NYSDOT contract D265453 bid tabulation
SAFETY IMPROVEMENT PROJECT - NY Route 270. Let by New York State DOT on February 27, 2025, Erie, Region 05. 4 bids received; low bid $5,919,028 by Oakgrove Construction Inc.
- Owner
- New York State DOT
- Letting
- 27 FEB 2025
- Pay items
- 200
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Oakgrove Construction Inc | $5,919,028 | Low |
| 2 | D&H Excavating Inc | $6,518,808 | +10% |
| 3 | Cold Spring Construction Company | $6,709,651 | +13% |
| 4 | Concrete Applied Technologies Corp/DBA:Catco | $7,259,599 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Oakgrove Construction Inc | 2. D&H Excavating Inc | 3. Cold Spring Construction Company | 4. Concrete Applied Technologies Corp/DBA:Catco |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $10,000 | $3,800.00 | $5,500.00 | $5,000.00 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 15,468.09 | $20.00 | $34.00 | $25.00 | $61.00 |
| 3 | Embankment In Place (203.03) | CY | 817 | $15.00 | $30.00 | $9.00 | $30.00 |
| 4 | Select Granular Fill (203.07) | CY | 394 | $70.00 | $105.00 | $48.00 | $85.00 |
| 5 | (203.24010017) | 2,115 | $25.00 | $1.00 | $25.00 | $5.00 | |
| 6 | (205.0201) | LS | 1 | $1,500.00 | $4,000.00 | $2,000.00 | $2,500.00 |
| 7 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 8 | $155.00 | $150.00 | $150.00 | $115.00 |
| 8 | Petroleum Contamination Parameter Analysis (205.0401) | EACH | 2 | $350.00 | $180.00 | $125.00 | $290.00 |
| 9 | Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic (205.0402) | EACH | 1 | $800.00 | $1,350.00 | $75.00 | $205.00 |
| 10 | Laboratory Analysis for Ignitability (205.0403) | EACH | 1 | $50.00 | $80.00 | $75.00 | $60.00 |
| 11 | Laboratory Analysis for ph (205.0404) | EACH | 1 | $30.00 | $35.00 | $75.00 | $30.00 |
| 12 | Laboratory Analysis for Polychlorinated Biphenyls (PCB's) (205.0405) | EACH | 1 | $125.00 | $110.00 | $100.00 | $100.00 |
| 13 | Laboratory Analysis for Total Petroleum Hydrocarbons– Gasoline Range Organics (205.0406) | EACH | 1 | $120.00 | $60.00 | $100.00 | $115.00 |
| 14 | Laboratory Analysis for Total Petroleum Hydrocarbons– Diesel Range Organics (205.0407) | EACH | 1 | $130.00 | $70.00 | $100.00 | $100.00 |
| 15 | (205.050201) | TON | 24 | $90.00 | $110.00 | $92.00 | $100.00 |
| 16 | Trench and Culvert Excavation (206.0201) | CY | 2,879 | $22.00 | $92.00 | $65.00 | $49.00 |
| 17 | (206.03050005) | 241 | $125.00 | $110.00 | $70.00 | $95.00 | |
| 18 | (206.03060005) | 298 | $75.00 | $65.00 | $45.00 | $35.00 | |
| 19 | Test Pit Excavation (206.05) | EACH | 4 | $2,500.00 | $1,070.00 | $2,500.00 | $2,000.00 |
| 20 | Geotextile Separation (207.21) | SY | 270 | $2.00 | $5.00 | $3.00 | $1.00 |
| 21 | (208.01030022) | 222 | $125.00 | $95.00 | $110.00 | $150.00 | |
| 22 | Seed and Mulch – Temporary (209.1003) | SY | 4,885 | $1.00 | $1.25 | $1.00 | $0.01 |
| 23 | Drainage Structure Inlet Protection, Gravel Bag – Temporary (209.1702) | CY | 49 | $300.00 | $1.00 | $240.00 | $10.00 |
| 24 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 1,030 | $7.00 | $5.00 | $8.25 | $7.00 |
| 25 | (209.23010009) | 603 | $8.00 | $10.00 | $10.50 | $9.00 | |
