000 | +7.0% |
| 14 MAR 2024 | D265224 | Region 05 | NY 438 PMI; SNI | 2 of 7 | $4,462,500 | +2.0% |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.