| 26 | Subbase Course, Optional Type (304.15) | CY | 8,964.99 | $50.00 | $63.00 | $69.00 | $90.00 |
| 27 | (404.0962) | TON | 5,252 | $100.00 | $102.00 | $97.00 | $128.00 |
| 28 | (404.1989) | TON | 146.91 | $160.00 | $600.00 | $146.00 | $114.00 |
| 29 | (404.3789) | TON | 9,202.29 | $75.00 | $65.00 | $95.00 | $50.00 |
| 30 | Diluted Tack Coat (407.0102) | GAL | 6,743.31 | $4.00 | $6.50 | $8.50 | $5.00 |
| 31 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 47,645.56 | $0.25 | $0.40 | $0.60 | $0.05 |
| 32 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 44,640 | $1.00 | $1.60 | $1.10 | $2.75 |
| 33 | Shields and Shoring (552.17) | SF | 9,069 | $0.25 | $0.50 | $1.50 | $0.40 |
| 34 | (603.541116) | EACH | 1 | $500.00 | $680.00 | $780.00 | $750.00 |
| 35 | (603.6001) | LF | 97 | $60.00 | $140.00 | $140.00 | $90.00 |
| 36 | (603.6002) | LF | 110 | $80.00 | $215.00 | $190.00 | $110.00 |
| 37 | (603.7301) | EACH | 1 | $1,500.00 | $1.00 | $3,000.00 | $4,500.00 |
| 38 | (604.070102) | EACH | 1 | $5,000.00 | $2,500.00 | $2,500.00 | $5,000.00 |
| 39 | (604.070501) | EACH | 13 | $600.00 | $1,350.00 | $3,500.00 | $2,500.00 |
| 40 | (604.300103) | LF | 17 | $850.00 | $840.00 | $850.00 | $900.00 |
| 41 | (604.300603) | LF | 15 | $750.00 | $850.00 | $900.00 | $950.00 |
| 42 | (604.300671) | LF | 6 | $900.00 | $800.00 | $975.00 | $1,200.00 |
| 43 | (604.301403) | LF | 28 | $1,050.00 | $960.00 | $1,125.00 | $1,100.00 |
| 44 | (604.301472) | LF | 27 | $1,200.00 | $1,120.00 | $1,125.00 | $1,200.00 |
| 45 | Underdrain Filter, Type I (605.0901) | CY | 549 | $65.00 | $120.00 | $55.00 | $85.00 |
| 46 | Underdrain Filter, Type II (605.1001) | CY | 1,035 | $65.00 | $127.00 | $75.00 | $80.00 |
| 47 | (605.1501) | LF | 23,307 | $7.00 | $3.75 | $1.75 | $12.00 |
| 48 | (605.25020007) | 60 | $110.00 | $420.00 | $200.00 | $20.00 | |
| 49 | (605.98101518) | 1,403 | $40.00 | $48.00 | $69.00 | $35.00 | |
| 50 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 120 | $75.00 | $78.00 | $74.00 | $78.00 |
| 51 | Box Beam Guide Railing End Assembly Type I with 18 ft Extension (606.120103) | EACH | 2 | $7,000.00 | $7,150.00 | $6,750.00 | $7,200.00 |
| 52 | (606.70000015) | 493 | $15.00 | $9.00 | $7.00 | $8.50 | |
| 53 | Concrete Sidewalks and Driveways (608.0101) | CY | 370 | $750.00 | $1,040.00 | $977.00 | $1,430.00 |
| 54 | (608.01070415) | 1,068 | $50.00 | $75.00 | $137.00 | $65.00 | |
| 55 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 359 | $175.00 | $290.00 | $270.00 | $362.00 |
| 56 | (609.0401) | LF | 931 | $50.00 | $40.00 | $41.00 | $65.00 |
| 57 | Compost (610.10) | CY | 62.50 | $125.00 | $105.00 | $130.00 | $150.00 |
| 58 | Topsoil - Roadside (610.1402) | CY | 1,084 | $65.00 | $110.00 | $110.00 | $90.00 |
| 59 | Turf Establishment -Lawns (610.1602) | SY | 9,770 | $2.00 | $1.60 | $2.60 | $2.50 |
| 60 | Watering Vegetation (610.19) | 1,000 GALLONS | 85 | $50.00 | $4.00 | $60.00 | $1.00 |
| 61 | (611.0151) | EACH | 9 | $1,100.00 | $1,200.00 | $1,100.00 | $1,170.00 |
| 62 | (611.0201) | EACH | 11 | $1,000.00 | $1,085.00 | $1,000.00 | $1,100.00 |
| 63 | (611.0351) | EACH | 23 | $800.00 | $850.00 | $800.00 | $850.00 |
| 64 | (611.0442) | EACH | 39 | $200.00 | $175.00 | $160.00 | $170.00 |
| 65 | Portable Drip Irrigation System (611.17) | EACH | 43 | $100.00 | $85.00 | $78.00 | $85.00 |
| 66 | (611.19010024) | 9 | $50.00 | $57.00 | $50.00 | $56.00 | |
| 67 | (611.19020024) | 11 | $50.00 | $57.00 | $50.00 | $56.00 | |
| 68 | (611.19030024) | 23 | $50.00 | $57.00 | $50.00 | $56.00 | |
| 69 | (611.19040024) | 39 | $10.00 | $11.00 | $10.00 | $30.00 | |
| 70 | Care of Trees up to 12” Diam. at Breast Height – Pruning (614.0411) | EACH | 10 | $400.00 | $425.00 | $400.00 | $420.00 |
| 71 | Care of Trees Over 12” to 24” Diam. at Breast Height - Pruning (614.0421) | EACH | 24 | $500.00 | $500.00 | $450.00 | $475.00 |
| 72 | (614.060104) | EACH | 8 | $400.00 | $1.00 | $375.00 | $460.00 |
| 73 | (614.060204) | EACH | 19 | $1,000.00 | $1.00 | $750.00 | $750.00 |
| 74 | (614.060304) | EACH | 4 | $2,000.00 | $1.00 | $1,852.00 | $1,500.00 |
| 75 | (614.060504) | EACH | 1 | $3,500.00 | $1.00 | $3,500.00 | $3,500.00 |
| 76 | Pre-Existing Stump Removal up to 24” diameter at 6 inches above grade (614.0701) | EACH | 10 | $500.00 | $500.00 | $450.00 | $750.00 |
| 77 | (617.10000024) | 20 | $50.00 | $100.00 | $135.00 | $120.00 | |
| 78 | (617.11000024) | LS | 1 | $500.00 | $350.00 | $235.00 | $1,000.00 |
| 79 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $767,500 | $400,000 | $490,000 | $400,000 |
| 80 | (619.080102) | LF | 32,340 | $0.45 | $0.55 | $0.47 | $0.50 |
| 81 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 35,370 | $0.45 | $0.01 | $2.00 | $0.75 |
| 82 | Cover Existing Pavement Marking Letters or Symbols (Removable Tape) (619.0804) | EACH | 2 | $600.00 | $285.00 | $500.00 | $620.00 |
| 83 | (619.0901) | LF | 63,000 | $0.40 | $0.40 | $0.45 | $0.39 |
| 84 | (619.100101) | LF | 57,081 | $0.40 | $0.40 | $0.45 | $0.39 |
| 85 | (619.100103) | LF | 58,370 | $0.40 | $0.01 | $2.00 | $0.75 |
| 86 | (619.100201) | EACH | 3 | $200.00 | $225.00 | $200.00 | $225.00 |
| 87 | (619.100203) | EACH | 2 | $500.00 | $285.00 | $500.00 | $300.00 |
| 88 | (619.100301) | EACH | 8 | $125.00 | $135.00 | $125.00 | $150.00 |
| 89 | (619.110513) | EACH | 6 | $6,500.00 | $8,300.00 | $9,000.00 | $500.00 |
| 90 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 24 | $150.00 | $170.00 | $200.00 | $10.00 |
| 91 | Mailboxes (619.27) | EACH | 105 | $200.00 | $290.00 | $240.00 | $400.00 |
| 92 | Stone Filling (Light) (620.03) | CY | 97 | $125.00 | $250.00 | $100.00 | $200.00 |
| 93 | Crushed Gravel (In-Place Measure) (623.11) | CY | 31 | $150.00 | $250.00 | $152.00 | $300.00 |
| 94 | Survey Operations (625.01) | LS | 1 | $20,000 | $75,000 | $65,000 | $60,000 |
| 95 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 7 | $600.00 | $1,350.00 | $900.00 | $600.00 |
| 96 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 18 | $100.00 | $350.00 | $200.00 | $400.00 |
| 97 | Permanent Survey Markers (625.06) | EACH | 4 | $1,000.00 | $1,050.00 | $950.00 | $2,000.00 |
| 98 | (625.09010015) | LS | 1 | $1,000.00 | $11,000 | $6,000.00 | $100.00 |
| 99 | (627.50140008) | 25,431 | $0.50 | $3.00 | $1.60 | $2.50 | |
| 100 | Cleaning, Sealing and/or Filling Cracks (633.12) | LS | 1 | $5,000.00 | $15,000 | $12,000 | $500.00 |
| 101 | Removal and Repair of Deteriorated Asphalt Pavement - Less than or equal to 4 Square Yards (633.1401) | SY | 149 | $70.00 | $105.00 | $125.00 | $90.00 |
| 102 | Removal and Repair of Deteriorated Asphalt Pavement – Greater than 4 Square Yards and less than 20 Square Yards (633.1402) | SY | 149 | $70.00 | $85.00 | $105.00 | $60.00 |
| 103 | Removal and Repair of Deteriorated Asphalt Pavement – 20 Square Yards or Greater (633.1403) | SY | 149 | $70.00 | $75.00 | $80.00 | $50.00 |
| 104 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,000.00 | $750.00 | $300.00 | $5,000.00 |
| 105 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 24 | $2,000.00 | $2,150.00 | $2,000.00 | $2,500.00 |
| 106 | Office Technology and Supplies (637.34) | DOL | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 107 | Construction Testing supplies – Consumables (637.36) | DOL | 300 | $1.00 | $1.00 | $1.00 | $1.00 |
| 108 | White Paint Reflectorized Pavement Stripes – 15 mils (640.10) | LF | 42,468 | $0.40 | $0.40 | $0.37 | $0.39 |
| 109 | Yellow Paint Reflectorized Pavement Stripes - 15 mils (640.11) | LF | 20,651 | $0.40 | $0.40 | $0.37 | $0.39 |
| 110 | Ground-Mounted Sign Panels without Z-bars (645.5101) | SF | 14 | $30.00 | $35.00 | $67.00 | $72.00 |
| 111 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 1,205 | $35.00 | $45.00 | $38.00 | $40.70 |
| 112 | Overhead Sign Panels (645.61) | SF | 84 | $70.00 | $100.00 | $110.00 | $75.00 |
| 113 | Type A Sign Posts (645.81) | EACH | 195 | $200.00 | $180.00 | $190.00 | $206.00 |
| 114 | High-Capacity Type A Sign Posts with Soil Plates Only (645.8106) | EACH | 6 | $1,000.00 | $1,070.00 | $1,350.00 | $1,442.00 |
| 115 | (645.81090003) | 50 | $70.00 | $75.00 | $75.00 | $80.00 | |
| 116 | Reference Marker Panel (646.21) | EACH | 50 | $25.00 | $45.00 | $37.00 | $40.00 |
| 117 | Steel Post, 2.0 lb/ft (646.32) | EACH | 50 | $100.00 | $73.00 | $74.00 | $79.00 |
| 118 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 3 | $25.00 | $40.00 | $6.50 | $10.00 |
| 119 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 108 | $50.00 | $40.00 | $6.50 | $7.00 |
| 120 | (647.83001002) | 50 | $25.00 | $11.50 | $5.25 | $6.00 | |
| 121 | Centerline Audible Roadway Delineators (CARDs) (649.11) | LF | 10,213 | $1.00 | $1.10 | $1.00 | $1.10 |
| 122 | Cast Frame F1, Mountable Curb Box CM1 & Reticuline Grate G1 (655.0701) | EACH | 1 | $1,200.00 | $2,800.00 | $1,900.00 | $2,000.00 |
| 123 | Cast Frame F2, Mountable Curb Box CM2 & Reticuline Grate G2 (655.0702) | EACH | 6 | $2,000.00 | $3,500.00 | $2,500.00 | $2,500.00 |
| 124 | Welded Frame & Reticuline Grate 3 (655.1103) | EACH | 14 | $1,000.00 | $2,650.00 | $1,600.00 | $1,600.00 |
| 125 | Manhole Frame & Grate (655.1201) | EACH | 1 | $1,000.00 | $2,100.00 | $1,100.00 | $1,300.00 |
| 126 | (662.60000108) | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 127 | (663.0404) | LF | 10 | $600.00 | $200.00 | $75.00 | $200.00 |
| 128 | (663.0406) | LF | 5 | $1,200.00 | $150.00 | $200.00 | $200.00 |
| 129 | (663.0408) | LF | 805 | $120.00 | $70.00 | $125.00 | $110.00 |
| 130 | (663.0606) | LF | 12 | $35.00 | $75.00 | $110.00 | $75.00 |
| 131 | (663.1204) | EACH | 1 | $2,000.00 | $1,450.00 | $2,500.00 | $1,900.00 |
| 132 | (663.1206) | EACH | 1 | $2,500.00 | $1,950.00 | $2,750.00 | $2,100.00 |
| 133 | (663.1208) | EACH | 3 | $3,000.00 | $2,800.00 | $3,500.00 | $3,000.00 |
| 134 | (663.13000010) | 2 | $2,500.00 | $9,700.00 | $3,000.00 | $9,500.00 | |
| 135 | Iron Water Main Fittings (3 - 8 inch diameter) (663.2001) | LB | 618 | $15.00 | $12.50 | $23.00 | $17.00 |
| 136 | (663.2204) | EACH | 1 | $350.00 | $400.00 | $1,300.00 | $900.00 |
| 137 | (663.2206) | EACH | 2 | $500.00 | $420.00 | $1,500.00 | $1,000.00 |
| 138 | (663.2208) | EACH | 3 | $600.00 | $550.00 | $1,700.00 | $1,200.00 |
| 139 | (663.2506) | EACH | 2 | $2,500.00 | $1,000.00 | $1,900.00 | $3,000.00 |
| 140 | (663.2606) | EACH | 1 | $600.00 | $650.00 | $1,450.00 | $1,300.00 |
| 141 | Remove and Dispose of Existing Water Valve & Valve Box (663.42) | EACH | 2 | $250.00 | $1,100.00 | $400.00 | $500.00 |
| 142 | Remove and Dispose of Existing Hydrant (663.43) | EACH | 2 | $2,000.00 | $1,900.00 | $1,400.00 | $1,000.00 |
| 143 | (680.05010007) | 2 | $20,000 | $22,700 | $20,000 | $21,000 | |
| 144 | (680.05020007) | 2 | $4,000.00 | $4,500.00 | $4,000.00 | $4,250.00 | |
| 145 | (680.05040004) | 6 | $3,700.00 | $4,200.00 | $3,000.00 | $4,250.00 | |
| 146 | (680.11120814) | 3 | $13,000 | $12,500 | $11,500 | $8,000.00 | |
| 147 | Pole Excavation and Concrete Foundation (680.5001) | CY | 13 | $3,500.00 | $3,750.00 | $2,650.00 | $3,400.00 |
| 148 | Concrete Base for Controller Cabinet (680.5002) | EACH | 1 | $6,000.00 | $6,400.00 | $1,500.00 | $5,000.00 |
| 149 | (680.50500005) | 6 | $600.00 | $685.00 | $550.00 | $1.00 | |
| 150 | (680.510201) | EACH | 2 | $2,000.00 | $2,000.00 | $2,500.00 | $2,200.00 |
| 151 | (680.510301) | EACH | 5 | $2,500.00 | $2,400.00 | $2,600.00 | $2,500.00 |
| 152 | (680.51100010) | 7 | $400.00 | $400.00 | $550.00 | $350.00 | |
| 153 | (680.520105) | LF | 30 | $20.00 | $23.00 | $21.00 | $50.00 |
| 154 | (680.520506) | LF | 57 | $20.00 | $17.00 | $26.00 | $14.00 |
| 155 | (680.520508) | LF | 923 | $25.00 | $24.00 | $21.00 | $20.00 |
| 156 | (680.622033) | EACH | 1 | $15,000 | $17,000 | $13,000 | $14,700 |
| 157 | (680.622042) | EACH | 1 | $16,000 | $18,000 | $15,000 | $15,900 |
| 158 | (680.622047) | EACH | 1 | $22,000 | $24,000 | $16,000 | $20,300 |
| 159 | (680.622048) | EACH | 1 | $25,000 | $27,000 | $16,000 | $22,450 |
| 160 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 1 | $1,500.00 | $1,600.00 | $2,000.00 | $900.00 |
| 161 | (680.730514) | LF | 2,810 | $5.00 | $5.75 | $4.50 | $5.00 |
| 162 | (680.730714) | LF | 771 | $6.00 | $7.00 | $6.75 | $6.00 |
| 163 | (680.77000105) | 1 | $6,000.00 | $6,000.00 | $2,000.00 | $1,500.00 | |
| 164 | (680.78020005) | 1 | $600.00 | $685.00 | $1,000.00 | $1,000.00 | |
| 165 | (680.79000105) | 1 | $5,500.00 | $6,000.00 | $8,000.00 | $4,000.00 | |
| 166 | (680.79000205) | 1 | $4,000.00 | $4,300.00 | $8,000.00 | $1,500.00 | |
| 167 | (680.80324515) | 2 | $3,500.00 | $3,500.00 | $1,500.00 | $3,800.00 | |
| 168 | (680.80324708) | 1 | $2,000.00 | $2,000.00 | $1,500.00 | $1,600.00 | |
| 169 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 9 | $150.00 | $135.00 | $150.00 | $160.00 |
| 170 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 4 | $150.00 | $150.00 | $170.00 | $160.00 |
| 171 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 9 | $150.00 | $165.00 | $180.00 | $160.00 |
| 172 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 8 | $150.00 | $165.00 | $180.00 | $160.00 |
| 173 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 9 | $150.00 | $170.00 | $180.00 | $160.00 |
| 174 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 4 | $160.00 | $175.00 | $180.00 | $160.00 |
| 175 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 43 | $200.00 | $230.00 | $170.00 | $160.00 |
| 176 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 13 | $500.00 | $525.00 | $600.00 | $420.00 |
| 177 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 2 | $300.00 | $285.00 | $800.00 | $270.00 |
| 178 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 4 | $300.00 | $320.00 | $275.00 | $240.00 |
| 179 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 2 | $400.00 | $430.00 | $250.00 | $325.00 |
| 180 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 2 | $300.00 | $320.00 | $375.00 | $270.00 |
| 181 | (680.8151) | EACH | 2 | $1,000.00 | $1,200.00 | $1,750.00 | $1,200.00 |
| 182 | Backplates for Traffic Signal Heads (680.8199) | EACH | 13 | $500.00 | $425.00 | $350.00 | $225.00 |
| 183 | (680.8203) | EACH | 3 | $1,000.00 | $850.00 | $900.00 | $1,100.00 |
| 184 | (680.8205) | EACH | 4 | $1,000.00 | $970.00 | $900.00 | $1,100.00 |
| 185 | (680.82250801) | 16 | $600.00 | $685.00 | $550.00 | $500.00 | |
| 186 | Meter Pan (680.9402) | EACH | 1 | $2,000.00 | $2,000.00 | $1,350.00 | $900.00 |
| 187 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 1 | $1,500.00 | $1,500.00 | $950.00 | $900.00 |
| 188 | (680.950106) | LF | 440 | $5.00 | $4.50 | $8.00 | $5.00 |
| 189 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $10.00 | $10.00 | $10.00 | $10.00 |
| 190 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 42,468 | $0.60 | $0.70 | $0.60 | $0.65 |
| 191 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 20,651 | $0.60 | $0.70 | $0.60 | $0.65 |
| 192 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 7,301 | $3.00 | $3.40 | $3.00 | $3.35 |
| 193 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 1,916 | $3.00 | $3.40 | $3.00 | $3.35 |
| 194 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 24 | $75.00 | $85.00 | $75.00 | $85.00 |
| 195 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 27 | $300.00 | $275.00 | $250.00 | $270.00 |
| 196 | Field Change Payment (FCP) (697.03) | DOL | 289,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 197 | Asphalt Price Adjustment (698.04) | DOL | 12,717 | $1.00 | $1.00 | $1.00 | $1.00 |
| 198 | Fuel Price Adjustment (698.05) | DOL | 2,928 | $1.00 | $1.00 | $1.00 | $1.00 |
| 199 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 200 | Mobilization (699.040001) | LS | 1 | $227,500 | $240,000 | $258,000 | $275,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of February 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.